- DocumentoResearch on E...ebble Stratum_孙正阳enviado por
Jovan
- DocumentoPrediction and analysis of slurry shield TBM disc cutter wear and itsenviado por
Jovan
- DocumentoSimulation_of_maintenance_strategies_in_mechanized_tunnelingenviado por
Jovan
- DocumentoRobustness evaluation of cutting tool maintenance planning for soft ground tunneling projectsenviado por
Jovan
- DocumentoShield Construction Multiobjective Optimization of Surface Settlement Safety Control Based on Machine Learningenviado por
Jovan
- DocumentoPrediction and analysis of replaceable scraper wear of slurry shield TBM in dense sandy ground A case study of Sutong GIL Yangtze River Crossing Cable Tunnelenviado por
Jovan
- DocumentoMachine learning forecasting models of disc cutters life of tunnel boring machineenviado por
Jovan
- DocumentoGeological adaptability matching design of disc cutter using multicriteriaenviado por
Jovan
- DocumentoPrediction of Disc Cutter Life During Shield Tunneling with AI via theenviado por
Jovan
- DocumentoIntroduction of an empirical TBM cutter wear prediction model for pyroclastic and mafic igneous rocks; a case history of Karaj water conveyance tunnel, Iranenviado por
Jovan
- DocumentoEvaluation of tool wear in EPB tunneling of Tehran Metro, Line 7 Expansionenviado por
Jovan
- DocumentoEmpirical Cutting Tool Wear Prognosis for Hydroshield TBM in Soft Groundenviado por
Jovan
- DocumentoEvaluation on the adaptability of shield cutter head systemenviado por
Jovan
- DocumentoCutting tool wear prognosis and management of wear related risks for Hydroshield TBM in soft groundenviado por
Jovan
- DocumentoAssessing maintenance strategies for cutting tool replacements in mechanized tunneling using process simulationenviado por
Jovan