OUTLINE OF PRESENTATION
Introduction. Pakistan EIA System. Stake Holders Laws and Legislations. Screening of Environment Imapct. Mitigation Measures Health and Safety. Audits.
INTRODUCTION
Project Description: Sonda-Jherruk Coal Mine and Power Plant Project developed by CMC will supply 405 megawatt power supply for Pakistan, which will be highly instrumental to promote the economic development of Pakistan, opening new doors for foreign investors. Jherruk Power plant proposes 405 MW mine mouth Coal-Fire Power Plant to meet power demand of our country. Project Location: It will be installed in Union council Jherruk in Thatta district Sindh, at west of River Indus. JPP is adjacent to Jherruk/Sonda coal mine Objective: JPP has been planed to meet the energy demand of Pakistan by economically exploiting the coal resourse.The expected enviormental aspects have been identified and mitigation measures have been incorporated in operations, waste water treatment, stack emissions and dust control to make project viable and environmenal friendly.
MITIGATION MEASURES
The main impact generation activities include clearing of JPP site, removal of top soil, large scale excavations, dumping of construction debris including soil waste, building of roads and campsites. Mitigation Measures for: Pre-Construction Phase: Adoptions of guidelines for safety, environment protection etc. Resolve issues of fire protection, waterproof, internal transportation. Construction Phase: Heavy structure will only be allowed when their vulnerability to seismic shocks has been taken into account. Open soil to remain covered into during monsoon . Dust should be controlled by frequently sprinkling of water. A comprehensive waste disposal plant should be integrated. Adoption of conservation practices to minimize the water losses. Campsite should be located atleast 500m from any locallity.
Land Environment: Traffic management, Covered trucks. Covered storage, First In First out usage. Use of ash in cement plant, approved disposal. Rehabilitation measures of trees to be removed as a factor in site Selection Water Environment: Waste water treatment, Aquatic/Marine Species rehabilitation. Social Environment: Control of Emission.
CONCLUSION / AUDITS
Compliance monitoring; Periodic submission of report to SEPA. Reporting will be carried out as per the legal requirement laid down in the self monitoring and reporting tools for industries-2000. SITE internal environmental audit; Daily assessment of environmental management activities on site. Environmental activities include all aspects of operations that result in effluent, emissions or wastes. Environmental management systems audit; Assessment of the implementation and operational success of Environmental Management Plan on site. It is achieved by assessing objectives, organizational structures, responsibilities, procedures, processes and resources available at the site.