CONCORRNCIA
011/1999
(15/03/2000)
003/2000
LOTE A
/08/2000)
N 002/2000
/08/2000)
N 002/2000
(04/04/2000)
Pgina 1 de 232
(14/02/2000)
LEILO N 004/2000
(14/02/2000)
LEILO N 004/2000
(31/08/2000)
LEILO N 002/2000
(31/08/2000)
LEILO N 002/2000
Pgina 2 de 232
LOTE B
LOTE C
LOTE A
LOTE B
LOTE C
LOTE A
(12/06/2001)
LEILO N 001/2001
(12/06/2001)
LEILO N 001/2001
Pgina 3 de 232
LOTE B
LOTE C
LOTE A
(28/09/2001)
LEILO N 003/2001
(28/09/2001)
LEILO N 003/2001
LOTE B
LOTE C
LOTE D
LOTE A
02
02
LOTE B
Pgina 4 de 232
LOTE C
(15/08/2002)
LEILO N 002/2002
(15/08/2002)
LEILO N 002/2002
LOTE D
LOTE E
LOTE F
LOTE G
LOTE H
LOTE A
Pgina 5 de 232
LOTE C
(23/09/2003)
LEILO N 001/2003
(23/09/2003)
LEILO N 001/2003
LOTE B
LOTE D
LOTE E
LOTE F
LOTE G
Pgina 6 de 232
Pgina 7 de 232
LOTE D
(30/09/2004)
LEILO N 001/2004
(30/09/2004)
LEILO N 001/2004
LOTE C
LOTE E
LOTE F
LOTE G
Pgina 8 de 232
(30/09/2
LEILO N
(30/09/2
LEILO N
LOTE A
(18/11/2004)
LEILO N 002/2004
(18/11/2004)
LEILO N 002/2004
LOTE K
Pgina 9 de 232
LOTE B
Pgina 10 de 232
(17/11/2005)
LEILO N 001/2005
(17/11/2005)
LEILO N 001/2005
LOTE B
Pgina 11 de 232
LOTE C
LOTE D
(17/11
LEILO N
(17/11
LEILO N
LOTE A
LOTE B
(15/12/2006)
LEILO N 003/2006
(15/12/2006)
LEILO N 003/2006
LOTE G
Pgina 12 de 232
LOTE C
LOTE D
LOTE E
LOTE F
LOTE A
(24/11/2006)
LEILO N 005/2006
(24/11/2006)
LEILO N 005/2006
Pgina 13 de 232
LOTE B
LOTE C
LOTE D
LOTE E
LOTE F
LOTE G
LOTE B
(07/11/2007)
LEILO N 004/2007
(07/11/2007)
LEILO N 004/2007
LOTE A
LOTE C
LOTE D
LOTE E
LOTE F
LOTE G
LOTE A
Pgina 14 de 232
LOTE D
(27/06/2008)
LEILO N 004/2008
(27/06/2008)
LEILO N 004/2008
LOTE C
Pgina 15 de 232
LOTE E
LOTE F
LOTE G
LEILO N 004/2008
LEILO N 004/2008
(27/06/2008)
(27/06/2008)
LOTE H
LOTE I
LOTE J
LOTE K
LOTE L
Pgina 16 de 232
LOTE B
LOTE C
(03/10/2008)
LEILO N 006/2008
(03/10/2008)
LEILO N 006/2008
Lota A
LOTE D
LOTE E
LOTE F
LOTE G
LOTE A
Pgina 17 de 232
LOTE B
LOTE C
(26/11/2008)
LEILO N 007/2008
(26/11/2008)
LEILO N 007/2008
LOTE D
LOTE E
LOTE F
LOTE G
Pgina 18 de 232
LOTE A
Pgina 19 de 232
(24/11/2008)
LEILO N 008/2008
(24/11/2008)
LEILO N 008/2008
Pgina 20 de 232
LOTE B
LE
LE
LOTE C
Pgina 21 de 232
LOTE D
LOTE E
(08/05/2009)
LEILO n 001/2009
(08/05/2009)
LEILO n 001/2009
LOTE C
Pgina 22 de 232
LOTE F
LOTE G
LOTE H
(08/05/200
LEILO n 0
(08/05/200
LEILO n 0
LOTE B
7/11/2009)
n 005/2009
7/11/2009)
n 005/2009
LOTE A
Pgina 23 de 232
LOTE C
(27/11/2009)
LEILO n 005/2009
(27/11/2009)
LEILO n 005/2009
LOTE B
(11/06/2010)
O n 001/2010
(11/06/2010)
O n 001/2010
LOTE A
Pgina 24 de 232
LOTE C
LOTE D
(11/06/2010)
LEILO n 001/2010
(11/06/2010)
LEILO n 001/2010
Pgina 25 de 232
LOTE E
LOTE F
LOTE G
LOTE H
LOTE I
LOTE A
(03/09/2010)
LEILO n 006/2010
(03/09/2010)
LEILO n 006/2010
LOTE B
LOTE C
010
010
LOTE A
Pgina 26 de 232
LOTE B
(09/12/2010)
LEILO n 008/2010
(09/12/2010)
LEILO n 008/2010
LOTE C
LOTE D
LOTE E
LOTE F
LOTE G
LOTE H
LOTE I
Pgina 27 de 232
LOTE A
(10/06/2011)
LEILO n 001/2011
(10/06/2011)
LEILO n 001/2011
Pgina 28 de 232
LOTE B
LOTE C
LOTE A
LOTE B
LOTE C
LOTE E
(02/09/2011)
LEILO n 004/2011
(02/09/2011)
LEILO n 004/2011
LOTE D
Pgina 29 de 232
LOTE F
LOTE G
LOTE H
(02/09/2011)
LEILO n 004/
(02/09/2011)
LEILO n 004/
LOTE A
LOTE B
Pgina 30 de 232
LOTE C
(16/12/2011)
LEILO n 006/2011
(16/12/2011)
LEILO n 006/2011
LOTE D
LOTE E
LOTE F
LOTE G
LOTE H
LOTE I
Pgina 31 de 232
Pgina 32 de 232
LOTE A
(08/02/2012)
LEILO n 02/2012
(09/03/2012)
LEILO n 02/2012
LOTE B
LOTE C
LOTE D
LOTE A
12)
3/2012
12)
3/2012
LOTE E
Pgina 33 de 232
Pgina 34 de 232
(06/06/2012)
EILO n 05/2012
(06/06/2012)
EILO n 05/2012
(20/04/2012)
LEILO n 03/2012
(20/04/2012)
LEILO n 03/2012
LOTE C
LOTE D
LOTE A
LOTE B
LOTE C
LOTE D
LEILO n 05/20
LEILO n 05/20
(06/06/2012)
(06/06/2012)
LOTE B
LOTE C
1/11/2012)
O n 07/2012
1/11/2012)
O n 07/2012
LOTE A
Pgina 35 de 232
LOTE D
(1/11/2012)
LEILO n 07/2012
(1/11/2012)
LEILO n 07/2012
LOTE E
LOTE F
LOTE G
LOTE H
Pgina 36 de 232
LOTE A
LOTE C
(10/5/2013)
LEILO n 01/2013
(10/5/2013)
LEILO n 01/2013
LOTE B
Pgina 37 de 232
LOTE D
LOTE E
LOTE F
LOTE G
LOTE H
LEILO n 01/2
LEILO n 01/2
(10/5/2013)
(10/5/2013)
LOTE I
LOTE J
LOTE A
13
13
LOTE B
Pgina 38 de 232
LOTE C
(12/7/2013)
LEILO n 02/2013
(12/7/2013)
LEILO n 02/2013
LOTE D
LOTE E
LOTE F
LOTE G
Pgina 39 de 232
Pgina 40 de 232
07/2013
/2013)
Pgina 41 de 232
H
(14/10/2013)
LEILO n 07/2013
LEILO n 07/2013
(14/11/2013)
I
J
K
L
M
N
O
Pgina 42 de 232
LOTE AB
(27/12/2013)
LEILO n 011/2013
(07/02/2014)
LEILO n 011/2013
P
Q
Pgina 43 de 232
LOTE A
LOTE B
LOTE B
(7/11/2013)
LEILO n 013/2013
(13/12/2013)
LEILO n 13/2013
LOTE A
LOTE C
LOTE D
Pgina 44 de 232
LOTE A
LOTE B
LOTE C
1/2014
1/2014
LOTE D
Pgina 45 de 232
LEILO n 001/2014
LEILO n 001/2014
LOTE F
LOTE G
LOTE H
LOTE I
LOTE J
Pgina 46 de 232
LOTE K
LOTE L
LOTE M
Pgina 47 de 232
LOTE A
LOTE B
Pgina 48 de 232
LEILO n 004/2014
LEILO n 004/2014
LOTE C
LOTE D
LOTE E
LOTE F
Pgina 49 de 232
LOTE G
LOTE H
LOTE I
Pgina 50 de 232
LEILO n 007/2014
LEILO n 007/2014
LOTE A
LOTE F
LOTE I
LOTE J
Pgina 51 de 232
LOTE A
LOTE B
Pgina 52 de 232
LEILO n 001/2015
LEILO n 004/2014
LOTE C
Pgina 53 de 232
LOTE BC
LOTE D
LEILO n 001/2015
LEILO n 004/2014
LOTE E
LOTE F
LOTE G
LOTE H
Pgina 54 de 232
LOTE I
LOTE J
LOTE K
Pgina 55 de 232
005/2015
005/2015
LOTE A
Pgina 56 de 232
LOTE B
LOTE C
LEILO n 005/2015
LEILO n 005/2015
LOTE E
LOTE F
LOTE G
LOTE H
LOTE I
LOTE J
LOTE K
Pgina 57 de 232
LEILO n
007/2015
LEILO n
007/2014
LOTE L
LOTE
NICO
LOTE A
LOTE B
Pgina 58 de 232
UF
SP
SC
MG
TOTAL
INTERLIGAO NORTE-SUL II
(Imperatriz - Colinas - Miracema - Gurupi - Serra da Mesa - Samambaia)
MA/TO /GO/DF
Pgina 59 de 232
GO/DF
INTERLIGAO SUDESTE-NORDESTE
(Serra da Mesa - B. J. da Lapa; B.J. da Lapa II - Ibicoara; Ibicoara - Sapeau; B.J. da Lapa II - B. J. da Lapa; Secionamentos em G. Mangabeira - Funil)
GO/BA
TOTAL
SP/PR
PA
PA/MA
Pgina 60 de 232
UF
TOTAL
LT Bateias - Jaquariava
PR
MG/ES
LT Itumbiara - Marimbondo
MG
TOTAL
Pgina 61 de 232
LT Goianinha - Mussur C3
UF
PE/PB
LT Chavantes - Botucatu
SP
PA
AL/PE/PB
TOTAL
RS
LT Uruguaiana - Maambar
LT Maambar - Santo ngelo
LT Santo ngelo - Santa Rosa
RS
Pgina 62 de 232
SC/RS
PA
SP
INTERLIGAO NORTE-NORDESTE C4
LT Tucuru - Marab C4
LT Marab - Aailndia C2
PA/MA
LT Itumbiara - Marimbondo
MG
LT Paraiso - Au
RN
TOTAL
LT Londrina - Assis - Araraquara
PR/SP
Pgina 63 de 232
PR
PI/CE
LT Camaari - Sapeau
BA
SC
MT
MG
Pgina 64 de 232
EMPREENDIMENTOS
UF
TOTAL
Pgina 65 de 232
MT/GO/MG
LT Ivaipor - Londrina
PR
PR
PA
LT Furnas - Pimenta - C2
MG
MG
LT Maca - Campos - C3
RS
Pgina 66 de 232
CE
LT Milagres - Coremas - C2
CE/PB
SP/MS
SC
TOTAL
LT Colinas - Sobradinho
TO/PI/BA
LT Irap - Araua
MG
Pgina 67 de 232
EMPREENDIMENTOS
UF
TOTAL
Pgina 68 de 232
PA/TO
TO/GO
GO/DF/MG
MG
Pgina 69 de 232
SC/RS
SC
SP
TOTAL
LT Paracatu 4 - Pirapora 2 - 500 kV
SE Pirapora 2 - 500/345 kV e 345/138 kV
MG
SC/PR
SP/PR
BA
SC/RS
PI/CE/RN
Pgina 70 de 232
UF
TOTAL
MT/RO
MG/SP
MG/SP
MG
BA
ES
PR
TOTAL
Pgina 71 de 232
TO/PI
PI/PE/CE
LT Jauru - Juba CD
SE Juba 2 TR's 230 / 138 kV
LT Maggi - Nova Mutum CD
SE Maggi 1 TR 230 / 138 kV
MT
RS
LT Jardim Penedo
SE Penedo - 1 TR
SE/AL
LT Bateias - Pilarzinho
PR
LT So Lus 2 - So Lus 3
SE So Lus 3 - 1 TR
MA
TOTAL
PA
Pgina 72 de 232
PA/AP
PA/AM
MT
SE Piratininga II 345/138/88 kV
LT 345 kV Interlagos - Piratininga II - CD
SP
LT N.S.Rita - Scharlau - CD
SE Scharlau 230/138 kV
RS
BA
Pgina 73 de 232
UF
SE Mirassol 440/138 kV
Seccionamento da LT 440 kV Ilha Solteira - Araraquara
SE Getulina 440/138 kV
Seccionamento da LT 440 kV Jupi - Bauru
SE Araras 440/138
Seccionamento da LT 440 kV Araraquara - Santo ngelo
SP
SC
RJ
SE Atibaia 2 345/138 kV
Seccionamento da LT 345 kV Poos de Caldas - Mogi da Cruzes
SP
LT So Simo - Itaguau
LT Itaguau - Barra dos Coqueiros
SE Itaguau 500/230 kV
SE Barra dos Coqueiros 230 kV
GO/MG
TOTAL
Pgina 74 de 232
PI/MA
MA
MG
RS
BA
RS
SE Suape II - 1 TR - 500/230 kV
SE Suape III - 2 TR's - 230/69 kV
PE
TOTAL
SE COLETORA PORTO VELHO 500/230 kV;
2 ESTAES CONVERSORAS CA/CC/CA BACK-TO-BACK 400 MW;
LT COLETORA PORTO VELHO PORTO VELHO, C1 E C2, 230 KV
RO
Pgina 75 de 232
UF
MT/GO
RO/SP
RO/SP
SP
RO/SP
RO/SP
TOTAL
Pgina 76 de 232
ICG:
LT INOCNCIA PARANABA I, CS, 138 KV;
LT CHAPADO GUATAMBU, CS, 138 kV;
TRANSFORMADOR ELEVADOR 138/230 KV 100 MVA NA SE INOCNCIA;
TRANSFORMADORES ELEVADORES 3X(138/230 KV 225 MVA) NA SE CHAPADO;
SE INOCNCIA 138 KV;
SE CHAPADO 138 KV;
SE PARANABA I 138 KV;
SE GUATAMBU 138 KV.
IEG:
LT PARANABA I UTE PARANABA II, CS, 138 KV;
LT CHAPADO UTE ENTRE RIOS CS 138 KV;
LT CHAPADO UTE PORTO DAS GUAS CS 138 KV;
LT CHAPADO UTE CHAPADO CS138 KV;
LT CHAPADO UTE COSTA RICA CS 138 KV;
LT GUATAMBU PCH FIGUEIRA CS 138 KV;
LT GUATAMBU UTE NARDINI CS 138 KV.
Pgina 77 de 232
MS/GO
ICG:
LT Rio Brilhante SANTA LUZIA II, CS, 138 KV;
TRANSFORMADOR ELEVADOR 138/230 KV 225 MVA NA SE SIDROLNDIA;
TRANSFORMADORES ELEVADORES 2X(138/230 KV 150 MVA) NA SE RIO BRILHANTE;
TRANSFORMADORES ELEVADORES 2X(138/230 KV 225 MVA) NA SE IVINHEMA;
SE SIDROLNDIA 138 KV;
SE RIO BRILHANTE 138 KV;
SE IVINHEMA138 KV;
SE SANTA LUZIA II 138 KV.
IEG:
LT Santa Luzia II UTE SANTA LUZIA I, CS, 138 KV;
LT SANTA LUZIA II UTE ELDORADO CS 138 KV;
LT IVINHEMA UTE IVINHEMA CS 138 KV;
LT IVINHEMA UTE CERONA CS138 KV;
LT IVINHEMA UTE TERRA VERDE CS 138 KV.
Pgina 78 de 232
MS
MS/GO/MT
IEG:
LT Jata UTE JATA, CS, 138 KV;
LT JATA UTE PEROLNDIA CS 138 KV;
LT MINEIROS UTE GUA EMENDADA CS 138 KV;
LT MORRO VERMELHO UTE ALTO TAQUARI CS138 KV;
LT QUIRINPOLIS UTE QUIRINPOLIS CS 138 KV;
LT QUIRINPOLIS UTE BOA VISTA CS 138 KV;
LT EDIA UTE TROPICAL BIOENERGIA I CS 138 KV;
LT EDIA UTE TROPICAL BIOENERGIA II CS 138 KV.
TOTAL
Pgina 79 de 232
RS
RS
LT Jauru - Vilhena - Pimenta Bueno - Ji-Paran - Ariquemes - Samuel - Porto Velho - C3 - 230 kV
MT/RO
RO/AC
LT Jauru - Cuiab;
SE Jauru 500/230 kV
MT/RO
PE/PB/AL/RN
SE Itatiba 500/138 kV
SP
MG
Pgina 80 de 232
SP
PR
GO
BA
TOTAL
LT Rio Verde - Trindade - 500 kV - CD;
LT Trindade - Xavantes - 230 KV - CD;
LT Trindade - Carajs - 230 kV - CS;
SE Trindade - 500/230 kV
GO
MG
MA/CE
Pgina 81 de 232
MT
ES
SE Camaari IV - 500/230 kV
BA
MG/ES
AM
TOTAL
LT Araraquara 2 - Taubat - CS
SP
RS
RS
PA
Pgina 82 de 232
EMPREENDIMENTOS
UF
LT Miranda - Encruzo - CS
SE Encruzo Novo 1x100 MVA
MA
MT
AL
SE Plo - 100MVA
BA
SP
TOTAL
Pgina 83 de 232
RN
BA
CE
TOTAL
SE Viamo 3 230/69 kV 3x83 MVA
SE Porto Alegre 12 230/69 kV 2x83 MVA
SE Restinga 230/69 kV 2x83 MVA
SE Candelria 2 - 230/69kV 2x83MVA
LT 230kV Viamo 3 - Restinga, CS
LT 230kV Restinga - Porto Alegre 13
LT 230kV Campo Bom - Taquara - CS
LT 230kV Porto Alegre 8 - Porto Alegre 9
LT 230kV Porto Alegre 9 - Nova Santa Rita
RS
Pgina 84 de 232
UF
RS
GO
PR
LT Xavantes II - Pirineus - C2
GO
MT
MS
MG
LT Itacainas - Carajs - C3
PA
TOTAL
Pgina 85 de 232
UF
RN/PB
BA
RN/CE
TOTAL
Pgina 86 de 232
AM/RR
SE Miramar
SE Tucuru (novo ptio)
PA
SE Nobres
MT
LT Xavantes II - Pirineus - C2
GO
SE Umuarama (nova)
LT Cascavel Oeste - Umuarama CS
PR
LT Mesquita - Timteo 2, CS
SE Timteo 2
Seccionamento da LT 230kV Ipatinga 1 - Timteo, CD
MG
PI
PE
Pgina 87 de 232
BA
SP/RJ
SP
AL/PE/BA
TOTAL
PR/SC/RS
SE/AL/BA
Pgina 88 de 232
AM
SC
PR/SC/RS
PR/SC/RS
RN
GO
MA
TOTAL
Pgina 89 de 232
EMPREENDIMENTOS
Pgina 90 de 232
UF
SE 500 kV Paranata
LT 500 kV Paranata Cludia, CD
SE Cludia 500 kV
LT 500 kV Cludia Paranatinga, CD
SE Paranatinga 500 kV
LT Paranatinga Ribeirozinho 500kV, CD
UF
MT/GO
MT/GO/MG
AM
BA
RJ
TOTAL
SE 230/69kV Mirueira II
SE 230/69kV Jaboato
PE
Pgina 91 de 232
RN
BA
MG
TOTAL
RS
MS
PR
BA
Pgina 92 de 232
MG
MG
TOTAL
TO/PI/BA
BA
SP
SP
SP/MG
Pgina 93 de 232
UF
CE/RN
MG
BA/GO/MG
AC
TOTAL
Pgina 94 de 232
TO/PI/BA
PI/CE
PI/MA/CE
GO
SP/PR
SP
PI/RN
PA/TO
Pgina 95 de 232
UF
PA/TO
SP
TOTAL
AC
DF/GO
Pgina 96 de 232
BA/PI
RS
RN
MS
MA
TOTAL
Pgina 97 de 232
EMPREENDIMENTOS
Pgina 98 de 232
UF
SP/PR
MG/SP
MG
GO
CE
PR
PA
Pgina 99 de 232
PA
RS/SC
MG
MS
RO
MA
AC
CE
SP/MS
SP
TOTAL
PA/TO/GO/MG
Estao Conversora CA/CC, 800 kV, 4.000 MW, junto SE 500 kV Xingu
Estao Conversora CA/CC, 800 kV, 3.850 MW, junto SE 500 kV Estreito
PA/MG
PA/TO/GO/MG
TOTAL
Pgina 101 de 232
MG
RO
MA
PI
TO
REDE BSICA
LT 230kV Russas II Aracati III C2 (65km);
SE 230kV Aracati III.
ICG:
Transformao 230/138kV 300 MVA na SE Aracati III; e
SE Aracati III 138 kV
CE
TOTAL
UF
PA
PA/AM
SP
BA
CE/RN
MG/SP
PA
PA
MT
PI/MA
EMPREENDIMENTOS
UF
PR
MG
SP/PR
TOTAL
RS
PA
MT
SE 500/230 kV Itabira 5;
SE 230/69 kV Joo Monlevade 4;
SE 230/138 kV Janaba 3;
SE 230/138 kV Branas;
SE 230/69 kV Timteo 2;
LT 230 kV Itabira 5 Itabira 2 C2;
LT 230 kV Irap - Janaba 3 C1;
LT 230 kV Irap - Araua 2 C2.
MG
MS
GO/MG
UF
TO
AP/PA
PA
TOTAL
UF
BA
RO
SP
GO
TOTAL
UF
MG
MT
UF
MT
MT
PA
UF
SC
RS
AL
PE
PB
SE
PI
MA
RO
UF
TO
RS
GO
TOTAL
MG
MT
MT
ES/MG
PR/SC
LT 500 kV Campinas - Itatiba C2, com 25,1 kmLT 440 kV Cabreva - Ferno Dias C1/C2, CD - 71 km
SE 440/138 kV gua Azul - (6+1R) x 100MVASE 440 kV Bauru - Compensador Esttico 440 kV (-125/+250) Mvar
SP
MT
AL/BA/PE/PB
PA
PA
CE
GO
PA
TO
GO
MG
RJ
PI/CE/MA
MG/SP
Pgina 116 de 232
Km
(meses)
505.00
Edital
Proposta
18
45,290.00
41,657.76
8.02
253.00
16
34,605.00
23,964.00
30.75
6.00
16
15,280.56
10,260.36
32.85
764.00
*****
95,175.56
75,882.12
20.27
1,278.00
28
145,232.32
140,950.00
2.95
RAP -LICITAES
Receita Anual Permitida DE LINHAS DE
RESULTADO GERAL DAS
R$ x 10
Extenso
Prazo
Desgio
Km
(meses) TRANSMISSO
%
3
Edital
Proposta
575.00
28
52,476.04
52,000.00
0.91
1,050.00
28
132,636.00
128,200.00
3.34
2,903.00
*****
330,344.36
321,150.00
2.78
332.00
22
81,531.00
81,531.00
0.00
330.00
14
31,134.00
28,636.80
8.02
924.00
22
123,333.00
123,333.00
0.00
Prazo
(meses)
1,586.00
R$ x 103
Desgio
%
Edital
Proposta
*****
235,998.00
233,500.80
1.06
137.00
18
5,812.19
5,812.19
0.00
*****
*****
*****
*****
*****
*****
*****
*****
*****
*****
137.00
*****
5,812.19
5,812.19
0.00
Km
(meses)
51.00
Edital
Proposta
18
2,764.78
2,750.95
0.50
137.00
18
6,910.01
6,910.01
0.00
*****
*****
*****
*****
*****
386.00
24
47,835.30
47,350.00
1.01
574.00
*****
57,510.09
57,010.96
0.87
127.10
18
8,012.70
8,011.98
0.01
389.00
20
26,567.23
25,800.00
2.89
Edital
Proposta
187.30
20
12,324.12
12,320.00
0.03
155.00
20
12,895.69
12,882.79
0.10
181.00
24
31,631.61
27,840.00
11.99
464.00
24
85,852.39
72,900.00
15.09
212.00
18
29,721.01
26,250.00
11.68
135.00
15
6,917.68
6,917.00
0.01
1,850.40
*****
213,922.43
192,921.77
9.82
365.00
24
100,733.48
64,395.00
36.07
RAP -LICITAES
Receita Anual Permitida DE LINHAS DE
RESULTADO GERAL DAS
R$ x 10
Extenso
Prazo
Desgio
Km
(meses) TRANSMISSO
%
3
Edital
Proposta
376.00
24
81,679.53
41,649.53
49.01
541.00
24
128,144.28
77,850.00
39.25
106.00
18
24,596.92
15,742.02
36.00
39.00
18
14,846.06
11,505.69
22.50
205.00
18
33,518.47
20,496.00
38.85
139.00
22
26,720.83
17,635.74
34.00
Extenso
Km
Prazo
(meses)
1,771.00
*****
Proposta
410,239.57
249,273.98
Desgio
%
39.24
Edital
Proposta
817.00
24
164,578.93
98,747.36
40.00
122.10
18
19,828.07
14,376.00
27.50
****
****
****
****
****
328.20
20
54,004.03
34,500.00
36.12
75.00
18
9,242.37
8,160.00
11.71
140.00
20
15,202.56
11,700.00
23.04
92.00
20
10,780.70
8,840.18
18.00
Edital
Proposta
220.00
20
13,816.00
6,396.83
53.70
110.00
18
7,597.53
3,584.94
52.81
506.10
22
57,514.85
43,711.29
24.00
359.00
20
66,496.30
39,400.00
40.75
2,769.40
*****
419,061.34
269,416.59
35.71
942.00
24
204,902.08
107,571.00
47.50
61.00
18
11,586.25
10,311.75
11.00
Extenso
Km
Prazo
(meses)
1,003.00
*****
Proposta
216,488.33
117,882.75
Desgio
%
45.55
Edital
Proposta
453.80
24
107,584.39
54,114.00
49.70
695.00
24
112,670.87
65,349.09
42.00
681.00
24
116,548.51
66,900.00
42.60
708.00
24
102,300.85
55,200.00
46.04
RAP -LICITAES
Receita Anual Permitida DE LINHAS DE
RESULTADO GERAL DAS
R$ x 10
Extenso
Prazo
Desgio
Km
(meses) TRANSMISSO
%
3
Edital
Proposta
273.00
20
32,414.71
21,000.00
35.21
195.00
20
30,390.47
17,796.00
41.44
50.00
18
9,618.25
9,570.17
0.50
3,055.80
*****
511,528.05
289,929.26
43.32
246.00
22
41,921.28
17,000.00
59.45
85.00
20
19,916.19
11,480.70
42.35
132.00
20
16,933.28
9,790.00
42.18
105.00
20
11,829.03
4,880.00
58.75
131.00
20
14,053.33
10,665.00
24.11
315.00
18
14,788.88
6,654.99
55.00
Km
(meses)
1,014.00
Edital
Proposta
*****
119,441.99
60,470.69
49.37
949.00
18
66,118.68
32,390.00
51.01
308.00
22
56,073.53
23,430.00
58.22
412.00
22
38,422.49
18,499.80
51.85
172.00
18
17,949.78
10,769.86
40.00
198.00
18
8,736.26
3,751.43
57.06
107.00
18
7,338.76
4,750.00
35.28
115.00
20
8,707.57
5,780.00
33.62
2,261.00
*****
203,347.07
99,371.09
51.13
Km
(meses)
720.00
Edital
Proposta
21
66,689.12
28,940.00
56.60
400.00
21
31,889.64
13,756.80
56.86
402.00
18
32,142.70
14,946.00
53.50
233.00
18
7,400.71
3,848.36
48.00
110.00
18
4,699.45
2,819.68
40.00
29.00
15
1,410.32
665.00
52.85
36.00
18
4,330.58
2,121.98
51.00
1,930.00
*****
148,562.52
67,097.82
54.84
527.00
36
98,529.53
74,300.00
24.59
Km
(meses)
713.00
Edital
Proposta
36
86,498.64
71,880.00
16.90
586.00
36
109,255.45
101,607.56
7.00
775.00
20
36,796.78
25,950.00
29.48
1.50
18
9,089.58
6,103.00
32.86
23.00
18
3,689.38
3,674.90
0.39
152.00
18
4,832.17
2,980.00
38.33
Prazo
(meses)
3.00
R$ x 103
Desgio
%
Edital
Proposta
18
21,181.84
10,321.74
51.27
150.00
18
6,649.32
6,616.07
0.50
23.00
18
6,951.94
4,970.00
28.51
4.00
18
3,633.77
2,622.49
27.83
72.00
15
8,256.50
4,541.07
45.00
3,029.50
*****
395,364.90
315,566.83
20.18
RAP -LICITAES
Receita Anual Permitida DE LINHAS DE
RESULTADO GERAL DAS
R$ x 10
Extenso
Prazo
Desgio
Km
(meses) TRANSMISSO
%
3
Edital
Proposta
95.00
18
8,613.03
6,029.12
30.00
*****
22
7,855.91
6,284.73
20.00
180.00
21
11,146.73
6,832.94
38.70
*****
18
*****
*****
*****
*****
24
10,367.28
4,146.91
60.00
*****
16
3,254.37
3,235.00
0.60
*****
24
14,989.38
8,543.94
43.00
56,226.70
35,072.64
37.62
44,752.00
44,751.00
0.00
275.00
17.30
36
Prazo
(meses)
606.00
R$ x 103
Desgio
%
Edital
Proposta
36
41,707.00
35,448.00
15.01
*****
38
160,839.00
144,755.00
10.00
2,375.00
36
176,626.00
176,249.00
0.21
30.00
36
21,933.00
15,463.00
29.50
*****
50
168,654.00
151,788.00
10.00
2,375.00
48
185,024.00
173,922.00
6.00
5,403.30
*****
799,535.00
742,376.00
7.15
RAP -LICITAES
Receita Anual Permitida DE LINHAS DE
RESULTADO GERAL DAS
R$ x 10
Extenso
Prazo
Desgio
Km
(meses) TRANSMISSO
%
3
Edital
Proposta
59,212.00
48,550.00
248.00
75.00
18
224.00
18.01
Edital
Proposta
38,631.00
34,768.00
446.00
22.00
18
150.00
10.00
RAP -LICITAES
Receita Anual Permitida DE LINHAS DE
RESULTADO GERAL DAS
R$ x 10
Extenso
Prazo
Desgio
Km
(meses) TRANSMISSO
%
3
Edital
Proposta
18
42,670.00
34,500.00
19.15
*****
140,513.00
117,818.00
16.15
238.00
125.00
272.00
1,800.00
RAP -LICITAES
Receita Anual Permitida DE LINHAS DE
RESULTADO GERAL DAS
R$ x 10
Extenso
Prazo
Desgio
Km
(meses) TRANSMISSO
%
Edital
Proposta
3
11.00
20
9,896.32
5,225.09
47.20
*****
*****
*****
*****
*****
987.00
24
50,424.07
42,688.00
15.34
487.00
24
27,816.67
24,400.00
12.28
348.00
24
39,323.78
27,516.00
30.03
116.30
22
20,648.34
15,899.22
23.00
1.00
22
10,388.64
8,174.00
21.32
2.00
18
10,823.02
8,322.90
23.10
Edital
Proposta
10.90
24
24,506.29
21,804.00
11.03
115.00
24
12,294.99
7,315.52
40.50
188.00
20
9,129.43
7,577.42
17.00
152.00
18
5,124.67
4,868.44
5.00
2,418.20
*****
220,376.22
173,790.59
21.14
259.00
24
49,959.31
33,750.00
32.45
162.00
24
28,340.51
20,916.00
26.20
36.00
22
29,688.83
20,485.30
31.00
RAP -LICITAES
Receita Anual Permitida DE LINHAS DE
RESULTADO GERAL DAS
R$ x 10
Extenso
Prazo
Desgio
Km
(meses) TRANSMISSO
%
3
Edital
Proposta
235.00
20
9,576.32
8,424.00
12.03
99.00
24
7,749.53
5,269.68
32.00
*****
22
10,110.47
6,976.22
31.00
258.00
24
31,966.37
23,007.11
28.03
30.00
15
3,454.43
3,454.00
0.01
1,079.00
*****
170,845.77
122,282.31
28.43
356.00
24
31,233.16
20,017.33
35.91
4.00
24
13,646.81
8,325.00
39.00
33.00
24
2,265.83
2,244.00
0.96
79.00
24
7,720.44
6,420.44
16.84
Prazo
(meses)
240.00
Desgio
%
Edital
Proposta
24
12,262.94
8,100.00
33.95
2.00
24
3,411.07
2,960.00
13.22
92.00
24
6,407.83
5,318.49
17.00
*****
18
1,975.03
967.76
51.00
2.00
24
5,261.50
3,254.76
38.14
808.00
*****
84,184.61
57,607.78
31.57
Edital
Proposta
289.00
18
21,785.57
10,326.36
52.60
115.00
18
10,272.71
4,190.00
59.21
97.00
18
7,117.51
4,718.90
33.70
501.00
*****
39,175.79
19,235.26
50.90
117.15
24
37,080.18
19,980.00
46.12
Km
(meses)
*****
Edital
Proposta
20
3,097.10
1,860.00
39.94
*****
20
4,072.74
3,258.19
20.00
*****
*****
*****
*****
*****
*****
*****
*****
*****
*****
*****
24
2,951.68
1,917.60
35.03
295.00
24
33,254.89
16,632.00
49.99
*****
24
7,058.11
3,876.00
45.08
108.00
18
5,559.02
4,900.00
11.85
520.15
*****
93,073.72
52,423.79
43.67
Prazo
(meses)
318.50
Desgio
%
Edital
Proposta
22
75,956.48
31,901.72
58.00
65.00
22
5,469.78
4,047.64
26.00
76.00
22
12,174.56
7,791.72
36.00
459.50
*****
93,600.82
43,741.08
53.27
Edital
Proposta
715.00
36
121,128.71
121,128.00
0.00
*****
24
7,045.88
3,940.00
44.08
*****
18
2,665.58
1,464.00
45.08
50.00
24
3,235.16
3,020.00
6.65
143.00
24
9,167.26
8,880.00
3.13
25.00
22
3,308.64
2,878.51
13.00
26.00
20
7,004.68
7,004.68
0.00
44.00
22
5,606.89
5,606.88
0.00
RAP -LICITAES
Receita Anual Permitida DE LINHAS DE
RESULTADO GERAL DAS
R$ x 10
Extenso
Prazo
Desgio
Km
(meses) TRANSMISSO
%
3
Edital
Proposta
136.00
24
12,259.88
8,459.32
31.00
252.10
26
49,964.34
27,980.04
44.00
****
20
8,626.56
4,399.55
49.00
836.20
30
111,255.68
68,900.00
38.07
2,227.30
*****
341,269.26
263,660.97
22.74
800.00
24
60,966.68
49,392.00
18.99
32.40
24
17,119.86
14,551.87
15.00
RAP -LICITAES
Receita Anual Permitida DE LINHAS DE
RESULTADO GERAL DAS
R$ x 10
Extenso
Prazo
Desgio
Km
(meses) TRANSMISSO
%
3
Edital
Proposta
*****
*****
*****
*****
*****
9.50
24
23,263.90
14,423.62
38.00
139.30
24
22,997.53
17,708.10
23.00
35.50
24
12,972.09
12,972.00
0.00
*****
18
4,035.44
2,278.80
43.53
*****
20
7,855.95
7,447.44
5.20
365.00
24
44,405.01
26,643.01
40.00
1,381.70
*****
193,616.46
145,416.83
24.89
Extenso
Km
Prazo
(meses)
Proposta
Desgio
%
Km
(meses)
1,005.00
Edital
Proposta
32
221,824.16
126,420.00
43.01
606.00
44
115,935.38
73,080.00
36.96
30.00
20
7,779.31
7,080.00
8.99
50.00
18
11,257.56
10,694.68
5.00
*****
20
7,147.09
7,004.15
2.00
1,691.00
*****
363,943.50
224,278.82
38.38
*****
20
8,936.28
8,310.73
7.00
RAP -LICITAES
Receita Anual Permitida DE LINHAS DE
RESULTADO GERAL DAS
R$ x 10
Extenso
Prazo
Desgio
Km
(meses) TRANSMISSO
%
Edital
Proposta
3
210.00
19
13,925.83
12,115.46
13.00
85.00
19
27,200.99
18,224.65
33.00
*****
*****
*****
*****
*****
295.00
*****
50,063.10
38,650.85
22.80
504.00
24
77,417.97
77,417.97
0.00
*****
24
3,096.18
3,096.00
0.01
98.00
24
4,182.21
4,182.21
0.00
*****
24
2,357.45
1,414.48
40.00
RAP -LICITAES
Receita Anual Permitida DE LINHAS DE
RESULTADO
GERAL
DAS
R$ x 10
Extenso
Prazo
Desgio
Km
(meses) TRANSMISSO
%
Edital
Proposta
3
*****
18
3,738.97
3,738.97
0.00
*****
*****
*****
*****
*****
602.00
*****
90,792.78
89,849.63
1.04
36
204,217.34
145,607.00
28.70
37.00
22
6,165.92
5,857.60
5.00
*****
22
14,638.69
8,867.85
39.42
296.50
28
35,769.73
29,010.00
18.90
1,816.00
489.00
Prazo
(meses)
286.00
R$ x 103
Desgio
%
Edital
Proposta
36
46,131.43
31,969.00
30.70
383.00
30
37,043.36
30,890.00
16.61
967.00
36
106,172.16
100,263.55
5.57
*****
*****
*****
*****
*****
4,274.50
*****
450,138.63
352,465.00
21.70
Km
(meses)
394.00
Edital
Proposta
36
44,973.23
34,550.00
23.18
315.00
36
58,718.72
49,030.10
16.50
544.00
36
58,594.09
45,725.00
21.96
*****
*****
*****
*****
*****
*****
*****
*****
*****
*****
*****
*****
*****
*****
*****
201.00
28
20,051.93
18,790.00
6.29
563.00
36
62,134.49
52,750.00
15.10
Prazo
(meses)
938.00
R$ x 103
Desgio
%
Edital
Proposta
36
207,729.11
197,300.00
5.02
*****
****
*****
*****
*****
2,955.00
*****
452,201.57
398,145.10
11.95
*****
36
*****
*****
*****
162.00
24
31,009.28
27,400.00
11.64
RAP -LICITAES
Receita Anual Permitida DE LINHAS DE
RESULTADO GERAL DAS
R$ x 10
Extenso
Prazo
Desgio
Km
(meses) TRANSMISSO
%
3
Edital
Proposta
418.00
36
36,512.40
31,596.00
13.47
112.40
30
11,928.51
9,858.91
17.35
28.00
30
5,520.26
4,929.59
10.70
*****
24
4,482.23
4,258.00
5.00
*****
24
*****
*****
*****
720.40
*****
89,452.68
78,042.50
12.76
Extenso
Km
Prazo
(meses)
Proposta
Desgio
%
RAP -LICITAES
Receita Anual Permitida DE LINHAS DE
RESULTADO GERAL DAS
R$ x 10
Extenso
Prazo
Desgio
Km
(meses) TRANSMISSO
%
3
Edital
Proposta
847
42
174,447.72
174,447.00
0.00
367
36
58,292.80
52,405.23
10.10
*****
****
****
****
*****
69
30
3,066.69
3,050.00
0.54
220
36
30,641.49
24,493.76
20.06
33
30
7,045.10
6,692.80
5.00
120
30
13,295.49
11,899.98
10.50
RAP -LICITAES
Receita Anual Permitida DE LINHAS DE
RESULTADO GERAL DAS
R$ x 10
Extenso
Prazo
Desgio
Km
(meses) TRANSMISSO
%
3
Edital
Proposta
*****
****
****
****
*****
616
30
23,265.70
16,286.00
30.00
*****
****
****
****
*****
24
3,619.50
2,534.00
29.99
*****
****
****
****
*****
*****
****
****
****
*****
657
30
38,913.86
38,913.86
0.00
*****
****
****
****
*****
Edital
Proposta
33
30
16,110.25
11,599.38
28.00
*****
****
****
****
*****
2,962.00
*****
368,698.60
342,322.01
7.15
2,092.00
46.00
701,043.61
434,647.04
38.00
****
****
****
****
*****
****
****
****
****
*****
2,092.00
*****
701,043.61
434,647.04
38.00
Edital
Proposta
85
36
11,539.91
10,990.35
4.76
*****
*****
*****
*****
*****
316
36
17,063.98
16,040.00
6.00
65
22
8,288.08
7,782.51
6.10
466.00
*****
36,891.97
34,812.86
5.64
Km
(meses)
*****
Edital
Proposta
*****
*****
*****
*****
240.00
42
102,161.43
92,531.00
9.43
20.00
36
30,383.46
28,865.00
5.00
300.00
24 ou 36
71,312.95
45,569.00
36.10
Edital
Proposta
492.00
36
63,628.19
48,835.00
23.25
328.00
42
76,938.57
76,935.00
0.00
137.00
24 ou 36
36,867.82
36,499.00
1.00
*****
*****
*****
*****
*****
*****
*****
*****
*****
*****
*****
*****
*****
*****
*****
Prazo
(meses)
53.00
Desgio
%
Edital
Proposta
30
5,745.06
5,745.00
0.00
*****
*****
*****
*****
*****
120.00
36
16,035.27
14,987.00
6.54
1,690.00
*****
403,072.75
349,966.00
13.18
Edital
Proposta
2,168.00
36
390,756.75
336,000.00
14.01
*****
*****
*****
*****
*****
Edital
Proposta
*****
*****
*****
*****
*****
*****
*****
*****
*****
*****
265.00
30
22,827.55
22,000.00
3.63
11.00
30
1,645.33
1,640.00
0.32
Prazo
(meses)
*****
R$ x 103
Desgio
%
Edital
Proposta
*****
*****
*****
*****
105.00
42
17,332.21
17,228.17
0.60
*****
*****
*****
*****
*****
2,549.00
*****
376,868.17
12.88
432,561.84
Prazo
(meses)
903.00
Desgio
%
Edital
Proposta
36
146,817.85
144,600.90
1.51
****
****
*****
*****
*****
2.00
30
16,078.31
10,836.78
32.60
****
****
*****
*****
*****
905.00
*****
155,437.68
4.58
162,896.16
Prazo
(meses)
*****
*****
R$ x 103
Desgio
%
Edital
Proposta
*****
*****
*****
*****
*****
*****
*****
*****
Prazo
(meses)
*****
R$ x 103
Desgio
%
Edital
Proposta
*****
*****
*****
*****
*****
*****
*****
*****
*****
436
48
119,083.70
117,300.00
1.50
Km
(meses)
*****
Edital
Proposta
*****
*****
*****
*****
*****
*****
*****
*****
*****
*****
*****
*****
*****
*****
250
42
96,116.62
96,000.00
0.12
Prazo
(meses)
*****
158
844.00
Desgio
%
Edital
Proposta
*****
*****
*****
*****
36
17,744.00
17,744.00
0.00
36
21,123.29
17,849.00
*****
*****
254,067.60
248,893.00
2.04
Edital
Proposta
1,300.00
448,842.73
448842.73
0.00
****
*****
*****
*****
****
*****
*****
*****
RAP -LICITAES
Receita Anual Permitida DE LINHAS DE
RESULTADO GERAL DAS
R$ x 10
Extenso
Prazo
Desgio
Km
(meses) TRANSMISSO
%
3
Edital
Proposta
****
*****
*****
*****
273
97,948.31
97,948.30
0.00
****
*****
*****
*****
350
64,460.18
60,500.00
6.14
****
*****
*****
*****
****
*****
*****
*****
****
*****
*****
*****
****
*****
*****
*****
88
Edital
Proposta
6,550.24
6,550.24
2,518.00
50.00
1,219,791.34
988,030.99
19.00
1,126.00
48
404,961,072.00
404,961,072.00
0.00
****
60
*****
*****
*****
NO LEILOADO
Observao: Relanado no Edital de LEILO n 002/2002.
Abengoa S.A.
CONCESSIONRIA
Abengoa S.A.
CONCESSIONRIA
ABENGOA S.A.
Companhia Hidro Eltrica do So Francisco - CHESF
ABENGOA S.A.
ELECNOR S.A.
CONCESSIONRIA
CONSRCIO GARANHUNS
CHESF (49%); CTEEP (51%)
CONSRCIO BRASILEIRO
Eletrosul Centrais Eltricas S.A. (80%) e Copel Gerao e
Transmisso S.A. (20%)
CONCESSIONRIA
CONRCIO SINO-COPELIANO
COPEL GERAO DE ENERGIA S.A. (49%) e STATE GRID BRAZIL
HOLDING S.A. (51%)
CONSORCIO GUARACIABA
COPEL GERAO DE ENERGIA S.A. (49%) e STATE GRID BRAZIL
HOLDING S.A. (51%)
ELETRONORTE - CENTRAIS ELTRICAS DO NORTE DO BRASIL
S.A.
CHESF - COMPANHIA HIDRO ELTRICA DO SO FRANCISCO
NO LEILOADO
CONSRCIO BAL
ELETROSUL CENTRAIS ELTRICAS S.A. (51%) e COMPANHIA
ESTADUAL DE GERAO E TRANSMISSO DE ENERGIA
ELTRICA (49%)
NO LEILOADO
NO LEILOADO
NO LEILOADO
NO LEILOADO
NEOENERGIA S/A
ISOLUX ENERGIA E PARTICIPAES S/A
NO LEILOADO
NO LEILOADO
NO LEILOADO
CONCESSIONRIA
NO LEILOADO
NO LEILOADO
NO LEILOADO
NO LEILOADO
NO LEILOADO
CONCESSIONRIA
NO LEILOADO
NO LEILOADO
NO LEILOADO
NO LEILOADO
NO LEILOADO
NO LEILOADO
NO LEILOADO
NO LEILOADO
NO LEILOADO
NO LEILOADO
NO LEILOADO
NO LEILOADO
NO LEILOADO
NO LEILOADO
NO LEILOADO
NO LEILOADO
NO LEILOADO
NO LEILOADO
PLANOVA PLANEJAMENTO E CONSTRUES S.A.
NO LEILOADO
NO LEILOADO
NO LEILOADO
NO LEILOADO
NO LEILOADO
Pgina 232 de 232