Escolar Documentos
Profissional Documentos
Cultura Documentos
Regulate STEAM FLOW into TURBINE such that at the desired SPEED the OUTPUT TORQUE of the Turbine is exactly equal the LOAD Torque of the Generator
(If torque is not equal the result is a change in speed Newtons Law)
In the event of sudden LOAD TORQUE loss, Quickly reduce STEAM FLOW to maintain desired SPEED below Emergency trip Speed
(excessive TURBINE OUTPUT TORQUE results in rapid speed increase)
In the event of a complete failure of speed control, emergency over speed governor shall limit speed less than 120%
Servo Valve
Null
Servo Valve
Opening
Servo Valve
Closing
Servo Valve
Failed Jet
BLOCK
MSV
CV
CV Balance Chamber
MSV & CV
ISV
Intercept Valves
Primary Purpose: To regulate steam flow to the IP (LP) turbine in an overspeed where the control valves have been closed and speed continues to increase. Also, to blow down reheater and/or steam piping prior to opening of control valves.
IV
CIV
ByPass Valves
Purpose: Regulate reactor steam flow to the condenser, when steam flow is not needed by the turbine BPV use a simple double acting actuator (no ETS supply) 1) can be manualy opened during intial criticallity 2) regulated by Pressure Control over range of 150 to 1050 psig
ByPass Valves
Speed Control
Measure turbine speed and provide Speed error to Load Control INPUTS Turbine speed Speed hold selection Acceleration selection OUTPUT Speed Error to Load Control Speed related Logic
Load Control
Using operator desired set points and measured turbine conditions, provided a valve demand signal to Flow Control
Inputs Speed error Load reference Operating condition (i.e. warming, rolling, or online) BWR- Pressure error
Output EsubLs
Flow Control
INPUTS EL Valve Position OUTPUT Servo Current
Each valve has its own Flow Control Loop MSV#2 (master) CV 1, 2, 3 & 4 IV 1, 2 (master) BPV 1 - 10
Incremental Regulation
Protection (trips)
Vital Loss of Life Redundant tripping and testable Important Loss of Capital 2 out of 3 logic for increased availability Operational Increased maintenance Pre alarm