Você está na página 1de 1

A B C D E F G H I J K L

TOWER - A
NOTE: HVAC PIPING LEGENDS: A4

18
T

2600
T'

F AO
ABOVE
2880
A'' A'''

8160
V'
A3

FFL
A2

34860

11°
A1

11°
AD

7400
AE'''

4000
AH

3400
AJ

6700
AN

FFL
-19. 85
SSL
ENT RY/E XIT
T OW ER-B
12600
AT

5500
AV

18
TA5

480 0
-20. 00 SP-T A-2 -20. 00
120
SSL

103
-20. 00 TA4
111 112 113 114 115 116 117 118 119
TA3

1) SEPERAT DRAWING FOR SUPPORT LOCATION AND DETAIL SHALL BE


110

CONDENSER WATER SUPPLY


11°
102

121
109

108 T W O W AY DRIVEW AY
105 FFL SP-T A-3

930 0
FFL -20. 00
-20. 00 SSL
SSL -20. 00
-20. 00 11°

107
A5 123
FFL
-19. 85
FI RE FI G HTI NG
R36
SSL
LO BBY 2
SERVI CE LI FT LO BBY- 2
6 0 0 x 5
7 0 6 0 0 x 0
9 0
-20. 00
79 78
7 5 0 x 1 0
4 0

99 27. 50m ²
R3
TA2
106 80 B5- 02- 05
8. 20m ²
PR- 1 PR- 2 2 0 0 x 2 5
3 0

B5- SS- 02
SP-T A-9 1 3 0 x 5
7 0 1 3 0 x 0
9 0

PART-1 PART-2
TECHN I CAL
81 RO O M 2
STAI R- 02

77

CONDENSER WATER RETURN


17. 94m ²
8. 06m ² SRL 3 F L2
124

11°
B5- ST- 02

- 19. 85

- 20. 00
FFL

SSL
B5- 02- 06
UP
98

SUBMITTED AS PER APPROVED PIPE STRESS ANALYSIS REPORT

378 00
ELV RM . - 2

111 00
SERVI CE
7. 81m ²
AREA
R1 R2

T W O W AY DRIVEW AY
B5- 02- 08
97 10. 12m ²
B5- 02- 10
F AO
84 ELEC. RM . - 2
ABOVE
14. 02m ²
FFL
-19. 85
M CC RM . 2 B5- 02- 09
75
7. 55m ² 126
SSL B5- 02- 07
-20. 00

AY
TA1

VEW
85 74

-20. FFL
FFL FFL

RI
01

00

8. 33% slope
96 -19. 85

-20. SSL
11°
-20. 00

Y D

RAM P
00
A6 73
2 6 0
5 x 1 0 0

SSL 22

A
SSL
-20. 00

W
-20. 00

T WO
FFL FFL
-20. 00 -20. 00
72
SSL SSL
95 -20. 00 -20. 00

CHILLED WATER SUPPLY


127
FFL
-19. 85 ONE W AY DRIVEW AY
71
SSL

895 0
-20. 00

1
88
94
70

Y
WA
FFL FFL FFL

11°

VE
-19. 85 -19. 85 -19. 85 129

DRI
SSL SSL SSL
23

Y
-20. 00 -20. 00

WA
-20. 00 38 37

O NE
FFL 69

214 9
-20. 00 55
SSL
-20. 00
A7 24
54 39

25 92

130
36
5000

CHILLED WATER RETURN


56

755 1
68

T W O W AY DRIVEW AY
15000
FFL TECHNI CAL RO O M 3

- 20. 00
SSL
FFL 131

- 20. 00
FFL
-19. 85 91 89 SP-T A-7 35
-19. 85 9. 86 m ²
52 41
SSL B5- 02- 15

890 0

11°
-20. 00 SSL
-20. 00
FFL
-20. 00
57
SSL 26

1
-20. 00
I RRI G ATI O N W AT ER TANK ( I W T)
67
##### m ²

285 0
B5- 02- 14
FFL 51
CHANGE THE 132
12
V=47. 24 m ³
-19. 70 CHANGE THE
PIPE S ZI E 1 " TO
2 9 0 x 1 0 2 0

41FT 42 34 PIPE S ZI E 1 " TO


27
( o e
p in g b
a o ve )

SSL
1. 25"
11FT 27
-20. 00 1. 25"
BASED ON BASED ON
PR- 4
HYDRA ULIC HYDRA ULIC
F L1 CALCUL ATION

ONE W AY DRIVEW AY
CHANGE THE CALCUL ATION
1 5 0 x 5
6 0

SP-T A-8
TECHNI CAL RO O M 4
PIPE SIZ E 2. 5"

- 20. 00

- 20. 00

- 20. 00
SSL

FFL

SSL
- 19. 85

- 20. 00

- 20. 00
FFL

SSL

FFL
74. 24m ²
8 0 0 x 5
6 0
TO 3" 5. 5FT
B5- 02- 21 12FT BASED ON
FFL 58
-20. 00 FI RE FI G HTI NG HYDRAULIC
SSL LO BBY 1 7FT ELEC. RM . - 1
RAM P
8. 33% slope
CALCUL ATION

765 0
SP-T A-4 5FT 11. 5FT 11. 5FT 11. 5FT

DRAIN PIPE
PR- 3
-20. 00 5. 83m ² SP-1
1 7 0 x 0
6 0
13. 59m ² 4FT I RRI G ATI O N PUM P RO O M 134 5. 5FT

890 0
B5- 02- 02
40. 74m ²
48 FFL
B5- SS- 01
-20. 00

SERVI CE LI F T LOBBY- 1
STAI R- 01
B5- 02- 13 44 32
24. 56m ² R4 FFL SSL

34. 45m ²
-20. 00 -20. 00

B5- 02- 01
B5- ST- 01 2 6 0
5 x 7
6 0
59
SSL
-20. 00 FFL
UP SRL 2 -20. 00
SSL
66 -20. 00 28

NOT UPDATED RCP


SP-T A-5
29' SRL 1
FFL 31
-19. 85 60 45 135
48
SSL
-20. 00

ONE W AY DRIVEW AY
R5

700 0
PART-4 PART-3
6 7 0 x 3 0
2 0

- 20. 00
SSL
- 20. 00
FFL
136
47 46
78FT EAO
SW I M M I NG PO O L ABOVE
W ATER TANK ( SPT)

TECHNI CAL RO O M 1 M CC RO O M 1 70FT


35. 03m ²
B5- 02- 03FFL
22. 60m ²

FFL
22. 79 m ²
30
-19. 85
B5- 02- 04
62
B5- 02- 12
29

124 50
-20. 00

MAKEUP WATER PIPE


STAI R- 15
63 V=##### m ³ FFL
SSL SSL -19. 70 17. 04m ²

41319
-20. 00 -20. 00 SSL B5- ST- 15
FFL FFL
-20. 00
30' FFL
-19. 85 -19. 85
SSL SSL

505 0
-19. 85 -20. 00 -20. 00 FFL
SSL -19. 85
-20. 00
SSL
FFL -20. 00
-19. 85 SM O KE STO P LO BBY

SSL
-20. 00
5. 60m ²
B5- SS- 15
31
FFL
-19. 85

31' 19 20 22 SSL
-20. 00 27 28
23 24 26
RAM P-DN RAM P-UP

597 5
F R B4 T O B4 137
SP-T A-6
140FT

5000
3
DISCHARGE LINE
FFL 31''

914 0
T W O W AY DRIVEW AY T W O W AY DRIVEW AY T W O W AY DRIVEW AY -19. 85

ENT RY/E XIT


T OW ER-D
MOTORIZED SERVICE ON OFF VALVE/
SSL
FFL FFL FFL -20. 00
-20. 00 -20. 00 -20. 00
SSL SSL SSL
-20. 00 -20. 00 -20. 00

481 5
15000
32 32

A103
18 17 16 14 13 11 10 08 07 06 05 02 01
FI LL W I TH SAND
74. 55m ²
B5- 02- 16

SECONDARY PUMPS MOTORIZED ISOLATING VALVE

566 0
EAO

566 0
ABOVE FFL
-20. 00
SSL
-20. 00

33
E 33

NOT UPDATED RCP


3800 10080 5820 11100 8200 2900 3900 600 7840 2960 1450 900 8315 3385 5500
6500

9100 1300 9300 9907


8650
N=396369500
T V Y Z' AB AC AD AE AF AH AM AN AP AR AT AV
E=231006875
TA5 TA4 TA3 TA2 TA1

2340
TA/S/CHWP-1 TA/S/CHWP-2 TA/S/CHWP-3 TA/S/CHWP-4 SHUT OFF GATE VALVE
Ø500 CHWS (DUTY)2284 GPM (DUTY)2284 GPM (DUTY)2284 GPM PG & DC
(STAND BY)2284 GPM
KEYPLAN
BOP: 4146mm CV CV CV
BUTTERFLY VALVE

GLV GLV Ø500ø CHWS GLV GLV


BALANCING VALVE
Ø300 CHWS PG & DC PG & DC PG & DC
FC FC FC CV FC
BOP: 873mm
(TYPICAL) SOLENDID VALVE

2710
700 700 700 700 GATE VALVE
SUCTION LINE 2

PRESSURE GAUGE

Ø300 CHWS FC
PG & DC PG & DC FC FC FC CHECK VALVE
BOP: 873mm ST ST PG & DC ST PG & DC ST
2
(TYPICAL) GV GV GV GV FLEXIBLE VICTAULIC COUPLING
Ø500ø CHWS
FLEXIBLE
2
THIS DRAWING COORDINATED WITH THE FOLLOWING

TA/GF/FCU-2

750
A102
TA/GF/FCU-1

"Y"STRAINER REFERENCE DRAWINGS

BOU:4500
Ø500 CHWS
BOU:4500

NUMBER NAME REV


BOP: 4146mm

510
Ø32 CHWS/R Ø32 CHWS/R
FLOW SWITCH
BOP:3924 mm BOP:4179 mm
Ø500 CHWS Ø600 CWS
Ø600 CWS
BOP: 4846mm BOP: 4095mm
BOP: 4095mm
568 908 859 860 2025 5929 2575 3330 848
Ø600 CWS
TA/CWP-1
BOP: 4095mm BV
MV TA-CHILLER-1 (DUTY)3426 GPM Architectural lFC's
ST
TA-1006 GROUND FLOOR PLAN 0
FS
Ø500 CHWR BV TB-1006 GROUND FLOOR PLAN 0
FC FC FC
BOP: 4146mm

Ø500 CHWS
BOP: 4846mm
CV ST PG & DC
MV GLV GV Ø600 CWS
Ø600 CWR ST

700
3

BY PASS LINE
3
BOP: 4095mm DV BOP: 4095mm
BV PG TM FC
Structural IFC's
TA-S-105 GROUND FLOOR GENERAL ARRANGEMENTS LAYOUT 5
TA-S-106 1ST FLOOR GENERAL ARRANGEMENTS LAYOUT 4
Ø600 CWS DISCHARGE LINE TB-S-105 GROUND FLOOR GENERAL ARRANGEMENTS LAYOUT
BOP: 4095mm BV FS TB-S-107 1ST FLOOR GENERAL ARRANGEMENTS LAYOUT
A2 DV

BOP:4179 mm
TA/CWP-2

Ø32 CHWS/R
BY PASS LINE

1 (DUTY)3426 GPM
Ø350 CWR A102
1740

(TYP) BOP: 393mm


Mechanical & Electrical
2
Ø300 CHWS BV TA-CHILLER-2 CH-TA-1006 GROUND FLOOR CHILLED WATER LAYOUT
MV FC FC AC-TA-0140A EQUIPMENTS INSTALLATION DETAILS-PART-A 0
(TYP) BOP: 1507mm ST CONDENSER PUMPS AC-TA-0140B EQUIPMENTS INSTALLATION DETAILS-PART-B 0
FS CV ST AC Z' AC-TA-0160(A TO G) CHILLED WATER RISER DIAGRAM (PART-A TO G) 1
BV FC GLV GV

700
Ø300 CHWR
TA/GF/FCU-3

Ø600 CWS
BOU:4500

(TYP) BOP: 917mm


MV BOP: 4095mm
ST
18 DV
BV PG TM 1ST FLOOR LEVEL
FC
4
SUCTION LINE 7600
Ø350 CWS BV FS 1ST FLOOR LVL
(TYP) BOP: 947mm DV TA/CWP-3 7500
Ø500 CHWS
BOP: 4846mm

(DUTY)3426 GPM
ANTI SURGE VALVE

Ø500 CHWS Ø600 CWS Ø600 CWR


BOP: 4095mm
1741

Ø600 CWS FC FC Ø50 CHWS/R BOP: 4846mm BOP: 4095mm


BOP: 4095mm CV ST BOP:3915 mm 4
TA/GF/FCU-3 Ø500 CHWS
BV TA-CHILLER-3 GLV GV Ø500 CHWS
MV PG
700

ST Ø600 CWS BOU:4500 BOP: 4146mm


Ø600 CWR BV FS BOP: 4846mm
BOP: 4095mm
BOP: 4095mm PG FC Ø600 CWS Ø600 CWS Ø600 CWS Ø500 CHWR
Ø350 CWS (TYP) BOP: 4095mm BOP: 4095mm BOP: 4095mm BOP: 4146mm
MV BOP: 852mm
ST
Ø500 CHWS BV BV
DV MBV MBV
BOP: 4146mm PG TM
Ø50 CHWR GV GLV Ø350ø CWS
BV FC
1379
TA/CWP-4 BOP: 3915mm TA/CHILLER-1
(STAND BY)3426 GPM ST ST
Ø350ø CWS
Ø500 CHWR FS BV BV
BV DV DN ST Ø300ø CHWS

4846

4846
BOP: 4146mm PG

4500
5
FC FC Ø350 CWS (TYP) CV TM

4089

4095

4095
CV ST BOP: 852mm FC FS PG
Ø350ø CWS PG/DC PG/DC
Ø300ø CHWR
Ø100 DRAIN PIPE GLV GV FC
Ø25 DOSING LINE
BOP: 93mm GV FC FC TA/CWP-2 TM Ø350ø CWR
BOP:1458mm FC
(DUTY)3426 GPM
TA/GF/FCU-4

Ø600 CWR
BOU:4500

AUTOMATIC CHEMICAL
BOP: 4095mm DV
G R U N D F O S

G R U N D F O S

G R U N D F O S

TREATMENT PLANT AS PER MS:

852
CODE DESCRIPTION CHECKED BY 5
1074

BY PASS VALVE OE-SMK-MT-MECH-MAT-0104 R1 FC FS A APPROVED


Ø100ø DRAIN PIPE GF-FFL
B APPROVED AS NOTED
Ø500 CHWS 0 C REVISE AND RE SUBMIT
AUTOMATIC CHEMICAL BOP: 3146mm FOR CONTINUATION PLEASE REFER PUMP INSTERIA BASE AS PER MATERIAL SUBMITTAL GROUND FLR LVL D ADDITIONAL INFO REQUIRED
678

TREATMENT PLANT AS PER GROUND FLOOR CHW SHOP DRAWING


Ø500 CHWR NO:OE-SMK-MT-MECH-MAT-0219-R0 -100 E REJECTED
Ø32 CHWS/R
TA4
Ø32 CHWS/R BOP: 3846mm
BOP:4429 mm
CHILLER SECTION-1 F OTHER

BOP:4429 mm GV GV GV GV 1
1187

4
ST ST ST ST A103 TO COOLING TOWER 1 : 50
Ø500 CHWR
Z' AC
OS
DF
N
RU
G

BOP: 3846mm
6
FROM COOLING TOWER ISSUED FOR APPROVAL 0 08-09-2021 SAMKO
PG PG PG PG 1ST FLOOR LEVEL
PURPOSE OF ISSUE Rev. Date Authorized
TA3 Ø25 DOSING LINE GV
FC FC FC FC 1782 924
Ø50 CHWS/R
PROJECT:

7600 MOZOON TOWERS - TOWER-A


BOP:4083 mm BOP:3915 mm THE OBEROI HOTELS & HOTEL SUITES
Ø500 CHWR TA/P/CHWP-4 1ST FLOOR LVL
2779

BOP: 3846mm 700 700 700 (STAND BY)3426 GPM HVAC PIPING ABBREVATION: 5B + G + 2 + 23 FLOORS
7500 DAFNA, QATAR
CV CHECK VALVE PIN. NO. 63080002
FC FC FC FC TA/P/CHWP-1 Ø500 CHWR Ø500 CHWS CLIENT:
TA/P/CHWP-1 PG PRESSURE GAUGE 6
(DUTY)3426 GPM BOP: 3846mm BOP: 4846mm
(DUTY)3426 GPM Ø500 CHWR MBV MOTORIZED SERVICE ON-OFF VALVE
Ø500 CHWS
BOP: 4146mm Ø50 MAKE UP W
BV BALANCING VALVE/BUTTERFLY VALVE BOP: 4146mm
PG CV PG CV PG CV PG BOP:4070mm Ø500 CHWR QATAR GENERAL INSURANCE & RE INSURANCE CO.
CV
TA/P/CHWP-2 5
BOP: 1912mm GV GATE VALVE
1727

A103 PROJECT CONSULTANT:


(DUTY)3426 GPM GLV GLV 6 GLV GLV GLV GLOBE VALVE ARCHITECTURAL

PRIMARY PUMPS A103


FC FLEXIBLE COUPLING
STRUCTURAL
MECHANICAL
A3 AAV Ø500 CHWR
AIR SEPARATOR ELECTRICAL

7250
BOP: 1912mm SV SOLENDID VALVE SUPERVISION
GV GV GV GV
TEL:44 363813-4 , 44 360764-5 FAX:44 363812 P.O.B: 5785-QATAR
EXP.V-1 DN UP DV DRAIN VALVE MAIN CONTRACTOR
Ø300ø CHWS Ø300ø CHWS Ø300ø CHWS Ø300ø CHWS
651

7
GV WM WATER METER
07-Sep-21 4:06:23 PMC:\Users\5210\Documents\Samko_TA_Chiller Plant Room_sali5MB5M.rvt

PRESSURIZATION UNITS COMPLETE WITH PRESSURE UP


BV BV
ORIENTALS

4846
VESSELS EXPANSION TANKS AND PUMP SETS T/A TO ABOVE ST ST ST ST
ENTERPRISES W.L.L
4146

AIR SEPARATOR AS PER MS: T/B TO BELOW TA/S/CHWP-1 TA/S/CHWP-2 TA/S/CHWP-3 TA/S/CHWP-3
Ø50 MAKE UP W PG PG PG PG P.O. BOX : 4729, DOHA, QATAR TEL: 44098222 FAX: 44657053
OE-SMK-MT-MECH-MAT-0183 R1 (DUTY)2284 GPM (DUTY)2284 GPM (DUTY)2284 GPM (STAND BY)2284 GPM
BOP:270mm F/A FROM ABOVE MEP CONTRACTOR
DC DC DC DC SAMKO INTERNATIONAL CO. W.L.L.
Ø500 CHWS
F/B FROM BELOW
PRESSURIZATION UNIT BOP: 5346mm
ZONE 38, STREET 231, BLDG. 95 SUHAIM BIN HAMAD STREET
REGENCY TRAVELS AND TOURS BUILDING, 1ST FLOOR
2895 ACROSS AL SADD AHLIBANK 7
CWS CONDENSER WATER SUPPLY DOHA, STATE OF QATAR
Ø500 CHWR TEL : +974 44 56 95 05 - 06 FAX : +974 44 67 35 80
e-mail : info@samko.qa web : http:\\www.samko.qa
Ø50 MAKE UP W BOP: 5346mm CWR CONDENSER WATER RETURN
SAMKO
FROM SYSTEM

BOP:3484mm GF-FFL
TO SYSTEM

SUPPLIER
FS FILTERATION SUPPLY
1588 2430
0
FR FILTERATION RETURN
PUMP INSTERIA BASE AS PER MATERIAL SUBMITTAL GROUND FLR LVL
FOR CONTINUATION PLEASE REFER
GROUND FLOOR CHW SHOP DRAWING
OF OVER FLOW PIPE
CHILLER SECTION-2 NO:OE-SMK-MT-MECH-MAT-0219-R0 -100
BOU BOTTOM OF UNIT 2 1 : 50
8
EM ENERGY METER TOWER-A

GROUND FLOOR
A3 Z' A2 AC A1 DRAWING TITLE
CHILLER PLANT ROOM
CHILLER SCHEDULE AIR SEPARATOR SCHEDULE
EXPANSION TANK SCHEDULE 8

SL.NO TOWER UNIT REFERENCE LOCATION QTY FLOW(GPM) MODEL NO. SIZE(INCH) PART-1 OF 2
SL.NO TOWER UNIT REFERENCE LOCATION MODEL CAPACITY(TR) CONDENSER(GPM) EVAPORATOR(GPM) QTY SL.NO TOWER UNIT REFERENCE LOCATION MODEL NO. VOLUME Ltrs RATED PRESSURE QTY
TA-GROUND FLOOR CHILLER PLANT ROOM FLAMCOVENT CLEAN
SCALE:
DRAW : ALI DATE: 08-09-2021
0 1 : 50 01 TOWER-A TA/CHILLER GROUND FLOOR DWDC100M 1142 3315 2277 03 01 TOWER-A EXPANSION TANK LOWER ZONE
FLEXCON M exp.ves
2000L (16 bar)
2000 liters 16 bar 1 01 TOWER-A AIR SEPARATOR LOWER ZONE 1 NO 6747
SEP.500F 25b SMART
20"
PRINT SIZE: A0 CHECKED : RIZA PROJECT NO: C-275

MATERIAL SUBMITTAL NO:OE-SMK-MT-MECH-MAT-0194 R0 MATERIAL SUBMITTAL NO:OE-SMK-MT-MECH-MAT-0183 R1 DRAWING NO. OE-SMK-MECH-HVAC-SD-MT-TA-5000-09 0


MATERIAL SUBMITTAL NO:OE-SMK-MT-MECH-MAT-0146 R1
THIS DRAWING IS UNDER COPYRIGHT AND IS NOT TO BE COPIED OR PRESENTED
TO UNAUTHORIZED PARTIES WITHOUT SPECIAL PERMISSION

A B C D E F G H I J K L

Você também pode gostar