ALVENARIA QTD
Blocos de concreto não estrutural do tipo canaleta - 14 x 20 cm 2180.00
Sacos de argamassa para assentamento de blocos - 20kg 16.00
Barra de aço 3/8" CA-50 (A ou B) fyk= 500 Mpa 98.56
Barra de aço 5/16" CA-50 (A ou B) fyk= 500 Mpa 140.80
PRAINHA QTD
Armadura em tela soldada de aço 10 x 10 cm 24.00
IMPERMEABILIZAÇÃO 01 QTD
Bianco - 18 Litros 2.00
Saco de cimento CPII 20.00
Areia média lavada 1.00
REBOCO QTD
Saco de cimento CPII 32.00
Areia media lavada 15.00
Sacos de Cal hidratada 7.00
IMPERMEABILIZAÇÃO 02 QTD
Vedacit 18 Litros 2.00
ILUMINAÇÃO QTD
Lâmpadas de LED 7.00
Tubo de PVC 50mm 48.00
Curva 90º 50 mm PVC 4.00
Tê Pvc 50 mm 1.00
IMPERMEABILIZAÇÃO 03 QTD
Argamassa Tecplus Quartzolit - 20kg 5.00
ELÉTRICA QTD
Tubo de PVC 3/4" 0.00
Fio de cobre 2,5 mm² 85.00
Disjuntor 1.00
Conjunto motobomba e filtro para piscina 1.00
GRAMA QTD
Grama do tipo esmeralda 100.00
EPI'S QTD
Capacete de segurança V-gard Com Jugular 7.00
Óculos de Proteção Incolor Anti-Risco - Spectra 2000 7.00
Protetor Auditivo Pomp Plus com Cordão em Poliéster Par 7.00
Uniforme manga longa 7.00
Protetor Solar Profissional FPS 60 1/3 UVA 7.00
Luva de Segurança Confort Latex DA-299 7.00
Botina de couro sem biqueira de aço 7.00
Touca de proteção solar - Touca soldador 7.00
EPI'S QTD
Enxadas 3.00
Pás 2.00
Carrinho de mão 2.00
Linhas de pedreiro 2.00
Mangueira 1.00
Colher de pedreiro 4.00
Bloco de Espuma 1.00
Espátulas 3.00
Tubos de Cola PVC 5.00
Martelos 2.00
Rolos de pintura com cabo 2.00
UM Valor Unit. Total CA
meses R$ - R$ - N/A
DRENO E HIDRÁULICA
25.00 m Tubo de PVC rígido soldável marrom, DN= 50 mm, (1 1/2´), inclusive conexões
1.00 un Acabamento em Alumínio para dreno 50 mm
ALVENARIA
2180.00 un Blocos de concreto não estrutural do tipo canaleta - 14 x 20 cm
16.00 un Sacos de argamassa para assentamento de blocos - 20kg
98.56 kg Barra de aço 3/8" CA-50 (A ou B) fyk= 500 Mpa
140.80 kg Barra de aço 5/16" CA-50 (A ou B) fyk= 500 Mpa
PRAINHA
24.00 m² Armadura em tela soldada de aço 10 x 10 cm
IMPERMEABILIZAÇÃO 01
2.00 un Bianco - 18 Litros
20.00 un Saco de cimento CPII
1.00 m³ Areia média lavada
REBOCO
32.00 un Saco de cimento CPII
15.00 m³ Areia media lavada
7.00 un Sacos de Cal hidratada
IMPERMEABILIZAÇÃO 02
2.00 un Vedacit 18 Litros
ILUMINAÇÃO
7.00 un Lâmpadas de LED
48.00 m Tubo de PVC 50mm
4.00 un Curva 90º 50 mm PVC
1.00 un Tê Pvc 50 mm
IMPERMEABILIZAÇÃO 03
5.00 un Argamassa Tecplus Quartzolit - 20kg
CASA DE MÁQUINAS 2 x 2 m
1142.00 un Blocos de concreto 14 x 19 x 39cm
9.00 un Sacos de argamassa para assentamento de blocos - 20kg
10.00 un Saco de cimento CPII
5.00 m³ Areia Media Lavada
3.00 un Saco de Cal hidratada
1.00 un Lata de tinta látex acrílica - 18L
ELÉTRICA
60.00 m Tubo de PVC 3/4"
85.00 m Fio de cobre 2,5 mm²
1.00 un Disjuntor
1.00 un Conjunto motobomba e filtro para piscina
CONCRETAGEM DO PASSEIO
5.00 un Saco de cimento CPII - 50kg
1.00 m² Areia media lavada
ACABAMENTO DO PASSEIO
40.00 m² Pedra madeira
GRAMA
100.00 m² Grama do tipo esmeralda
Valor Unit. Total EQUIPE
2.00 Pedreiros
5.00 Ajudantes
Valor Unit. Total
EPI'S PEDREIRO
Cada Pedreiro deve receber: Valor Unit. Total
1.00 ete de segurança V-gard Com Jugular R$ 10.33 R$ 20.66
1.00 eção Incolor Anti-Risco - Spectra 2000 R$ 5.44 R$ 10.88
Pomp Plus com Cordão em Poliéster Par R$ 2.84
1.00
Valor Unit. Total 1.00 Uniforme manga longa R$ 37.40
onexões 1.00 etor Solar Profissional FPS 60 1/3 UVA
1.00va de Segurança Confort Latex DA-299
1.00 Botina de couro sem biqueira de aço R$ 35.04
Valor Unit. Total 1.00 uca de proteção solar - Touca soldador R$ 6.40
EPI'S AJUDANTE
Cada Ajudante deve receber: Valor Unit. Total
Valor Unit. Total 1.00 ete de segurança V-gard Com Jugular R$ 10.33
1.00 eção Incolor Anti-Risco - Spectra 2000 R$ 5.44
Pomp Plus com Cordão em Poliéster Par R$ 2.84
1.00
1.00 Uniforme manga longa R$ 37.40
1.00 etor Solar Profissional FPS 60 1/3 UVA
1.00va de Segurança Confort Latex DA-299
Valor Unit. Total 1.00 Botina de couro sem biqueira de aço R$ 35.04
1.00 uca de proteção solar - Touca soldador R$ 6.40
6136
5745
N
N
17010
N
CA
6136
5745
N
N
17010
N
E)
ND
ES
ID DE
(O
AD
IV A
IS
AT AP
CA
M
LO
SERVIÇOS (O QUE)
SERVIÇOS PRELIMINARES SVP
FUNDAÇÃO - VIGAS E PILARES FVP
DRENO E HIDRÁULICA DRH
CONCRETAGEM VIGAS E PISOS CVP
ALVENARIA ALV
PRAINHA PRA
CONCRETAGEM PRAINHA,PAREDES E PILARES CPP
IMPERMEABILIZAÇÃO 01 IMP
REBOCO REB
IMPERMEABILIZAÇÃO 02 IMP2
ILUMINAÇÃO ILU
IMPERMEABILIZAÇÃO 03 IMP3
TESTE DE ESTANQUEIDADE TES
CASA DE MÁQUINAS 2 x 2 m CMQ
ELÉTRICA ELT
CONCRETAGEM DO PASSEIO COP
REVESTIMENTO CERÂMICO (APÓS 45 DIAS DO
RCR
TESTE)
ACABAMENTO DO PASSEIO ACP
GRAMA GRA
Cronograma de Obra
Obra: Construção da Pisicina
Local: São Miguel Arcanjo
4/8/2018
Jan-18 Feb-18 Mar-18 Apr-18
4/15/2018
SERVIÇOS PRELIMINARES
4/8/2018
FUNDAÇÃO - VIGAS E PILARES
4/15/2018
DRENO E HIDRÁULICA
4/22/2018 CONCRETAGEM VIGAS E PISOS
4/29/2018 ALVENARIA
4/29/2018 PRAINHA
5/6/2018 CONCRETAGEM
PRAINHA,PAREDES E PILARES
5/6/2018 IMPERMEABILIZAÇÃO 01
5/13/2018 REBOCO
IMPERMEABI
4/22/2018
ILUMINAÇÃO
5/20/2018
IM
6/27/2018 TEST
6/10/2018
6/17/2018
5/20/2018 CONC
7/25/2018
5/6/2018 ACABAMENTO DO PASSEIO
7/25/2018
Data:
E PISOS
ENARIA
PRAINHA
CONCRETAGEM
PRAINHA,PAREDES E PILARES
IMPERMEABILIZAÇÃO 01
REBOCO
IMPERMEABILIZAÇÃO 02
ILUMINAÇÃO
IMPERMEABILIZAÇÃO 03
TESTE DE ESTANQUEIDADE
CASA DE MÁQUINAS 2 x 2 m
ELÉTRICA
CONCRETAGEM DO PASSEIO
REVESTIMENTO CERÂMICO
(APÓS 45 DIAS DO TESTE)
ACABAMENTO DO PASSEIO
GRAMA
5-May-18
Aug-18
Cronograma de Obra
Obra: Construção da Pisicina
Local: São Miguel Arcanjo
No. Item Tarefa Custo
R$
SEMANA 0
SEMANA 1
SEMANA 2
SEMANA 3
SEMANA 4
SEMANA 5
SEMANA 6
(semanas) (dias)
SEMANA 11
SEMANA 12
SEMANA 13
SEMANA 14
SEMANA 15
SEMANA 16
SEMANA 17
SEMANA 7
SEMANA 8
SEMANA 9
0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0%
0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0%
0.0% 50.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0%
0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0%
0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0%
0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0%
0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0%
0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0%
0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0%
0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0%
0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0%
100.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0%
14.3% 14.3% 14.3% 14.3% 14.3% 14.3% 14.3% 0.0% 0.0% 0.0% 0.0%
0.0% 33.3% 33.3% 33.3% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0%
0.0% 0.0% 50.0% 0.0% 50.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0%
100.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0%
0.0% 0.0% 0.0% 0.0% 0.0% 20.0% 0.0% 20.0% 20.0% 20.0% 20.0%
0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0%
0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 33.3% 0.0% 0.0% 33.3% 33.3%
EngenheiroNoCanteiro.com.br
Cronograma de Obra
Instruções:
• Essa planilha foi adquirida em www.engenheironocanteiro.com.br
• A utilização é de inteira responsabilidade do usuário
• Visite o artigo: http://engenheironocanteiro.com.br/cronograma-de-obras/
• Esta aba tem preenchimento automático, não precisa ser completada com nenhuma informação.
Construção da Pisicina
São Miguel Arcanjo
5-May-18
Custo Global R$ 2,149,844.13
R$
5 ALVENARIA R$ 142,612.95
6 PRAINHA R$ 114,090.36
8 IMPERMEABILIZAÇÃO 01 R$ 418,331.33
9 REBOCO R$ 47,537.65
10 IMPERMEABILIZAÇÃO 02 R$ 115,090.36
11 ILUMINAÇÃO R$ 114,873.36
12 IMPERMEABILIZAÇÃO 03 R$ 104,070.36
19 GRAMA R$ 142,612.95
Custo Mensal 0 66,553 366,040 243,225 276,211
% mensal 0.0% 3.1% 17.0% 11.3% 12.8%
Custo Acum. 0 66,553 432,593 675,818 952,028
% Acum. 0.0% 3.1% 20.1% 31.4% 44.3%
SEMANA 0
SEMANA 1
SEMANA 2
SEMANA 3
SEMANA 4
(Ssemana) (dias)
SEMANA 10
SEMANA 11
SEMANA 12
SEMANA 13
SEMANA 14
SEMANA 15
SEMANA 16
SEMANA 5
SEMANA 6
SEMANA 7
SEMANA 8
SEMANA 9
0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0%
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0%
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
0.0% 0.0% 0.0% 50.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0%
0.00 0.00 0.00 47,537.65 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0%
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0%
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0%
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0%
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
50.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0%
209,165.66 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
100.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0%
47,537.65 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
0.0% 100.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0%
0.00 115,090.36 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0%
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
0.0% 0.0% 100.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0%
0.00 0.00 104,070.36 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
0.0% 0.0% 14.3% 14.3% 14.3% 14.3% 14.3% 14.3% 14.3% 0.0% 0.0% 0.0%
0.00 0.00 12,884.33 12,884.33 12,884.33 12,884.33 12,884.33 12,884.33 12,884.33 0.00 0.00 0.00
0.0% 0.0% 0.0% 33.3% 33.3% 33.3% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0%
0.00 0.00 0.00 34,860.91 34,860.91 34,860.91 0.00 0.00 0.00 0.00 0.00 0.00
0.0% 0.0% 0.0% 0.0% 50.0% 0.0% 50.0% 0.0% 0.0% 0.0% 0.0% 0.0%
0.00 0.00 0.00 0.00 57,045.18 0.00 57,045.18 0.00 0.00 0.00 0.00 0.00
0.0% 0.0% 100.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0%
0.00 0.00 104,093.36 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 20.0% 0.0% 20.0% 20.0% 20.0%
0.00 0.00 0.00 0.00 0.00 0.00 0.00 9,507.53 0.00 9,507.53 9,507.53 9,507.53
0.0% 100.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0%
0.00 71,306.48 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 33.3% 0.0% 0.0% 33.3%
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 47,537.60 0.00 0.00 47,537.60
57,045
2.7%
2,149,844
100.0%
SEMANA 17
0.0%
0.00
0.0%
0.00
0.0%
0.00
0.0%
0.00
0.0%
0.00
0.0%
0.00
0.0%
0.00
0.0%
0.00
0.0%
0.00
0.0%
0.00
0.0%
0.00
0.0%
0.00
0.0%
0.00
0.0%
0.00
0.0%
0.00
0.0%
0.00
20.0%
9,507.53
0.0%
0.00
33.3%
47,537.60
EngenheiroNoCanteiro.com.br
Baseline Físico-Financeiro
400,000 Custo Mensal 100.0%
366,040
% Acum.
90.0%
350,000
80.0%
276,211
300,000
256,703
70.0%
243,225
221,048
250,000
60.0%
186,397
200,000 50.0%
40.0%
150,000
104,790
95,283
30.0%
100,000
69,930
66,553
60,422
57,045
57,045
20.0%
47,745
50,000
22,392
10.0%
9,508
9,508
-
0 0.0%
0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17
A A A A A A A A A A A A A A A A A A
AN AN AN AN AN AN AN AN AN AN AN AN AN AN AN AN AN AN
M M M M M M M M M M
SE SE SE SE SE SE SE SE SE SE SEM
SEM
SEM
SEM
SEM
SEM
SEM
SEM