CAPTACION C-1
01.00
01.01
TRABAJOS PRELIMINARES
Limpieza de terreno
01.02
N CAPTACIONES
3.321
8.837 m2
8.84
2.461 * 3.121
MOVIMIENTO DE TIERRAS
Excavacin de material suelto en terreno saturado
1.000 * 1.000 * 0.763
CAJA HUMEDA
0.500 * 0.400 * 0.275
CAJA VALVULA
3.521 +
1.400 * 1.361 * 0.763
ALEROS
2
02.02 Refine, nivelacin y compactacin
1.000 * 1.000
02.02 Acarreo de material excedente D = 30M
3.370 * 1.300
EXACAVACION
0.200 * 1.000 * 4.000
RELLENO
0.100 * 0.400 * 3.000
0.400 * 1.361 * 1.000
7.681 m2
7.68
=
=
=
0.763
0.055
2.553
3.370
m3
m3
m3
m3
3.37
1.000 m2
1.00
=
=
=
=
4.382
0.800
0.120
0.544
2.917
2.92
2.661
02.00
02.01
03.00
03.01
03.02
04.00
m3
m3
m3
m3
m3
1.061
0.328 m3
*
1
rehabilitacion captacion existente
0.33
1.061
1.053 m3
*
1
rehabilitacion captacion existente
1.05
0.15
1.50
CORTE A-A'
1.06
0.50
0.15
0.10
0.05
0.30
0.70
0.40
0.10
0.15
0.10
1.06
0.10
0.15
0.70
0.20
0.15
0.30
0.10
1.06
PLANTA
0.20
0.15
0.30
*
*
*
*
*
*
*
5.000
3.000
3.000
1.000
2.000
4.000
2.000
=
=
=
=
0.150
0.020
0.040
0.070
m3
m3
m3
m3
=
=
=
=
=
0.285
0.200
0.032
0.012
0.653
1.461
m3
m3
m3
m3
m3
m3
3.325
2.850
0.360
0.200
0.320
6.600
0.330
13.985
m2
m2
m2
m2
m2
m2
m2
m2
=
=
=
=
=
=
=
0.70
0.20
1.46
13.99
1.050
1.250
1.350
0.700
0.950
0.600
1.750
2.061
*
*
*
*
*
*
*
*
5.000
5.000
5.000
3.000
3.000
3.000
5.000
5.000
*
*
*
*
*
*
*
*
2.000
4.000
4.000
3.000
1.000
2.000
1.000
1.000
*
*
*
*
*
*
*
*
0.580
0.580
0.580
0.580
0.580
0.580
0.580
0.280
=
=
=
=
=
=
=
=
6.09
14.50
15.66
3.65
1.65
2.09
5.08
2.88
51.60 *
fondo losa
fondo losa
muro camara humeda
muro camara humeda
muro camara seca
muro camara seca
cubierta de filtro
cubierta de filtro
51.60
1 =
04.04
0.05
0.15
0.05
0.60
1.10
0.05
0.15
0.05
0.05
0.05 0.15
Tapa captacin
04.05
04.06
0.60
0.10 0.15
1.100
0.050
0.050
*
*
*
1.100
1.100
1.000
*
*
*
*
*
0.000
2.000
2.000
4.000
4.000
=
=
=
=
=
=
0.000
0.110
0.100
0.210
m3
m3
m3
m3
1.210
0.550
0.200
1.960
m2
m2
m2
m2
0.21
1.96
12.000
2.000
0.280 =
8.74
8.74 *
losa prefabricada
8.74
1 =
=
=
2.660 m2
0.490 m2
3.150 m2
3.15
2.850
0.320
0.200
0.360
2.850
6.580
6.58
05.00
05.01
05.02
06.02
07.00
07.01
0.950
0.400
0.400
0.400
0.950
FILTROS
Filtro de arena
0.850
+
3.121 * 1.061
2
Filtro de grava
0.850
+
3.121 * 1.061
2
VALVULAS Y ACCESORIOS
Vlvulas y Accesorios de captacin
*
*
*
*
*
VARIOS
=
=
=
=
=
m2
m2
m2
m2
m2
m2
0.200
0.421 m3
0.42
*
1
=
( Refaccion de una camara de captacion)
0.300
0.632 m3
0.63
*
1
=
( Refaccion de una camara de captacion)
3.000
2.000
1.000
3.000
2.000
1.0
1.0
2.0
2.0
1.0
2.0
1.0
1.0
2.0
3.0
Und.
Und.
Und.
Und.
Und.
Und.
Und.
Und.
Und.
ml.
*
*
*
*
*
*
*
*
*
*
1
1
1
1
1
1
1
1
1
1
=
=
=
=
=
=
=
=
=
=
1.00
1.00
2.00
2.00
1.00
2.00
1.00
1.00
2.00
3.00
08.01
08.02
08.03
1.0 Und.
1.0 Und.
=
16.000 m
*
*
1
1
=
=
1.00
1.00
16.00
m2
m2
m3
m2
m3
m3
m3
0.075
0.95
0.15
0.35
m3
m2
kg
m3
m2
kg
m2
m2
m3
m3
und.
und.
und.
und.
und.
und.
und.
und.
und.
ml.
und.
und.
m
MEMORIA DE METRADO
RESERVORIO 8 M3
Volumen=
m3
3.60
12.96
m2
12.96
m2
3.20
3.20
10.24
m2
10.24
m2
0.50
5.12
m3
5.12
m3
10.24
m2
10.24
m2
*
*
2.00
2.00
=
=
0.256
0.224
0.03
m3
6.614
6.61
m3
10.24
m2
3.20
*
*
0.20
0.20
5.09
1.30
3.20
10.24
m2
*
*
0.20
0.20
0.20 0.15
0.15 0.20
0.20
0.15
2.50
2.80
0.15
0.20
0.10
1.60
0.20
0.10
solado e = 4"
0.20
0.15
2.50
0.15
0.20
0.20
2.00
2.00
=
=
=
2.05
1.34
1.20
m3
m3
m3
4.59
m3
4.00
4.00
=
=
17.92
16.00
m2
m2
33.92
m2
MUROS LATERALES
0.20
0.20
0.20
1.70
L3=
0.20
3/8"a 0.20 m
3.10
3/8"a
0.10
0.20
0.30
3/8"
0.26
horizontal
3.30
2.60
3/8"
0.10
L1
L2
L3
L4
L5
0.26
L4=
1.20
3/8"
3/8"
3/8"
3/8"
3/4"
L2=
1.40
3.30
1.40
1.90
4.20
0.60
*
*
*
*
*
vertical
0.50
0.10
L1=
1.90
3/8"
3/8"
0.30
0.50
17
11
9
6
6
*
*
*
*
*
2.00
4.00
4.00
4.00
1.00
=
=
=
=
=
112.20
63.47
65.87
103.38
3.80
*
*
*
*
*
ESCALINES
0.30
4.20
0.58 kg/m
0.58 kg/m
0.58 kg/m
0.58 kg/m
2.26 kg/m
=
=
=
=
=
0.15
0.15
3/4"
L5=
0.60
65.08
36.81
38.20
59.96
8.59
kg
kg
kg
kg
kg
208.64
kg
2.90
0.10
0.84
m3
0.84
m3
*
*
4.00
4.00
=
=
=
6.25
2.00
0.24
m2
m2
m2
8.49
m2
51.04
49.28
*
*
0.58kg/cm2
0.58kg/cm2
=
=
kg
kg
58.19
kg
0.05
2.80
3/8"
0.25
L6=
2.90
L7=
2.80
2.00
2.00
=
=
m
2.80
2 3/8"
L6
L7
3/8"
3/8"
2.90
2.80
*
*
9
9
*
*
29.60
28.58
3/8"
3/4"
445.24
3.80
*
*
0.58
2.26
=
=
05.00 TARRAJEOS
05.01 Tarrajeos con impermeabilizante
2.50
*
1.60
*
2.50
*
2.50
*
05.02 Tarrajeos exterior
2.80
*
1.60
*
258.24
8.59
m
m
4.00
1.00
=
=
16.00
6.25
m2
m2
22.25
m2
4.00
17.92
m2
17.92
m2
6.25
m2
6.25
m2
1.00
Und.
=
=
1.00
1.00
Und.
Und.
24.00
VARIOS
Marco y Tapa metlica de inspeccin de 0.60 x 0.60
Tubera de ventilacin FG 2"
Cerco perimetrico
L=
6.00
+
B=
6.00
24.00
MEMORIA DE METRADO
CASETA DE VALVULAS
01.00 TRABAJOS PRELIMINARES
01.01 Limpieza de terreno
N CASETAS
1.25
1.50
1.88
m2
1.88
1.25
1.50
1.88
m2
1.88
1.250
0.400
0.750
m3
0.75
1.25
1.50
1.88
m2
1.88
0.975 m3
0.150 m3
0.825 m3
0.83
1.875 m2
1.88
0.150 =
0.281 m3
0.727 m3
0.73
2.700 m2
3.510 m2
6.210 m2
6.21
1.30
3.750 *
=
0.400 =
1.25
0.10
0.075
0.15
1.00
0.9
0.15
0.10
0.15
0.100.15
1.00
1.300 *
1.000 *
0.900 *
0.900 *
0.150 *
0.150 *
0.900 *
0.900 *
0.1755
0.27
1.000 =
2.000 =
3.000 =
3.000 =
3/8"
3/8" 0.2
1.00
L1=
1.00
1.20
0.20
L3=
0.20
3/8"
0.2
L2=
1.00
0.200
1.30
4
1.25
3/8" 0.2
L4=
0.3
0.200
L1
1.00
6.00 *
2 *
0.58 =
6.96 kg
L2
1.30
6.00 *
3 *
0.58 =
13.57 kg
L3
1.60
6.00 *
2 *
0.58 =
11.14 kg
L4
1.65
6.00 *
1 *
0.58 =
5.74 kg
37.41
0.122 m3
0.122 m3
0.12
1.62 m2
0.38 m2
2.00 m2
2.00
0.28 =
8.37 m
8.37
1.80
1.80
1.17
2.07
6.84 m2
6.84
37.410
04.05 Concreto F'c=175 kg/cm2 (losa tapa)
Tapa
1.350 *
04.06 Encofrado y desencofrado (losa tapa)
1.35 *
1.35 *
1.200 *
0.075 =
1.20
1.200 *
=
0.075 =
0.1 m
1.15
1.15
13.00 *
2 *
2
2
1
2
=
=
=
=
m2
m2
m2
m2
Salida
Canastilla de Bronce de 3'' a 2"
Vlvula compueta de bronce 1"
Tuberia F G 1''
1.0
1.0
4.0
1.0
1.0
2.0
2.0
3.0
und.
und.
und.
und.
und.
und.
und.
ml
*
*
*
*
*
*
*
*
1
1
1
1
1
1
1
1
=
=
=
=
=
=
=
=
1.00
1.00
4.00
1.00
1.00
2.00
2.00
3.00
=
=
=
=
=
=
=
=
1.0
1.0
2.0
2.0
1.0
1.0
1.0
2.0
und.
und.
und.
und.
und.
und.
und.
ml
*
*
*
*
*
*
*
*
1
1
1
1
1
1
1
1
=
=
=
=
=
=
=
=
1.00
1.00
2.00
2.00
1.00
1.00
1.00
2.00
=
=
=
=
1.0
2.0
2.0
1.0
und.
und.
ml
und.
*
*
*
*
1
1
1
1
=
=
=
=
1.00
2.00
2.00
1.00
=
=
=
=
=
=
=
1.0
1.0
2.0
2.0
1.0
2.0
1.5
und.
und.
und.
und.
und.
und.
ml
*
*
*
*
*
*
*
1
1
1
1
1
1
1
=
=
=
=
=
=
=
1.00
1.00
2.00
2.00
1.00
2.00
1.50
Revose
Tuberia F G 2''
Brida rompe agua 2"
Limpia
Tee F G 2" x 2"
Vlvula compueta de bronce 2"
=
=
=
1.0 und.
2.0 und.
2.0 und.
*
*
*
1
1
1
=
=
=
1.00
2.00
2.00
m2
m2
m3
m2
m3
m2
0.10
1.30
0.20
0.10
m3
m2
1.60
1.65
kg
m3
m2
kg
m2
und.
und.
und.
und.
und.
und.
und.
ml
und.
und.
und.
und.
und.
und.
und.
ml
und.
und.
ml
und.
und.
und.
und.
und.
und.
und.
ml
und.
und.
und.
MEMORIA DE METRADO
CAJA DE VALVULAS DE AIRE
01.00 TRABAJOS PRELIMINARES
01.01 Limpieza de terreno
N CAJA
0.90
0.90
0.81
m2
0.81 m2
0.90
0.90
0.81
m2
0.81 m2
0.800
0.648
m3
0.65 m3
0.90
0.81
m2
0.81 m2
0.252 m3
0.252
0.25 m3
0.100 *
0.700 *
4.000 =
0.842 m3
0.84 m3
0.810 m2
0.81 m2
0.900
0.1
0.10
0.1
TUBERIA PVC LINEA
DE CONDUCCION
0.5
0.70
TEE PVC SAP
TUBERIA PVC DE PURGA
0.1
0.1
0.10
TUBERIA PVC
DE PURGA
0.5
0.1
0.1
2.00
2.00
1.00
4.000 =
4.000 =
=
=
=
0.10
0.07
0.08
0.25
m3
m3
m3
m3
1.960 m2
1.400 m2
0.25 m3
3.360 m2
3.36 m2
1
0.75
0.75
3/8a 0.20 m
3/8a 0.20 m
0.65
1)
2)
3)
3/8"
3/8"
3/8"
2.15
2.15
2.80
0.65
0.65
*
*
*
4
3
4
=
=
=
8.60
6.45
11.20
26.25
*
*
*
m
3/8a 0.20m
0.65
4.988
3.741
6.496
15.225
=
0.58 kg/cm2
=
0.58 kg/cm2
0.58 kg/cm2
=
0.100 =
=
0.10 =
###
###
###
*
0.049 m3
0.049 m3
0.49 m2
0.28 m2
0.77 m2
0.77 m2
3.14 kg
3.14 kg
1.400 m2
1.40 m2
*
*
*
*
*
*
1
1
1
1
1
1
=
=
=
=
=
=
2.00
4.00
2.00
1.00
1.00
1.00
15.23 kg
0.05 m3
0.05
0.05
0.1
1/4" a 0.10m.
0.10 0.10
0.80
7.00
11.20 *
0.28 kg/m
05.00 TARRAJEOS
05.01 Tarrajeos interior y exterior
Interior
0.500 *
0.700 *
2.00
4.000 =
Niples FG 1"
Unin universal FG 1"
Valvula de compuerta de Bronce 1"
11.20 m
2.0
4.0
2.0
1.0
1.0
1.0
und.
und.
und.
und.
und.
und.
MEMORIA DE METRADO
LINEA DE CONDUCCION Y ADUCCION
01.00
01.01
TRABAJOS PRELIMINARES
Trazo, nivelacin y replanteo zanjas
02.00
02.02
02.02
02.03
02.04
02.05
MOVIMIENTO DE TIERRAS
Excavacin con maquinaria en roca suelta (ver plano de secciones)
Excavacin manual en roca suelta
1075.50
0.50
Refine, nivelacin y fondo para tuberia
Cama de apoyo (material sarandeado)
Relleno, compactado de zanjas para tuberia de agua
03.00
03.01
03.02
1075.50 ml
13680.00 m3
322.65 m3
0.6
=
=
=
1075.50 ml
1075.50 ml
1075.50 ml
=
=
1075.50 ml
1075.50 ml
04.00
04.01
longitud (m)
1075.50
Ms desp. 3%
1107.77
VALVULAS Y ACCESORIOS
Accesorios
Codos de 1 1/2 "x 45
Valvula compuerta de bronce de 1 1/2''
Unione Universal de F. G. de 1 1/2''
Caja de Concreto C/T Tipo
long/tubo (m.)
6.00
=
=
=
=
tubo (unidad)
179
4.0
1.0
2.0
1.0
tubos
Und.
Und.
Und.
Und.
0.844
0+040
40
0.356
0.600
0+080
40
0.009
0.183
7.300
0+120
40
10.585
5.297
211.880
0+160
40
74.436
42.511
1700.420
0+200
40
98.384
86.410
3456.400
0+240
40
67.643
83.014
3320.540
0+280
40
52.474
60.059
2402.340
0+320
40
23.278
37.876
1515.040
0+360
40
10.560
16.919
676.760
0+400
40
3.417
6.989
279.540
0+440
40
0.854
2.136
85.420
TOTAL
24.000
13679.640
OBSERV.
MEMORIA DE METRADO
LINEA DE DISTRIBUCION
01.00
01.01
TRABAJOS PRELIMINARES
Trazo, nivelacin y replanteo
02.00
02.01
02.01
02.04
02.03
02.05
MOVIMIENTO DE TIERRAS
Excavacin manual en terreno normal 0.60 x 0.80
Excavacin manual en roca suelta 0.50 x 0.60
Refine, nivelacin y fondo
Cama de apoyo (material sarandeado)
Relleno y apisonado
03.00
03.01
03.02
03.02
03.03
04.00
04.01
4889.50 ml
3178.18 =
1711.33
=
=
=
1525.52
513.40
4889.50
4889.50
4889.50
m3
m3
ml
ml
ml
=
=
=
=
2660.00
1620.00
609.50
4889.50
ml
ml
ml
ml
VALVULAS Y ACCESORIOS
Vlvula de bronce + accesorios
vlvula de bronce 1"
Reduccin PVC SAP 11/2" a 3/4"
Reduccin PVC SAP 1" a 3/4"
Tee PVC SAP 1 1/2" A 3/4"
Tee PVC SAP 1" A 3/4"
Tee PVC SAP 3/4"
Uniones Universales FG 1"
Caja para valvulas
Codos de 1" x 45
Codos de 3/4" x 90
Codos de 3/4" x 45
=
=
=
=
=
=
=
=
=
=
=
5.0
9.0
14.0
11.0
16.0
12.0
10.0
5.0
4.0
4.0
2.0
3/4"
1 1/2"
1"
longitud (m)
2660.00
609.50
1620.00
long/tubo (m.)
6.00
6.00
6.00
tubo (unidad)
443
102
270
tubos
tubos
tubos
Und.
Und.
Und.
Und.
Und.
Und.
Und.
Und.
Und.
Und.
Und.
MEMORIA DE METRADO
PILETA PUBLICA
01.00 TRABAJOS PRELIMINARES
01.01 Limpieza de terreno
N PILETA
48
1.50
1.50
2.25
m2
* 48 =
108.00
1.50
1.50
2.25
m2
* 48 =
108.00
1.500
0.250
0.563
m3
* 48 =
27.00
0.731 m3
0.600 m3
0.131 m3
* 48 =
6.30
1.690 m2
* 48 =
81.12
* 48 =
37.05
* 48 =
146.45
=
4.000 =
1.30
GRAVA CLASIFICA DA a
GRA VA CLASIFICADA
1 a
Grifo
0.60
0
0.60
0 .70
0 .60
0
GRAVA CLASIFICADA
1 a
0.10
0.10
0.15
0 .20
0
0 .50
0
0.20
0.6 0
0
0.2 0
0 0.1 5
0.6 0
0 .20
0.1 50
0.50
0.80
0 .50
0.100
0.100
0.200
0.900
0.700
0.100
0.100
3.000
1.000
2.000
2.000
0.150
*
*
*
*
*
2.000
2.000
4.000
1.000
2.000
0.150 *
2.000
=
=
=
=
=
=
=
=
=
=
=
=
0 .60
0.208 m3
m3
m3
m3
m3
m3
m3
0.065
0.039
0.081
0.243
0.108
0.028
0.772
m3
0.320
0.260
0.720
1.170
m2
m2
m2
m2
0.371 m2
0.210 m2
3.051 m2
0.90
1 / 4" .15
m.
1.30 *
4.00
5.20 m
1.30 *
2.00
2.60 m
0.85 *
2.00
1.70 m
1.30 *
7.00
9.10 m
18.60 m
4.65 kg
18.60 *
05.00 TARRAJEOS
05.01 Tarrajeos interior y exterior
batea interior 0.60
*
0.60
*
0.60
*
0.10
*
exterior 0.90
*
0.10
*
0.90
*
0.15
*
pedestal
0.33
+
0.20 *
2.00
0.70 *
losa exterior
0.35
*
1.30
*
0.20
*
0.90
*
07.00 FILTROS
07.01 Grava clasificada 1 1/2" a 1/4"
0.60
*
0.60
*
2.00
*
0.50
*
2.30
*
0.50
*
0.25 kg/m
1.00
4.00
4.00
4.00
0.70 *
0.15 *
2.00
2.00
0.80
0.20
0.20
*
*
2.00
2.00
2.00
2.00
* 48 =
223.20
=
=
=
=
=
m2
m2
m2
m2
0.371 m2
=
=
=
0.210
0.910
0.360
3.35
m2
m2
m2
m2
* 48 =
160.85
0.29
0.40
0.46
1.15
m3
m3
m3
m3
* 48 =
55.10
10.0
6.0
1.0
1.0
1.0
2.0
1.0
2.0
1.0
2.0
2.0
ml
ml
und.
und.
und.
und.
und.
und.
und.
und.
und.
*
*
*
*
*
*
*
*
*
*
*
=
=
=
0.360
0.240
0.360
0.540
48
48
48
48
48
48
48
48
48
48
48
=
=
=
=
=
=
=
=
=
=
=
480.00
288.00
48.00
48.00
48.00
96.00
48.00
96.00
48.00
96.00
96.00
m2
m2
m3
m3
m2
m3
m2
kg
m2
m3
und.
und.
und.
und.
und.
und.
und.
und.
und.
und.
und.