Escolar Documentos
Profissional Documentos
Cultura Documentos
Grupo:
DIVERSOS
00001
00002
PISO EM TABUA DE MADEIRA DE LEI IA, ESPESSURA 2,5CM, FIXADO EM PECAS DE MADEIRA
00003
00004
PISO EM PEDRA ARDOSIA, 40X40CM, ESPESSURA lCM, ASSENTADA COM ARGAMASSA COLANTE,COM REJUNTE EM C
00007
002
Grupo:
00001
003
Grupo:
00001
004
SERVICOS PRELIMINARES
MOVIMENTO DE TERRA
ESCAVAO MANUAL CAMPO ABERTO EM TERRA, DE 2,01 A 4,00M
Grupo:
FUNDAES E ESTRUTURAS
00001
00002
00003
00004
00005
00006
005
Grupo:
PAREDES E PAINIS
00001
ALVENARIA DE TIJOLO CERMICO FURADO (9x19x19)cm C/ARGAMASSA MISTA DE CAL HIDRATADA ESP.=10cm (1:2:8)
00002
ALVENARIA DE TIJOLO CERMICO FURADO (9x19x19)cm C/ARGAMASSA MISTA DE CAL HIDRATADA ESP=20 cm
00003
00004
006
Grupo:
ESQUADRIAS E FERRAGENS
00001
00002
00003
00004
007
Grupo:
COBERTURA
00001
00002
00003
008
Grupo:
IMPERMEABILIZAO
00001
00002
009
Grupo:
REVESTIMENTOS
00001
CHAPISCO C/ ARGAMASSA DE CIMENTO E AREIA S/PENEIRAR TRAO 1:3 ESP.= 5mm P/ PAREDE
00002
00003
CERMICA ESMALTADA C/ ARG. CIMENTO E AREIA AT 30x30cm (900 cm) - PEI-5/PEI-4 P/ PAREDE
00004
00005
REJUNTAMENTO C/ ARG. PR-FABRICADA, JUNTA AT 2mm EM CERMICA, AT 30x30 cm (900 cm) (PAREDE/PISO)
00006
REJUNTAMENTO C/ ARG. PR-FABRICADA, JUNTA ENTRE 2mm E 6mm EM CERMICA, AT 30x30 cm (900 cm) (PARED
00007
00008
FORRO DE GESSO CONVENCIONAL (60x60)cm COM TIRO E ARAME GALVANIZADO ENCAPADO - FORNECIMENTO E MO
010
Grupo:
PISOS
00001
00002
00003
PISO CIMENTADO C/ ARGAMASSA DE CIMENTO E AREIA S/ PENEIRAR, TRAO 1:4, ESP.= 1,5cm C/ IMPERMEABILIZANT
00004
REGULARIZAO DE BASE C/ ARGAMASSA CIMENTO E AREIA S/ PENEIRAR, TRAO 1:4 - ESP= 3cm
00005
00006
00007
SOLEIRA DE MRMORE L= 25 cm
011
Grupo:
PINTURA
00001
00002
00003
00004
012
Grupo:
00001
013
Grupo:
00001
014
URBANIZAO/PAISAGISMO
SERVIOS DIVERSOS
LIMPEZA DE PISOS E REVESTIMENTOS
Grupo:
INSTALAES
00001
INSTALAES ELTRICAS/TELEFONE
00002
TOTAL DA OBRA
Pgina
1 de
TOTAL GRUPO
R$
65,576.71
20.92 M2
294.14
6,153.41
221.66 M2
172.66
38,271.82
262.68 M2
21.86
5,742.18
122.05 M2
35.48
4,330.33
24.08 M2
460.09
11,078.97
TOTAL GRUPO
416.20 M2
TOTAL GRUPO
90.15 M3
TOTAL GRUPO
R$
3.49
R$
28.66
R$
1,452.54
1,452.54
2,583.70
2,583.70
105,693.21
8.24 M3
392.24
4.13 M3
443.76
1,832.73
326.00 M2
68.54
22,344.04
4,004.00 KG
5.99
23,983.96
42.89 M3
319.94
13,722.23
607.64 M2
66.78
40,578.20
TOTAL GRUPO
R$
3,232.06
64,410.35
1,024.41 M2
37.08
37,985.12
170.33 M2
65.51
11,158.32
49.48 M3
280.09
13,858.85
1.56 M3
902.60
1,408.06
TOTAL GRUPO
R$
41,024.28
86.63 M2
226.08
19,585.31
11.00 UN
442.70
4,869.70
10.00 UN
452.75
4,527.50
36.60 M2
329.01
12,041.77
TOTAL GRUPO
R$
92,217.46
116.18 M
15.89
1,846.10
532.85 M2
70.60
37,619.21
532.85 M2
99.00
52,752.15
TOTAL GRUPO
R$
3,065.21
55.63 M2
19.20
1,068.10
55.63 M2
35.90
1,997.12
TOTAL GRUPO
R$
87,698.30
2,389.48 M2
4.00
9,557.92
2,976.90 M2
22.00
65,491.80
82.04 M2
61.88
5,076.64
15.29
1,858.65
4.71
386.41
121.56 M
82.04 M2
21.11 M2
5.46
115.26
589.42 M2
7.55
4,450.12
33.65 M2
22.63
761.50
TOTAL GRUPO
R$
23,710.23
21.11 M2
49.01
1,034.60
21.42 M3
282.10
6,042.58
44.85 M2
28.66
1,285.40
608.78 M2
14.81
9,016.03
438.87 M
11.91
5,226.94
6.00 M
63.60
381.60
15.50 M
46.65
723.08
TOTAL GRUPO
R$
42,071.92
829.45 M2
10.55
8,750.70
1,270.26 M2
12.21
15,509.87
494.36 M2
13.11
6,481.06
829.45 M2
13.66
11,330.29
TOTAL GRUPO
528.92 M2
R$
9.03
TOTAL GRUPO
103.15 M2
R$
4.06
TOTAL GRUPO
R$
4,776.15
4,776.15
418.79
418.79
80,500.00
1.00 VB
22,500.00
22,500.00
1.00 VB
58,000.00
58,000.00
R$
615,198.84
()