The Centre for Cancer Research and Cell Biology (CCRCB) Queens University, Belfast
23 years experience in M&E Consultancy Field Key areas of expertise full spectrum of mechanical services
Electronic cleanrooms
Industrial Commercial Educational WYG Belfast Technical Director
www.wyg.com/ireland
Also takes lead in low energy solutions and office commissioning champion
Laboratories
QUB CCRCB QUB Health Sciences Campus Redevelopment 16no. projects majority lab fit outs or refurbishments Included refurbishment of MBC tower block, a new build and a BRU
facility
Downe Hospital Phase 2B (ICU) Facility at RVH, Belfast Exemplar design & PFI procurement Enniskillen and Omagh hospitals Exemplar design of Womens and Childrens, RVH Exemplar Design for National Paediatrics Hospital, Dublin
Safe, Successful and Sustainable Laboratories
creative minds safe hands
www.wyg.com/ireland
WYG Ireland
Established March 1999 Over 450 staff in 10 geographical locations throughout Ireland Provide Engineering, Environmental, Town Planning, Surveying &
Project Management Services
Belfast office is the centre for Laboratory and Healthcare projects Belfast M&E 30No Engineers
www.wyg.com/ireland
Maintain the desired internal environmental conditions Safe for users and surrounding occupants Resilient Reliable Reduced Energy Costs and sustainable design Flexible Co-ordinated design Meet Budget Costs Meets end user needs and expectations
Easy to maintain
www.wyg.com/ireland
Attend end user briefing sessions Determine preliminary plant sizes Determine services distribution strategy Size Plantrooms and Risers
www.wyg.com/ireland
www.wyg.com/ireland
True value for money can only be determined by life cycle costing.
Design, 1 Construction, 5
Running, 200
www.wyg.com/ireland
By using dynamic analysis software we can assist the design team by simulating passive design solutions and providing feedback on fabric analysis, building orientation, layout and environmental interactions
Building Shape Orientation Glazing analysis Fabric analysis Dynamic solar analysis Passive Engineering solutions Building Regulations Part F2 Analysis
www.wyg.com/ireland
www.wyg.com/ireland
Passive Solutions Building Shape Fabric and Glazing Enhancements Orientation Brise Soleil / solar shading Natural Ventilation
Renewable / Low Carbon Technologies Ventilation heat recovery Ground source water Ground source heat pumps Biomass boilers / Combined Heat & Power Solar water heating Lighting control
www.wyg.com/ireland
Enhanced external fabric U values Enhanced glazing Window Design to Assist Natural ventilation of Offices and atrium
Mechanical
Ultra low temperature hot water heating system to maximise gas fired condensing boiler efficiency
www.wyg.com/ireland
AHU 1
AHU 2
AHU 3
Roof Platform
CVB
CVB
3rd Floor
CVB
CVB
2nd Floor
CVB
CVB
1st Floor
CVB
CVB
Ground Floor
www.wyg.com/ireland
AHU 4
AHU 5
Roof Platform
VAV
3rd Floor
FC
2nd Floor
1st Floor
NO NC
Ground Floor
Lecture Theatre
www.wyg.com/ireland
Electrical
High efficiency lighting (T5 lamps) Variable speed drives on all pumps and fans. Switching of lights in offices and corridors G59 synchronisation using electrical standby generator metering
www.wyg.com/ireland
Safety Issues
Liquid Nitrogen dewar filling store purge ventilation activated using oxygen depletion alarm system
Carbon dioxide(CO2) and Argon bottle manifold room oxygen depletion alarm system Natural gas - gas detection and pipe pressure testing/ alarm systems Drainage from radioactive labs separate identified waste direct to external underground drainage
Fume extract from radioactive labs discharge via safe change HEPA filter
Fire strategy and smoke ventilation fire fighting lift, dry riser and basement smoke ventilation system Future operation and maintenance sufficient space for maintenance and plant replacement strategy agreed
www.wyg.com/ireland
www.wyg.com/ireland
www.wyg.com/ireland
www.wyg.com/ireland
Category 3 Laboratory
The management, design and operation of microbiological containment laboratories. ACDP. 2001. HSE Books. ISBN 0 7176 2034 4. Room to be under negative pressure HEPA Filters on Exhaust Sealable for Fumigation Separate from other activities Access restricted utilising keypad access both in and out Observation windows for safety
Safe, Successful and Sustainable Laboratories
www.wyg.com/ireland
Thimble Connections
DX Heat Pump
Safety Cabinets
www.wyg.com/ireland
www.wyg.com/ireland
Mechanical
Ultra low temperature hot water heating utilising ultra high efficiency condensing gas boilers
Chilled water system utilising high efficiency chillers Central plant mechanical ventilation of Primary and Secondary labs Direct Expansion (DX) cooling of Equipment Rooms and Tissue Culture Rooms
High efficiency condensing gas fired domestic hot water heating linked to solar water heating
Boosted cold mains water system Rain water recovery serving WCs Carbon dioxide system serving tissue culture rooms
www.wyg.com/ireland
M&E Systems
Electrical
Fire Alarm
Door Access CCTV Intruder Alarm
www.wyg.com/ireland
Resilience
Mechanical 4No Modular Boilers (3No duty/ 1No standby) All pumps duty/ standby Ventilation zoned and served by 5No AHUs Each group of MBSCs in a Tissue Culture room served by an individual
extract fan
Each fume cupboards served by an individual extract fan Solvent cabinets on separate and served by duty/ standby fan arrangement 2No chillers (each rated at 50% load and having 4No compressors each) All equipment rooms served 2No DX systems DX units in Cat 3 Lab and Tissue Culture Rooms to maintain conditions Duty/ standby compressors CO2 and Argon duty/ standby bottle manifolds
Safe, Successful and Sustainable Laboratories
creative minds safe hands
www.wyg.com/ireland
Resilience
Electrical
www.wyg.com/ireland
Higher than normal standard of M&E commissioning Good working relationships with all parties Post occupancy debriefing session with Facility Manager, Pat White
www.wyg.com/ireland
www.wyg.com/ireland
Verification of ventilation air change rates Checking the performance of cooling systems using heat load tests Checking room temperatures Checking humidity levels where air conditioning is installed Verifying temperatures, flow rates and operating pressures of specialist systems (eg chilled water systems) Simulation of different scenarios to prove operation of BMS controls KI discus and DOP test of safety cabinets of safety cabinets Cause and Effect Testing relating to Fire Alarm Electrical Main incomer shut down/ elect standby generator 3 day Steady state running
www.wyg.com/ireland
Energy
Adjusted for 95 hour week and 2360 degree days for Belfast and elect equip running 24 hours/day 365 days per year Target fossil fuel 265kWh/m2 elect 246kWh/m2