Você está na página 1de 1

N

W E
Zone-05
S

Zone-06

Zone-09

Zone-04
Zone-07
Zone-03

Zone-08

RIVER
PALAR
Zone-02
Zone-01

Key-Plan Showing the Proposed


Distribution System Zones

Z5-DMA-1
Z5-32
GL:247.70m
Z5-31 PR:7.8m
GL:246.04m
Z5-30 PR:9.5m
GL:246.36m
PR:9.6m 90.0/HDPE 90.0/HDPE
Z5-38/344.4m Z5-39/312.2m

R
90.0/HDPE Zone-5 / Malaigai Street - DMA Boundary
R RIVE Z5-37/180.7m
PALA
Z5-29
GL:246.41m
PR:9.9m
Distribution Pipe Line : Legend:
Pipe Size (Meter) Project Area Boundary

Zone-05 Pipe Material Proposed DS Zone Boundary

Z5-36/145.4m
90.0/HDPE
XXX / HDPE DMA Boundary
Z5-DMA-1 Roads
P-XX / XXXm Pipe with Flow Direction
Water Bodies
Z5-26
GL:247.83m
PR:9.2m
Pipe Length (Meter)
Pipe Number / Lable Existing ESR Proposed ESR

PE
0.6m
/HD
Node Tag No. : Valve Details:

3/32
90.0
Z5-3
Z5-28
GL:248.22m
PR:8.6m
Junction / Node PRV-1 - Pressure Reducing Valve
J-189 Junction No. / Node No. PBV-1 - Pressure Breaking Valve
GL:285.93m Ground Level (meter) ISO-1 - Isolation Valve
PR:8.55m Pressure Head (meter)
90.0/H
DPE
Z5-34/4
25.8m
Z5-27
GL:246.68m
PR:10.3m
Z5-35/143.2m
90.0/HDPE

Z5-17
GL:245.98m
PR:11.6m

Z5-24 Z5-25
GL:249.22m GL:248.77m
90.0

PR:8.1m
Z5-2

PR:8.4m
90.0/HDPE
/HD

90.0/HDPE
2/21

PE

Z5-18
DPE
/22.8m

Z5-24/166.4m
7.8m

GL:249.46m Z5-32/300.5m
PR:8.1m
90.0/H
Z5-31

Z5-23
GL:250.18m Z5-22
90.0/HDPE GL:248.39m
PR:7.2m
DPE PR:9.1m
90.0/H Z5-28/109.1m
Z5-23/43.6m
90.0/HDPE

-1 7 /219.5m
Z5
m
90.0/HDPE
Z5-30/41.1

Z5-12
GL:250.49m Z5-15 Z5-16
PR:7.2m 90.0/HDPE GL:249.41m GL:249.92m
PR:8.2m PR:7.7m Z5-19
90.0/HDPE GL:250.47m
DPE

Z5-19/147.6m
Z5-29/69.1m
90.0/HDPE

PR:7.0m
m20/5.5

Z5-14 Z5-21/67.4m
90P.0E/H

GL:250.31m Z5-13
PR:7.3m GL:249.33m
/11Z.95-
D

PR:8.3m
90.0/H
Z5-18

Z5-10 90.0/H
GL:249.67m DPE Z5-11
PR:8.0m GL:250.05m
Z5-16/4 PR:7.6m
1.6m
Z5-25/62.9m
90.0/HDPE

90.0/HDPE Z5-20
GL:248.32m
Z5-15/53.1m

Z5-26/137.3m PR:9.1m
90.0/HDPE
90
.0/
Z5

HD
-10

PE
/10
8.3

Z5-27/43.3m
m

90.0/HDPE

Z5-8 Z5-9
GL:250.36m GL:249.88m
PR:7.4m 90.0/HDPE PR:7.8m

Z5-14/154.1m
Z5-7 90.0/HDPE Z5-21
GL:250.49m GL:248.29m
PR:7.2m Z5-11/149.0m PR:9.2m
90.0/HDPE
Z5-13/53.5m
90.0/HDPE
Z5-12/48.1m

Zone-5 / Maligai Street


90.
0/H
Z5-

Z5-6
Existing ESR
DP
8/3

Z5-5 GL:250.46m
E

Z5-3
9.4

GL:250.75m 90.0/HDPE PR:7.3m GL:249.78m


m

PR:7.0m 90.0/HDPE
Z5-7/194.0m
Z5-5/152.6m
PR:8.1m
Cap. & St. Ht. : 0.6 LL / 7.5m
G.L : 250.660m
L.W.L : 258.160m
110.0/HDP
Z5-6/62.7m

M.W.L : 261.160m
E
90

PRV-Z5-1
110.0/HDPE
.0/

Z5-1
Z5

Z5-2/5.5m
HD

GL:250.30m
-9/

140.0/HDPE
PE
12

PR:7.8m R-Z5
8.0

Z5-1/9.9m
m

Z5-3/10.3m
Z5-4 Z5-2
GL:250.85m 90.0/HDPE GL:250.24m
PR:7.0m PR:7.8m
Z5-4/206.6m

Zone-06
Z6-DMA-2 Detailed Project Report for Improvements of
Project: Water Supply Scheme to Pallikonda Town
Panchayat in Vellore District.
Client:

Pallikonda Town Panchayat

Consultant:

ABS CONSULTS - CHENNAI

DRAWN . TITLE:
CHECKED . Water Supply Distribution Piping Network
APPROVED . Drawing for Zone-5 / Malaigai Street
DATE .
(0.6 LL Capacity Existing ESR)
SCALE NTS (A1) SHEET NO.
DRG
REVISION R-0 NO. PTP-ABSC-WSS-DS-05 1 of 1

Você também pode gostar