W E
Zone-05
S

Zone-06

Zone-09

Zone-04
Zone-07
Zone-03
Z4-25
GL:256.88m
PR:6.9m
Zone-08

m
90.0/HDPE
Zone-02

Z4-33/120.2
Zone-01

Zone-04
Key-Plan Showing the Proposed
Z4-DMA-1 Distribution System Zones

Z4-12 Z4-16 Z4-19


GL:255.21m Z4-11 GL:256.43m Z4-DMA-1
GL:255.49m GL:256.83m
PR:8.5m PR:6.9m PR:7.3m

90.0/HDPE
90.0/HDPE PR:8.3m PE
90.0/HDPE 90.0/HD

Z4-21/5.6mZ
Z4-18/36.1m 1.1m
Z4-17/86.5m
Z4-15 Z4-24/5
GL:256.78m

90.0/HDPE
Z4-15/34.3m
PR:7.0m Z4-18

90.0/HDPE

4-22/25.5m
GL:256.04m Zone-4 / Ambedkar Nagar - DMA Boundary
Z4-6 Z4-10 PR:7.7m
GL:255.94m PE
GL:255.90m
PR:7.8m Z4-14 90.0/HD Distribution Pipe Line : Legend:
PR:7.9m Z4-9
GL:256.12m 8.4m Project Area Boundary
Z4-23/4
90.0/HDPE GL:255.72m E Pipe Size (Meter)
PR:8.0m 90.0 PR:7.6m 90.0/HDP Z4-17 Pipe Material Proposed DS Zone Boundary
Z4-14/30.3m /HDPE .0m GL:256.79m
Z4-20/42 PR:7.0m XXX / HDPE DMA Boundary

Z4-10/35.7m
90.0/HDPE Z4-16/52.0m Roads
P-XX / XXXm Pipe with Flow Direction

90.0/HDPE
Water Bodies

Z4-7/33.0m
Pipe Length (Meter)
Pipe Number / Lable Existing ESR Proposed ESR

90.0/HD
Z4-25/6
Z4-5
GL:255.93m Z4-4 Node Tag No. : Valve Details:

90.0/HDPE
Z4-26/61.6m
PR:7.8m 90.0/HDPE GL:255.76m

PE
Junction / Node PRV-1 - Pressure Reducing Valve

0.3m
PR:8.0m J-189 Junction No. / Node No. PBV-1 - Pressure Breaking Valve
Z4-9/88.4m GL:285.93m Ground Level (meter) ISO-1 - Isolation Valve
PR:8.55m Pressure Head (meter)
Z4-8/33.5m
90.0/HDPE

90.0/HDPE
Z4-6/29.8m
Z4-20
Z4-3 GL:257.49m
GL:256.60m PR:6.3m
90.0/HD PR:7.2m DPE
Z4-8 PE 90.0/H
GL:256.02m E 49.2m
/HDP Z4-13/9 Z4-27/

90.0/HDPE
90.0 0.8m

Z4-4/14.2m
PR:7.7m Z4-7 Z4-21 Z4-24
m
- 1 1 /17.0 GL:256.11m GL:257.58m GL:257.47m
Z4

90.0/HDPE
PR:6.2m

Z4-28/48.7
Z4-2 PR:6.3m

90.0/HDP
PR:7.6m

Z4-5/41.1
GL:256.51m
PR:7.3m
Z4-12/50.8m
90.0/HDPE

m
90.0/HDPE

m
Z4-23 E
Z4-34/107.4m GL:257.62m / H DP
Z4-1 0
90. 2m
110.0/HDPE GL:257.83m PR:6.1m
2/ 74.
3

90.0
R-Z4110.0/HDPE PR:6.0m Z4-

Z4-3
Z4-3/26.8m 90.0/HDPE
Zone-4 / Ambedkar Nagar

/HDP
Z4-26
Z4-1/34.4m

0/12
GL:255.84m m
PRV-Z4-1 Z4-31/103.6

E
PR:7.9m Z4-22

.8m
Existing ESR Z4-2/52
90.0/HD
GL:257.54m
PR:6.2m

Cap. & St. Ht. : 1.0 LL / 7.50m HDPE


PE

0.0/
.5m

9 m
93.3
G.L : 256.580m
90.0/HDPE
Z4-35/76.5

9/
Z4-2
Z4-13
L.W.L : 264.080m GL:257.57m
PR:6.2m
m

M.W.L : 267.080m
DPE
90.0/H
Z4-27 - 19 / 1 06.3m
Z4
GL:256.68m
PR:7.0m
Detailed Project Report for Improvements of
Project: Water Supply Scheme to Pallikonda Town
Panchayat in Vellore District.
DPE
90.0/H Client:
m
/176.6
Z4-36 Pallikonda Town Panchayat
Z4-28
GL:256.91m Consultant:
PR:6.6m
ABS CONSULTS - CHENNAI

DRAWN . TITLE:
CHECKED . Water Supply Distribution Piping Network
APPROVED . Drawing for Zone-4 / Ambedkar Nagar
DATE .
(1.0 LL Capacity Existing ESR)
SCALE NTS (A2) SHEET NO.
DRG
REVISION R-0 NO. PTP-ABSC-WSS-DS-04 1 of 1