- DocumentoBM1-661-DCN-9002enviado porRahmatur Ridha
- Documentoequipment 16-18enviado porRahmatur Ridha
- DocumentoBeam CIS (28'-29 L-M) 13 JUNI 2023enviado porRahmatur Ridha
- DocumentoBM1-661-C-1058 R2.0 EL+104.300m Cast In Situ Beam Layout - CCKenviado porRahmatur Ridha
- DocumentoBM1-661-C-1014 -2.1 Grid L Elevation layout for CCK area _CECenviado porRahmatur Ridha
- DocumentoBM1-661-C-1004-002 -2.0 PILECAP AND GROUND BEAM DETAIL DRAWING-CCK _CECenviado porRahmatur Ridha
- DocumentoBM1-661-C-1013 -2.1 Steel roof trusses and braces layout for CCK area _CECenviado porRahmatur Ridha
- DocumentoBM1-661-C-1056 Rev2.1 EL 104.300m FLOOR EQUIPMENT FOUNDATION LAYOUT-CCKenviado porRahmatur Ridha
- DocumentoBM1-861-C-1453 R2.2 EL 120.8 MezzanineRoof Beams Layout - Grid 6-15enviado porRahmatur Ridha
- DocumentoBM1-661-C-1152-002 Rev2.0 GROUND FLOOR EQUIPMENT DETAIL-WECenviado porRahmatur Ridha
- DocumentoBM1-661-C-1151-001 Rev2.1 EL 104.300m FLOOR LAYOUT-WECenviado porRahmatur Ridha
- DocumentoTugas 10 Pbak 2020enviado porRahmatur Ridha
- DocumentoTUGAS 10 PBAK 2020enviado porRahmatur Ridha
- DocumentoTUGAS 5 PBAK 2020enviado porRahmatur Ridha
- DocumentoTUGAS 8 PBAK 2020enviado porRahmatur Ridha
- Documentoالباب لأول - الباب الرابعenviado porRahmatur Ridha
- Documentoالإملاء لصف الأولenviado porRahmatur Ridha
- Documentoالباب لأول - الباب الرابعenviado porRahmatur Ridha
- DocumentoBAB I (4).pdfenviado porRahmatur Ridha
- Documentosuaatu usaha.docxenviado porRahmatur Ridha
- Documento192635-ID-estimasi-kadar-aspal-optimum-pada-laston.pdfenviado porRahmatur Ridha
- DocumentoMakalah Jalan Dan Jembatanenviado porRahmatur Ridha
- DocumentoBERBISNIS ONLINE.docxenviado porRahmatur Ridha
- DocumentoBerbisnis Onlineenviado porRahmatur Ridha