Você está na página 1de 28

Workings of a Nuclear Reactor

Reactor Basics PWR BWR

Key Reactor Power Terms


Availability Fraction of time over a reporting period that the plant is operational
If a reactor is down for maintenance 1 week and refueling 2 weeks every year, the availability factor of the reactor would be (365(365-3 * 7) / 365 = 0.94

Key Reactor Power Terms


Capacity Fraction of total electric power that could be produced
If reactor with a maximum thermal power rating of 1000 MWt only operates at 900 MWt, the capacity factor would be 0.90

Efficiency Electrical energy output per thermal energy output of the reactor
Eff=W/QR (MWe/MWt)

Term Visualization

Piecing Together a Reactor


1. 2. 3. 4. 5. 6. 7. 8.
Fuel Moderator Control Rods Coolant Steam Generator Turbine/Generator Pumps Heat Exchanger

1. Fuel 3. Control rod

4. Coolant

Basic Reactor Model

7. 5. Steam generator 6. 8.

Nuclear Power in the United States


~20% Nuclear Energy 103 Nuclear Reactors
31 States 34 BWRs 69 PWRs

Largest Plant
Palo Verde 3825 MWe/3 reactors 12th Largest in World
http://www.nei.org

Nuclear Power in the United States


Manufacturers
General Electric
www.ge.com

Westinghouse
www.westinghouse.com

AREVA NP
www.framatomewww.framatome-anp.com

ABB Combustion Eng.


www.abb.com
http://www.chemsoc.org

World Nuclear Power


443 Nuclear Reactors in 30 Countries in Operation, January 2006 Provided ~16% World Production of Energy in 2003 24 Nuclear Power Plants under Construction

http://www.insc.anl.gov

Reactor Generations
Gen I
Prototypes in 50 s & 60 s

Gen III+
Current Advanced Designs in the Approval Process Pebble Bed Reactor

Gen II
70 s & 80 s Today s Operational Reactors BWR, PWR, CANDU,

Gen IV
Deploy in 2030 Economical Safe Minimize Waste Reduce Proliferation

Gen III
ABWR, APWR Approved 90 s Some Built around the World

Reactor Generations

http://www.whitehouse.gov/

Pressurized Water Reactor (PWR)


Pressure Vessel Light Water 3.2% U-235 Fuel U2-4 Loops => Steam UO2 Pellets in Zircaloy 17 x 17 array 12 foot long bundle ~32% Efficiency External Pipe Corrosion Lower Capital Cost AP600 Westinghouse 600 MWe Passive Safety Cooling Systems Prefabricated and Assembled On-Site OnSimple Plant Design = Reduced Volume and Cost 3-year Construction

Basic Diagram of a PWR

http://www.nrc.gov/

A PWR in Practice

http://www.nukeworker.com/

VVER Russian PWR (Water-Cooled, (WaterWaterWater-Moderated, Energy Reactor)

http://www.nucleartourist.com/

Other LWR Reactors


Republic of Korea
Optimized Power Reactor, OPR-1000 OPRAdvanced Power Reactor, APR-1400 APRSystem-integrated Modular Advanced Reactor, SMART System(330 MWt)

Germany
KONVOI, 1300 MW

France
N4, 1450 MW

AREVA NP EPR (European PressurizedPressurized-Water Reactor)


1600 MWe 36 37% Efficiency Mixed Oxide (MOX) Fuel 60 yr Service Life 3 4 yr Construction Multiple Barriers and Simple Safety Systems
http://www.framatome-anp.com/

Westinghouse
1117 1154 MWe Improved AP600 Design
Same Basic Design Same Inherent Safety Optimized Power Output Reduced Energy Costs

AP1000 Reactor

2 Steam Generators 3 year Construction Final Design Approval in December 2005!


http://www.ap1000.westinghousenuclear.com/

AP1000

Less Pieces

Nuclear News, November 2004

Boiling Water Reactor (BWR)


Direct Boiling 10% Coolant = Steam Similar Fuel to PWR Lower Power Density than PWR Corrosion Product Activated in Core Higher Radiation Field GE ABWR 1350 MWe (3926 MWt) UO2 Fuel 60 yr Service Life Internalized Safety and Recirculation Systems

Basic Diagram of a BWR

http://www.nrc.gov/

A BWR in Practice

http://www.energy-northwest.com

ABWR (Advanced Boiling Water Reactor)


1350 MWe 77% more compact than BWR design 39 month construction period

GE TOSHIBA, Kashiwazaki-Kariwa Unit 6, Japan

ABWR

Less Pieces

ABWRABWR-II
Early 1990s - TEPCO, 5 other utilities, GE, Hitachi and Toshiba began development 1700 MWe Goals
30% capital cost reduction reduced construction time 20% power generation cost reduction increased safety increased flexibility for future fuel cycles
PRCS

PHRS

PCCS

D/W

Commercialize 2010s

latter

S/P

GE ESBWR (Economic Simplified Boiling Water Reactor)


1550 MWe (4500 MWt) Passive Condenser Systems for Heat Transfer Standard Seismic Design Improved Economics Shorter Construction Time Reduced Plant Staff and Operator Requirements

Decay Heat Heat Exchangers Above Drywell High Elevation Gravity Drain Pools

All Pipes/ Valves Inside Containment

Raised Suppression Pool

ESBWR

Você também pode gostar