- Documento8680- Abans Engenviado porLakshan Fonseka
- DocumentoGTEC-IRE-0195 Observation Report for Witness Inspection schedule item Nr 9 on 15.09.2022_Building 2enviado porLakshan Fonseka
- Documento0415_Master Plan for BD 1.2 & B3_v5 _EL & ES_Denviado porLakshan Fonseka
- DocumentoProcurement Scheduleenviado porLakshan Fonseka
- DocumentoGTEC-IRE-0059enviado porLakshan Fonseka
- DocumentoGTEC-IRE-0201 Observation Report for Witness Inspection Schedule Item Nr 3 & 4 on 03.10.2022_BD 2enviado porLakshan Fonseka
- DocumentoGTEC-IRE-0202 Observation Report for Witness Inspection schedule item Nr 5 on 04.10.2022_Building 2enviado porLakshan Fonseka
- DocumentoSBD-STEAM-Connection_Resources-1-Materials_engineerenviado porLakshan Fonseka
- DocumentoWitness inspection schedule (04th October 2022)enviado porLakshan Fonseka
- DocumentoSubmit 3rd Party Inspection Reports of Elevators at Building 4,5 & 6enviado porLakshan Fonseka
- Documento852903enviado porLakshan Fonseka
- DocumentoPerformance_Criterion_BSc-Eng-2011_21stMarch2012enviado porLakshan Fonseka
- DocumentoHKN-MCD-CN-13517-Abans Eng & CAN I(1)enviado porLakshan Fonseka
- DocumentoGTEC-IRE-0204_ Observation Report on non-conformances observed in lift lobby area_Level 1 & BOH area_Level 3_Building 2enviado porLakshan Fonseka
- DocumentoInstallation Schedule (1)enviado porLakshan Fonseka
- DocumentoStudying Overseasenviado porLakshan Fonseka
- DocumentoInformation for Candidatesenviado porLakshan Fonseka
- DocumentoIELTS PRACTICE TEST 01enviado porLakshan Fonseka
- DocumentoHKN-SUB-HAJV-4735enviado porLakshan Fonseka
- DocumentoHKN-MCD-CN-13555-Abans Engineeringenviado porLakshan Fonseka
- DocumentoReplacement of wear and tear parts of construction use elevator_FSL6.2(1)enviado porLakshan Fonseka
- DocumentoNon-Comprehensive Maintenance Agreement_Waterfront Integrated Resort (003)enviado porLakshan Fonseka
- DocumentoWater Front Inetgrated Resort Maintainance Agreementenviado porLakshan Fonseka
- DocumentoRevised (1) BD 4 Elevator Balance Works Schedule_2021!11!16enviado porLakshan Fonseka
- DocumentoBD 123 Progress Work (Autosaved)enviado porLakshan Fonseka
- DocumentoElevator and Escalator Installation Progress of WaterFront Projectenviado porLakshan Fonseka
- DocumentoRevised (1) BD 4 Elevator balance works Schedule_2021_11_16enviado porLakshan Fonseka
- DocumentoElevator and Escalator Installation Progress of WaterFront Projectenviado porLakshan Fonseka
- DocumentoBD 123 Progress Work (Autosaved)enviado porLakshan Fonseka
- DocumentoElevator and Escalator Installation Templateenviado porLakshan Fonseka
- DocumentoCladding SubCon Analysisenviado porLakshan Fonseka
- DocumentoBD#4 Rectification Workenviado porLakshan Fonseka
- DocumentoREPORT ON DAMAGES A 1enviado porLakshan Fonseka
- DocumentoReplacement parts of the temporary liftsenviado porLakshan Fonseka
- DocumentoNew Microsoft Word Document (2)enviado porLakshan Fonseka
- DocumentoReply to Letter Dated 29th Dec 2021enviado porLakshan Fonseka
- DocumentoNew Microsoft Word Documentenviado porLakshan Fonseka
- DocumentoSL 6.1 Modificationenviado porLakshan Fonseka
- DocumentoSL 2.09 Sill modificationenviado porLakshan Fonseka
- DocumentoSL 2.09 Jamb Modificationenviado porLakshan Fonseka
- DocumentoSL 2.09 Core Cuttingenviado porLakshan Fonseka
- DocumentoSL 2.09 Header Modificationenviado porLakshan Fonseka
- DocumentoES 2.3 Chippingenviado porLakshan Fonseka
- DocumentoGmail - Water Seeping Through Drain Pipe in to FSL 2.1 & FSL 2.2enviado porLakshan Fonseka
- DocumentoGmail - FW_ requesting to remove glass materials in level 25 shaft entranceenviado porLakshan Fonseka
- DocumentoGmail - Chipping details of FSL 2.1 & 2.02enviado porLakshan Fonseka
- DocumentoDocument 12 - Ribbon Cables Were Damaged Due to Rats in Machine Roomenviado porLakshan Fonseka
- DocumentoGmail - BD#2 pit waterenviado porLakshan Fonseka
- DocumentoDocument 13 - Fwd_ BD#2 Pit Waterenviado porLakshan Fonseka