DAILY DRILLING ACTIVITY REPORT
Interruptions:
From
to
from
to
from
Goal
erra
jical formations:
Yes ofr
fea
from (mn)
o
72-14
74-76
76-78
78-80
"30-82
2.84
84-86
86-88
38-90
90-92
34-96
96-98
Pome Todas tt Tonzache
ministrative Pe ordinal at 4237 ee
[Aaministrative Post [Coordinates let g2ar0e [ow zip ace
Conract: TAN St Borehote no
cient: Pag Vago
Pate: Zefos /eorr|Oriler: PLoire Joie fe supervisor: Zacaninsd Abeverm
‘Operation wie. time Diiling progress
Starimoving isl Stat Tend [Duration [ (mn) | Stan End] Duration
Reach site 2375/1 3082 [oazJaet
Star anil Tee neo loe ep 52.54
Fremp. casing inst ‘54-56
[Start dri ( 2/03 7/F | OF; ta 56-58
Reach final depth. ae Er
[PVG instalation 6062
[Gravel pack instalation 62-64
Development 6466;
[Pumprest start 6556)
Pumpiest finish 68-70
Leave ste 70-72
Comments
Weather conditions , .
Negative ~ Dawea az
Meg x Les Gen
. Nes ,
Gee) (ond: Leon,
For the Contractor For the Sprovisr on beha othe Ciont
Zacanis ereddrilling consumption
Contractor
from tom)
[Cement ta] [Drag bit gram: 0 — Jom
Polymer a} [Drag bit
Foam tws| [Drag bit
|Gravelpack a] [Drag bit
|Gravelpack diam. mm] [Drag bit
Clay seal a] [Button bit
Diese! tr] [Button bit
|Sand '
lAggregate ka] [Moved from well no.
Stone a] [Moving to well no,
Brick a} [Total distance km
Geophysics Estimated aquifer depth m Success rate %
/,
Drilting rig type Dritersname: CL /ivng /
Development Duration hs Limpidity ater hrs
Disinfection Chemical used Quantity °
Hand pump JAFRIDEV
‘Superstructure [Concrete slab Drainage trench [Soakaway pit
|Water quality [Bacteriological |Chemical (basic) |chemical (complete)
[Remarks and stoppage
[Comments
[aoproved: Jeeniied
ao
ClientDAILY DRILLING ACTIVITY REPORT
Province
Ma
Petit Mynrae cher
[Administrative Post
[Coordin
Lat “2 9st
2 flora: 7112 677
contact: « Zp ayg fd/
[Borehole no.
lotent: ZV PAG
lvitage
pate 43/28/2012
de
[Supervisor
faeve
‘Operation
[Start moving
[Reach site
Start rl (
a]
[Temp. casing inst
Start dil ( 7
[Reach final depth
[PVC installation
[Gravel pack installation
[Development
[Pumptest star
[Pumptest finish
Geological formations:
aL
Aes 9
2a
prone
igs Lie
rota Jeti
Tees {0 67
fede see
Trev dy
eb re
25st hia
02
24
‘Start End
¢
Dn
Duration
(Stan End] Duration
a
7
aaa
8 od
a.i8
38:50 3-100
Consumption Dally si
Disel Date | bap
or rs =
Power Da
Foam
[cement
[lay sea
Comments
Mes ahve - Docea apn
For the Sprevisor on behalf of the Client
ZDrilling consumption
rom -t0 (m)
[Cement ra] [Drag bit yf feLimws eae
Polymer 6] |Dragbit Gove oy —Carwe
Foam wa] [Drag bit
IGravelpack a} [Drag bit
IGravelpack diam mm} [Drag bit
Clay seal a} [Button bit
Diesel wrs| [Button bit
sand re
lAggregate ta] [Moved from well no.
stone a] _ | Moving to well no
Brick ta} [Total distance xm
Geophysics Estimated aquifer depth m Success rate %
Drilling rig type pitersname: CYiene Dew if
Development Duration ts Limpidity after ns
Disinfection Chemical used Quantity °
Hand pump JAFRIDEV
|Superstructure Concrete slab Drainage trench Soakaway pit
lWater quality Bacteriological [chemical (basic) |chemical (complete)
Remarks and stoppage
(Comments
Pancreas
Contractor