MEMORIA DE METRADO

CAPTACION C-1
01.00
01.01

TRABAJOS PRELIMINARES
Limpieza de terreno

01.02

Trazo y replanteo preliminar

N CAPTACIONES

3.321

8.837 m2

8.84

2.461 * 3.121
MOVIMIENTO DE TIERRAS
Excavacin de material suelto en terreno saturado
1.000 * 1.000 * 0.763
CAJA HUMEDA
0.500 * 0.400 * 0.275
CAJA VALVULA
3.521 +
1.400 * 1.361 * 0.763
ALEROS
2
02.02 Refine, nivelacin y compactacin
1.000 * 1.000
02.02 Acarreo de material excedente D = 30M
3.370 * 1.300
EXACAVACION
0.200 * 1.000 * 4.000
RELLENO
0.100 * 0.400 * 3.000
0.400 * 1.361 * 1.000

7.681 m2

7.68

=
=
=

0.763
0.055
2.553
3.370

m3
m3
m3
m3

3.37

1.000 m2

1.00

=
=
=
=

4.382
0.800
0.120
0.544
2.917

2.92

2.661

02.00
02.01

03.00
03.01

03.02

04.00

OBRAS DE CONCRETO SIMPLE


Cubierta de filtro F'c=140 kg/cm2
3.121
+
1.000 * 0.150
2
Concreto bajo filtro F'c=100 kg/cm2
0.850
+
3.121 * 0.500
2

m3
m3
m3
m3
m3

1.061

0.328 m3

*
1
rehabilitacion captacion existente

0.33

1.061

1.053 m3

*
1
rehabilitacion captacion existente

1.05

OBRAS DE CONCRETO ARMADO

0.15
1.50

CORTE A-A'

1.06

0.50

0.15
0.10

0.05

0.30

0.70

0.40

0.10
0.15

0.10

1.06
0.10

0.15

0.70

0.20

0.15

0.30

0.10
1.06

PLANTA

0.20

04.01 Concreto F'c=175 kg/cm2 (losa de fondo y muros)


Losa fondo
1.000 * 1.000 * 0.150
Losa caseta valvula
0.400 * 0.500 * 0.100
Dentellones
1.000 * 0.200 * 0.200
1.000 * 0.350 * 0.200
muros
*
0.950 * 0.150 * 2.000
Caja captacion 1.000
0.700
*
0.950 * 0.150 * 2.000
0.400
*
0.400 * 0.100 * 2.000
Caja valvula
0.300
*
0.400 * 0.100 * 1.000
1.500
*
1.450 * 0.150 * 2.000
Aleros
04.02 Encofrado y desencofrado (muros)
Caja captacin
0.700 * 0.950
1.000 * 0.950
Caja vlvula
0.300 * 0.400
0.500 * 0.400
0.400 * 0.400
Aleros
1.500 * 1.100
0.150 * 1.100
04.03

0.15
0.30

*
*
*
*
*
*
*

5.000
3.000
3.000
1.000
2.000
4.000
2.000

=
=
=
=

0.150
0.020
0.040
0.070

m3
m3
m3
m3

=
=
=
=
=

0.285
0.200
0.032
0.012
0.653
1.461

m3
m3
m3
m3
m3
m3

3.325
2.850
0.360
0.200
0.320
6.600
0.330
13.985

m2
m2
m2
m2
m2
m2
m2
m2

=
=
=
=
=
=
=

0.70

0.20

1.46

13.99

Acero F'y=4200 kg/cm2 (losa de fondo y muros)


L1 =
L2 =
L3 =
L4 =
L5 =
L6 =
L7 =
L8 =

1.050
1.250
1.350
0.700
0.950
0.600
1.750
2.061

*
*
*
*
*
*
*
*

5.000
5.000
5.000
3.000
3.000
3.000
5.000
5.000

*
*
*
*
*
*
*
*

2.000
4.000
4.000
3.000
1.000
2.000
1.000
1.000

*
*
*
*
*
*
*
*

0.580
0.580
0.580
0.580
0.580
0.580
0.580
0.280

=
=
=
=
=
=
=
=

6.09
14.50
15.66
3.65
1.65
2.09
5.08
2.88
51.60 *

fondo losa
fondo losa
muro camara humeda
muro camara humeda
muro camara seca
muro camara seca
cubierta de filtro
cubierta de filtro
51.60
1 =

04.04

Concreto F'c=175 kg/cm2 (losa tapa)

0.05
0.15
0.05
0.60

1.10

0.05
0.15
0.05
0.05
0.05 0.15

Tapa captacin

04.05

04.06

0.60

0.10 0.15

1.100
0.050
0.050

*
*
*

1.100
1.100
1.000

Encofrado y desencofrado (losa tapa)


1.100 * 1.100
1.100 * 0.125
1.000 * 0.050

*
*
*

*
*

0.000
2.000
2.000

4.000
4.000

=
=
=

=
=
=

0.000
0.110
0.100
0.210

m3
m3
m3
m3

1.210
0.550
0.200
1.960

m2
m2
m2
m2

0.21

1.96

Acero F'y=4200 kg/cm2 (losa tapa)


1.300

12.000

2.000

TARRAJEOS ENLUCIDOS Y MOLDURAS


Tarrajeos con impermeabilizante
0.700 * 0.950 * 4.000
MUROS
0.700 * 0.700 *
1.000
LOSA PISO

0.280 =

8.74
8.74 *

losa prefabricada
8.74
1 =

=
=

2.660 m2
0.490 m2
3.150 m2

3.15

2.850
0.320
0.200
0.360
2.850
6.580

6.58

05.00
05.01

05.02

Tarrajeos en interiores y exterior


1.000 *
Caja captacin
0.400 *
Caja valvulas
0.500 *
0.300 *
1.500 *
Aleros
06.00
06.01

06.02

07.00
07.01

0.950
0.400
0.400
0.400
0.950

FILTROS
Filtro de arena
0.850
+
3.121 * 1.061
2
Filtro de grava
0.850
+
3.121 * 1.061
2
VALVULAS Y ACCESORIOS
Vlvulas y Accesorios de captacin

*
*
*
*
*

VARIOS

=
=
=
=
=

m2
m2
m2
m2
m2
m2

0.200

0.421 m3

0.42
*
1
=
( Refaccion de una camara de captacion)

0.300

0.632 m3

0.63
*
1
=
( Refaccion de una camara de captacion)

Canastilla de bronce 2"


Vlvula de compuerta bronce 1"
Unin universal FG 1"
Niple de F.G. 1"
Unin Simple F.G. 1"
Adaptadores PVC F.G. 1"
Cono de rebose 4" x 2"
Unin Simple 2" PVC SAP
Codo 90 PVC SAP 2"
Tuberia PVC SAP 2"
08.00

3.000
2.000
1.000
3.000
2.000

1.0
1.0
2.0
2.0
1.0
2.0
1.0
1.0
2.0
3.0

Und.
Und.
Und.
Und.
Und.
Und.
Und.
Und.
Und.
ml.

*
*
*
*
*
*
*
*
*
*

1
1
1
1
1
1
1
1
1
1

=
=
=
=
=
=
=
=
=
=

1.00
1.00
2.00
2.00
1.00
2.00
1.00
1.00
2.00
3.00

08.01
08.02
08.03

Marco y Tapa metlica de inspeccin de 0.60 x 0.60


Tubera de ventilacin FG 2"
Cerco perimetrico
L= 4.000 B= 4.000 =

1.0 Und.
1.0 Und.
=

16.000 m

*
*

1
1

=
=

1.00
1.00
16.00

m2
m2

m3
m2

m3

m3

m3

0.075

0.95

0.15
0.35

m3

m2

muro camara humeda


muro camara humeda

kg

m3

m2

kg

m2

m2

m3

Refaccion de una camara de captacion)

m3

Refaccion de una camara de captacion)

und.
und.
und.
und.
und.
und.
und.
und.
und.
ml.

und.
und.
m

MEMORIA DE METRADO
RESERVORIO 8 M3
Volumen=

m3

01.00 TRABAJOS PRELIMINARES


01.01 Limpieza de terreno
3.60

3.60

12.96

m2

12.96

m2

3.20

3.20

10.24

m2

10.24

m2

02.00 MOVIMIENTO DE TIERRAS


02.01 Excavacin de material suelto en terreno seco
3.20
*
3.20
*

0.50

5.12

m3

5.12

m3

10.24

m2

10.24

m2

*
*

2.00
2.00

=
=

0.256
0.224

0.03

m3

6.614

6.61

m3

10.24

m2

01.02 Trazo y replanteo preliminar

02.02 Refine, nivelacin y compactacin


3.20
*

3.20

02.03 Relleno con material propio


3.20
2.80

*
*

0.20
0.20

02.04 Acarreo de material excedente


Excavacin
5.12
Relleno
0.03

5.09

1.30

03.00 OBRAS DE CONCRETO SIMPLE


03.01 Solado e = 4"
3.20
*

3.20

10.24

m2

*
*

0.20
0.20

04.00 OBRAS DE CONCRETO ARMADO


2.50

0.20 0.15

0.15 0.20

0.20
0.15

2.50

2.80

0.15
0.20

0.10

1.60

0.20
0.10

solado e = 4"
0.20

0.15

2.50

0.15

0.20

04.01 Concreto F'c=175 kg/cm2 (losa de fondo y muros)


Losa fondo
3.20
*
3.20
*
muros
2.80
*
1.60
*
0.15
*
2.50
*
1.60
*
0.15
*

0.20
2.00
2.00

=
=
=

2.05
1.34
1.20

m3
m3
m3

4.59

m3

04.02 Encofrado y desencofrado ( losa de fondo y muros)


muros
2.80
*
1.60
*
2.50
*
1.60
*

4.00
4.00

=
=

17.92
16.00

m2
m2

33.92

m2

04.03 Acero F'y=4200 kg/cm2 (losa de fondo y muros)


LOSA DE FONDO

MUROS LATERALES
0.20

0.20

0.20

1.70

L3=

0.20
3/8"a 0.20 m

3.10

3/8"a

0.10

0.20

0.30

3/8"

0.26

horizontal

3.30

2.60

3/8"

0.10

L1
L2
L3
L4
L5

0.26
L4=

1.20

3/8"
3/8"
3/8"
3/8"
3/4"

L2=

1.40

3.30
1.40
1.90
4.20
0.60

*
*
*
*
*

vertical

0.50

0.10
L1=

1.90

3/8"

3/8"

0.30

0.50

17
11
9
6
6

*
*
*
*
*

2.00
4.00
4.00
4.00
1.00

=
=
=
=
=

04.04 Concreto F'c=210 kg/cm2 (losa tapa)


losa superior
2.90
*

112.20
63.47
65.87
103.38
3.80

*
*
*
*
*

ESCALINES

0.30
4.20

0.58 kg/m
0.58 kg/m
0.58 kg/m
0.58 kg/m
2.26 kg/m

=
=
=
=
=

0.15

0.15

3/4"

L5=

0.60

65.08
36.81
38.20
59.96
8.59

kg
kg
kg
kg
kg
208.64

kg

2.90

0.10

0.84

m3

0.84

m3

04.05 Encofrado y desencofrado (losa tapa)


2.50
*
2.50
2.50
*
0.20
0.60
*
0.10

*
*

4.00
4.00

=
=
=

6.25
2.00
0.24

m2
m2
m2

8.49

m2

51.04
49.28

*
*

0.58kg/cm2
0.58kg/cm2

=
=

kg
kg
58.19

kg

04.06 Acero F'y=4200 kg/cm2 (losa tapa)


0.05

0.05
2.80
3/8"

0.25

L6=

2.90

L7=

2.80

2.00
2.00

=
=

m
2.80
2 3/8"

L6
L7

3/8"
3/8"

2.90
2.80

*
*

9
9

*
*

29.60
28.58

Resumen acero (en metros lineales)

3/8"
3/4"

445.24
3.80

*
*

0.58
2.26

=
=

05.00 TARRAJEOS
05.01 Tarrajeos con impermeabilizante
2.50
*
1.60
*
2.50
*
2.50
*
05.02 Tarrajeos exterior
2.80
*
1.60
*

258.24
8.59

m
m

4.00
1.00

=
=

16.00
6.25

m2
m2

22.25

m2

4.00

17.92

m2

17.92

m2

6.25

m2

6.25

m2

1.00

Und.

=
=

1.00
1.00

Und.
Und.

24.00

05.03 Mortero para dar pendiente de fondo


2.50
*
2.50
06.00 HIPOCLORADOR DIFUSO
06.01 Suministro y colocacin de hipoclorador
07.00
07.01
07.02
07.03

VARIOS
Marco y Tapa metlica de inspeccin de 0.60 x 0.60
Tubera de ventilacin FG 2"
Cerco perimetrico
L=
6.00
+
B=
6.00

24.00

MEMORIA DE METRADO
CASETA DE VALVULAS
01.00 TRABAJOS PRELIMINARES
01.01 Limpieza de terreno

N CASETAS

1.25

1.50

1.88

m2

1.88

1.25

1.50

1.88

m2

1.88

1.250

0.400

0.750

m3

0.75

1.25

1.50

1.88

m2

1.88

0.975 m3
0.150 m3
0.825 m3

0.83

1.875 m2

1.88

0.150 =

0.281 m3

0.727 m3

0.73

2.700 m2
3.510 m2
6.210 m2

6.21

01.02 Trazo y replanteo preliminar

02.00 MOVIMIENTO DE TIERRAS


02.01 Excavacin manual
* caja
1.500

02.02 Refine y Nivelacion y Compactado

02.03 Acarreo de material excedente


Excavacin
0.750 *
Relleno
0.100 *

1.30
3.750 *

03.00 OBRAS DE CONCRETO SIMPLE


03.01 Solado e=2"
caja
1.50
*

=
0.400 =

1.25

04.00 OBRAS DE CONCRETO ARMADO

0.10

0.075

0.15

1.00

0.9

0.15
0.10

0.15

0.100.15

1.00

04.01 Concreto F'c=175 kg/cm2 (losa de fondo y muros)


Losa fondo
1.500 *
1.250 *
Muros

1.300 *
1.000 *

0.900 *
0.900 *

0.150 *
0.150 *

04.03 Encofrado y desencofrado (muros)


Interior
1.000 *
Exterior
1.300 *

0.900 *
0.900 *

0.1755
0.27

1.000 =
2.000 =

3.000 =
3.000 =

04.04 Acero de refuerzo F'y=4200 kg/cm2 (losa fondo y muro)


0.2 m

3/8"

3/8" 0.2

1.00

L1=

1.00

1.20

0.20

L3=

0.20

3/8"

0.2
L2=

1.00

0.200
1.30

4
1.25

3/8" 0.2

L4=

0.3

0.200

L1

1.00

6.00 *

2 *

0.58 =

6.96 kg

L2

1.30

6.00 *

3 *

0.58 =

13.57 kg

L3

1.60

6.00 *

2 *

0.58 =

11.14 kg

L4

1.65

6.00 *

1 *

0.58 =

5.74 kg

37.41

0.122 m3
0.122 m3

0.12

1.62 m2
0.38 m2
2.00 m2

2.00

0.28 =

8.37 m

8.37

1.80
1.80
1.17
2.07

6.84 m2

6.84

37.410
04.05 Concreto F'c=175 kg/cm2 (losa tapa)
Tapa
1.350 *
04.06 Encofrado y desencofrado (losa tapa)
1.35 *
1.35 *

1.200 *

0.075 =

1.20
1.200 *

=
0.075 =

04.07 Acero F'y=4200 kg/cm2 (losa tapa)


1/4"a

0.1 m

1.15

1.15

13.00 *

05.00 TARRAJEOS ENLUCIDOS Y MOLDURAS


05.01 Tarrajeos interior y exterior
interior 1.00
*
0.90
*
1.00
*
0.90
*
exterior 1.30
*
0.90
*
1.15
*
0.90
*

2 *

2
2
1
2

=
=
=
=

m2
m2
m2
m2

07.00 VALVULAS Y ACCESORIOS INGRESA CON 1" Y SALE CON 1"


07.01 Vlvula de bronce + accesorios de caseta de vlvulas
Ingreso
Adaptador 1" PVC - FG
=
Tee F G 1" x 1"
=
Codo F G 1" x 90
=
Brida rompe agua F.G. 1"
=
Vlvula compueta de bronce 1"
=
Unin Universal FG 1"
=
Niples FG 1"
=
Tuberia F G 1''
=

Salida
Canastilla de Bronce de 3'' a 2"
Vlvula compueta de bronce 1"

Unin Universal FG 1"


Niples FG 1"
Adaptador 1" PVC - FG

Brida rompe agua F.G. 1"


Tee F G 1" x 1"

Tuberia F G 1''

1.0
1.0
4.0
1.0
1.0
2.0
2.0
3.0

und.
und.
und.
und.
und.
und.
und.
ml

*
*
*
*
*
*
*
*

1
1
1
1
1
1
1
1

=
=
=
=
=
=
=
=

1.00
1.00
4.00
1.00
1.00
2.00
2.00
3.00

=
=
=
=
=
=
=
=

1.0
1.0
2.0
2.0
1.0
1.0
1.0
2.0

und.
und.
und.
und.
und.
und.
und.
ml

*
*
*
*
*
*
*
*

1
1
1
1
1
1
1
1

=
=
=
=
=
=
=
=

1.00
1.00
2.00
2.00
1.00
1.00
1.00
2.00

=
=
=
=

1.0
2.0
2.0
1.0

und.
und.
ml
und.

*
*
*
*

1
1
1
1

=
=
=
=

1.00
2.00
2.00
1.00

=
=
=
=
=
=
=

1.0
1.0
2.0
2.0
1.0
2.0
1.5

und.
und.
und.
und.
und.
und.
ml

*
*
*
*
*
*
*

1
1
1
1
1
1
1

=
=
=
=
=
=
=

1.00
1.00
2.00
2.00
1.00
2.00
1.50

Revose

Cono de rebose PVC 2" x 4"


Codo PVC SAP 2" x 90

Tuberia F G 2''
Brida rompe agua 2"
Limpia
Tee F G 2" x 2"
Vlvula compueta de bronce 2"

Unin Universal FG 2"


Adaptador 2" PVC - FG

Brida rompe agua 2"


Niples FG 2"
Tuberia F G 2''
Cruce en casos de limpieza

Vlvula compueta de bronce 1"

Unin Universal FG 1"


Niples FG 1"

=
=
=

1.0 und.
2.0 und.
2.0 und.

*
*
*

1
1
1

=
=
=

1.00
2.00
2.00

m2

m2

m3

m2

m3

m2
0.10

1.30

0.20
0.10

m3

m2

1.60

1.65

kg

m3

m2

kg

m2

und.
und.
und.
und.
und.
und.
und.
ml

und.
und.
und.
und.
und.
und.
und.
ml

und.
und.
ml
und.

und.
und.
und.
und.
und.
und.
ml

und.
und.
und.

MEMORIA DE METRADO
CAJA DE VALVULAS DE AIRE
01.00 TRABAJOS PRELIMINARES
01.01 Limpieza de terreno

N CAJA

0.90

0.90

0.81

m2

0.81 m2

0.90

0.90

0.81

m2

0.81 m2

02.00 MOVIMIENTO DE TIERRAS


02.01 Excavacin de material suelto en terreno seco
0.900
*
0.900
*

0.800

0.648

m3

0.65 m3

0.90

0.81

m2

0.81 m2

0.252 m3
0.252

0.25 m3

01.02 Trazo y replanteo preliminar

02.02 Refine y Nivelacion y Compactado


0.90

02.03 Relleno con Material Propio


0.90 *

0.100 *

0.700 *

4.000 =

02.04 Acarreo de material excedente D = 30 M.


Excavacin
0.648
0.252
Relleno
0.396 *
1.3

0.842 m3

0.84 m3

03.00 OBRAS DE CONCRETO SIMPLE


03.01 Solado e=2"
0.900 *

0.810 m2

0.81 m2

0.900

0.1

0.10

0.1
TUBERIA PVC LINEA
DE CONDUCCION

0.5

0.70
TEE PVC SAP
TUBERIA PVC DE PURGA

0.1
0.1

0.10

TAPON PVC MACHO 3/4"

TUBERIA PVC
DE PURGA

0.5

0.1

0.1

04.00 OBRAS DE CONCRETO ARMADO


04.01 Concreto F'c=175 kg/cm2 (losa fondo y muros)
muros
0.70
*
0.70
*
0.10
*
0.50
+
0.70
*
0.10
*
Losa fondo
0.90
*
0.90
*
0.10
*

04.02 Encofrado y desencofrado (losa fondo y muros)


exteriores
0.700 *
0.700 *
interiores
0.500 *
0.700 *

2.00
2.00
1.00

4.000 =
4.000 =

=
=
=

0.10
0.07
0.08
0.25

m3
m3
m3
m3

1.960 m2
1.400 m2

0.25 m3

3.360 m2

3.36 m2

04.03 Acero F'y=4200 kg/cm2 (losa fondo y muros)

1
0.75

0.75
3/8a 0.20 m

3/8a 0.20 m

0.65

1)
2)
3)

3/8"
3/8"
3/8"

2.15
2.15
2.80

0.65

0.65

*
*
*

4
3
4

=
=
=

8.60
6.45
11.20
26.25

*
*
*
m

3/8a 0.20m

0.65

4.988
3.741
6.496
15.225

=
0.58 kg/cm2
=
0.58 kg/cm2
0.58 kg/cm2
=

04.04 Concreto F'c=175 kg/cm2 (losa tapa)


LOSA MACISA
0.700 *
0.700 *

0.100 =

04.05 Encofrado y desencofrado (losa tapa)


0.70 *
0.70
0.70 *
0.70 *

=
0.10 =

###
###
###
*

0.049 m3
0.049 m3

0.49 m2
0.28 m2
0.77 m2

0.77 m2

3.14 kg

3.14 kg

1.400 m2

1.40 m2

*
*
*
*
*
*

1
1
1
1
1
1

=
=
=
=
=
=

2.00
4.00
2.00
1.00
1.00
1.00

15.23 kg

0.05 m3

04.06 Acero F'y=4200 kg/cm2 (losa tapa)


0.70
0.1

0.05

0.05

0.1
1/4" a 0.10m.

0.10 0.10

0.80

7.00

11.20 *

0.28 kg/m

05.00 TARRAJEOS
05.01 Tarrajeos interior y exterior
Interior
0.500 *

0.700 *

2.00

4.000 =

06.00 VALVULAS Y ACCESORIOS


06.01 Vlvula de bronce + accesorios de caseta de vlvulas
Adaptador PVC - FG 1"

Niples FG 1"
Unin universal FG 1"
Valvula de compuerta de Bronce 1"

Tee FG 1" a 1 1/2"


Tapn 1"

11.20 m

2.0
4.0
2.0
1.0
1.0
1.0

und.
und.
und.
und.
und.
und.

MEMORIA DE METRADO
LINEA DE CONDUCCION Y ADUCCION
01.00
01.01

TRABAJOS PRELIMINARES
Trazo, nivelacin y replanteo zanjas

02.00
02.02
02.02
02.03
02.04
02.05

MOVIMIENTO DE TIERRAS
Excavacin con maquinaria en roca suelta (ver plano de secciones)
Excavacin manual en roca suelta
1075.50
0.50
Refine, nivelacin y fondo para tuberia
Cama de apoyo (material sarandeado)
Relleno, compactado de zanjas para tuberia de agua

03.00
03.01
03.02

SUMINISTRO E INSTALACION DE TUBERIAS


Tubera PVC SAP Clase 10 D = 1 1/2"
Doble prueba hidrulica y limpieza de tuberias

1075.50 ml

13680.00 m3
322.65 m3

0.6

=
=
=

1075.50 ml
1075.50 ml
1075.50 ml

=
=

1075.50 ml
1075.50 ml

Resumen tuberia (por unidad de 6.0 m.)


Dimetro
1 1/2''

04.00
04.01

longitud (m)
1075.50

Ms desp. 3%
1107.77

VALVULAS Y ACCESORIOS
Accesorios
Codos de 1 1/2 "x 45
Valvula compuerta de bronce de 1 1/2''
Unione Universal de F. G. de 1 1/2''
Caja de Concreto C/T Tipo

long/tubo (m.)
6.00

=
=
=
=

tubo (unidad)
179

4.0
1.0
2.0
1.0

tubos

Und.
Und.
Und.
Und.

PLANILLA DE MOVIMIENTO DE TIERRAS


Linea de Conduccion Cuyomoco-Achaypia
CORTE
PROGR.
DIST.
m2
Prom.
0+000

Tramo : Captacion a reservorio


RELLENO
VOLUMEN m3
m2
Prom.
CORTE
RELLENO

0.844

0+040

40

0.356

0.600

0+080

40

0.009

0.183

7.300

0+120

40

10.585

5.297

211.880

0+160

40

74.436

42.511

1700.420

0+200

40

98.384

86.410

3456.400

0+240

40

67.643

83.014

3320.540

0+280

40

52.474

60.059

2402.340

0+320

40

23.278

37.876

1515.040

0+360

40

10.560

16.919

676.760

0+400

40

3.417

6.989

279.540

0+440

40

0.854

2.136

85.420

TOTAL

24.000

13679.640

OBSERV.

MEMORIA DE METRADO
LINEA DE DISTRIBUCION
01.00
01.01

TRABAJOS PRELIMINARES
Trazo, nivelacin y replanteo

02.00
02.01
02.01
02.04
02.03
02.05

MOVIMIENTO DE TIERRAS
Excavacin manual en terreno normal 0.60 x 0.80
Excavacin manual en roca suelta 0.50 x 0.60
Refine, nivelacin y fondo
Cama de apoyo (material sarandeado)
Relleno y apisonado

03.00
03.01
03.02
03.02
03.03
04.00
04.01

4889.50 ml

3178.18 =
1711.33
=
=
=

1525.52
513.40
4889.50
4889.50
4889.50

m3
m3
ml
ml
ml

SUMINISTRO E INSTALACION DE TUBERIAS


Tubera PVC SAP Clase 10 3/4''
Tubera PVC SAP Clase 10 1"
Tubera PVC SAP Clase 10 1 1/2"
Doble prueba hidrulica y desinfeccin de tuberias

=
=
=
=

2660.00
1620.00
609.50
4889.50

ml
ml
ml
ml

VALVULAS Y ACCESORIOS
Vlvula de bronce + accesorios
vlvula de bronce 1"
Reduccin PVC SAP 11/2" a 3/4"
Reduccin PVC SAP 1" a 3/4"
Tee PVC SAP 1 1/2" A 3/4"
Tee PVC SAP 1" A 3/4"
Tee PVC SAP 3/4"
Uniones Universales FG 1"
Caja para valvulas
Codos de 1" x 45
Codos de 3/4" x 90
Codos de 3/4" x 45

=
=
=
=
=
=
=
=
=
=
=

5.0
9.0
14.0
11.0
16.0
12.0
10.0
5.0
4.0
4.0
2.0

Resumen tuberia (por unidad de 6.0 m.)


Dimetro

3/4"
1 1/2"
1"

longitud (m)

2660.00
609.50
1620.00

long/tubo (m.)

6.00
6.00
6.00

tubo (unidad)

443
102
270

tubos
tubos
tubos

Und.
Und.
Und.
Und.
Und.
Und.
Und.
Und.
Und.
Und.
Und.

MEMORIA DE METRADO
PILETA PUBLICA
01.00 TRABAJOS PRELIMINARES
01.01 Limpieza de terreno

N PILETA

48

1.50

1.50

2.25

m2

* 48 =

108.00

1.50

1.50

2.25

m2

* 48 =

108.00

1.500

0.250

0.563

m3

* 48 =

27.00

0.731 m3
0.600 m3
0.131 m3

* 48 =

6.30

1.690 m2

* 48 =

81.12

* 48 =

37.05

* 48 =

146.45

01.02 Trazo y replanteo preliminar

02.00 MOVIMIENTO DE TIERRAS


02.01 Excavacin de material suerlto
* caja
1.500
*

02.02 Acarreo de material excedente D = 30 M.


Excavacin
0.563 *
1.30
Relleno
1.500 *
0.100 *
03.00 OBRAS DE CONCRETO SIMPLE
03.01 Solado e=2"
caja
1.30
*

=
4.000 =

1.30

04.00 OBRAS DE CONCRETO ARMADO


PLANTA
0 .50
0
0.20
0 .15
000

GRAVA CLASIFICA DA a

GRA VA CLASIFICADA
1 a

Grifo

0.60
0

0.60

0 .70
0 .60
0
GRAVA CLASIFICADA
1 a

0.10
0.10

0.15
0 .20
0
0 .50
0

0.20
0.6 0
0
0.2 0
0 0.1 5

0.6 0

0 .20
0.1 50

0.50

0.80

0 .50

04.01 Concreto F'c=140 kg/cm2 (losa y pedestal)


Losa fondo
1.600 *
1.300 *
0.500 *
1.300 *
0.100 *
1.300 *
0.100 *
batea
0.900 *
0.900 *
0.100 *
0.900 *
0.900 *
0.150 *
0.600 *
0.600 *
0.150 *
Pedestal
0.330
+
0.200 *
0.700 *
2.000
04.03 Encofrado y desencofrado (muros)
Losa Fondo
1.600 *
1.300 *
batea
0.900 *
Pedestal
1.300 *
0.330
+
0.200 *
2
0.700 *

0.100
0.100
0.200
0.900
0.700

0.100
0.100
3.000
1.000
2.000
2.000
0.150

*
*
*
*
*

2.000
2.000
4.000
1.000
2.000

0.150 *

2.000

=
=
=
=
=
=
=

=
=
=
=
=

0 .60

0.208 m3
m3
m3
m3
m3
m3
m3

0.065
0.039
0.081
0.243
0.108
0.028
0.772

m3

0.320
0.260
0.720
1.170

m2
m2
m2
m2
0.371 m2
0.210 m2
3.051 m2

04.04 Acero de refuerzo F'y=4200 kg/cm2

0.90

1 / 4" .15

m.

1.30 *

4.00

5.20 m

1.30 *

2.00

2.60 m

0.85 *

2.00

1.70 m

1.30 *

7.00

9.10 m
18.60 m
4.65 kg

18.60 *
05.00 TARRAJEOS
05.01 Tarrajeos interior y exterior
batea interior 0.60
*
0.60
*
0.60
*
0.10
*
exterior 0.90
*
0.10
*
0.90
*
0.15
*
pedestal
0.33
+
0.20 *
2.00
0.70 *
losa exterior
0.35
*
1.30
*
0.20
*
0.90
*

07.00 FILTROS
07.01 Grava clasificada 1 1/2" a 1/4"
0.60
*
0.60
*
2.00
*
0.50
*
2.30
*
0.50
*

0.25 kg/m

1.00
4.00
4.00
4.00
0.70 *
0.15 *
2.00
2.00

0.80
0.20
0.20

*
*

08.00 VALVULAS Y ACCESORIOS


08.01 Vlvula de bronce + accesorios de pileta publica
Tuberia PVC SAP 1/2"
Tuberia PVC SAL 2"
Grifo 1/2"
Valvula de bronce de 1/2"
Codo PVC SAL 2 " * 45
Unin universal FG 1/2"
Sumidero de Bronce 2"
Adaptadores PVC SAP 1/2"
Unin roscada FG 1/2"
Niple FG 1/2"
Codo FG 1/2" * 90

2.00
2.00

2.00
2.00

* 48 =

223.20

=
=
=
=
=

m2
m2
m2
m2
0.371 m2

=
=
=

0.210
0.910
0.360
3.35

m2
m2
m2
m2

* 48 =

160.85

0.29
0.40
0.46
1.15

m3
m3
m3
m3

* 48 =

55.10

10.0
6.0
1.0
1.0
1.0
2.0
1.0
2.0
1.0
2.0
2.0

ml
ml
und.
und.
und.
und.
und.
und.
und.
und.
und.

*
*
*
*
*
*
*
*
*
*
*

=
=
=

0.360
0.240
0.360
0.540

48
48
48
48
48
48
48
48
48
48
48

=
=
=
=
=
=
=
=
=
=
=

480.00
288.00
48.00
48.00
48.00
96.00
48.00
96.00
48.00
96.00
96.00

m2

m2

m3

m3

m2

m3

m2

kg

m2

m3

und.
und.
und.
und.
und.
und.
und.
und.
und.
und.
und.