Reposicion de la Infraestructura de la IEP. JOSE MARIA ARGUEDAS , Distrito de Chirinos-San Ignacio-Cajamarca.

AULAS PRIMER PISO


Partida

Unidad

Descripcin

Cantidad

Largo

Ancho

Alto

Parcial

Total

1m a cada lado

1.00

12.20

16.65

--------

203.13

203.13

1.00

12.20

16.65

0.25

50.78

50.78

Z3:

2.00

1.50

1.00

1.50

4.50

Z2:

2.00

1.80

1.20

1.50

6.48

Z1

2.00

2.10

1.40

1.50

8.82

Z4

2.00

4.70

2.60

1.50

36.66

Z5

2.00

2.70

1.50

1.50

12.15

Z6

1.00

3.10

1.70

1.50

7.91

Z7

1.00

1.90

1.90

1.50

5.42

Z8

1.00

1.20

2.20

1.50

3.96

Eje A-A

2.00

2.48

0.50

1.50

3.7125

2.00

2.75

0.50

1.50

4.125

2.00

1.53

0.50

1.50

2.295

2.00

1.95

0.50

1.50

2.925

2.00

1.60

0.50

1.50

2.4

2.00

1.30

0.50

1.50

1.95

1.00

1.20

0.50

1.50

0.9

1.00

0.75

0.50

1.50

0.5625

2.00

1.00

0.50

0.70

0.70

TRABAJOS PRELIMINARES
TRAZO Y REPLANTEO

m2

MOVIMIENTO DE TIERRAS
CORTE DE TERRENO NATURAL Hmax<=1.00m EN TERRENO
NORMAL
m3

85.89

EXCAVACION DE ZANJAS Y/O ZAPATAS Hmax<=1.50m


m3EN TERRENO NORMAL
ZAPATAS

CIMIENTOS CORRIDOS

Eje C-C
Eje 4-4; 8-8
Eje 6-6
RELLENO CON MATERIAL PROPIO

m3
ZAPATAS

39.42
Z3: Eje C,/ 4 y 8

2.00

0.75

0.75

0.70

0.79

Z2: Eje B-B,/4-4

2.00

0.95

1.80

0.70

2.39

Z1: Eje B,/4-4 y 8-8

2.00

1.15

1.05

0.70

1.69

2.00

0.80

1.40

0.70

1.57

Z4: Eje C-C / 5-5 y 7-7 2.00

2.35

2.60

0.70

8.55

2.00

2.10

2.60

0.70

7.64

2.00

1.10

1.50

0.70

2.31

2.00

1.35

1.50

0.70

2.84

1.00

1.20

0.68

0.70

0.57

2.00

1.10

0.47

0.70

0.72

Z8: Eje 6-6

2.00

0.82

1.90

0.70

2.18

Z6: Eje 6-6

2.00

0.73

1.48

0.70

1.51

1.00

1.30

1.70

0.70

1.55

2.00

2.48

0.25

0.70

0.87

2.00

2.75

0.25

0.70

0.96

2.00

1.53

0.25

0.70

0.54

2.00

1.95

0.25

0.70

0.68

2.00

1.60

0.25

0.70

0.56

2.00

1.30

0.25

0.70

0.46

1.00

1.20

0.25

0.70

0.21

1.00

0.75

0.25

0.70

0.13

--------

170.84

Z5: Eje A-A /5-5 y 7-7


Z8: Eje 6-6

CIMIENTOS CORRIDOS

Eje A-A
Eje C-C
Eje 4-4; 8-8
Eje 6-6

ELIMINACION DE MATERIAL EXCEDENTE

m3

Factor de esponjamiento1.25
25% --------

--------

RELLENO CON MATERIAL DE PRESTAMO MANUAL m3


ZAPATAS

18.87

131.42
31.29

Z3:

2.00

1.50

1.00

0.30

0.90

Z2:

2.00

1.80

1.20

0.30

1.30

Z1

2.00

2.10

1.40

0.30

1.76

Z4

2.00

4.70

2.60

0.30

7.33

Z5

2.00

2.70

1.50

0.30

2.43

Reposicion de la Infraestructura de la IEP. JOSE MARIA ARGUEDAS , Distrito de Chirinos-San Ignacio-Cajamarca.


Partida

Unidad

Cantidad

Largo

Ancho

Z6

1.00

3.10

1.70

0.30

Z7

1.00

1.90

1.90

0.30

1.08

Z8

1.00

1.20

2.20

0.30

0.792

Eje A-A

2.00

2.48

0.50

0.30

0.7425

2.00

2.75

0.50

0.30

0.825

2.00

1.53

0.50

0.30

0.459

2.00

1.95

0.50

0.30

0.585

2.00

1.60

0.50

0.30

0.48

2.00

1.30

0.50

0.30

0.39

1.00

1.20

0.50

0.30

0.18

1.00

0.75

0.50

0.30

0.1125

2.00

6.50

7.95

0.10

10.34

aula 1

1.00

6.50

7.95

51.68

aula 2

1.00

6.50

7.95

51.68

Z3: Eje A-A/4-4

2.00

0.50

1.00

1.00

Z5: Eje A-A/5-5 y 7-7

2.00

1.50

1.10

3.30

Z8: EjeA-A/ 6-6

1.00

1.80

0.85

1.53

Z1 : Eje C-C /4-4 y 8-8 2.00

1.40

0.80

2.24

Z4: Eje C-C/5-5 y 7-7

2.00

2.60

2.10

10.92

Z6 : Eje C-C /6-6

1.00

1.70

1.30

2.21

Vereda frontal

1.00

1.00

25.04

25.04

Exterior posterior

1.00

16.65

0.50

8.33

Z1

2.00

2.10

1.40

--------

5.88

Z2

2.00

1.80

1.20

--------

4.32

Z3

2.00

1.50

1.00

--------

3.00

Z4

2.00

2.60

4.70

--------

24.44

Z5

2.00

2.70

1.50

--------

8.10

Z6

1.00

3.10

1.70

--------

5.27

Z7

1.00

1.90

1.90

--------

3.61

Z8

1.00

1.20

2.20

--------

2.64

Eje 4-4 y 8-8

2.00

1.60

0.50

0.60

0.96

1.00

1.30

0.50

0.60

0.39

1.00

1.20

0.50

0.60

0.36

1.00

0.75

0.50

0.60

0.23

2.00

2.75

0.50

0.60

1.65

2.00

2.48

0.50

0.60

1.49

2.00

1.53

0.50

0.60

0.92

2.00

1.95

0.50

0.60

1.17

Eje A-A

4.00

3.80

0.15

0.45

1.03

Eje C-C

2.00

3.80

0.15

0.45

0.51

2.00

2.80

0.15

0.45

0.38

1.00

1.00

0.15

0.25

0.04

6.00

2.88

0.25

0.45

1.94

ENCOFRADO Y DESENCOFRADO NORMAL EN SOBRECIMIENTOS


m2 Eje A-A

8.00

3.80

----

0.45

13.68

Eje C-C

4.00

3.80

----

0.45

6.84

4.00

2.80

----

0.45

5.04

2.00

1.00

----

0.25

0.50

12.00

2.88

----

0.45

15.55

CIMIENTOS CORRIDOS

Descripcin

Eje C-C
Eje 4-4; 8-8
Eje 6-6
Relleno cama para el falso piso
NIVELACION Y APISONADO MANUAL

Alto

Parcial

Total

1.58

m2

157.92

OBRAS DE CONCRETO SIMPLE


SOLADO PARA ZAPATAS E= 4"

CONCRETO CICLOPEO 1:10+30% P.M.

m2

m3

Eje 6-6
Eje A-A
Eje C-C

CONCRETO 1:8+25% P.M. PARA SOBRECIMIENTOS m3

Ejes 4,6,8

Ejes 4,6,8
OBRAS DE CONCRETO ARMADO
ZAPATAS

57.26

7.16

3.90

41.61

Reposicion de la Infraestructura de la IEP. JOSE MARIA ARGUEDAS , Distrito de Chirinos-San Ignacio-Cajamarca.


Partida
CONCRETO PARA ZAPATAS F'C=210 KG/CM2

Unidad
m3

ACERO ESTRUCTURAL TRABAJADO PARA ZAPATASKg

Cantidad

Largo

Ancho

Z1

Descripcin

3.00

2.10

1.40

Alto
0.50

Parcial
4.41

Z2

4.00

1.80

1.20

0.50

4.32

Z3

2.00

1.50

1.00

0.50

1.50

Z4

2.00

4.70

2.60

0.50

12.22

Z5

2.00

2.27

1.50

0.50

3.41

Z6

1.00

3.10

1.70

0.50

2.64

Z7

1.00

1.90

1.90

0.50

1.81

Z8

1.00

1.20

2.20

0.50

1.32

Z1- transversal

28.00

2.00

1/2

1.02

57.12

Z1- longitudinal

18.00

1.30

1/2

1.02

23.87

Z2- transversal

48.00

1.10

1/2

1.02

53.86

Z2 - longitudinal

28.00

1.70

1/2

1.02

48.55

Z3- transversal

18.00

0.90

1/2

1.02

16.52

Z3- longitudinal

14.00

1.40

1/2

1.02

19.99

62.00

2.50

1/2

1.02

158.10

Z4- longitudinal

34.00

4.60

1/2

1.02

159.53

Z5- transversal

36.00

1.40

1/2

1.02

51.41

Z5 - longitudinal

20.00

2.60

1/2

1.02

53.04

Z6- transversal

21.00

1.60

1/2

1.02

34.27

Z6- longitudinal

11.00

3.00

1/2

1.02

33.66

Z7- transversal

13.00

1.80

1/2

1.02

23.87

Z7- longitudinal

13.00

1.80

1/2

1.02

23.87

Z8- transversal

8.00

2.10

1/2

1.02

17.14

Z8- longitudinal

15.00

1.10

1/2

1.02

16.83

6.00

2.88

0.25

0.40

1.73

8.00

3.85

0.25

0.40

3.08

12.00

2.88

--------

0.40

13.82

8.00

3.85

--------

0.40

12.32

Total
31.62

219.91

VIGAS DE CIMENTACION
CONCRETO EN VIGAS DE CIMENTACION F'C= 210 KG/CM2
m3 Eje 4-4,6-6-2,8-8
Eje A-A, C-C
ENCOFRADO Y DESENCOFRADO VIGA DE CIMENTACION
m2 Eje 1-1,2-2,3-3
Eje A-A, C-C
ACERO ESTRUCTURAL TRABAJADO PARA VIGAS DEKg
CIMENTACION
Eje 4-4,6-6,8-8

4.81

26.14

24.00

3.70

1/2

1.02

90.58

226.03

132.00

1.66

1/4

0.25

54.78

86.32

Eje A-A, C-C

32.00

4.15

1/2

1.02

135.46

VC . ESTRIBOS

76.00

1.66

1/4

0.25

31.54

C1

4.00

0.50

0.25

3.00

1.50

C2

6.00

0.50

0.25

3.85

2.89

C3

3.00

0.25

0.25

3.85

0.72

8.00

0.20

0.15

1.20

0.29

8.00

0.20

0.15

2.10

0.50

Eje A-A/ 4-4 y 8-8 : C2 2.00

0.75

--------

3.00

4.50

Eje 5-5 y 7-7:

4.00

1.50

--------

3.00

18.00

VC . ESTRIBOS

COLUMNAS
CONCRETO F'C=210 KG/CM2. PARA COLUMNAS

m3

CONCRETO F'c=175 kG/CM2 PARA COLUMNETAS DEm3


CONFINAMIENTO
Eje C-C : C4

ENCOFRADO Y DESENCOFRADO DE COLUMNAS

m2

Eje B-B:

C1

3.00

0.50

--------

3.00

4.50

Eje C-C: C2

C3

2.00

1.00

--------

3.00

6.00

Eje 6-6/ A-A, C-C

2.00

1.25

--------

3.00

7.50

5.11

0.79

40.50

-------ACERO ESTRUCTURAL TRABAJADO PARA COLUMNAS


Kg

C-1 acero long. Laterales


32.00

4.80

3/4

2.25

345.60

C-1 acero en estribos 96.00

2.06

3/8

0.56

110.75

C-2 acero long. Laterales


48.00

4.80

5/8

1.56

359.42

1,234.41

Reposicion de la Infraestructura de la IEP. JOSE MARIA ARGUEDAS , Distrito de Chirinos-San Ignacio-Cajamarca.


Partida

Unidad

Cantidad

Largo

C-2 acero en estribos144.00

Descripcin

2.06

Ancho
3/8

Alto
0.56

Parcial
166.12

C-3 acero long. Laterales


18.00

4.80

1/2

1.02

88.13

C-3 acero en estribos 72.00

0.96

3/8

0.56

38.71

C-4 acero longitudinal 32.00

2.15

3/8

0.56

38.53

C-4 acero longitudinal 32.00

3.05

3/8

0.56

54.66

C-4 acero en estribos 80.00

0.65

1/4

0.25

13.00

C-4 acero en estribos 120.00

0.65

1/4

0.25

19.50

VP-1

2.00

7.00

0.25

0.45

1.58

VP-1 : VOLADIZO

2.00

2.50

0.25

0.33

0.41

Total

VIGAS
CONCRETO F'C=210 KG/CM2. PARA VIGAS

m3

2.00

0.40

0.25

0.20

0.04

VP 2 - (25x55)

3.00

7.00

0.25

0.30

1.58

VP 2 - Voladizo

3.00

2.50

0.25

0.33

0.61

VP 2 -Voladizo poster. 3.00

0.40

0.25

0.20

0.06

VS - (30 X 20)

4.00

3.85

0.30

0.20

0.92

VA (20 X 20)

4.00

3.85

0.20

0.20

0.62

VIGUETA

4.00

3.85

0.20

0.10

0.31

CONCRETO F'c=175 kG/CM2 PARA VIGUETAS DE CONFINAMIENTO


m3 Eje A-A

ENCOFRADO Y DESENCOFRADO DE VIGAS

m2

6.00

3.85

0.15

0.15

0.52

Eje C-C

2.00

2.58

0.15

0.15

0.12

Eje 4-4,6-6,8-8

3.00

7.00

------

0.20

4.20

Eje 5--5,7-7

2.00

7.00

------

0.75

10.50

VP-1 voladizo

5.00

2.50

------

0.65

8.13

6.00

3.85

------

0.30

6.93

Eje C-C

2.00

2.68

VP-1

4.00

9.82

4.00

ENCOFRADO Y DESENCOFRADO EN VIGUETAS DE CONFINAMIENTO


m2 Eje A-A
ACERO ESTRUCTURAL TRABAJADO PARA VIGAS

Kg

estribos
VP-2

VS
VA

0.30

1.61

3/4

2.25

88.38

10.00

3/4

2.25

90.00

4.00

7.90

3/4

2.25

71.10

4.00

9.80

3/4

2.25

88.20

2.00

2.00

5/8

1.56

6.24

4.00

4.15

5/8

1.56

25.90

104.00

1.26

3/8

0.56

73.38

6.00

9.82

3/4

2.25

132.57

6.00

8.30

3/4

2.25

112.05

3.00

1.00

3/4

2.25

6.75

6.00

1.45

3/4

2.25

19.58

6.00

3.10

3/4

2.25

41.85

40.00

4.28

5/8

1.56

267.07

16.00

4.28

5/8

1.56

106.83

Estribos VP - 2

177.00

1.26

3/8

0.56

124.89

Estribos VS

208.00

1.06

1/4

0.25

55.12

Estribos VA

104.00

0.76

1/4

0.25

19.76

22.00

8.30

0.10

0.15

2.74

1.00

8.30

9.90

0.05

4.11

1.00

8.30

9.90

-------

82.17

22.00

8.30

1/2

1.02

186.25

44.00

1.30

1/2

1.02

58.34

22.00

3.05

3/8

0.56

37.58

22.00

3.05

1/2

1.02

68.44

Acero de temperatura 42.00

9.90

1/4

0.25

103.95

6.12

0.64

31.36

1,329.67

LOSAS ALIGERADAS
CONCRETO F'C=175 KG/CM2. PARA LOSAS ALIGERADAS
M3

Primera planta

ENCOFRADO Y DESENCOFRADO NORMAL EN LOSAS


M2ALIGERADAS
Primera planta
ACERO ESTRUCTURAL TRABAJADO PARA LOSAS ALIGERADAS
KG Acero en vigueta

6.85

82.17

454.56

Reposicion de la Infraestructura de la IEP. JOSE MARIA ARGUEDAS , Distrito de Chirinos-San Ignacio-Cajamarca.


Partida
LAXDRILLO HUECO

Unidad

Descripcin

Cantidad

Largo

9.00

8.30

UND

Ancho

Alto

Parcial

Total

9.30

694.71

ALBAILERIA
MURO DE LADRILLO KK DE ARCILLA 9x14x24 Cm.

m2

DE CABEZA

Eje 4-4, 6-6,8-8

6.00

2.88

-------

2.60

44.93

44.93

DE SOGA

Eje A-A

4.00

3.40

-------

1.00

13.60

37.96

Eje C-C

2.00

3.40

-------

2.10

14.28

2.00

2.40

-------

2.10

10.08

Vereda frontal

1.00

2.50

8.30

-------

20.75

Vereda posterior

1.00

0.50

8.30

-------

4.15

AULA 1

1.00

6.70

7.95

-------

53.27

ESTRADO AULA 1

1.00

5.10

1.20

-------

6.12

AULA 2

1.00

6.70

7.95

-------

53.27

ESTRADO AULA 2

1.00

5.10

1.20

-------

6.12

Vereda frontal

1.00

2.50

8.30

-------

20.75

Vereda posterior

1.00

0.50

8.30

-------

4.15

AULA 1

1.00

6.70

7.95

-------

53.27

AULA 2

1.00

6.70

7.95

-------

53.27

PISOS Y PAVIMENTOS
CONCRETO F'c=140 kG/CM2 PARA VEREDAS e=4"

m2

CONCRETO F'C=140 KG/CM2- PARA FALSO PISO e= m2


4"

PISO DE CEMENTO PULIDO U BRUADO E: 1CM.

24.90

m2

118.77

131.43

REVESTIMIENTOS
TARRAJEO EN INTERIORES ACABADO CON CEMENTO-ARENA
m2 Eje 4-4, 6-6 , 8-8

8.00

2.88

-------

2.90

66.82

Eje A-A

4.00

3.40

-------

1.20

16.32

Eje C-C

2.00

3.40

-------

2.10

14.28

2.00

2.40

-------

2.10

10.08

TARRAJEO EN EXTERIORES CON CEMENTO-ARENA-BRUADO


m2 Eje A-A

2.00

3.40

-------

1.20

8.16

Eje C-C

2.00

3.4

-------

2.1

14.28

2.00

2.40

-------

2.10

10.08

1.00

6.70

7.75

-------

51.93

1.00

6.70

7.75

-------

51.93

Vereda delantera

1.00

2.50

7.75

-------

19.38

Vereda posterior
TARRAJEO DE SUPERFICIE DE COLUMNAS CON CEMENTO-ARENA
m2 Eje 4-4, 8-8

1.00

0.50

7.75

-------

3.88

2.00

1.50

-------

3.00

9.00

Eje 5-5, 7-7

2.00

2.50

-------

3.00

15.00

Eje 6-6

1.00

2.05

-------

3.00

6.15

columetas

8.00

0.40

-------

1.20

3.84

8.00

0.40

-------

2.10

6.72

VP- 2

4.00

6.85

-------

0.10

2.74

VP-1

2.00

6.85

-------

0.75

10.28

VS

8.00

3.85

-------

0.65

20.02

VA

4.00

3.85

-------

0.20

3.08

VIGUETA

4.00

3.85

-------

0.20

3.08

6.00

3.85

-------

-------

23.10

2.00

2.85

-------

-------

5.70

2.00

2.10

-------

-------

4.20

TARRAJEO EN CIELO RASO ACABADO CON CEMENTO-ARENA


m2 Primera planta

TARRAJEO DE SUPERF. VIGAS PERALTADAS-H:0.10m2

VESTIDURA DE DERRAMES ANCHO=15 CM.

m
P-2

107.50

32.52

127.10

40.71

39.20

33.00

Reposicion de la Infraestructura de la IEP. JOSE MARIA ARGUEDAS , Distrito de Chirinos-San Ignacio-Cajamarca.


Partida

Unidad

Descripcin

Cantidad

Largo

Ancho

Alto

Parcial

Total

2.00

-------

1.25

2.10

5.25

5.25

4.00

-------

3.85

0.90

13.86

35.42

3.85

1.40

21.56

CARPINTERIA METALICA
PUERTA - METALICA

M2

VENTANA - METALICA

M2

P-2

4.00
CARPINTERIA MADERA
TISERO

Unid

2.00

-------

1.00

5.00

10.00

P-2

2.00

-------

1.70

1.25

4.25

V3

2.00

3.85

1.30

10.01

18.33

V2

4.00

-------

2.60

0.80

8.32

22.58

VIDRIOS
PUERTA - METALICA

10.00
243.53

p2

VENTANA - METALICA
p2
PINTURA
PINTURA IMPRIMANTE DOS MANOS EN MUROS

m2

1.00

-------

-------

-------

347.02

347.02

PINTURA EN INTERIORES LATEX DOS MANOS

m2

1.00

-------

-------

-------

107.50

107.50

PINTURA EN EXTERIORES LATEX DOS MANO

m2

1.00

-------

-------

-------

32.52

32.52

PINTURA EN CIELO RASO 2 MANOS

m2

1.00

-------

-------

-------

127.10

127.10

m2
PINTURA EN VIGAS PERALTADAS H:.15 CM LATEX DOS
m2 MANO

1.00

-------

-------

-------

40.71

40.71

1.00

-------

-------

-------

39.20

39.20

PINTURA EN DERRAMES ANCHO=15 CM.

1.00

-------

-------

-------

33.00

33.00

12.00

-------

-------

-------

12.00

12.00

12.00

-------

-------

-------

12.00

12.00

4.00

-------

-------

-------

4.00

4.00

-------

-------

-------

12.00

-------

-------

-------

12.00

12.00

PINTURA EN COLUMNAS LATEX DOS MANO

INSTALACIONES ELECTRICAS
SALIDA PARA CENTROS DE LUZ C/INTERRUPTOR Pto
SALIDA PARA SPOT-LIGHT CON PVC
Pto
SALIDA PARA INTERRUPTOR SIMPLE

Pto

SALIDA PARA INTERRUPTOR DOBLE

Pto
SALIDA PARA TOMACORRIENTES BIPOLARES SIMPLES
Pto CON PVC
TABLERO ELECTRICO GAB.METALICO P/DISTRIBUCION
Unid DE 4 CIRCUITOS
TABLERO ELECTRICO GAB.METALICO GENERAL-02Unid
DE 4 CIRCUITOS

-------

-------

-------

1.00

-------

-------

-------

1.00

1.00

1.00

-------

-------

-------

1.00

1.00

FLETE
FLETE TERRESTRE

Unid

AULAS SEGUNDO PISO


Partida

Unidad

Descripcin

Cantidad

Largo

Ancho

Alto

Parcial

Total

COLUMNAS
CONCRETO F'C=210 KG/CM2. PARA COLUMNAS

m3

C1

4.00

0.50

0.25

3.00

1.50

C2

6.00

0.50

0.25

3.85

2.89

C3

3.00

0.25

0.25

3.85

0.72

8.00

0.20

0.15

1.20

0.29

8.00

0.20

0.15

2.10

0.50

Eje A-A/ 4-4 y 8-8 : C2

2.00

0.75

--------

3.00

4.50

Eje 5-5 y 7-7:

4.00

1.50

--------

3.00

18.00

CONCRETO F'c=175 kG/CM2 PARA COLUMNETAS DE CONFINAMIENTO


m3
Eje C-C :

ENCOFRADO Y DESENCOFRADO DE COLUMNAS

m2

Eje B-B:

C4

C1

3.00

0.50

--------

3.00

4.50

Eje C-C: C2

C3

2.00

1.00

--------

3.00

6.00

Eje 6-6/ A-A, C-C

2.00

1.25

--------

3.00

7.50

5.11

0.79

40.50

-------ACERO ESTRUCTURAL TRABAJADO PARA COLUMNAS

Kg

C-1 acero long. Laterales

32.00

3.20

3/4

2.25

230.40

C-1 acero en estribos

96.00

2.06

3/8

0.56

110.75

C-2 acero long. Laterales

48.00

3.20

5/8

1.56

239.62

144.00

2.06

3/8

0.56

166.12

C-3 acero long. Laterales

18.00

3.20

1/2

1.02

58.75

C-3 acero en estribos

72.00

0.96

3/8

0.56

38.71

C-4 acero longitudinal

32.00

1.50

3/8

0.56

26.88

C-4 acero longitudinal

32.00

2.30

3/8

0.56

41.22

C-4 acero en estribos

80.00

0.65

1/4

0.25

13.00

C-4 acero en estribos

120.00

0.65

1/4

0.25

19.50

acero de pasamanos

10.00

1.20

1/2

1.02

12.24

acero de pasamanos

30.00

0.20

1/4

0.25

1.50

VP-1

2.00

7.00

0.25

0.45

1.58

VP-1 : VOLADIZO

2.00

2.50

0.25

0.33

0.41

C-2 acero en estribos

958.68

VIGAS
CONCRETO F'C=210 KG/CM2. PARA VIGAS

m3

2.00

0.40

0.25

0.20

0.04

VP 2 - (25x55)

3.00

7.00

0.25

0.30

1.58

VP 2 - Voladizo

3.00

2.50

0.25

0.33

0.61

VP 2 -Voladizo poster.

3.00

0.40

0.25

0.20

0.06

VS - (30 X 20)

4.00

3.85

0.30

0.20

0.92

VA (20 X 20)

4.00

3.85

0.20

0.20

0.62

VIGUETA

4.00

3.85

0.20

0.10

0.31

CONCRETO F'c=175 kG/CM2 PARA VIGUETAS DE CONFINAMIENTO


m3
Eje A-A

6.00

3.85

0.15

0.15

0.52

Eje C-C

2.00

2.58

0.15

0.15

0.12

pasamanos

4.00

3.85

0.10

0.10

0.15

Eje 4-4,6-6,8-8

3.00

7.00

------

0.20

4.20

Eje 5--5,7-7

2.00

7.00

------

0.75

10.50

VP-1 voladizo

5.00

2.50

------

0.65

8.13

6.00

3.85

------

0.30

6.93

Eje C-C

2.00

2.68

0.30

1.61

pasamanos

4.00

3.85

0.20

3.08

VP-1

4.00

9.82

3/4

2.25

88.38

4.00

10.00

3/4

2.25

90.00

4.00

7.90

3/4

2.25

71.10

4.00

9.80

3/4

2.25

88.20

2.00

2.00

5/8

1.56

6.24

4.00

4.15

5/8

1.56

25.90

104.00

1.26

3/8

0.56

73.38

6.00

9.82

3/4

2.25

132.57

6.00

8.30

3/4

2.25

112.05

ENCOFRADO Y DESENCOFRADO DE VIGAS

m2

ENCOFRADO Y DESENCOFRADO EN VIGUETAS DE CONFINAMIENTO


m2
Eje A-A

ACERO ESTRUCTURAL TRABAJADO PARA VIGAS

Kg

estribos
VP-2

6.12

0.79

31.36

1,342.29

Partida

Unidad

Descripcin

VS
VA

Cantidad

Largo

Ancho

Alto

Parcial

3.00

1.00

3/4

2.25

6.75

6.00

1.45

3/4

2.25

19.58

6.00

3.10

3/4

2.25

41.85

40.00

4.28

5/8

1.56

267.07

Total

16.00

4.28

5/8

1.56

106.83

Estribos VP - 2

177.00

1.26

3/8

0.56

124.89

Estribos VS

208.00

1.06

1/4

0.25

55.12

Estribos VA

104.00

0.76

1/4

0.25

19.76

acero en pasamanos

4.00

3.85

3/8

0.56

8.62

acero en pasamanos

80.00

0.20

1/4

0.25

4.00

Segunda planta

22.00

8.30

0.10

0.15

2.74

1.00

8.30

9.90

0.05

4.11

ENCOFRADO Y DESENCOFRADO NORMAL EN LOSAS ALIGERADAS


M2
Segunda planta

1.00

8.30

9.90

ACERO ESTRUCTURAL TRABAJADO PARA LOSAS ALIGERADAS


KG
Acero en vigueta

22.00

8.30

1/2

1.02

186.25

44.00

1.30

1/2

1.02

58.34

22.00

3.05

3/8

0.56

37.58

22.00

3.05

1/2

1.02

68.44

42.00

9.90

1/4

0.25

103.95

454.56

LOSAS ALIGERADAS
CONCRETO F'C=175 KG/CM2. PARA LOSAS ALIGERADAS M3

Acero de temperatura

-------

82.17

6.85

82.17

ALBAILERIA
MURO DE LADRILLO KK DE ARCILLA 9x14x24 Cm.

m2

DE CABEZA

Eje 4-4, 6-6,8-8

6.00

2.88

-------

2.60

44.93

44.93

DE SOGA

Eje A-A

4.00

3.40

-------

1.00

13.60

62.86

Eje C-C

1.00

3.40

-------

2.10

7.14

3.00

2.40

-------

2.10

15.12

division 2do piso

1.00

9.00

-------

3.00

27.00

ESTRADO AULA 1

1.00

5.10

1.20

-------

6.12

ESTRADO AULA 2

1.00

5.10

1.20

-------

6.12

Vereda frontal

1.00

2.50

8.30

-------

20.75

Vereda posterior

1.00

0.50

8.30

-------

4.15

AULA 1

1.00

6.70

7.95

-------

53.27

AULA 2

1.00

6.70

7.95

-------

53.27

PISOS Y PAVIMENTOS
CONCRETO F'C=140 KG/CM2- PARA FALSO PISO e= 4"

PISO DE CEMENTO PULIDO U BRUADO E: 1CM.

12.24

m2

131.43

REVESTIMIENTOS
TARRAJEO EN INTERIORES ACABADO CON CEMENTO-ARENA
m2
Eje 4-4, 6-6 , 8-8

8.00

2.88

-------

2.90

66.82

Eje A-A

4.00

3.40

-------

1.20

16.32

Eje C-C

1.00

3.40

-------

2.10

7.14

3.00

2.40

-------

2.10

15.12

3.00

54.00

2.00

9.00

TARRAJEO EN EXTERIORES CON CEMENTO-ARENA-BRUADO


m2
Eje A-A

2.00

3.40

-------

1.20

8.16

Eje C-C

2.00

3.4

-------

2.1

14.28

2.00

2.40

-------

2.10

10.08

1.00

6.70

7.75

-------

51.93

1.00

6.70

7.75

-------

51.93

Vereda delantera

1.00

2.50

7.75

-------

19.38

Vereda posterior

1.00

0.50

7.75

-------

3.88

TARRAJEO DE SUPERFICIE DE COLUMNAS CON CEMENTO-ARENA


m2
Eje 4-4, 8-8

2.00

1.50

-------

3.00

9.00

Eje 5-5, 7-7

2.00

2.50

-------

3.00

15.00

Eje 6-6

1.00

2.05

-------

3.00

6.15

columetas

8.00

0.40

-------

1.20

3.84

TARRAJEO EN CIELO RASO ACABADO CON CEMENTO-ARENA


m2
Primera planta

159.40

32.52

127.10

40.71

Partida

TARRAJEO DE SUPERF. VIGAS PERALTADAS-H:0.10

VESTIDURA DE DERRAMES ANCHO=15 CM.

Unidad

m2

Descripcin

Cantidad

Largo

Ancho

Alto

Parcial

8.00

0.40

-------

2.10

VP- 2

4.00

6.85

-------

0.10

2.74

VP-1

2.00

6.85

-------

0.75

10.28

VS

8.00

3.85

-------

0.65

20.02

VA

4.00

3.85

-------

0.20

3.08

VIGUETA

4.00

3.85

-------

0.20

3.08

6.00

3.85

-------

-------

23.10

2.00

2.85

-------

-------

5.70

2.00

2.10

-------

-------

4.20

P-2

Total

6.72

39.20

33.00

CARPINTERIA METALICA
PUERTA - METALICA

M2

3.00

-------

1.25

2.10

7.88

7.88

VENTANA - METALICA

M2

4.00

-------

3.40

0.80

10.88

38.60

3.85

1.80

27.72

4.00
CARPINTERIA MADERA
PUERTA DE MADERA

M2

1.00

-------

0.90

3.00

2.70

P-2

3.00

-------

1.70

1.25

6.38

V3

2.00

3.85

1.30

10.01

18.33

V2

4.00

-------

2.60

0.80

8.32

24.71

VIDRIOS
PUERTA - METALICA

2.70

266.45
p2

VENTANA - METALICA

PINTURA
PINTURA IMPRIMANTE DOS MANOS EN MUROS

m2

1.00

-------

-------

-------

398.92

398.92

PINTURA EN INTERIORES LATEX DOS MANOS

m2

1.00

-------

-------

-------

159.40

159.40

PINTURA EN EXTERIORES LATEX DOS MANO

m2

1.00

-------

-------

-------

32.52

32.52

PINTURA EN CIELO RASO 2 MANOS

m2

1.00

-------

-------

-------

127.10

127.10

PINTURA EN COLUMNAS LATEX DOS MANO

m2

1.00

-------

-------

-------

40.71

40.71

PINTURA EN VIGAS PERALTADAS H:.15 CM LATEX DOS MANO


m2

1.00

-------

-------

-------

39.20

39.20

PINTURA EN DERRAMES ANCHO=15 CM.

1.00

-------

-------

-------

33.00

33.00

SALIDA PARA CENTROS DE LUZ C/INTERRUPTOR

Pto

12.00

-------

-------

-------

12.00

12.00

SALIDA PARA SPOT-LIGHT CON PVC

Pto

12.00

-------

-------

-------

12.00

12.00

SALIDA PARA INTERRUPTOR SIMPLE

Pto

6.00

-------

-------

-------

6.00

6.00

SALIDA PARA INTERRUPTOR DOBLE

Pto

-------

-------

-------

12.00

-------

-------

-------

12.00

12.00

TABLERO ELECTRICO GAB.METALICO P/DISTRIBUCION DE


4 CIRCUITOS
Unid

-------

-------

-------

TABLERO ELECTRICO GAB.METALICO GENERAL-02 DE 4Unid


CIRCUITOS

-------

-------

-------

1.00

-------

-------

-------

1.00

1.00

INSTALACIONES ELECTRICAS

SALIDA PARA TOMACORRIENTES BIPOLARES SIMPLES CON


Pto PVC

FLETE
FLETE TERRESTRE

Unid