PROJECT QUALITY MANAGEMENT

PROJECT QUALITY MANAGEMENT


is viewed as a total commitment to manage a firms resources to achieve the highest levels of performance in everything in which the firm is involved. provides all the tools to make sure your project turns out as planned harnessing everyones effort to achieve zero defects at lowest cost, and zero defects means continually satisfying customer requirements

PROJECT QUALITY MANAGEMENT is a method for ensuring that all the activities necessary to design, develop and implement a product or service are effective and efficient with respect to the system and its performance

THREE MAIN COMPONENT OF QUALITY MANAGEMENT


1) QUALITY CONTROL

In construction engineering and manufacturing, quality control and quality engineering are involved in developing systems to ensure products or services are designed and produced to meet or exceed customer requirements. These systems are often developed in conjunction with other business and engineering disciplines using a cross-functional approach.

THREE MAIN COMPONENT OF QUALITY MANAGEMENT


2) QUALITY ASSURANCE

refers to planned and systematic production processes that provide confidence in a product's suitability for its intended purpose. It is a set of activities intended to ensure that products (goods and/or services) satisfy customer requirements in a systematic, reliable fashion

THREE MAIN COMPONENT OF QUALITY MANAGEMENT


3) QUALITY IMPROVEMENT

These cover product improvement, process improvement and people based improvement.

Achieving Quality on Projects


Attitude of mind
Quality of management process

Achieving a quality product

Preventive medicine

Quality Assurance Quality Control

Curative Medicine

Quality of the product

Ultimate Goal

QUALITY?


The common element of the business definitions is that the quality of a product or service refers to the perception of the degree to which the product or service meets the customer's expectations: Quality has no specific meaning unless related to a specific function and/or object Quality is a perceptual, conditional and somewhat subjective attribute

Business has tried to define quality in a producer-consumer context, with the following variations:


ISO 9000: "Degree to which a set of inherent characteristic fulfills requirements." The standard defines requirement as need or expectation.

Business has tried to define quality in a producer-consumer context, with the following variations: Six Sigma: "Number of defects per million opportunities." The metric is tied in with a methodology and a management system.

Business has tried to define quality in a producer-consumer context, with the following variations:


Philip B. Crosby: "Conformance to requirements." The difficulty with this is that the requirements may not fully represent customer expectations; Crosby treats this as a separate problem.

Business has tried to define quality in a producer-consumer context, with the following variations:


Joseph M. Juran: "Fitness for use." Fitness is defined by the customer. Noriaki Kano presenting a two-dimensional model of quality: "must-be quality" and "attractive quality." The former is near to the "fitness for use" and the latter is what the customer would love, but has not yet thought about.

Genichi Taguchi, with two definitions:




"Uniformity around a target value." The idea is to lower the standard deviation in outcomes, and to keep the range of outcomes to a certain number of standard deviations, with rare exceptions. "The loss a product imposes on society after it is shipped." This definition of quality is based on a more comprehensive view of the production system.

American Society for Quality:




a subjective term for which each person has his or her own definition. In technical usage, quality can have two meanings: the characteristics of a product or service that bear on its ability to satisfy stated or implied needs; a product or service free of deficiencies.

Peter Drucker: "Quality in a product or service is not what the supplier puts in. It is what the customer gets out and is willing to pay for."

Quality Concepts
 For Design

*Aesthetics (good design taste) *Functionality (design does what it is intended to: meet building code requirements) *Safety (safe for occupiers; meet building code requirements) * Cost (within clients budget)

Quality Concepts
 For Construction Workmanship (quality of constructed

work) Integrity (according to drawings and specifications) Completion time in the project according to clients requirements

Quality Concepts


Zero Defects states that there is no tolerance for errors within the system. The goal of all processes is to avoid defects in the product or service
based on providing the internal organization a system that ensures the product or service is transferred to the next person in the process in a complete and correct manner

 The Customer is the Next Person in the Process

Quality Concepts


Continuous Improvement Process is a holistic approach to an organization that focuses on principles while making the process improvements Process Capability in evaluating the processes which will be used to produce a system, it is essential that the process be capable of performing the required functions to achieve the desire outcome.

Major Cost Categories of Quality


a)

Prevention Cost cost to plan and execute a project so that it will be error free. Some areas of prevention cost include planning of the scope, budget, performance and duration to meet customer requirements. (i Training, ii. Process capabilities studies, iii. Surveys of vendors/suppliers, iv. Surveys of subcontractors) Appraisal Cost- cost of evaluating the processes and the output of the process to ensure the product is error free. ( inspection and testing of products, maintenance ad test equipment, cost to process and report inspection data)

b)

Major Cost Categories of Quality


b)

Internal Failure Cost cost incurred to correct an identified defect before the customer receives the product. (scrap and rework, inventory costs) External Failure Cost relates to all errors not detected and corrected before delivery to the customer. (warranty cost, product liability) Measurement and Test Equipment capital cost of equipment used to perform prevention and appraisal activities.

c)

d)

HOW TO IMPROVE PRODUCTIVITY IN THE WORK PLACE TO ACHIEVE TOTAL QUALITY ON PROJECTS?

Achieving Quality on Projects

IMPROVING PRODUCTIVITY

Motivation of Employees

Setting-up of Quality Management System or Process

Motivational Theories

McGregor`s Theory X & Theory Y




Theory X - People are lazy by nature; dislike work & will avoid it whenever possible - They must be coerced, controlled and threatened with punishment in order to work. - They lack ambition and seek mainly security. - They avoid responsibility

Theory Y - Work is as natural to man as play & rest. - People are capable of self direction to objectives they are committed. - People will even seek responsibility given proper rewards. - Many people are creative, ingenious & imaginative but these intellectual potentialities are utilized only partially in most organizations.

Herzberg`s Two-Factor Theory


Motivators = Growth

Hygiene Factor = Replenishment Needs

Herzberg`s Two-Factor Theory


Motivators = Growth  Satisfiers
Achievement Recognition Responsibility Work itself Advancement

Hygiene Factor = Replenishment Needs  Dissatisfiers


Working conditions Administrative policies Supervision Salary Interpersonal Relations Status Job Security

Maslow`s Hierarchy of Human Needs


Existential Ego Social Safety Physiological

Chronological-Psychological Age

Physiological Need for air, water, food, warmth, sleep,sex & basic bodily satisfactions Safety-Security Freedom from actual danger & need for assurance of continued well being. Belonging-Love-social Need to give & receive attention, love & affection. Ego-Esteem Need for the respect & recognition of others Existential, Self-Actualization The need to become all that one is becoming.

These models are used in the construction industry FOCUSED ON MOTIVATION, EMPLOYEE NEEDS AND INCENTIVES

Motivation
 The

set of processes that determine the choices people make about their behaviours  It imparts incentives that require a response on part of someone else of achieve a defined goal

Motivation
 In

business, motivation is not synonymous with salaries; money is a means for accommodating the economic needs of workers

 Motivation means

an inner wholesome desire to exert effort without the external stimulus money

Context of MOTIVATING
It is the ability of indoctrinating the personnel with a unity of purpose and maintaining a continuing, harmonious relationship among all people.  A force which encourages and promotes a willingness of every employee to cooperate with every member of the team


Effective Motivation of Employee


Create proper conditions that cause people to do their work willingness and enthusiasm The willingness to exert high level of effort to reach organizational goals, conditioned by the efforts ability to satisfy some individual need

EMPOLYEE NEEDS MOTIVATION THRU:

Goal Setting Employee reward/incentives Reinforcement

Advantage of Productivity Improvement


Decreased total cost and duration of production  Improved quality  Growth in market share of product  Increased employment and wages without inflationary pressures  Enhanced purchasing capacities among employees, employers and customers


End of Presentation

QUALITY MANAGEMENT PROGRAM

Why quality management?


 The

implementation of quality management and the guidelines are designed to encourage and assist:
the management of projects and

contracts by all customers and service providers to consistently achieve the required outcomes; a better customer service approach by service providers;

Why quality management?


continual improvement in the delivery of

project and contract outcomes; and


a consistent approach by agencies in

specifying, and service providers in providing/implementing, Quality Management Systems, Quality Management Plans (including design plans), and Inspection and Test Plans, and in monitoring their implementation.

Quality Management Complements Project Management


QM & PM both recognize the importance of four (4) basic principles: Customer satisfaction Prevention over inspection Management responsibility Continuous improvement

1. Customer Satisfaction
Understanding, evaluating, defining, and managing expectations so that customer requirements are met: Conformance to requirements Fitness for use

2. Prevention over Inspection

Build quality in vs Inspect quality in The cost of preventing mistakes is generally much less than the cost of correcting them, as revealed by inspection/assessment

3) Management Responsibility
Success requires the participation of all members of the team, but management is responsible to provide the resources to succeed.

4. Continuous Improvement
The plan-do-checkact cycle is the basis for quality improvement. Quality improvement initiatives can improve the quality of project management as well as the quality of the product.

CONSTRUCTION PROJECT QUALITY MANAGEMENT

Quality Plan (PLAN) 1. Inputs 1.1 Quality Improvement 1.2. Quality Policy 1.3 Project Description 1.4. Standard Regulation 2. Tools and Techniques 2.1. Benefit/Cost analysis 2.2 Benchmarking 2.3 Flowcharting 3. Outputs 3.1 Quality Mgt Plan 3.2 Operational Definitions 3.3 Checklist 3.4 Quality Bassline 3.5. Quality Checklist 3.6. Project Management Plan (Update)

Quality Assurance (DO) 1. Inputs 1.1 Quality Improvement 1.2. Results of Quality Control Measurement 1.3 Operational Definitions 2. Tools and Techniques 2.1. Quality Planning 2.2 Tools and Techniques 2.3 Quality Audits 3. Outputs 3.1 Quality Improvement

Quality Control (CHECK) 1. Inputs

Quality Improvement (ACT) 1. Inputs 1.1 Quality Improvement Philosophy and Principles 2. Tools and Techniques 2.1. Suggestion Scheme 2.2. 5S 2.3 Work Simplification 2.4. Quality Control Circle 2.5. ISO 9000 3. Outputs 3.1 Improved Quality Standard

1.1 Work Results 1.2. Quality Mgt Plan 1.3 Operational Definition 1.4. Checklist 2. Tools and Techniques 2.1. Inspection 2.2 Seven New Quality Control Tools 2.3 Other Quality Mngt Tools and Techniques 3. Outputs 3.1 Quality Improvement 3.2 Acceptance Decision 3.3 Rework 3.4 Completed Checklist 3.5. Process Adjustments

CONSTRUCTION QUALITY PLANNING

INPUTS
1) enterprise environmental factors 2) organizational process assets 3) project scope statement 4) project management plan

PROCESS
1) cost benefit analysis 2) benchmarking 3) design of experiments 4) cost of quality 5) quality control tools and techniques

OUTPUT
1) requested changes 2) recommended corrective actions 3) organizational process assets (updates) 4) project management plan (updates)

PERFORM QUALITY ASSURANCE

INPUTS
1) quality management plan 2) quality metrices 3) process improvement plan 4) work performance information 5) approved change request 6) quality control measurements 7) implemented change request 8) implemented corrective actions 9) implemented defect repair 10) implemented preventive actions

TOOLS/ TECHNIQUES

OUTPUT
1) requested changes 2) recommended corrective actions 3) organizational process assets (updates) 4) project management plan (updates)

1) quality planning tools and techniques 2) quality audits 3) process analysis 4) quality control tools and techniques

PERFORM QUALITY CONTROL

INPUTS
1) quality management plan 2) quality metrices 3) quality checklists 4) organizational process assests 5) work performance information 6) approved change requests 7) deliverables

TOOLS/ TECHNIQUES
1) cause and effect diagram 2) control charts 3) flowcharting 4) pareto chart 5) scatted diagram 6) statistical sampling 7) histogram 8) inspection 9) defect repair review

OUTPUT
1) quality control measurements 2) validated defect repair 3) quality baseline 4) recommended quality actions 5) recommended preventive actions 6) requested changes 7) recommended defect repair 8) validated deliverables 9) organizational process assets 10) project management plan

Plan-Do-CheckPlan-Do-Check-Act Cycle
PLAN QUALITY PLAN

ACT QUALITY IMPROVEMENT

DO QUALITY ASSURANCE

CHECK QUALITY CONTROL

Quality Planning identify which quality standards are relevant to the project and determining how to satisfy them
1. Input Quality Improvement Quality Policy Project Description Standard Regulation 2. Tools and Techniques Benefit/Cost Analysis Benchmarking Flowcharting

3.

Outputs Quality Management Plan Operational Definitions] Checklist

PROJECT PLANNING STRATEGY CONDUCTING SWOT ANALYSIS


What STRENGTHS do we have? How can we take advantage of them? What WEAKNESSES do we have? How can we minimize the impact of these? What OPPORTUNITIES are there? How can we capitalize on them What THREATS might prevent us from getting there? (consider technical obstacles, competitive responses, values of people within your organization, and so on)

SWOT ANALYSIS
Internal

External

Factors
Strengths Internal Weaknesses

Examples
Abilities, core competencies, capabilities resources, weakness of the competition, or the opposing sources Critical parts of the organization to strengthen or hide from competitors. Failures, defeats, loses and inability to match up with the dynamic situation Possibilities/benefits of what can be done and where effectiveness is possible The pitfalls and the dangers, the variations and exceptions possible, changes in business environment, PEST forces (political, economic, social, technological)

Opportunities External Threats

For every obstacle identified,

what can we do to overcome or get around them? (This helps you develop contingency plans)

Obstacles are those frightful things you see when you take your eyes off your goal
Henry Ford

There are seven aspects of an organization that need to harmonize with each other, to point in the same direction like the needless of seven compasses

If each aspect supports the others then the organization can be said to be organized

S
Structure Strategy Systems Shared Values Style Skills Staff

Quality Assurance - evaluating overall project performance on a regular basis to provide confidence that the project will satisfy the relevant quality standards
1. Input 2. Quality Management Plan Results of quality control measurement Operational Definitions

Tools and Techniques Quality Planning (Tools and Techniques) Quality Audits

3.

Outputs Quality Improvements

Quality Control - monitoring specific project results to determine if they comply with the relevant quality standards and identify ways to eliminate causes of unsatisfactory performance
1. Input 2. Works results Quality Mngt Plan Operational Definition Checklist 3. Outputs Quality Improvements Acceptance Decisions Rework Completed Checklist Process Adjustments

Tools and Techniques Inspection Seven New Quality Control Tools

(Pareto Analysis, Data Tables, Cause-Effect Analysis, Trend Analysis Histograms, Scatter Diagrams, Control Charts) and other Management Tools and Techniques

Quality Improvement - includes taking action to increase the effectiveness and efficiency of the project maintaining and improving the current standard
1. Input 2. Quality Improvement Philosophy and Principles

Tools and Techniques Suggestion Scheme 5s (Sort, Systematize, Sweep, Sanitize, Self-Discipline) Work Simplification (Work Measurement & Work Study) Quality Circle ISO 9000 (Quality Management System Standards)

3.

Output Improved Quality Standard

Construction Project Quality Management must address both the management of the project and the product of the project. Failure to meet quality requirements in either dimension can have serious negative consequence for any or all of the project stakeholders

Why Quality Assurance? Why Quality Control?

Do I Have A Quality Assurance Program?




Often times the phrase quality assurance is mis-used and misunderstood To avoid any confusion, the following table can be utilized as a tool to assess if you have a quality assurance program.

DO I HAVE A QUALITY ASSURANCE PROGRAM?


IF NO WAS ANSWERED TO ANY OF THE ABOVE QUESTIONS, YOU DO NOT HAVE AN EFFECTIVE QUALITY ASSURANCE PROGRAM

Why Quality Assurance?

A good quality assurance system in the construction will: Identify objectives and standards Be multifunctional and prevention oriented Plan for collection and use data in a cycle of continuous improvement Plan for the establishment of and maintenance of performance measure

What Is Quality Assurance?




Quality assurance is about being in control of all major areas of your business (key processes) so that you can assure quality. Being in control also reduces variation, which improves quality. Control and variation reduction is accomplished using various methods.

QUALITY ASSURANCE = P-D-C-A CYCLE OR DEMING CYCLE


Plan:
Documented processes via quality procedures & quality plans

Act:

Act upon the results by implementing CAPA & conducting Management Reviews.

Do: Work
systematically by following your procedures.

Check: Verify with


quality audits & by documenting Non-conformances

Quality Assurance have a little value if the systematic methods were not properly managed that includes:

Document Control: To ensure


employees have the correct procedures and the procedures are properly maintained.

Audits: To verify quality procedures are


being followed. .

Quality Assurance have a little value if the systematic methods were not properly managed that includes:


Non-conformance Tracking: To monitor and track quality issues to ensure that defects are kept from your customer CAPA (corrective action and preventative action): To correct flawed processes (i.e. qualityprocedures) when detected via audits and non-conformance tracking to prevent defects from reoccurring.

Quality Assurance have a little value if the systematic methods were not properly managed that includes:

Management Review: Reviewing quality system data (performance) (quality metrics) to determine if the quality system is working and if it is not, taking the appropriate action to improve the system.

Numerical Data
Control and variation reduction is established by statistically evaluating the process capability and then controlling the process via process control charts using SPC (statistical process control).

Non-Numerical Data
 Control and

variation is also reduced by instituting systematic methods (i.e. quality procedures). also referred to as systematizing, standardizing, or proceduralizing your key business processes.

 This is

Construction Industry Needs




To be effective, a quality assurance program designed for construction must be streamlined, user-friendly, not overlyburdensome, and geared for the intended audience. In addition, it must strike the right balance between added cost and added value.

Construction Industry Needs




Unfortunately, the only quality assurance standard that is currently available to the construction industry is the ISO 9000 quality system, which is well known due to high levels of publicity

This standard has for the most part been completely ignored by the construction industry in the U.S. as only 42 construction companies are certified.

Construction Industry Needs




To be effective, a quality assurance program designed for construction must be streamlined, user-friendly, not overly-burdensome, and geared for the intended audience.

In addition, it must strike the right balance between added cost and added value.

Construction Industry Needs




Unfortunately, the only quality assurance standard that is currently available to the construction industry is the ISO 9000 quality system, which is well known due to high levels of publicity This standard has for the most part been completely ignored by the construction industry in the U.S. as only 42 construction companies are certified.

Construction Contractor Quality System Audit Checklist




   

Due to the lack of a basic construction quality assurance program for the construction industry, a construction contractor, quality system audit checklist was developed to assess a construction contractors quality system. The checklist was developed utilizing the following steps: 1) Using the ISO 9000: 1994 standard as a guide. 2) Stripping those elements from the standard that are not essential to construction. 3) Adding quality elements that are unique to construction.

Corporate Construction Quality Assurance Program


Due to a lack of a standard quality assurance program that meets the needs of the construction industry, a back-to-basics and streamlined construction quality assurance program was developed.  The goal was to develop a system that captured the essence of quality assurance, including:  Assuring quality.


Corporate Construction Quality Assurance Program


Adding value. Utilizing a risk-based approach (to minimize the cost of a quality system).  Reducing the cost of quality (and increasing profit).  Providing the tools required to successfully:
 
o Get the job done right the first time. o To find & correct defects before your customer

finds them. o Prevent defects from re-occurring.

Why Quality Control?

It is a process of diagnosis and cure. As the facility is erected and commissioned it is checked against the specification to ensure that it is of the required standard, and any variance are eliminated. The activities by which this is done must be (a) planned, (b) tested, ( c) recorded and, (d) analysed.

Planned: quality control consumes resources, and so activities must be planned so that those resources are allowed for in the projects estimated and are available to conduct the tests at the right time

Tested: it must be known that the method of checking the specification will highlight variances

Recorded: the results must be recorded to provide a historical record for planning future projects, and to be able to analyse trends

Analysed: the results must be analysed to determine the cause of any variance so it can be eliminated and the analysis of trends can indicate potential problems before they occur.

 Quality Control  Quality Assurance  Quality Management  Zero

Defects  Do the Right Thing Right the First Time  Construction Improvement Process

* Management by Objectives Management by Exception Management by Walking * Cost Analysis * Personnel/Equipment Allocation * Participative Management/Employee Involvement

Obligations and responsibilities of management Edward Demings 14 Points

(1) Create constancy of purpose for the improvement of product or service (2) Adopt the new philosophy  (3) Cease dependence on mass inspection  (4) End the practice of awarding business on  the basis of price tag  (5) Improve constantly  (6) Institute more thorough training  (7) Institute leadership
  

W. Edwards Deming 14 Points (8) Drive out fear  (9) Break down barriers between  departments  (10) Eliminate slogans and targets  (11) Eliminate work standards  (12)Remove the barriers that rob employees  of their right to pride in workmanship  (13) Institute programs of education and  self-improvement  (14) Put everybody to work to accomplish  the transformation


Basic Quality Control Tool: Cause and Effect Diagram (Fish Bone Diagram)

Machine

Method

Man

Problem Statement

Management

Environment

Material

Basic Quality Control Tool: Cause and Effect Diagram (Fish Bone Diagram)
Machine Method Man

Work Cutter

Too Slow Speed Too Fast

Wrong Sequence

Poor Training Bad Attitude

Problem

Poor Supervision Too High Poor Planning Temp Too Low Material Damage

Statement

Incorrect Material

Management

Environment

Material

Control Charts


The control chart is a graph used to study how a process changes over time. Data are plotted in time order. A control chart always has a central line for the average, an upper line for the upper control limit and a lower line for the lower control limit. These lines are determined from historical data. By comparing current data to these lines, you can draw conclusions about whether the process variation is consistent (in control) or is unpredictable (out of control, affected by special causes of variation). Control charts for variable data are used in pairs. The top chart monitors the average, or the centering of the distribution of data from the process. The bottom chart monitors the range, or the width of the distribution. If your data were shots in target practice, the average is where the shots are clustering, and the range is how tightly they are clustered. Control charts for attribute data are used singly.

When to use a Control Chart


   

When controlling ongoing processes by finding and correcting problems as they occur. When predicting the expected range of outcomes from a process. When determining whether a process is stable (in statistical control). When analyzing patterns of process variation from special causes (non-routine events) or common causes (built into the process). When determining whether your quality improvement project should aim to prevent specific problems or to make fundamental changes to the process

20 15 10 5 0 -5 -10 -15 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 Range Chart

Improving Quality


Four-Step Approach to Quality Improvement. 1) Early QI efforts assumed that improvements could be readily attained by adding new or more things, such as new machines, procedures, training, or supplies 2) It was believed that simply adding more resources or inputs would improve quality 3) People working to improve quality learned that increasing resources does not always ensure their efficient use and, consequently, may not lead to improvements in quality.

Four Step Approach to Quality Improvement


1) Step one: Identify > Determine what to improve 2) Step two: Analyze > Understand the problem 3) Step three: Develop > Hypothesize about what changes will improve the problem and develop solution strategy based on these changes 4) Step four: Test and implement > Test the hypothesized solution

1) Identify


The goal of the first step, identify, is to determine what to improve. This may involve a problem that needs a solution, an opportunity for improvement that requires definition, or a process or system that needs to be improved. Examples of problems or processes that are commonly identified include low coverage, inadequate counseling, lack of drugs, lost lab reports, and excessive waiting time.

1) Identify


This first step involves recognizing an opportunity for improvement and then setting a goal to improve it. Quality improvement starts by asking these questions: What is the problem? How do you know that it is a problem? How frequently does it occur, or how long has it existed? What are the effects of this problem? How will we know when it is resolved?

    

How Project Quality Management can be Applied More Effectively?


1. 2. 3. 4. 5. 6. 7. 8. 9. Customer-First Attitude Teamwork & Cooperation Internal Customer Support Long Term Improvements are Better Than Quick Fixes Facts and Data are Better Than Hunches and Guesses (Walang Patsamba tsamba) Worry About Solutions. Dont Concentrate on Finding Fault Total Involvement is the Key Make this a People Intensive Process Promote a Spirit of Commitment

IS CONSTRUCTION SCHEDULE IMPORTANT TO ATTAIN PRODUCTIVITY IN CONSTRUCTION?

IMPORTANCE OF QUALITY PROJECT PLANNING AND SCHEDULING IN CONSTRUCTION


(we are concerned with the timing

SCHEDULING

aspects, that is, how much duration to be allocated in the activity

PROJECT MANAGEMENT CYCLE

Project Scheduling
a. Time Estimates b. Timing Calculations c. Job Scheduling

The objectives of the Project Quality Management is defined as an attempt to make the most efficient and effective use of the resources: * Money * Machine/Equipment * Materials Proper utilization of resources will result a higher productivity, improve performance and customer satisfaction * Manpower * Methods

OST

PROJECT QUALITY

MANAGEMENT

ime

uality

Case Study
The Utility Operations organization of the construction company received a new heavy equipments. It is the latest technology and will replace its twenty five (25) year old model. It uses computerized controls vs manual in the old system. There has been very little turnover in the utility staff over the last 30 year and most operators are not familiar with computerized applications. Managements expectations are that the new system will be more efficient, come on line quicker than the old system and last longer. The team has been asked to write a procedure and develop training to ensure the expectations are met. Question: How would you apply the three steps of quality management? Quality Planning Perform Quality Assurance Perform Quality Control

High

Low Quality/Grade

% Quality

IMPORTANCE OF QUALITY PROJECT PLANNING AND SCHEDULING IN CONSTRUCTION

PLANNING

PROJECT MANAGEMENT CYCLE

SCHEDULING CONTROL

IMPORTANCE OF QUALITY PROJECT PLANNING AND SCHEDULING IN CONSTRUCTION


(we determine WHAT is to

PLANNING

be done in accomplishing a project)

PROJECT MANAGEMENT CYCLE

Project Planning
a. Objectives b. Content of project c. Arrow Diagram (Network Diagram)

IMPORTANCE OF QUALITY PROJECT PLANNING AND SCHEDULING IN CONSTRUCTION


(we are concerned for providing timely follow-up

CONTROL

information a convenient and effective form)

PROJECT MANAGEMENT CYCLE

Project Control
a. Follow-up b. Updating c. Reporting

IMPORTANCE OF QUALITY PROJECT PLANNING AND SCHEDULING IN CONSTRUCTION

(we determine WHAT has to

PLANNING

be done in accomplishing a project)

PROJECT MANAGEMENT CYCLE

(we are concerned with the timing

SCHEDULING

aspects, that is, how much)

CONTROL

(we are concerned for providing timely follow-up information a convenient and effective form)

MONITORING PROCEDURES AND CONTROL OF WORK PROGRESS

% Completion

ACTION REQUIRED

Planned

Actual

Time

Control Cycle
Gather Facts & Data Take corrective action and re-plan Analysis of Data and Progress

Predict likely outcome of current course of project

CONTROL INFORMATION PROVIDES A BASIS FOR MANAGEMENT DECISIONS, AND THE FOLLOWING REQUIREMENS SHOULD BE SATISFIED BY AN EFFECTIVE CONTROL SYSTEM:

Gather Facts & Data Take corrective action and re-plan Analysis of Data and Progress Predict likely outcome of current course of project

It should draw immediate attention to significant deviations from what is planned true and meaningful comparisons must be possible the information should indicate what corrective action is necessary, and by whom the action should be taken key areas of control must be chosen with care, so that the results of control are worth the time and effort

THREE ELEMENTS TO BE CONTROLLED IN A CONSTRUCTION PROJECT


Progress vs Time Cost vs Tender or Budget Quality vs Specification


TIME

CONTROL COST

QUALITY

QUALITY MANAGEMENT SYSTEM


A Quality Management System provides a structure, including documentation and processes, which enables the delivery of products and services to be controlled and managed to consistently meet the specified requirements. The extent and detail of the documentation and processes included in a service providers Quality Management System would be determined to suit the products, services, practices and characteristics of the service provider, its customers requirements, and the needs of its personnel and its own service providers. Establishing and implementing a Quality Management System involves: Identifying the areas and assessing the associated level (likelihood and impact) of risk of products and services not conforming with the specified requirements; developing processes, generally documented as plans and procedures, to manage the risks; identifying and providing resources and allocating responsibilities to suit the plans and procedures; implementing the plans and procedures; monitoring, auditing and improving the implementation of plans and procedures; and regularly reviewing and improving the Quality Management System.

QUALITY MANAGEMENT SYSTEM


A Quality Management System provides a structure, including documentation and processes, which enables the delivery of products and services to be controlled and managed to consistently meet the specified requirements. The extent and detail of the documentation and processes included in a service providers Quality Management System would be determined to suit the products, services, practices and characteristics of the service provider, its customers requirements, and the needs of its personnel and its own service providers. Establishing and implementing a Quality Management System involves: Identifying the areas and assessing the associated level (likelihood and impact) of risk of products and services not conforming with the specified requirements; developing processes, generally documented as plans and procedures, to manage the risks; identifying and providing resources and allocating responsibilities to suit the plans and procedures; implementing the plans and procedures; monitoring, auditing and improving the implementation of plans and procedures; and regularly reviewing and improving the Quality Management System.

           

Developing a Quality Management System The scope and extent of documentation in a service provider's Quality Management System will depend on the products and services delivered by the service provider and the particular customer requirements, including those of the agencies with which they wish to work. Service providers must allocate resources, including personnel with sufficient knowledge, skills and experience in quality management, and have corporate procedures for developing, implementing and maintaining their Quality Management System, Quality Management Plans, and Inspection and Test Plans, as applicable, and to monitor their effective implementation with contracts. Service providers that purchase or subcontract products and/or services would ensure each customers quality requirements are reflected in the applicable purchase or subcontract documents. 5.1.2 Addressing agency requirements Service providers interested in tendering for agency contracts must address the applicable agency

TIME CONTROL
Planned Completion Dates for each Stage or Phase Contractors responsibility is to prepare a DETAILED WORK PLAN which meets the requirements of the contract Responsibility of the General Contractor to coordinate the work of his subcontractors, suppliers and other stakeholders of the project

Important Steps That We Need To Do (Project Engineer) In Controlling The Progress Of The Project
Establish TARGETS or MILESTONES
As each Target Event Occurs, Asses the Effect of PERFORMANCE TO DATE ON FUTURE PROGRESS Compare Actual vs Targeted Performance Request Appropriate Action from those directly responsible for the various activities

If necessary, RE-PLAN so as to achieve Original Targets or to come as near as possible to achieve them

PROJECT BUDGET

A GOOD AID TO KEEP THE COST FORECAST UP TO DATE IS A COST DIARY FOR EACH ACCOUNT

These diaries should include such information as: cost checks prepared during the designing stage contracts with consultants, contractors, suppliers and other organizations variations orders, and variations foreseen expected cost changes due to disturbances in the planned progress of the works

Control Curves

%
Completion

Time

S-Curve relate to the value of WORK done, not to cash payments Contractors are paid PERIODICALLY, usually monthly, in a way related to the value of the WORK COMPLETED Cash Flow may be derived from the value of S-Curve

QUALITY CONTROL
Quality control in a construction project should aim at satisfying the clients stated needs and requirements. QC must be exercised during all stages of a project
BRIEFING STAGE DESIGNING STAGE TENDERING STAGE CONST. STAGE
COMMISSIONING STAGE

OVERALL CONTROL DECISION MAKING

inspection

Special test

PROJECT CONTROL IS A MUST!!!

VALUE ENGINEERING
- is a creative systematized approach whose objective is to seek out the best functional balance between cost, reliability and performance of a project - utilizes a functional analysis that modifies or delete elements that add to the cost of the project without contributing to its required functions

Value Engineering is a technique that is used to identify poor value functions and identify ideas for lower cost, higher value alternatives. It allows the creative generation of solutions to specific functionality problems, without reducing the scope of the process.

5. Operational Phase: Utilization of Facility 4. Construction Phase ::Bidding, Contract, 4. Construction Phase Bidding, Contract, Construction Construction

Value Engineering or Cost Reduction

3. Design Phase Design, Construction 3. Design Phase ::Design, Construction Materials, Space Utilization, Site layout, etc. Materials, Space Utilization, Site layout, etc. 2. Planning Phase : Scope of the Project, Site Location, Construction Budget

1. Conceptual Phase : Program Needs, Project Feasibility

Life Cycle Phases of Facility

One of the techniques of Value Engineering is asking a series of penetrating questions about a system or process.
What is it? What does it do? What does it cost? What is it worth? What is needed to Implement the alternative? What else might do the job? What do the alternatives cost? Which alternative is least expensive? Will the alternative meet the requirements?

Materials

Machine

Value Engineering

Manpower

Methods

Value engineering is not cost cutting but defining properly the function of work, activity and resources

The main differences between value engineering and cost cutting are summarised as follows: Value Engineering Cost Cutting It is Focus Results Optimises Clarifies Function based Poor value functions Increased value Overall design Equipment/material based Big cost items Scope reduction Local design

Client requirements Nothing

The Success of Value Engineering


Systematic and organized
The Value Engineering process uses tested and successful procedures that are directed toward achieving success in meeting the purposes for the "project" by all involved. A standard "job plan" is used to guide the entire process.

Alternatives
The Value Engineering generates, examines, and refines creative alternatives toward the concept of producing an end product that produces high customer acceptance. The process endeavors to widen the number and scope of the available alternatives. This is done to increase the potential for enhanced satisfaction, and take advantage of the added expertise brought into the studied activity through the value study process.

Functions and FAST


One of the most unique and useful qualities of the Value Method is its use of functions to describe the activity or product being studied. The value study breaks the "project" into components so as to avoid misunderstanding of the planned intents for the project.

Value
The true value of a activity or product is its relationship to its perceived worth as opposed to its life-cycle costs. In Value Engineering terms: Value = Worth / Cost. When an item has a Value greater than 1.0, the item is perceived to be a fair or good value. When an item has a Value is less than 1.0, the item is perceived to be a poor value or bad value. When the perceived worth far exceeds the life-cycle cost, we usually consider purchasing the item.

Worth
The worth of a product involves many features. The most common cited are: benefits received, services obtained, satisfaction of the product performance, quality, safety, and convenience. The worth of the product is a measure of what is in it for the customers involved. It is a measure of how well the end product meets the involved essential needs and the added desires of those that have a voice in the product selection or its use. An end product must always supply the essential need, or its worth will be poor

Life-Cycle Costs
T

The true cost of an item is not just the amount of money that you pay when you buy it. Much more is involved. When you buy something, you also buy its long-term effects. The initial costs plus these long-term costs are called life-cycle costs. This includes things like the time involved to get the project done, the people needed (number, expertise and so on), the degree of difficulty involved, availability of money or other resources, the amount of maintenance needed, and the money that must be expended and kept in reserve.

THANK YOU