Drain Stacks: Christian Care Communities

Situation
Vertical drain stacks connecting to kitchens from the tenth floor to the first and into the basement Twenty-one 3 cast iron pipes Pipe replacement was not feasible due to elderly residents

Benefits of Nu Flow Solution


Pipes were cleaned and lined in 100 foot lengths with Pull-in-Place technology Most stacks were lined ten floors at a time Avoided the need to cut access points

Sanitary Drains: Trump Towers


Situation
Basement drain line was experiencing frequent backups

16 foot 3 drain located underneath the elevator shaft

Benefits of Nu Flow Solution


Existing cleanouts were used for access Cast pipe was cleaned and restored Project completed faster and at less cost than a pipe replacement project

Roof Drains: Temple Emanu-El


Situation
10 roof drains encased in concrete pillars Badly corroded and leaking Multiple bends in the system

Benefits of Nu Flow Solution


Pipes were cleaned of all corrosion and restored to original diameter

Roof Drains: EEOB

Situation
Original pipes had almost entirely disintegrated Two 70 foot roof drains, each containing a double 45 degree bend

Benefits of Nu Flow Solution


Pipes are protected from corrosion and other problems with a long-term solution

Mainline: Shands Childrens Hospital


Situation
Badly corroded pipe running under hospitals intensive care unit with limited access Re-piping would require demolition and disruption to patients and staff 256 feet of 12 mainline with seven connections

Benefits of Nu Flow Solution


The system was cleaned and restored to the pipes capacity

The process preserved the structure, avoided reconstruction and occupant displacement

Sewer Main: Mar-A-Lago Resort


Situation
250 feet of 6-inch sanitary line experiencing infiltration and exfiltration into surrounding soil Roots intruded the leaking and corroded pipe

Benefits of Nu Flow Solution


System was cleaned of corrosion, buildup and roots

Lined from the building, under the golf greens and to the entrance road
Trenchless technology preserved landscape and hardscape

Sanitary Drains: Nestle Factory


Situation
Over 100 feet of 30-year-old cast iron pipe with extensive corrosion Digging was not an option since pipe was located under 100 feet of concrete

Benefits of Nu Flow Solution


The system was cleaned and restored A high heat resistant epoxy was used to safeguard the drains against further damage

Sanitary Drains: General Motors


Situation
100 feet of deteriorating 8 sanitary pipe was had blockages Two lateral connections 7 feet below grade needed to be rehabilitated

Benefits of Nu Flow Solution


Restoration work with reinstatements of laterals completed in 5 days Plant avoided shut down with Nu Flow process

Sewer Main: Sarasota County


In 2003, Sarasota County was forced to haul 1.4 million gallons of excess ground water that had infiltrated their Sewage system at a single pump station. Since lining that neighborhoods mains and laterals the over flow problem virtually disappeared. The savings on overflow water treatment is in the MILLIONS for a SINGLE PUMP STATION. Sarasota County has between 40 and 50 active pump stations at any given time.

Sanitary Drains: Beachplace Condos


Situation
More than a mile of cast iron vertical stacks with 3 to 4 diameters were increasingly experiencing more leaks Management had been replacing the pipes as they broke, but it was a messy, time-consuming and costly process

Benefits of Nu Flow Solution


Technicians only opened up walls inside condos when there was a problem, otherwise there wasnt any construction Nu Flows structural liner is permanent and will protect the pipes to prevent future leaks Customer saved time, money and hassle

Sewer Stack: Columbia Center


Situation
228 feet of cast iron drain pipes with diameters ranging from 3 to 6 Pipes ran from 7th floor to the 25th floor in a 27-story building Corroded pipes obstructed flow and caused back-ups in the sewer stacks

Benefits of Nu Flow Solution


Structural liner installation is trenchless, so there wasnt any destruction or reconstruction to the office building Nu Flow installed a permanent solution to prevent future corrosion Cost-effective compared to paying professionals to repeatedly clean the pipes

Sanitary Stack: Central Park Condos


Situation
42-year-old 3 and 4 cast iron sanitary drain stacks were leaking and failing Nu Flow technicians were on site the day after we were contacted for an emergency relining

Benefits of Nu Flow Solution


Pipes were behind concrete, so repiping would have been destructive, disruptive and costly

We were able to quickly and efficiently line the piping system to stop leaks and prevent future problems

Sanitary Stack: Princess Del Mar Condos


Situation
2,400 feet of cast iron vertical drain stacks with diameters of 2, 3 and 4 22 cracked and about-to-fail sanitary vertical stacks

Benefits of Nu Flow Solution


Majority of pipes were behind finished drywall or concrete, which makes Nu Flows no-dig technology the best choice Residents were not disturbed and no destruction of the property took place Structural liner will prevent future corrosion, saving the tenants time, money and hassle

Sewer Stack: 101 West Broadway


Situation
491 feet of cast iron sewer pipes with diameters of 3, 4, 5, 6 and 8

Aged pipes had corrosion, causing significant cracking and leaking

Benefits of Nu Flow Solution


Nu Flows Pull-in-Place, trenchless lining solution prevented destruction to the building and disruption of normal operations to the offices Structural liner formed a permanent, protective barrier inside the host pipes

Sewer Drain: Omni Hotel

Situation
The hotel sits at sea level with its parking structure below the hotel. Drain lines are located below the parking structure, under the water table 70 feet of 5-year-old cast iron sewer drain line with a 4 diameter was corroded and had breaks, causing failures

Benefits of Nu Flow Solution


Nu Flows Pull-in-Place, trenchless lining solution prevented unsightly construction and inconvenience for hotel guests Structural liner formed a permanent, protective barrier inside the host pipes to prevent future problems

Fountain Drain System: Sorrento Towers


Situation
Sorrento Towers, seven-story office buildings in San Diego, had a courtyard fountain that experienced chronic corrosion, staining orange water and leaks that dripped onto cars in the parking structure below The pipes ranged from 2 to 12 in diameter

Benefits of Nu Flow Solution


Nu Flow was able to clean, reinstate and line the entire fountain drain system The exposed pipes that hung from the underground parking structures ceiling were not moved for the lining installation, except for some transition and elbow pipes There was no destruction to the property or inconvenience to tenants

Main Drain Line & Storm Drain Stacks: Las Flores High-Rise Condo
Weve been perfectly happy with the job Nu Flow has done. We would have had to dig up the whole front end of the property to replace the main line, had we decided thats the way to go. But this lining has done away with all that.
-Dennis Brokaw, Property Manager, Las Flores Tower

Situation
Part of the 10 cast iron main line was missing Vertical cast iron storm drain lines were cracked and leaking into units

Benefits of Nu Flow Solution


Nu Flow was able to clean and line the entire main line and all storm drains by using existing access points There were no holes dug and the residents were not inconvenienced

Customer did not want a re-pipe because of the cost and the destruction it would cause
The luxury, waterfront condo is 15 stories

Sewer Drains: Colony Point Condos


Situation
Cast iron kitchen, laundry and sanitary sewer drain lines with diameters of 3 and 4 are located under the concrete foundations and floors covered with ceramic tile or carpets Pipes were cracked and leaked into some of the waterfronts units

Colony Point did not want to re-pipe the underground sewer drain lines because of the destruction it would cause

Benefits of Nu Flow Solution


Nu Flows no-dig technology allowed us to inspect, clean and line the pipes using existing access points No inconvenience, displacement, messy construction site for residents

We had a budget and we were able to stay inside the budget. We felt this process that Nu Flow developed would be very effective, not only from a cost standpoint, but for the sake of convenience.
-David Baker, Colony Point, Resident and Member of Colony Points Building Grounds Committee

Sewer Drains and Main: Cabrillo Tower


Situation
The 40-year-old horizontal cast iron sewer pipes located in 4- or 5-foot-thick concrete slabs in the parking garage were corroded and leaking The pipes, consisting of 3, 4, 6 and 8 diameters, were stuck inside the concrete without protective sleeving, so the customer originally did not think there was a way to fix the leaks

Benefits of Nu Flow Solution


Nu Flows trenchless technology allowed us to inspect, clean and line the pipes inside the concrete using existing access points Our patented structural lining covered the cracks and is a long-term solution against future pipe problems We cleaned and lined the aged 10 cast iron main line to prevent future issues

Nu Flow was the most economically prudent and practical solution to a problem that could have cost thousands upon thousands of dollars.
- Mark Tracy, Cabrillo Tower Property Manager

Sewer Drain: VA Long Beach Hospital


Situation
Several thousand feet of sanitary drain pipes, ranging 1/5 to 6, experienced backups and cracks, as a result of age and corrosion. Some of the sewer lines are located in hardto-access areas, so a traditional re-pipe would be a nightmare for the customer

Benefits of Nu Flow Solution


Nu Flow successfully installed our structural liner in the drain without having to close the hospital or inconveniencing the patients or employees

The structural liner cures in place and becomes a new protective pipe within the host pipe, which covers all holes and cracks, as well as prevents future problems from occurring

Sewer Main: Hesperia Junior High


Situation
Serious root intrusion caused consistent backups in the middle schools 6 sewer main The 40-year-old clay pipes run under the foundation from the schools kitchen to the septic tank outside, beneath a paved area The sewer main is 826 feet long The customer spent thousands of dollars per year in maintenance costs to routinely clean the drain pipes so the middle school looked for a long-term solution to save money

Benefits of Nu Flow Solution


Nu Flow was able to successfully get the work done within the customers strict timeline Our patented Pull-in-Place structural liner was installed using existing access points, so the floors were preserved and there was no damage to the property Nu Flows seamless liner is an effective long-term solution against pipe movements at the joints, which increase the likelihood of root intrusion

Fountain Drain: Chick-Fil-A Corporate


Situation
12 PVC drain pipes that run from the corporate headquarters large stone fountain to a pump room were leaking The 13-year-old return lines are 10 feet beneath the outside fountain and surrounding sidewalk A traditional re-pipe would cause destruction to the fountain and sidewalk, which the customer wanted to avoid

Benefits of Nu Flow Solution


Nu Flows no-dig technology was the only feasible solution for the customer

Nu Flows Pull-in-Place structural liner was installed using existing access points, preventing any damage to the fountain or sidewalk
The 12 drain lines and several 90 degree and 45 degree bends were successfully lined, so all leaks were covered and the pipes are protected to prevent future leaks and other problems

Sanitary Drain System: First Ave Apartments


Situation
This 3-story apartment complex has a 40year-old shared sanitary waste system with cast iron pipes, ranging from 2 through 6 in diameter Some of the pipe lines run through walls and beneath the ground Corrosion reduced the pipes diameters by 75%, which caused back-ups and floods

A traditional re-pipe would have been intrusive and destructive

Benefits of Nu Flow Solution


Our technicians successfully broke through the thick sludge built inside the pipes and brought the pipes back to their original diameter.

Nu Flows no-dig technology prevented resident displacement and offered maximum convenience for the residents
Our pipe rehabilitation solution was about 40% cheaper than a re-pipes cost

Sewer Main: 225 Broadway NBC Building


Situation
22-story busy office building in downtown San Diego, California 8 sewer main was about 40 years old and had corrosion and cracks, which caused failures The sewer main is located under the parking garage and nearby streets

Benefits of Nu Flow Solution


Nu Flows trenchless technology preserved the parking garage and streets, preventing disruption and inconvenience Our Pull-in-Place structural liner forms a protective pipe within a pipe to serve as a long-term solution to prevent future pipe failures

Dishwasher Drain System: York University


Situation
24-year-old 4 cast iron dishwasher drain pipe system experienced leaks and low flow The pipe system was failing due to heavy scale build-up from age The pipes are located 6 feet beneath the kitchens cement floor, making them difficult to access The customer did not want a messy and disruptive re-pipe

Benefits of Nu Flow Solution


Technicians used our special high temperature epoxy to accommodate the 140-degree dishwasher water

Our patented Pull-in-Place structural liner was installed using existing access points, so there were no holes dug in the cement floor and therefore, no mess
The customer was so happy with Nu Flow that we were asked to do another job with them Normal operations continued as Nu Flow worked

Sewer Line: Hoag Hospital Newport Beach


Situation
4" cast iron sewer pipes, located underneath the mechanical rooms' floors in the hospital's basement, are more than 50 years old These pipes became so corroded that holes formed and leaked foul sewer gases into the mechanical rooms and hallways The not-for-profit hospital wanted the pipes fixed but did not want normal operations disturbed

Benefits of Nu Flow Solution


Nu Flow used existing access points to clean and line the aged sewer pipes so there was no damage to the building The 3 by 6 exposed pipe in the concrete floor was also successfully lined Nu Flow worked at night for minimum disruption