- DocumentoImprove Your Topdressing Sand with PPC (3)enviado porAmihan Santos
- Documento5. Method of Statement, SteelGrid series with MacMatenviado porAmihan Santos
- Documentocest2015_00259_oral_paperenviado porAmihan Santos
- DocumentoA study on the durability impact of concrete by using recycled waste waterenviado porAmihan Santos
- Documento30Jan20131206585-use ofenviado porAmihan Santos
- DocumentoPlumber's Handbookenviado porAmihan Santos
- DocumentoEffect of Primary Treated Waste Water in Concrete Mixenviado porAmihan Santos
- DocumentoFresh and Hardened Properties of Sustainable Concrete Using Recycled Household Greywaterenviado porAmihan Santos
- DocumentoScienceenviado porAmihan Santos
- DocumentoCH-HW-PH-115 MWAC BARAS SOLAR POWER PLANT CHANNEL LINING SOLUTION-Rev2-Jun22-ENenviado porAmihan Santos
- DocumentoCH-EC-PH-20MW ORMOC BATTER ENERGY STORAGE SYSTEM – SLOPE PROTECTION-Rev2-Nov22-ENenviado porAmihan Santos
- DocumentoCH-RF-TR-141(BALIKESİR), 142 (ÇANAKKALE), 145 (KÜTAHYA) ROAD PROJECT-Rev2-Nov20-ENenviado porAmihan Santos
- DocumentoCH-RF-TR-141(BALIKESİR), 142 (ÇANAKKALE), 145 (KÜTAHYA) ROAD PROJECT-Rev2-Nov20-EN (1)enviado porAmihan Santos
- DocumentoROCKFALL BARRIERenviado porAmihan Santos
- DocumentoEAST GATE SLIP ROCKFALL PROTECTIONenviado porAmihan Santos
- DocumentoROCKFALL MITIGATION MEASURESenviado porAmihan Santos
- DocumentoROCKFALL MITIGATION MEASURESenviado porAmihan Santos
- DocumentoENBRIDGE T-SOUTH EXPANSIONenviado porAmihan Santos
- DocumentoCRUSHER WALLenviado porAmihan Santos
- DocumentoROCK FALL PROJECTenviado porAmihan Santos
- DocumentoGOLD MINE RETAINING WALLSenviado porAmihan Santos
- DocumentoEROSION CONTROL MEASURESenviado porAmihan Santos
- DocumentoCase Historyenviado porAmihan Santos