163.0 163.0 163.0 163.

162.0 TERRENO NATURAL


162.0 162.0 TERRENO NATURAL
162.0
MURO DE VEDAÇÃO

TERRENO MODELADO TERRENO MODELADO


161.0 161.0 161.0 161.0
A ENTREGAR NO
COLECTOR 1

160.0 160.0 160.0 160.0

A ENTREGAR NA
VALA EXISTENTE
159.0 159.0 159.0 159.0

158.0 158.0 158.0 158.0

157.0 157.0 157.0 157.0


1.00

RASTO DO COLECTOR RASTO DO COLECTOR

COLECTOR 1 156.0
CAIXA DE ENTREGA NA VALA EXISTENTE
(RETENÇÃO DE h=1.0m)
156.0
COLECTOR 1.16 156.0 156.0

Esc. H=1:1000; V=1:100 Esc. H=1:1000; V=1:100


155.0 155.0 155.0 155.0

DESIGNAÇÃO V1 CP1.1 CP1.2 CP1.3 CP1.4 CP1.5 CP1.6 CP1.7 CP1.8 CP1.9 CP1.10 CP1.11 CP1.12 CP1.13 CP1.14 CP1.15 CP1.16 CP1.17 CP1.18 CP1.19 CP1.20 DESIGNAÇÃO CP1.16 CP1.16.1 CP1.16.2
PARCIAIS 20.52 40.13 33.64 43.65 17.40 30.60 12.39 15.89 15.85 42.55 42.55 22.97 36.23 50.55 48.95 49.59 35.69 34.80 25.50 24.40 PARCIAIS 28.21 28.21
DISTÂNCIAS DISTÂNCIAS

157.18 159.68 137.94

157.20 159.68 155.33

157.23 159.68 185.94

157.24 159.68 198.33

157.26 159.68 214.22

157.28 159.68 230.07

157.32 159.68 272.61

157.36 159.68 315.22

157.38 159.68 338.13

157.42 159.68 374.37

157.47 159.68 424.92

157.52 159.68 473.87

157.57 159.68 523.46

157.81 159.68 559.14

157.84 159.68 593.94

158.07 159.68 619.44

158.09 159.68 643.84


20.52

60.65

94.29

28.21

56.42
(m) (m)
0.00

0.00
À ORIGEM À ORIGEM
157.00 157.00
159.83

159.90
157.06 159.95
156.07 160.13
157.07 160.25

160.25

157.11 159.68

157.14 159.68

157.77 159.55

159.55

159.68

159.68

159.68
COTAS DA TAMPA COTAS DA TAMPA
(m) (m)

158.04

2.16 157.57
1.76 157.97

1.73 158.00

1.70 158.03
DA SOLEIRA DA SOLEIRA
3.12
4.12
3.12

2.62

2.59

2.55

2.53

2.50

2.49

2.47

2.46

2.41

2.37

2.35

2.31

2.26

2.21

2.16
1.96

1.92

1.89
1.69

1.66

1.64
PROFUNDIDADE À SOLEIRA (m) PROFUNDIDADE À SOLEIRA (m)

MATERIAL / DIÂMETRO NOMINAL BA Ø1500 BOX CULVERT 2000x1500 BA Ø1200 BA Ø1000 BA Ø800 MATERIAL / DIÂMETRO NOMINAL
INCLINAÇÃO DOS TROÇOS (%) i=0.3% i=0.1% i=0.1% i=0.1% i=0.1% INCLINAÇÃO DOS TROÇOS (%)

163.0 163.0

162.0 TERRENO NATURAL


162.0

MURO DE VEDAÇÃO TERRENO MODELADO


161.0 161.0

160.0 160.0

A ENTREGAR
159.0 NA 159.0
VALA EXISTENTE

158.0 158.0

157.0 157.0
1.00

RASTO DO COLECTOR

COLECTOR 2 156.0

CAIXA DE ENTREGA NA VALA EXISTENTE


156.0

Esc. H=1:1000; V=1:100 (RETENÇÃO DE h=1.0m)


155.0 155.0

DESIGNAÇÃO V2 CP2.1 CP2.2 CP2.3 CP2.4 CP2.5 CP2.6 CP2.7 CP2.8 CP2.9 CP2.10 CP2.11 CP2.12 CP2.13 CP2.14 CP2.15 CP2.16 CP2.17 CP2.18 CP2.19 CP2.20 CP2.21 CP2.22 CP2.23 CP2.24
PARCIAIS 18.78 27.77 30.88 31.48 35.97 35.97 25.53 19.60 25.00 30.60 23.50 25.23 19.80 18.70 24.77 35.21 35.21 34.24 34.44 38.89 10.19 24.00 24.95 26.73 POIBA - POLO INDUSTRIAL DE BEBIDAS E ALIMENTOS DE ANGOLA, LDA.
DISTÂNCIAS Estrada Nacional 105 - Km13 - Comuna de Arimba
156.88 159.73 108.91

156.92 159.73 144.88

156.95 159.73 180.85

156.98 159.73 206.39

157.00 159.73 225.98

157.02 159.73 250.98

157.05 159.73 281.59

157.08 159.73 305.09

157.10 159.73 330.32

157.12 159.73 350.12

157.14 159.73 368.82

157.17 159.73 393.59

157.20 159.73 428.80

157.24 159.73 464.01

157.27 159.73 498.25

157.31 159.73 532.69

157.34 159.73 571.58

157.34 159.73 581.77

157.58 159.73 605.77

157.61 159.73 630.72

157.83 159.73 657.45


18.78

46.55

77.43

(m)
0.00

Município do Lubango - Província da Huíla - Angola


À ORIGEM www.poiba.com
156.74 156.48
156.59

158.72
156.79 159.68
155.79 159.73

156.82 159.73

156.85 159.73

Arquitetura e Coordenação Geral do Projeto:


COTAS DA TAMPA
(m)
Av. Miguel Bombarda 42-6ºC - 1050-166 Lisboa - Portugal
156.79

157.56

157.81
DA SOLEIRA T (+351) 21 793 13 42 E info@tallandtaller.com
www.tallandtaller.com
Fundações e Estruturas
2.94
3.94
2.94

2.91

2.88

2.85

2.81

2.78

2.75

2.73

2.71

2.68

2.65

2.63

2.61

2.59

2.56

2.53

2.49

2.46

2.43

2.39

2.38
2.17

2.15

2.12
1.92

1.90
PROFUNDIDADE À SOLEIRA (m)
Cristina Alves Saavedra
MATERIAL / DIÂMETRO NOMINAL BA Ø1500 BOX CULVERT 2000x1500 BA Ø1200 BA Ø1000 BA Ø800 E n g e n h e i r a C i v i l S é n i o r Rua Professor Carlos Teixeira - 1600-608 Lisboa - Portugal
T (+351) 916 135 894 E cas.estruturas@gmail.com
INCLINAÇÃO DOS TROÇOS (%) i=0.3% i=0.1% i=0.1% i=0.1% i=0.1% Inscrita na OE - 24226
Plataformas, Arruamentos, Águas e Esgotos

Avenida 22 de Dezembro 31-3ºEsq.º - 2900-670 Setúbal - Portugal


C o n s u l t o re s T (+351) 265 418 167 E geral@dimestconsult.com
de Engenharia www.dimestconsult.com
Instalações Elétricas, Telecomunicações e Segurança
Edifício Lisboa-Oriente
Av. Infante D. Henrique 333H - Edifício 4 - Fração 23 - 1800-282 Lisboa - Portugal
T (+351) 210 132 014 F (+351) 210 132 016 E csantos@maisengenharia.com
www.maisengenharia.com
Ventilação e Ar Condicionado

Largo dos Topázios 37 - 2785-817 São Domingos de Rana - Portugal


T (+351) 919 016 111 E info@beringela.com.pt
www.beringela.com.pt

Projeto
Complexo Industrial POIBA Kikuxi
Local
Kikuxi - Município de Viana
Dono de Obra
POIBA - Polo Industrial de Bebidas e Alimentos de Angola Lda.
Fase
Projeto de Licenciamento
Título do Desenho
PERFIS LONGITUDINAIS DOS COLECTORES 1, 1.16 e 2
Especialidade
REDE DE ESGOTOS
Técnico Responsável
José Moreira
Escala
1:500 Data
15OUT2021 Proj.No.
26419 Des.No.
GE.PL.04.03 Rev.
0