DESIGN CONDITION
No. ITEM VALUE 30 deg C 83 % 1.013 bar 50 Hz 0.85 43,377 kJ/kg 47,971 kJ/kg 238,500 kW 9,894 kJ/kWh (LHV) 10,942 kJ/kWh (HHV) 1 Ambient air temp. 2 Ambient humidity 3 Ambient press. 4 Frequency 5 Generator power factor 6 Low heating value High heating value 7 GT Gross power output 8 GT Gross heat rate

4/15/12

CORRECTED FACTOR
Digunakan untuk mengevaluasi kondisi gas turbine, apakah performance sama atau lebih baik dengan designnya. Hal ini dikarenakan GT didesign dengan kondisi tertentu, sesuai dengan kontrak.
Ambient Temp. Barometric Press. Relative Humidity FG Characteristic Frequency Power Factor K1 K2 K3 K4 K5 K6 C1 C2 C3 C4 C5 C6 C7

No . ITEM 1 2 3 4 5 6 7

Deterioration K7 (Permanent Degradation & Recoverable Degradation

4/15/12

CORRECTED CALCULATION
No . ITEM 1 Ambient Temp. Power K1 = 0.00000008 X3 + 0.00000183 X2 -0.00637779 X + 1.18758184 Heat Rate C1 = -0.00000024 X3 + 0.00004078 X2 + 0.00023174 X + 0.96280199

Barometri K2 = 0.0000000283 C2 = 0.00000001 X2 c Press. X2 + 0.0009429623 + 0.00003796 X + X + 0.0155110728 0.99676846 Relative K3 = -0.00000005 C3 = 0.00000001 Humidity X2 + 0.00013857 X X2 + 0.00003796 X + + 0.98881642 0.99676846

4/15/12

No . ITEM 4

Power

CORRECTED CALCULATION

Heat Rate

Fuel K4 = -1.127E-15 C4 = 3.57E-16 C/H = 3.1 Characteri X3 + 1.72021406E- X3 + -5.5909834E-11 stic 10 X2 + X2 + -9.6443303329610 3.256438259823E-06 E-06 X+ X+ 9.34074501142657E1.1891927060165 01

K4 = -1.098E-15 C4 = 3.67E-16 C/H = X3 + 1.68598981E- X3 -5.7508787E-11 3.25 10 X2 + X2 3.341963951649E-06 -9.508924691077E X + -06 9.33384234149882EX+ 01 1.18464715808102 4/15/12 K4 = -1.028E-15 C4 = 3.54E-16 C/H = 3.4

No . ITEM 5 Frequency

CORRECTED CALCULATION Power


K5 = 0.00047151 X3 -0.07356773 X2 + 3.83797472 X -65.91782359

Heat Rate C5 =-0.00019953 X3 + 0.03096583 X2 + -1.60074851 X + 28.56388374 C6 = / ( ED )

Power Factor K6 = ( ED ) /

: Generator Efficiency ED : Efficiency Difference X : GT Load (MW) = -0.00000000074 X4 + 0.000000704 X3 -0.000259 X2 + POWER FACTOR 0.0441 X + 96.2 GT Load (kW) 100 99 98 248,200 186,150 4/15/12 -0.10050 -0.07532 -0.09534 -0.07145 -0.08996 -0.06742

No ITEM 7

CORRECTED CALCULATION
Power K7 : Fd = ( 100 + P1 + P2 ) / 100

Heat Rate C7 : Gd = ( 100 + HR1 + HR2 ) / 100

Deterioration (Permanent Degradation & Recoverable Degradation

Fd : Degradation power output correction P1 : Permanent degradation of power output P2 : Recoverable degradation of power output Gd : Degradation heat rate correction HR1 : Permanent degradation of power output HR2 : Recoverable degradation of power output

4/15/12

P2 = 0.000262 X4 -0.0109 X3 + 0.173 X2 -1.28X + 0.0294 for X = EDH2 HR2 = -0.0004516 X4 + 0.01299 X3 -0.1472 X2 + 0.8745 X + 0.001748 for X = EDH2 P1 = -0.04222 X + 0.003693 for X = EDH2 HR1 = 0.02064 X -0.001364 for X = EDH2

4/15/12

GT Gross Power Output Correction kW GT (i) = kW GTM K1 x K2 x K3 x K4 x K5 x K6 x K7 kW GTM : Measured GT Generator Power Output kW GT (i) : Corrected GT Generator Power Output

4/15/12

GT Gross Heat Rate Correction HR GTM = Wf GTM x HHV M kW GTM HR GT (i) = HR GTM C1 x C2 x C3 x C4 x C5 x C6 x C7 HR GTM : Measured GT Gross Heat Rate HR GT (i) : Corrected GT Gross Heat Rate
4/15/12

CALCULATION STRATEGY
1. 2. 3.

4.

5. 6.

7.

8.

Download ACS data Temp., Humidity & Barometric Collect current report from CNOOC, PGN & ODIRA Calculate heating value, compressibility, density etc. Calculate flow rate gas to GT Calculate correction factor for gross power output & heat rate Calculate gross power output actual & corrected Calculate heat rate actual & corrected

4/15/12

TERIMA KASIH & SELAMAT MENCOBA