Calculos para Tubulo Circular

Tenso do solo (Kgf/cm) 2.5


Fora N (Kgf) 50000
A. Base (cm) 20000.00
B (cm) 159.58
B Adot. (cm) 160
Fck (Mpa) 15
C (Kgf/cm) 56.92
A. Fuste (cm) 878.43
F (cm) 33.44
F Adot. (cm) 70
H. Base (cm) 77.94
As Long. (cm) 10.78
Barra Long (cm) 1.25
NBar. Long (UN) 8.78
lb Ancoragem (cm) 66.25
lb Ancoragem Adot.(cm) 70
Comp. Bar. Long sem lb (cm) 210
Comp. Bar. Long Total (cm) 280
As Estb (cm) 3.85
Barra Estb (cm) 0.8
NBar. Estb p/ 1m (UN) 3.83
NBar. Estb Adot. p/ 1m (UN) 4
NBar. Estb Total( UN) 8.4
NBar. Estb Adot. Total( UN) 9
Esp. entre Estb (cm) 26.25
Comp. Das Dobras (10 a 15 cm) 14
Comp. Total Estb (cm) 215.06
Calculos para tubulo Semi Circular Quadr
Tenso do solo (Kgf/cm) 2.5 Elemento N
Forca N (Kgf) 38000 T1 1
B (cm) 100 2
x (cm) 73.46 T2 1
x Adot. (cm) 75 2
A (cm) 175 T3 1
Verificao <= 2,5 1.75 2
Fck (Mpa) 15 T4 1
C (Kgf/cm) 56.92 2
A. Fuste (cm) 667.61 T5 1
F (cm) 29.16 2
F Adot. (cm) 70 T6 1
H. Base (cm) 90.93 2
As Long. (cm) 10.78 T7 1
Barra Long (cm) 1.25 2
NBar. Long (UN) 8.78 T8 1
lb Ancoragem (cm) 66.25 2
lb Ancoragem Adot.(cm) 70 T9 1
Comp. Bar. Long sem lb (cm) 210 2
Comp. Bar. Long Total (cm) 280 T10 1
As Estb (cm) 3.85 2
Barra Estb (cm) 0.8 T11 1
NBar. Estb p/ 1m (UN) 3.83 2
NBar. Estb Adot. p/ 1m (UN) 4 T12 1
NBar. Estb Total( UN) 8.4 2
NBar. Estb Adot. Total( UN) 9 T13 1
Esp. entre Estb (cm) 26.25 2
Comp. Das Dobras (10 a 15 cm) 14
Comp. Total Estb (cm) 215.06
Quadro de Ao
(mm) Quantidade Comp. Unit Comp. Total
12.5 9 280 2520
8 9 215 1935
12.5 9 280 2520
8 9 215 1935
12.5 9 280 2520
8 9 215 1935
12.5 9 280 2520
8 9 215 1935
12.5 9 280 2520
8 9 215 1935
12.5 9 280 2520
8 9 215 1935
12.5 9 280 2520
8 9 215 1935
12.5 9 280 2520
8 9 215 1935
12.5 9 280 2520
8 9 215 1935
12.5 9 280 2520
8 9 215 1935
12.5 9 280 2520
8 9 215 1935
12.5 9 280 2520
8 9 215 1935
12.5 9 280 2520
8 9 215 1935