Hoppin Gavap=ino GA
2.5 Sectional Steel
Fabrications
‘Section steel fabrications ere usectpredom
pany toa geder construction. Tha flow
lng guidance there apples principaly tc
Stuetues nvoling steel girder consruction.
1 Materials and Thickness of
Materials.
‘Tha tel used inthe manufacture of sectional
star ebratona shouldbe suitabofor hot dip
{geluanzing in acootdance vith ES 728: 1971
(lo86). An appropriate agreement between
the processor and the stoe supplier shouldbe
‘malo when placing te ordarfor the steel (See
false Data Shoat 22),
‘Asa, agar hickrosse8 of material equire
fa longar perlod of irenersion the zinc bath
bolore assuming the bath temperature. The
Sectional staal wt the Largest Mickness of
motel lays determines te perod ofr
fsion of the hola componer. Sectional
Sel workpes wich evhbita ilar oa
most urn riko of material ae there
fore bes for not ip galvanizing, Large oiler.
fenoas inthe thikewass of rata shou DO
‘cided wherever possible
Early ageamant with the galvaner shoud
‘alse be sought regarcing the maximum d-
Tenions ard woghts of components end
‘workpleoes s00 also Dala Shoot 2.9),
2. Surface Preparation
Goneraly speaking, sectional ste! fabrice
tions sould ave tthe qavarizer in on ur
{Teste state as the creperation necessary for
hotolp gavanizins usually cared aut atthe
‘alvanzer Some common propio suoh 35,
paint meriangs,grosee or welding lag which
Gennot alays be allewated by pledng and
‘egreesing snauld ba deat wih by the up
Tere alse Data Sheet 2.1).
Viner stee sttuctures are 16 be shot blasted
‘he shoud be dove atthe steel fabricators
utcaremustpotaken nat any reside of re
Blasting materal's competely removed from
the component (¢g. fom comers and hol
lows)
\inere there are edges in the sectional stea,
Ipftirom cutting by acetvere, and especialy
on workpieces edueed by plasmas
cutting, changos inthe surface of tho work- shouldbe welded o ensure that no gaps are
plece may aocur in bre aaa ofthe Cut (6g. present fru to paratrate
Gecerbontato). Tesechanges mayalooal- ierge owstaps are nacossay (eg. vath ak
fect the 2con reaction reauting nthe f- —Wontal fang sate, eit Pot trav tre
‘mation of hot dip gavaned comings with ® —sirass shauc theveere be mado on at last
Feducad thckees. In such cases it may be one side of tho ovorapping pla 80 aa 10
‘Roceasary to work on te edges fo adopth of _avolthe rung excussprassure caused by
atleast Ot, e.g. by gin. heating of tho rn he gap between Wolayers
0.2
3. Internal Stresses and
Distortion
‘When intomal stresses arerollved by the hoa
ff the gehanzng process this may roou
the dlstorion of setlonel soe fatrications,
Various types intemal stresses may be ro
sent any fabrication dus to welding, rlln,
for extusion. These hniernal stresses iti
fama in equebrum but the introduction of
Feat may raleve these bull in stresaos anc
detoton results,
‘There are. certain constructive. measures
vihich canbe taken to overcome the dangers
Of estortonon steel abceatons, or aven ds
fotion due to watdng
CCross-sectons to be joined together, which
fre galvanzed ncualy and thon assor
bledby some mechanicalmeans(@.g- sare) favourable
‘cause no problems. Where such a Method is
fot possible, the welding seams at tha join
should be arranged 0 that they are susted ri
: iat jure 2: old over.
Roar the main ex ofthe ste! secton, Otter ea ee
‘ge they shoud places as symmeticaly a eee
‘Sspossibie questa fem the main axis and
welding cared out as. simuftanecusly 3s
oss.
The dangor of dstorton is inmisea by using
symmelical cross-sectons, Asymmetica Figure 3: Provide
‘toss- sections exh a reat danger of coveraps wih
{orton i hicker welding seams am eranges ‘openings.
Shoes sr anarc rm
oe ee
—
PS
4. Overlaps =
Cheiapong suraoss shold be aces at
en okie mare of conecce ae
Senet ag igloo ont
ree aie neuraerie
Vapees eon iacecin femtoien ae
sora erence
Figure 1: Greater isk
a
a
Ay. Te
QQ?Hotel Saeae="9
2.5 Sectional Steel
Fabrications
5. Outlets and Drain-holes
In oder to not ip galvanize sectoral steal fo
Ercatons to a hgh andar. reinforcing
pleses, end platos and ine features must
Popravided with vent hele. As the compan
tents ore always immersed at an angi tne
Verbus veatment haths fhe galerizing
plans, tr noloe mustbeso aranged that the
Ge cartun ancl out realy of comars and
anges of a component. Otherwise zinc may
be dawn oul withthe component Fig 4) or
tregpedl ar ay resut in Getects nthe galva-
nizing
Vens'end cn-hae sould arranged fn
ple ae ar as possble, Oull's may be made
Figure 5: Dra
holes in te comer are
necessary for he zino
‘ovum nan oat ret.
Figute 4: xara
sf galvanizing defects
‘iueta inademate
‘ranage
‘as shown nFigue Sin the peample fo tho ar.
Fangement io“) sctlns. rt blesn rer
{oreing plates end ovetaps should bomadein
ast wy.
Ingenerl dear holes to le out ihe pee
tno kya anlthe ig! sne ually have 3
Gamer > TOmm As] rue of fumb the d
tenet eheukd slemye Bo about rm on
Scotlona sel, fut ths Mey change cepsrct
Ingenthe eze.and eumborot oran-hles,
6. Connections
‘Gannecting seclonal ote componsnts by
Techanicel means, eg. bts, can be cariod
Gitinthewortatos oron eto. Assembly js
vith ameonanical means of eernection ae to
te void in prefencesto wadiejonts es they
Can easly bocismanted.
Usinga meshancal means of connection hes
{ha advantage that al surfaces of the inv
lil Pol dip galvanized sectons and pisos
Dldced nex! exon cher ee Completely ro
tected, Materials used for connections must
dso baholcip caverized.
7. Improving Defective Areas
welding is tobe cared out alte hoi cip gal
Nanzina, 2ro sous be moved fom the
bea to be welcad for a clstance of at st
10 mv fo eech sive ofthe seam. Alter we:
ding, dorosion prolcten i tus area rt Bo
fosiorod.
Even whan transporting or assembiing soc
tral Stal abreations hry happen that the
Zine cosing clamaged in paces: Such de
{ecive aaa rust als bo repaired and se
Ccommarcied trata areas 2 cbaing are
freatod'n accordance with 8S 728 = 1971
{1986}, This states that areas may bo rono
vated ihe ye use Of la mating point
Zinc aloyrebak rods or rowcers made sae
iealy forthe purpose orby the use of alias!
‘we coats of goog quality znerch paint Su
‘ent meted shod be applod 19 provas «
Zine coming a least equal mn thickness 0 the
Gakenized Iyer. This recommended pro:
Beckie sroulbe flowed ntne aplicaion
anytepar mean
Published by
(Gevaniore Assocation
‘rents Ccurt 58 Viciora Road,
Sulton Gottat,
‘West Mictands,
Br 187.0: