TJDFT

SOLUES EM FUNDAES - MAIO 2009

200
80

50 70
40 40
17.5
480 3
2
8

A rq u iv o M ID

PLANILHA PARA CLCULO E ORAMENTO DE PROJETOS EM TUBU

Melhor visualizado em 1024 x 768 pixels

Licenciado para: TRIBUNAL DE JUSTIA DO DISTRITO FEDERAL E TERRITRIOS


5
TJDFT
3

O 2009

CLIQUE ABAIXO PARA COMEAR

O DE PROJETOS EM TUBULES
Autor: Eng. Civil Guilherme Magalhes Almeida
do em 1024 x 768 pixels Matr. 315255
TJDFT - SERCIV
Tel: (61)3103-7759
FEDERAL E TERRITRIOS
ESTE MDULO DO
SOFTWARE AINDA EST EM
FASE DE DESENVOLVIMENTO.
AGUARDE O LANAMENTO
DA NOVA VERSO!!!
1

1
DATA

CONTADOR
O QUE VOC DESEJA FAZER?

QUERO CALCULAR UM TUBULO DE BASE OVAL (FALSA ELIPSE)

QUERO CALCULAR UM TUBULO DE BASE CIRCULAR

QUERO ORAR UM TUBULO OVAL (FALSA ELIPSE) J CALCULADO

QUERO ORAR UM TUBULO CIRULAR J CALCULADO


TUBULO DE BASE CIRCULAR ENTRADA
fck (kg/cm2) CP 200 200.00
Taxa do terrento sigma s (kg/cm2) 3.00
Carga Q (Tf) 500.00
Perfurao do fuste Pf (m) 12.00
Limite para altura da base - h lim (cm) 200.00
NMERO DE REPETIES 1.00
RECALCULAR OS PARMETROS ABAIXO

TAXA DO TERRENO NECESSRIA PARA H=200 CM (kg/cm2) 6.03


CARGA MXIMA PARA H=200 CM (Tf) 194.24
ngulo da base alfa (graus) 60.35
rea da base (m2) 16.98
rea do fuste (m2) 0.71
Volume da base (m3) 24.91
Volume alargamento base (m3) 22.61
Volume total (m3) 31.11
Valor do fuste para h lim = 200 cm 235.00
rea da base com fuste alterado (m2) 16.98
rea do fuste com a alterao (m2) 4.34
Volume da base com fuste alterado (m3) 21.34
Vol. alargamento da base com fuste alterado (m3) 12.66
Volume total com fuste alterado (m3) 64.71
Percentual de aumento do volume total com alterao do fuste 108.00%

CARGA ATUANTE 500.00


CARGA MAXIMA 194.24

TAXA CALCULADA 6.03


TAXA ORIGINAL 3.00
RESULTADOS fuste alter
200 D (cm) 460.67 ADOTAR 465.00 vinc test 1
d (cm) 91.59 ADOTAR 95.00
h (cm) 320.42 ADOTAR 325.00
ATENO! h = 325 > h lim = 200
valor do fuste recalculado = 235 cm

Recalcula fuste quando h > h lim Alternar fuste

CP 100 4 1
CP 135 2
CP 150 3
CP 200 4
CP 250 5
CP 300 6
CP 400 7
CP 500 8
COTAO DOS INSUMOS
MO DE OBRA UNIDADE PREO Nivel
Armador h 3.31 de
Carpinteiro h 3.31 Perdas
Pedreiro h 3.31 Perdas =
Servente h 2.13
Poceiro h 3.31

MATERIAIS UNIDADE PREO TAXA DE LEIS SOCIAIS (%)


Concreto C-15 usinado - p/ tubules M3 275.32
APLICAR TAXA DE LEIS SOCIAIS
Concreto estrutural C15 usinado - p/ blocos M3 275.32
Armadura CA-50 diam. 12,5 mm KG 4.16
Arame Recozido, 18 BWG KG 11.75
Cimento comum KG 0.39
Brita 1 M3 66.27
Areia lavada M3 83.73
Tbua 1''x12'' , pinus ou similar METRO 7.21
Sarrafo 1''x4'' , pinus ou similar METRO 2.58
Pontalete 3''x3'' , pinus ou similar METRO 9.19
Prego 18x30 KG 6.85
Desmoldante para formas LITRO 6.99

COMPOSIES

Nvel de perdas
Perfurao do fuste (CIRULARES) ml mn med
Servente h 5.4285 6.0317
Pocerio h 5.4285 6.0317

Perfurao do fuste (OVAIS) ml mn med


Servente h 3.0535 3.3928
Pocerio h 3.0535 3.3928

Alargamento da base m3 mn med


Servente h 10.0000 12.0000
Pocerio h 12.0000 14.0000

Lanamento de concreto C-15 - p/ tubules m3 mn med


Concreto C-15 usinado m3 1.0300 1.0500
Pedreiro h 3.0000 4.0500
Servente h 3.0000 4.0500

Colocao de ferragem de topo - CA-50 12mm kg mn med


Armadura CA-50 diam. 12,5mm kg 1.0800 1.1500
Arame recozido, 18 BWG kg 0.0200 0.0200
Armador h 0.0700 0.0900
Servente h 0.0700 0.0900

Escavao manual m3 mn med


Servente h 1.6000 2.1700

Lastro de concreto magro m3 mn med


Cimento comum kg 209.0000 220.0000
Areia mdia - lavada e peneirada m3 0.6631 0.6980
pedra 1 m3 0.8342 0.8780
Pedreiro m3 3.0000 4.0500
Servente h 4.0000 5.4000

Corte e preparo de cabea de tubulo Unidade mn med


Pedreiro h 0.2400 0.2500
Servente h 2.4000 2.5000

Confeco, colocao e remoo da frma m2 mn med


Tbua 1''x12'' , pinus ou similar m 1.0000 1.0500
Sarrafo 1''x4'' , pinus ou similar m 3.5000 3.9000
Pontalete 3''x3'' , pinus ou similar m 0.9000 0.9800
Prego 18x30 kg 0.1500 0.1600
Desmoldante para formas l 0.1500 0.1700
Carpinteiro h 1.3500 1.5000
Servente h 1.3500 1.5000

Dobramento e colocao da armadura kg mn med


Armadura CA-50 diam, 12,5 mm kg 1.0800 1.1500
Arame recozido , 18 BWG kg 0.0200 0.0200
Armador h 0.0700 0.0900
Servente h 0.0700 0.0900

Lanamento e adensamento de concreto


estrutural para blocos m3 mn med
Servente h 3.0000 4.0500
Pedreiro h 3.0000 4.0500
Concreto usinado para blocos m3 1.0000 1.0500

Reaterro m3 mn med
Servente h 1.5000 2.0300

Bota fora m3 mn med


Servente h 1.6000 2.1700
VOC TEM CERTEZA QUE DESEJA APAGAR TODOS
OS QUANTITATIVOS DA LISTA?
VOC TEM CERTEZA QUE DESEJA APAGAR TODOS
OS QUANTITATIVOS DO PROJETO?
min 1.00
med 2.00
mx 3.00
2

XA DE LEIS SOCIAIS (%) 124.00

APLICAR TAXA DE LEIS SOCIAIS


1

el de perdas
mx adotada preo
7.2380 6.0317 4.77 28.78
7.2380 6.0317 7.41 44.72
Total: 73.50

mx adotada preo
4.0714 3.3928 4.77 16.19
4.0714 3.3928 7.41 25.16
Total: 41.34
mx adotada preo
14.0000 12.0000 4.77 57.25
16.0000 14.0000 7.41 103.80
Total: 161.06
mx adotada preo
1.0700 1.0500 275.32 289.09
4.8600 4.0500 7.41 30.03
4.8600 4.0500 4.77 19.32
Total: 338.44
mx adotada preo
1.2500 1.1500 4.16 4.78
0.0200 0.0200 11.75 0.24
0.1100 0.0900 7.41 0.67
0.1100 0.0900 4.77 0.43
Total: 6.12
mx adotada preo
2.6000 2.1700 4.77 10.35
Total: 10.35

mx adotada preo
242.0000 220.0000 0.39 85.80
0.7678 0.6980 83.73 58.44
0.9658 0.8780 66.27 58.19
4.8600 4.0500 7.41 30.03
6.4800 4.0500 4.77 19.32
Total: 251.78
mx adotada preo
0.2600 0.2500 7.41 1.85
2.6000 2.5000 7.41 18.54
Total: 20.39
mx adotada
1.1000 1.0500 7.21 7.57
4.1000 3.9000 2.58 10.06
1.0800 0.9800 9.19 9.01
0.1700 0.1600 6.85 1.10
0.2000 0.1700 6.99 1.19
1.5500 1.5000 7.41 11.12
1.5500 1.5000 4.77 7.16
Total: 47.20
mx adotada preo
1.2500 1.1500 4.16 4.78
0.0200 0.0200 11.75 0.24
0.1100 0.0900 7.41 0.67
0.1100 0.0900 4.77 0.43
Total: 6.12

mx adotada preo
4.8600 4.0500 4.77 19.32
4.8600 4.0500 7.41 30.03
1.1000 1.0500 275.32 289.09
Total: 338.44
mx adotada preo
2.4300 2.0300 4.77 9.69
Total: 9.69
mx adotada preo
2.6000 2.1700 4.77 10.35
Total: 10.35
TUBULO OVAL - ENTRADA DE DADOS
ENTRADA
NMERO DE REPETIES 1.00
DADOS DO FUSTE
DIMETRO DO FUSTE d (cm) 80.00
PERFURAO DO FUSTE Pf (m) 21.00
DADOS DA BASE
ALTURA DA BASE h (cm) 205.00
ALTURA DO RODAP dh (cm) 20.00
DIAMETRO DA BASE D 10.00
DADOS DO BLOCO
COMPRIMENTO DO BLOCO X (cm) 100.00
LARGURA DO BLOCO Y (cm) 100.00
ALTURA DO BLOCO HB (cm) 95.00
BITOLA UTILIZADA NO BLOCO (mm) 12.50
12.5
CONSUMO MDIO DE ARMADURA NO BLOCO (kg / m3) 80.00
Distncia a1 (cm) 60.00
Distncia a2 (cm) 50.00
Distncia a3 (cm) 50.00
Distncia a4 (cm) 60.00
Distncia b1(cm) 60.00
Distncia b2 (cm) 50.00
Distncia b3 (cm) 50.00
Distncia b4 (cm) 60.00
ARMADURA LONGITUDINAL
BITOLA UTILIZADA (mm) 12.50
12.50
QUANTIDADE DE FERROS 8
COMPRIMENTO DO FERRO (cm) 200.00
8 FERROS DIMETRO DE 12.5 mm - 200
ARMADURA TRANVERSAL (ESTRIBOS)
BITOLA UTILIZADA (mm) 5.00
5.00
ESPAAMENTO (cm) 20.00
COBRIMENTO (cm) 3.00
COMPRIMENTO DO ESTRIBO (cm) 260.00
QUANTIDADE DE ESTRIBOS (un) - 1 TUBULO 10.00
10 FERROS DIMETRO DE 5 C/ 20 - 260
DADOS COMPLEMENTARES
NGULO DA INCLINAO DO TALUDE BETA (GRAUS) 60.00
ALTURA DO CONCRETO MACRO C (cm) 5.00
ENTRADA NO BLOCO D (cm) DESCONTA VOLUME DA ENTRADA 5.00
Distncia A (ARREDONDADA) 60.00 57.73
ngulo Beta adotado (graus) 60.00 DIST. A ORIG.
Material + mo de obra
PREO (R$)
Descrio Unidade Quantidade Unitrio
Perfurao do fuste ml 21.00 73.50
TUBULO

Alargamento da base m3 -0.68 161.06


Lanamento de concreto m3 9.88 338.44
Armadura longitudinal kg 15.98 6.12
Armadura tranversal kg 4.16 6.12
Escavao manual m3 6.88 10.35
Lanamento e adenamento de
Concreto magro e= 5cm m3 0.17 251.78
Corte e preparo da cabea do
tubulo Unid. 1.00 20.39
Confeco, colocao e remoo
BLOCO

de forma m2 3.80 47.20


Dobramento e colocao de
armadura no bloco kg 76.00 6.12
Lanamento e adenamento de
concreto estrutural p/ blocos m3 0.95 338.44
Reaterro m3 5.76 9.69
Bota fora m3 11.01 10.35
Total material + mo de obra:

MATERIAL
PREO (R$)
Descrio Unidade Quantidade Unitrio
Concreto m3 9.88 289.09
Tub.

Armadura longitudinal kg 15.98 5.02


Armadura tranversal kg 4.16 5.02
Concreto magro m3 0.17 202.43
Concreto estrutural m3 0.95 289.09
Bloco

Forma m2 3.80 28.92


Armadura kg 76.00 5.02
Total material
Total mo de obra:
VOC TEM CERTEZA QUE DESEJA APAGAR TODOS
OS QUANTITATIVOS DA LISTA?
VOC TEM CERTEZA QUE DESEJA APAGAR TODOS
OS QUANTITATIVOS DO PROJETO?
PREO (R$)
Total ARMADURA
1,543.49
-108.76 Vol. Base = 0.36 m3
3,343.81
97.74 CA-50 DIAM. 12.5 8 BARRAS C = 200
25.41 CA-60 DIAM. 5 10 BARRAS C = 260
71.23

44.03

20.39

179.37

464.79 CA-50 DIAM. 12.5

321.52
55.74
113.94
R$ 6,172.71

PREO (R$)
Total
2,856.21
80.22
20.86
35.40
274.63
109.91
381.44
R$ 3,758.67
R$ 6,172.71
R$ 2,414.05
DADOS TIPO 1 TIPO 2

ES
X (cm) 100.00 -

BLOCO
AR
Y (cm) 100.00 -

U L
HB (cm) 95.00 -

R C
ARMADURA CA-50 DIAM. 12,5 -

CI Pf (m)
Fuste d (cm) 80.00 -

ES
21.00 -

h (cm) 205.00 -

TUBULO
BUL dh (cm)
D (cm)
20.00 -
-
TU ARM. LONG.
ARM.TRANV.
CA-50 DIAM. 12,5
CA-60 DIAM. 5
8 BARRAS C = 200
10 BARRAS C = 260
REPETIES 1.00
MATERIAL + MO DE OBRA UNIDADE TOTAL UNITRIO TOTAL
Perfurao do fuste m 21.00 21.00
Alargamento da base unid. -0.72 -0.72
TUBULO

Lanamento de concreto m3 9.83 9.83


Armadura longitudinal kg 15.98 15.98
Armadura tranversal kg 4.16 4.16
Escavao manual m3 6.88 6.88
Concreto magro m2 0.17 0.17
Corte e preparo da cabea do
tutulo m3 1.00 1.00
Confeco, colocao e remoo
BLOCO

de forma m2 3.80 3.80


Dobramento e colocao de
armadura kg 76.00 76.00
Lanamento e adensamento de
concreto estrutural m3 0.95 0.95
Reaterro m3 5.76 5.76
Bota fora m3 10.96 10.96
MATERIAL UNIDADE
Concreto m3 9.83 9.83
TUB.

Armadura longitudinal kg 15.98 15.98


Armadura tranversal kg 4.16 4.16
Concreto magro m3 0.17 0.17
BLOCO

Concreto estrutural m3 0.95 0.95


Forma m2 3.80 3.80
Armadura kg 76.00 76.00

PREO UNITRIO DA PERFURAO (R$) - POR METRO 73.50


PREO TOTAL DA PERFURAO (R$) 1,543.49 UNITRIO
PREO UNITRIO DO MATERIAL (R$) 3,745.61
PREO TOTAL DO MATERIAL (R$) 3,745.61
PREO UNITRIO DA MO DE OBRA (R$) 2,404.08
PREO TOTAL DA MO DE OBRA (R$) 2,404.08
PREO UNITRIO (MO+MAT) (R$) 6,149.69
PREO TOTAL(MO+MAT) (R$) 6,149.69
TIPO 1 TIPO 2

SOMA QUANTITATIVOS T1 A T10 PREO (R$) QUADRO ORIGINAL DAS QUANTIDADES


GERAL - BLOCOS RETANGULARES UNIDADE QUANT. UNITRIO TOTAL
Perfurao do fuste m 21.00 VAR #VALUE!
Alargamento da base m3 -0.72 161.06 -116.03
TUBULO

Lanamento de concreto m3 9.83 338.44 3,328.53


Armadura longitudinal kg 15.98 6.12 97.74
Armadura tranversal kg 4.16 6.12 25.41
Escavao manual m3 6.88 10.35 71.23
Concreto magro m2 0.17 251.78 44.03
Corte e preparo da cabea do
tutulo unid. 1.00 20.39 20.39
BLOCO

Confeco, colocao e remoo


de forma m2 3.80 47.20 179.37
Dobramento e colocao de
armadura kg 76.00 6.12 464.79
BLOCO
Lanamento e adensamento de
concreto estrutural p/ blocos m3 0.95 338.44 321.52
Reaterro m3 5.76 9.69 55.74
Bota fora m3 10.96 10.35 113.47
Total material + mo de obra #VALUE!
Total material 3,745.61
Total mo de obra 2,404.08

TUBULES CIRCULARES PREO (R$) PRIMEIRA DEZENA COPIADA


GERAL - BLOCOS RETANGULARES UNIDADE QUANT. UNITRIO TOTAL
Perfurao do fuste m 21.00 VAR 1,543.49
Alargamento da base m3 -0.72 161.06 -116.03
TUBULO

Lanamento de concreto m3 9.83 338.44 3,328.53


Armadura longitudinal kg 15.98 6.12 97.74
Armadura tranversal kg 4.16 6.12 25.41
Escavao manual m3 6.88 10.35 71.23
Concreto magro m2 0.17 251.78 44.03
Corte e preparo da cabea do
tutulo unid. 1.00 20.39 20.39
BLOCO

Confeco, colocao e remoo


de forma m2 3.80 47.20 179.37
Dobramento e colocao de
armadura kg 76.00 6.12 464.79
Lanamento e adensamento de
concreto estrutural m3 0.95 338.44 321.52
Reaterro m3 5.76 9.69 55.74
Bota fora m3 10.96 10.35 113.47
Total material + mo de obra 6,149.69
Total material 3,745.61
Total mo de obra 2,404.08
TUBULES CIRCULARES PREO (R$) SEGUNDA DEZENA COPIADA
GERAL - BLOCOS RETANGULARES UNIDADE QUANT. UNITRIO TOTAL
Perfurao do fuste m 21.00 VAR 1,543.49
Alargamento da base m3 -0.72 161.06 -116.03
TUBULO

Lanamento de concreto m3 9.83 338.44 3,328.53


Armadura longitudinal kg 15.98 6.12 97.74
Armadura tranversal kg 4.16 6.12 25.41
Escavao manual m3 6.88 10.35 71.23
Concreto magro m2 0.17 251.78 44.03
Corte e preparo da cabea do
tutulo unid. 1.00 20.39 20.39
BLOCO

Confeco, colocao e remoo


de forma m2 3.80 47.20 179.37
Dobramento e colocao de
armadura kg 76.00 6.12 464.79
Lanamento e adensamento de
concreto estrutural m3 0.95 338.44 321.52
Reaterro m3 5.76 9.69 55.74
Bota fora m3 10.96 10.35 113.47
Total material + mo de obra 6,149.69
Total material 3,745.61
Total mo de obra 2,404.08

TUBULES CIRCULARES PREO (R$) TERCEIRA DEZENA COPIADA


GERAL - BLOCOS RETANGULARES UNIDADE QUANT. UNITRIO TOTAL
Perfurao do fuste m 21.00 VAR 1,543.49
Alargamento da base m3 -0.72 161.06 -116.03
TUBULO

Lanamento de concreto m3 9.83 338.44 3,328.53


Armadura longitudinal kg 15.98 6.12 97.74
Armadura tranversal kg 4.16 6.12 25.41
Escavao manual m3 6.88 10.35 71.23
Concreto magro m2 0.17 251.78 44.03
BLOCO
Corte e preparo da cabea do
tutulo unid. 1.00 20.39 20.39
BLOCO

Confeco, colocao e remoo


de forma m2 3.80 47.20 179.37
Dobramento e colocao de
armadura kg 76.00 6.12 464.79
Lanamento e adensamento de
concreto estrutural m3 0.95 338.44 321.52
Reaterro m3 5.76 9.69 55.74
Bota fora m3 10.96 10.35 113.47
Total material + mo de obra 6,149.69
Total material 3,745.61
Total mo de obra 2,404.08

TUBULES CIRCULARES PREO (R$) QUARTA DEZENA COPIADA


GERAL - BLOCOS RETANGULARES UNIDADE QUANT. UNITRIO TOTAL
Perfurao do fuste m 21.00 VAR 1,543.49
Alargamento da base m3 -0.72 161.06 -116.03
TUBULO

Lanamento de concreto m3 9.83 338.44 3,328.53


Armadura longitudinal kg 15.98 6.12 97.74
Armadura tranversal kg 4.16 6.12 25.41
Escavao manual m3 6.88 10.35 71.23
Concreto magro m2 0.17 251.78 44.03
Corte e preparo da cabea do
tutulo unid. 1.00 20.39 20.39
BLOCO

Confeco, colocao e remoo


de forma m2 3.80 47.20 179.37
Dobramento e colocao de
armadura kg 76.00 6.12 464.79
Lanamento e adensamento de
concreto estrutural m3 0.95 338.44 321.52
Reaterro m3 5.76 9.69 55.74
Bota fora m3 10.96 10.35 113.47
Total material + mo de obra 6,149.69
Total material 3,745.61
Total mo de obra 2,404.08

TUBULES CIRCULARES PREO (R$) DEZENA 5 AINDA NO UTILIZADA


GERAL - BLOCOS RETANGULARES UNIDADE QUANT. UNITRIO TOTAL
Perfurao do fuste m
Alargamento da base m3
TUBULO

Lanamento de concreto m3
Armadura longitudinal kg
Armadura tranversal kg
Escavao manual m3
Concreto magro m2
Corte e preparo da cabea do
tutulo unid.
BLOCO

Confeco, colocao e remoo


de forma m2
Dobramento e colocao de
armadura kg
Lanamento e adensamento de
concreto estrutural m3
Reaterro m3
Bota fora m3
Total material + mo de obra
Total material
Total mo de obra

TUBULES OVAIS PREO (R$) RESULTADO FINAL - SOMA DAS 5 DEZENAS


GERAL - BLOCOS RETANGULARES UNIDADE QUANT. UNITRIO TOTAL
Restaurar Adequar alterao do unitrio do fuste
Perfurao do fuste m 84.00 VAR 6,173.97 Restaurar Adequar alterao do unitrio do fuste

Alargamento da base m3 -2.88 161.06 -464.13 Restaurar

Restaurar
TUBULO

Lanamento de concreto m3 39.34 338.44 13,314.12


Armadura longitudinal kg 63.93 6.12 390.97 Restaurar

Armadura tranversal kg 16.62 6.12 101.65 Restaurar

Escavao manual m3 27.52 10.35 284.93 Restaurar

Concreto magro m2 0.70 251.78 176.11 Restaurar


Corte e preparo da cabea do
Restaurar
tutulo unid. 4.00 20.39 81.56
Confeco, colocao e remoo
BLOCO

Restaurar
de forma m2 15.20 47.20 717.46
Dobramento e colocao de
Restaurar
armadura kg 304.00 6.12 1,859.17
Lanamento e adensamento de
Restaurar
concreto estrutural m3 3.80 338.44 1,286.06
Reaterro m3 23.02 9.69 222.97 Restaurar

Bota fora m3 43.84 10.35 453.89 Restaurar


Total material + mo de obra 24,598.75
Total material 14,982.44 Restaurar todas as quantidades e preos originais do BD
Total mo de obra 9,616.30

TUBULES OVAIS PREO (R$)


QUANTITATIVOS GERAL UNIDADE QUANT. UNITRIO TOTAL
Perfurao do fuste m 160.00 VAR 10,471.00
TUBULO
Alargamento da base m3 79.37 91.39 7,253.96
TUBULO

Lanamento de concreto m3 205.03 159.37 32,676.60


Armadura longitudinal kg 599.34 2.15 1,290.95
Armadura tranversal kg 245.87 2.15 529.60
Escavao manual m3 249.68 6.32 1,577.74
Concreto magro m2 5.46 132.92 726.36
Corte e preparo da cabea do
tutulo unid. 20.00 8.75 174.99
BLOCO

Confeco, colocao e remoo


de forma m2 110.40 24.54 2,709.11
Dobramento e colocao de
armadura kg 2,649.60 2.15 5,707.13
Lanamento e adensamento de
concreto estrutural m3 33.12 177.22 5,869.63
Reaterro m3 211.10 5.91 1,247.86
Bota fora m3 243.62 6.32 1,539.42
Total material + mo de obra R$ 71,774.35
Total material R$ 39,324.06
Total mo de obra R$ 32,450.29
LUCRO (%) 10.00
ADMNISTRAO (%) 12.00
CUSTOS FINANCEIROS (%) 6.00
CUSTO FINAL
Total material + mo de obra R$ 93,731.56
total material R$ 51,354.08
Total mo de obra R$ 42,377.48
BDI MDIO 30.59%
DIFERENA BRUTA R$ 21,957.21
TIPO 3 TIPO 4 TIPO 5

- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -

UNITRIO TOTAL UNITRIO TOTAL UNITRIO TOTAL UNITRIO


UNITRIO UNITRIO UNITRIO UNITRIO

TIPO 2 TIPO 3 TIPO 4 TIPO 5

ANTIDADES
erao do unitrio do fuste
erao do unitrio do fuste

s e preos originais do BD
TIPO 6 TIPO 7 TIPO 8 TIPO 9

- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -

TOTAL UNITRIO TOTAL UNITRIO TOTAL UNITRIO TOTAL


UNITRIO UNITRIO UNITRIO

TIPO 6 TIPO 7 TIPO 8 TIPO 9


TIPO 10

- -
- -
- -
- -
- -
- -
- -
- -
- -

UNITRIO TOTAL UNITRIO


UNITRIO UNITRIO

TIPO 9 TIPO 10
AO TIPO 1 TIPO 2 TIPO 3 TIPO 4
BLOCO
CA-50
8.0
10.0
RESUMO DOS FERROS TABELA ORIGINAL 12.5 76.00
16.0
20.0
25.0
CA-60
5.0
6.0
ARM. LONGIT.
CA-50
8.0
10.0
12.5 15.98
16.0
20.0
25.0
CA-60
5.0
6.0
ARM. TRANSV.
CA-50
6.3
8.0
10.0
12.5
16.0
CA-60
3.4
5.0 4.16
6.0
TIPO 5 TIPO 6 TIPO 7 TIPO 8 TIPO 9 TIPO 10 AO
BLOCO
SOMA 1 CA-50
0.00 8.0
0.00 10.0
76.00 12.5
0.00 16.0
0.00 20.0
0.00 25.0
0.00 CA-60
0.00 5.0
0.00 6.0
0.00 ARM. LONGIT.
0.00 CA-50
0.00 8.0
0.00 10.0
15.98 12.5
0.00 16.0
0.00 20.0
0.00 25.0
0.00 CA-60
0.00 5.0
0.00 6.0
0.00 ARM. TRANSV.
0.00 CA-50
0.00 6.3
0.00 8.0
0.00 10.0
0.00 12.5
0.00 16.0
0.00 CA-60
0.00 3.4
4.16 5.0
0.00 6.0
RESULTADO DAS ARMADURAS DO QUADRO ORIGINAL DE QUANTIDADES
3.40 5.00 6.00 6.30 8.00 10.00 12.50 16.00 20.00
0.00 4.16 0.00 0.00 0.00 0.00 91.98 0.00 0.00

RESULTADO DAS ARMADURAS DA PRIMEIRA DEZENA


3.40 5.00 6.00 6.30 8.00 10.00 12.50 16.00 20.00
0.00 4.16 0.00 0.00 0.00 0.00 91.98 0.00 0.00

RESULTADO DAS ARMADURAS DA SEGUNDA DEZENA


3.40 5.00 6.00 6.30 8.00 10.00 12.50 16.00 20.00
0.00 4.16 0.00 0.00 0.00 0.00 91.98 0.00 0.00

RESULTADO DAS ARMADURAS DA TERCEIRA DEZENA


3.40 5.00 6.00 6.30 8.00 10.00 12.50 16.00 20.00
0.00 4.16 0.00 0.00 0.00 0.00 91.98 0.00 0.00

RESULTADO DAS ARMADURAS DA QUARTA DEZENA


3.40 5.00 6.00 6.30 8.00 10.00 12.50 16.00 20.00
0.00 4.16 0.00 0.00 0.00 0.00 91.98 0.00 0.00

RESULTADO DAS ARMADURAS DA QUINTA DEZENA


3.40 5.00 6.00 6.30 8.00 10.00 12.50 16.00 20.00

3.40 0.00
CA - 60
RESULTADO FINAL AO

5.00 16.62 kg
6.00 0.00
6.30 0.00
8.00 0.00
10.00 0.00
CA - 50

12.50 367.93 kg
16.00 0.00
20.00 0.00
25.00 0.00
CA-50+10 % 405.00
CA-60+10 % 19.00
DADES
25.00
0.00

25.00
0.00

25.00
0.00

25.00
0.00

25.00
0.00

25.00
ENTRADA DE DADOS DE TUBULES OVAIS DE DIVISA - CLCULO
DADOS ENTRADA
fck (kgf/cm2) 200.00
CP 200
Taxa do terreno sigma s (kg/cm2) 3.00
Carga Q1 (tf) - TUBULO OVAL DE DIVISA 50.00
gama f (NB51/78 =1,4) 1.40
gama c (NB51/78 =1,6) 1.60
Lado do pilar paralelo viga alavanca b0 (cm) 40.00
Brao de alavanca y (dist. eixo-eixo entre pilares) [cm] 500.00
Valor de n (a = nb) a < 2,5b 2.00
Perfurao do fuste Pf (m) 21.00
Carga Q2 (tf) - TUBULO CIRCULAR 10.00
Valor limite para altura da base - h lim (cm) 200.00
Nmero de conjuntos (1 conjunto = 1 apoio) 1.00
RECALCULAR OS PARMETROS ABAIXO REPRODUZIR COM CARGA MXIMA
NMERO DE TUBULES NECESSRIOS PARA 1 CONJUNTO COM h lim = 200 cm
TAXA DO TERRENO NECESSRIA PARA USAR S 1 TUBULO COM h lim 200 cm (kg/cm2)
CARGA MXIMA PARA H=200 CM (Tf)
TUBULO COM H < 200 cm OK!
Dimetro do fuste d (cm) 29.87 adotar
rea para b (cm2) 16,666.67
Dimetro do setor circular b (cm) 96.62 adotar
R1 (ton) - reao no tubulo 53.19
rea para clculo x (cm2) 17,730.50
X (cm) 98.77 adotar
Altura da base h (cm) 121.24 h <= 200 - ok!
Comprimento da base oval a (cm) 200.00 adotar
a/b (cm) 2.07 a/b < 2,5 - ok!
ngulo alfa (rad/graus) 1.06 60.75
Excentricidade (cm) 30.00
Alvio (tf) 3.19
Alvio/2 (tf) 1.60
Reao no tubulo central (tf) - [Q2-(alvio/2)] 8.40 1
rea da base - RAIO MDIO (m2) 1.77 1
rea do fuste (m2) 0.28
Volume da base (m3) 1.85
Volume alargamento base (m3) 1.50
Volume total (m3) 7.44
1 CP 100 4
2 CP 135
3 CP 150
4 CP 200
5 CP 250
6 CP 300
7 CP 400
8 CP 500
0
dh adotar (cm)
10
ATENO !
Volume calculado com dh = 20 cm!
valor da norma NB51/78 ok!
valor da norma NB51/78 ok!

Volume total ser calculado

*** RESULTADOS ***


1.00
1.59
94.07

60.00
16,666.67 2
100.00 1
54.00
17,730.50
100.00
125.00
200.00

Recalcula fuste quando h > h lim


Alternar fuste
1.60
8.40
1.77
0.28
1.85
1.50
7.44
CALCULO TUBUL. NECESS. 1.00
CARGA ATUANTE 50.00
CARGA MAXIMA 94.07
CARGA AT/CARGA MAX 0.53
SEGURANA 88.14%

TAXA CALCULADA 1.59


TAXA ORIGINAL 3.00
PRODUTO 1.00

fuste alterado
vinculo do fuste 1
338.44 0
TUBULO OVAL - ENTRADA DE DADDOS
ENTRADA
NMERO DE CONJUNTOS (APOIOS) 1.00
NMERO DE TUBULES NECESSRIOS P/ 1 CONJ. 1.00
NMERO TOTAL DE TUBULES 1.00
DADOS DO FUSTE
DIMETRO DO FUSTE d (cm) 60.00
PERFURAO DO FUSTE Pf (m) 21.00
DADOS DA BASE
ALTURA DA BASE h (cm) 100.00
ALTURA DO RODAP dh (cm) 20.00
COMPRIMENTO DA BASE OVAL a (x + b) - (cm) 175.00
BASE RETA x - (cm) 90.00
DIMETRO b (cm) 85.00
DADOS DO BLOCO
COMPRIMENTO DO BLOCO X (cm) 80.00
LARGURA DO BLOCO Y (cm) 80.00
ALTURA DO BLOCO HB (cm) 75.00
BITOLA UTILIZADA NO BLOCO (mm) 10.00
10
CONSUMO MDIO DE ARMADURA NO BLOCO (kg / m3) 80.00
Distncia a1 (cm) 50.00
Distncia a2 (cm) 50.00
Distncia a3 (cm) 50.00
Distncia a4 (cm) 50.00
Distncia b1(cm) 50.00
Distncia b2 (cm) 50.00
Distncia b3 (cm) 50.00
Distncia b4 (cm) 50.00
ARMADURA LONGITUDINAL
BITOLA UTILIZADA (mm) 12.50
12.50
QUANTIDADE DE FERROS 6.00
COMPRIMENTO DO FERRO (cm) 200.00
6 FERROS DIMETRO DE 12.5 mm - 200
ARMADURA TRANVERSAL (ESTRIBOS)
BITOLA UTILIZADA (mm) 6.30
6.30
ESPAAMENTO (cm) 20.00
COBRIMENTO (cm) 3.00
COMPRIMENTO DO ESTRIBO (cm) - 1 TUBULO 197.00
QUANTIDADE DE ESTRIBOS (un) - 1 TUBULO 10.00
10 FERROS DIMETRO DE 6.3 C/ 20 - 197
DADOS COMPLEMENTARES
NGULO DA INCLINAO DO TALUDE BETA (GRAUS) 60.00
ALTURA DO CONCRETO MACRO C (cm) 5.00
ENTRADA NO BLOCO D (cm) DESCONTA VOLUME DA ENTRADA 5.00
Distncia A (ARREDONDADA) 50.00 46.19
ngulo Beta adotado (graus) 60.00 DIST. A ORIG.

Material + mo de obra
PREO (R$)
Descrio Unidade Quantidade Unitrio
Perfurao do fuste ml 21.00 41.34
TUBULO

Alargamento da base m3 0.92 161.06


Lanamento de concreto m3 6.85 338.44
Armadura longitudinal kg 12.00 6.12
Armadura tranversal kg 5.00 6.12
Escavao manual m3 4.30 10.35
Lanamento e adenamento de
Concreto magro e= 5cm m3 0.15 251.78
Corte e preparo da cabea do
tubulo Unid. 1.00 20.39
Confeco, colocao e remoo de
BLOCO

forma m2 2.40 47.20


Dobramento e colocao de
armadura no bloco kg 38.40 6.12
Lanamento e adenamento de
concreto estrutural p/ blocos m3 0.47 338.44
Reaterro m3 3.67 9.69
Bota fora m3 7.48 10.35
Total material + mo de obra:

MATERIAL
PREO (R$)
Descrio Unidade Quantidade Unitrio
Concreto m3 6.85 289.09
Tub.

Armadura longitudinal kg 12.00 5.02


Armadura tranversal kg 5.00 5.02
Concreto magro m3 0.15 202.43
Bloco

Concreto estrutural m3 0.47 289.09


Forma m2 2.40 28.92
Armadura kg 38.40 5.02
Total material
Total mo de obra:
VOC TEM CERTEZA QUE DESEJA APAGAR TODOS
OS QUANTITATIVOS DA LISTA?
VOC TEM CERTEZA QUE DESEJA APAGAR TODOS
OS QUANTITATIVOS DO PROJETO?
PREO (R$)
Total ARMADURA
868.21
147.73 Vol. Base = 1.2 m3
2,319.89
73.39 CA-50 DIAM. 12.5 6 BARRAS C = 200
30.58 CA-60 DIAM. 6.3 10 BARRAS C = 197
44.51

37.23

20.39

113.28

234.84 CA-50 DIAM. 10

157.67
35.55
77.47
R$ 4,160.74

PREO (R$)
Total
1,981.60
60.23
25.10
29.93
134.67
69.42
192.73
R$ 2,493.67
R$ 4,160.74
R$ 1,667.07
DADOS TIPO 1 TIPO 2

X (cm) 100.00 - 100.00

BLOCO
Y (cm) 100.00 - 100.00
HB (cm) 95.00 - 95.00
ARMADURA
AIS
CA-50 DIAM. 10 - CA-50 DIAM. 10

OV
Fuste d (cm) 80.00 - 80.00
Pf (m) 21.00 - 21.00

ES h (cm) 205.00 - 205.00

L
dh (cm) 20.00 - 20.00

U a (cm) 335.00 - 350.00

TUBULO
U B x (cm) 150.00 - 135.00
T ARM. LONG. b (cm) 185.00
CA-50 DIAM. 12,5
-
8 BARRAS C = 200
215.00
CA-50 DIAM. 12,5
ARM.TRANV. CA-60 DIAM. 6,3 10 BARRAS C = 260 CA-60 DIAM. 6,3
NUM. CONJUNTOS 1.00 1.00
NUM. TUB. 1 CONJ. 1.00 1.00
TOTAL TUBULES 1.00 1.00
MATERIAL + MO DE OBRA UNIDADE TOTAL UNITRIO TOTAL
Perfurao do fuste m 21.00 21.00 21.00
Alargamento da base unid. 7.37 7.37 8.77
TUBULO

Lanamento de concreto m3 17.93 17.93 19.33


Armadura longitudinal kg 16.00 16.00 16.00
Armadura tranversal kg 7.00 7.00 7.00
Escavao manual m3 6.88 6.88 6.88
Concreto magro m2 0.17 0.17 0.17
Corte e preparo da cabea do
tutulo m3 1.00 1.00 1.00
Confeco, colocao e remoo
BLOCO

de forma m2 3.80 3.80 3.80


Dobramento e colocao de
armadura kg 76.00 76.00 76.00
Lanamento e adensamento de
concreto estrutural m3 0.92 0.92 0.92
BLOC
Reaterro m3 5.76 5.76 5.76
Bota fora m3 19.05 19.05 20.45
MATERIAL UNIDADE
Concreto m3 17.93 17.93 19.33
TUB.

Armadura longitudinal kg 16.00 16.00 16.00


Armadura tranversal kg 7.00 7.00 7.00
Concreto magro m3 0.17 0.17 0.17
BLOCO

Concreto estrutural m3 0.92 0.92 0.92


Forma m2 3.80 3.80 3.80
Armadura kg 76.00 76.00 76.00

PREO UNITRIO DA PERFURAO (R$) - POR METRO 73.50 73.50


PREO TOTAL DA PERFURAO (R$) 1,543.49 1 CONJUNTO 1,543.49
PREO UNITRIO DO MATERIAL (R$) 6,091.43
PREO TOTAL DO MATERIAL (R$) 6,091.43 6,496.15
PREO UNITRIO DA MO DE OBRA (R$) 4,191.94
PREO TOTAL DA MO DE OBRA (R$) 4,191.94 4,501.01
PREO UNITRIO (MO+MAT) (R$) 10,283.37
PREO TOTAL(MO+MAT) (R$) 10,283.37 10,997.15
TIPO 1 TIPO 2
PREO MDIO MATERIAL - 1 TUBULO 6,091.43 6,496.15
PREO MDIO MO DE OBRA - 1 TUBULO 4,191.94 4,501.01
PREO MDIO MATERIAL + MO DE OBRA - 1 TUBULO 10,283.37 10,997.15

SOMA QUANTITATIVOS T1 A T10 PREO (R$) QUADRO ORIGINAL DAS QUANTIDADES


GERAL - BLOCOS RETANGULARES UNIDADE QUANT. UNITRIO TOTAL
Perfurao do fuste m 105.00 VAR #VALUE!
Alargamento da base m3 24.75 161.06 3,986.87
TUBULO

Lanamento de concreto m3 72.58 338.44 24,565.12


Armadura longitudinal kg 76.00 6.12 464.79
Armadura tranversal kg 33.00 6.12 201.82
Escavao manual m3 31.63 10.35 327.44
Concreto magro m2 0.85 251.78 213.29
BLOCO
Corte e preparo da cabea do
tutulo unid. 5.00 20.39 101.95
BLOCO

Confeco, colocao e remoo


de forma m2 17.52 47.20 826.97
Dobramento e colocao de
armadura kg 338.16 6.12 2,068.09
Lanamento e adensamento de
concreto estrutural m3 4.11 338.44 1,392.04
Reaterro m3 26.55 9.69 257.17
Bota fora m3 77.66 10.35 804.03
Total material + mo de obra #VALUE!
Total material 25,094.54
Total mo de obra 17,108.98

TUBULES OVAIS PREO (R$) PRIMEIRA DEZENA COPIADA


GERAL - BLOCOS RETANGULARES UNIDADE QUANT. UNITRIO TOTAL
Perfurao do fuste m 105.00 VAR 6,993.95
Alargamento da base m3 24.75 161.06 3,986.87
TUBULO

Lanamento de concreto m3 72.58 338.44 24,565.12


Armadura longitudinal kg 76.00 6.12 464.79
Armadura tranversal kg 33.00 6.12 201.82
Escavao manual m3 31.63 10.35 327.44
Concreto magro m2 0.85 251.78 213.29
Corte e preparo da cabea do
tutulo unid. 5.00 20.39 101.95
BLOCO

Confeco, colocao e remoo


de forma m2 17.52 47.20 826.97
Dobramento e colocao de
armadura kg 338.16 6.12 2,068.09
Lanamento e adensamento de
concreto estrutural m3 4.11 338.44 1,392.04
Reaterro m3 26.55 9.69 257.17
Bota fora m3 77.66 10.35 804.03
Total material + mo de obra 42,203.52
Total material 25,094.54
Total mo de obra 17,108.98

TUBULES OVAIS PREO (R$) DEZENA 2 AINDA NO UTILIZADA


GERAL - BLOCOS RETANGULARES UNIDADE QUANT. UNITRIO TOTAL
Perfurao do fuste m
Alargamento da base m3
TUBULO

Lanamento de concreto m3
Armadura longitudinal kg
Armadura tranversal kg
Escavao manual m3
Concreto magro m2
Corte e preparo da cabea do
tutulo unid.
BLOCO

Confeco, colocao e remoo


de forma m2
Dobramento e colocao de
armadura kg
Lanamento e adensamento de
concreto estrutural m3
Reaterro m3
Bota fora m3
Total material + mo de obra
Total material
Total mo de obra

TUBULES OVAIS PREO (R$) DEZENA 3 AINDA NO UTILIZADA


GERAL - BLOCOS RETANGULARES UNIDADE QUANT. UNITRIO TOTAL
Perfurao do fuste m
Alargamento da base m3
TUBULO
TUBULO
Lanamento de concreto m3
Armadura longitudinal kg
Armadura tranversal kg
Escavao manual m3
Concreto magro m2
Corte e preparo da cabea do
tutulo unid.
BLOCO

Confeco, colocao e remoo


de forma m2
Dobramento e colocao de
armadura kg
Lanamento e adensamento de
concreto estrutural m3
Reaterro m3
Bota fora m3
Total material + mo de obra
Total material
Total mo de obra

TUBULES OVAIS PREO (R$) DEZENA 4 AINDA NO UTILIZADA


GERAL - BLOCOS RETANGULARES UNIDADE QUANT. UNITRIO TOTAL
Perfurao do fuste m
Alargamento da base m3
TUBULO

Lanamento de concreto m3
Armadura longitudinal kg
Armadura tranversal kg
Escavao manual m3
Concreto magro m2
Corte e preparo da cabea do
tutulo unid.
BLOCO

Confeco, colocao e remoo


de forma m2
BLOCO
Dobramento e colocao de
armadura kg
Lanamento e adensamento de
concreto estrutural m3
Reaterro m3
Bota fora m3
Total material + mo de obra
Total material
Total mo de obra

TUBULES OVAIS PREO (R$) DEZENA 5 AINDA NO UTILIZADA


GERAL - BLOCOS RETANGULARES UNIDADE QUANT. UNITRIO TOTAL
Perfurao do fuste m
Alargamento da base m3
TUBULO

Lanamento de concreto m3
Armadura longitudinal kg
Armadura tranversal kg
Escavao manual m3
Concreto magro m2
Corte e preparo da cabea do
tutulo unid.
BLOCO

Confeco, colocao e remoo


de forma m2
Dobramento e colocao de
armadura kg
Lanamento e adensamento de
concreto estrutural m3
Reaterro m3
Bota fora m3
Total material + mo de obra
Total material
Total mo de obra
TUBULES OVAIS PREO (R$) RESULTADO FINAL - SOMA DAS 5 DEZENAS
GERAL - BLOCOS RETANGULARES UNIDADE QUANT. UNITRIO TOTAL
Perfurao do fuste m 105.00 ^VAR 6,993.95 Restaurar Adequar alterao do unitrio do fuste

Alargamento da base m3 24.75 161.06 3,986.87 Restaurar


TUBULO

Lanamento de concreto m3 72.58 338.44 24,565.12 Restaurar

Armadura longitudinal kg 76.00 6.12 464.79 Restaurar

Armadura tranversal kg 33.00 6.12 201.82 Restaurar

Escavao manual m3 31.63 10.35 327.44 Restaurar

Concreto magro m2 0.85 251.78 213.29 Restaurar


Corte e preparo da cabea do Restaurar
tutulo unid. 5.00 20.39 101.95
Confeco, colocao e remoo
BLOCO

Restaurar
de forma m2 17.52 47.20 826.97
Dobramento e colocao de Restaurar
armadura kg 338.16 6.12 2,068.09
Lanamento e adensamento de
Restaurar
concreto estrutural m3 4.11 338.44 1,392.04
Reaterro m3 26.55 9.69 257.17 Restaurar

Bota fora m3 77.66 10.35 804.03 Restaurar

Total material + mo de obra R$ 42,203.52


Total material R$ 25,094.54 Restaurar todas as quantidades e preos originais do BD
Total mo de obra R$ 17,108.98
TUBULES OVAIS PREO (R$)
QUANTITATIVOS GERAL UNIDADE QUANT. UNITRIO TOTAL
Perfurao do fuste m 8.00 VAR 577.21
Alargamento da base m3 21.71 91.39 1,984.37
TUBULO

Lanamento de concreto m3 28.64 159.37 4,564.41


Armadura longitudinal kg 15.00 2.15 32.31
Armadura tranversal kg 18.00 2.15 38.77
Escavao manual m3 11.48 6.32 72.57
Concreto magro m2 0.21 132.92 27.89
Corte e preparo da cabea do
tutulo unid. 1.00 11.09 11.09
BLOCO

Confeco, colocao e remoo


de forma m2 6.00 24.54 147.23
Dobramento e colocao de
armadura kg 150.00 2.15 323.09
Lanamento e adensamento de
concreto estrutural m3 1.83 177.22 324.62
Reaterro m3 9.40 5.91 55.56
Bota fora m3 30.72 6.32 194.15
Total material + mo de obra R$ 8,353.28
Total material R$ 4,418.61
Total mo de obra R$ 3,934.67
LUCRO (%) 10.00
ADMNISTRAO (%) 12.00
CUSTOS FINANCEIROS (%) 6.00
CUSTO FINAL
Total material + mo de obra R$ 10,908.72
Total material R$ 5,770.35
Total mo de obra R$ 5,138.37
BDI MDIO 30.59%
DIFERENA BRUTA R$ 2,555.44
TIPO 3 TIPO 4 TIPO 5

- 100.00 - 90.00 - 90.00 -


- 100.00 - 90.00 - 90.00 -
- 95.00 - 85.00 - 85.00 -
- CA-50 DIAM. 10 - CA-50 DIAM. 10 CA-50 DIAM. 10
- 80.00 - 70.00 - 70.00 -
- 21.00 - 21.00 - 21.00 -
- 205.00 - 70.00 - 100.00 -
- 20.00 - 20.00 - 20.00 -
- 330.00 - 140.00 - 170.00 -
- 145.00 - 60.00 - 90.00 -
- 185.00 - 80.00 - 80.00 -
8 BARRAS C = 200 CA-50 DIAM. 12,5 8 BARRAS C = 200 CA-50 DIAM. 12,5 7 BARRAS C = 200 CA-50 DIAM. 12,5 7 BARRAS C = 200
10 BARRAS C = 260 CA-60 DIAM. 6,3 10 BARRAS C = 260 CA-60 DIAM. 6,3 10 BARRAS C = 228 CA-60 DIAM. 6,3 10 BARRAS C = 228
1.00 1.00 1.00
1.00 1.00 1.00
1.00 1.00 1.00
UNITRIO TOTAL UNITRIO TOTAL UNITRIO TOTAL UNITRIO
21.00 21.00 21.00 21.00 21.00 21.00 21.00
8.77 7.27 7.27 0.53 0.53 0.82 0.82
19.33 17.83 17.83 8.61 8.61 8.90 8.90
16.00 16.00 16.00 14.00 14.00 14.00 14.00
7.00 7.00 7.00 6.00 6.00 6.00 6.00
6.88 6.88 6.88 5.49 5.49 5.49 5.49
0.17 0.17 0.17 0.16 0.16 0.16 0.16

1.00 1.00 1.00 1.00 1.00 1.00 1.00

3.80 3.80 3.80 3.06 3.06 3.06 3.06

76.00 76.00 76.00 55.08 55.08 55.08 55.08

0.92 0.92 0.92 0.67 0.67 0.67 0.67


5.76 5.76 5.76 4.64 4.64 4.64 4.64
20.45 18.95 18.95 9.46 9.46 9.75 9.75

19.33 17.83 17.83 8.61 8.61 8.90 8.90


16.00 16.00 16.00 14.00 14.00 14.00 14.00
7.00 7.00 7.00 6.00 6.00 6.00 6.00
0.17 0.17 0.17 0.16 0.16 0.16 0.16
0.92 0.92 0.92 0.67 0.67 0.67 0.67
3.80 3.80 3.80 3.06 3.06 3.06 3.06
76.00 76.00 76.00 55.08 55.08 55.08 55.08

73.50 56.27 56.27


1 CONJUNTO 1,543.49 1 CONJUNTO 1,181.74 1 CONJUNTO 1,181.74 1 CONJUNTO
6,496.15 6,062.52 3,181.09 3,263.35
6,062.52 3,181.09 3,263.35
4,501.01 4,169.86 2,091.68 2,154.49
4,169.86 2,091.68 2,154.49
10,997.15 10,232.38 5,272.77 5,417.84
10,232.38 5,272.77 5,417.84
TIPO 2 TIPO 3 TIPO 4 TIPO 5
6,062.52 3,181.09 3,263.35
4,169.86 2,091.68 2,154.49
10,232.38 5,272.77 5,417.84

ANTIDADES
terao do unitrio do fuste

s e preos originais do BD 1
TIPO 6 TIPO 7 TIPO 8 TIPO 9

- - -
- - -
- - -

- - -
- - -
- - -
- - -
- - -
- - -
- - -

TOTAL UNITRIO TOTAL UNITRIO TOTAL UNITRIO TOTAL


1 CONJUNTO 1 CONJUNTO 1 CONJUNTO

TIPO 6 TIPO 7 TIPO 8 TIPO 9


TIPO 10

- -
- -
- -

- -
- -
- -
- -
- -
- -
- -

UNITRIO TOTAL UNITRIO


#VALUE!
1 CONJUNTO 1 CONJUNTO

TIPO 9 TIPO 10
AO TIPO 1 TIPO 2 TIPO 3 TIPO 4
BLOCO
CA-50
8.0
10.0 76.00 76.00 76.00 55.08
RESUMO DOS FERROS TABELA ORIGINAL 12.5
16.0
20.0
25.0
CA-60
5.0
6.0
ARM. LONGIT.
CA-50
8.0
10.0
12.5 16.00 16.00 16.00 14.00
16.0
20.0
25.0
CA-60
5.0
6.0
ARM. TRANSV.
CA-50
6.3 7.00 7.00 7.00 6.00
8.0
10.0
12.5
16.0
CA-60
3.4
5.0
6.0
TIPO 5 TIPO 6 TIPO 7 TIPO 8 TIPO 9 TIPO 10 AO
BLOCO
SOMA 1 CA-50
0.00 8.0
55.08 338.16 10.0
0.00 12.5
0.00 16.0
0.00 20.0
0.00 25.0
0.00 CA-60
0.00 5.0
0.00 6.0
0.00 ARM. LONGIT.
0.00 CA-50
0.00 8.0
0.00 10.0
14.00 76.00 12.5
0.00 16.0
0.00 20.0
0.00 25.0
0.00 CA-60
0.00 5.0
0.00 6.0
0.00 ARM. TRANSV.
0.00 CA-50
6.00 33.00 6.3
0.00 8.0
0.00 10.0
0.00 12.5
0.00 16.0
0.00 CA-60
0.00 3.4
0.00 5.0
0.00 6.0
RESULTADO DAS ARMADURAS DO QUADRO ORIGINAL DE QUANTIDADES
3.40 5.00 6.00 6.30 8.00 10.00 12.50 16.00 20.00
0.00 0.00 0.00 33.00 0.00 338.16 76.00 0.00 0.00

RESULTADO DAS ARMADURAS DA PRIMEIRA DEZENA


3.40 5.00 6.00 6.30 8.00 10.00 12.50 16.00 20.00
0.00 0.00 0.00 33.00 0.00 338.16 76.00 0.00 0.00

RESULTADO DAS ARMADURAS DA SEGUNDA DEZENA


3.40 5.00 6.00 6.30 8.00 10.00 12.50 16.00 20.00

RESULTADO DAS ARMADURAS DA TERCEIRA DEZENA


3.40 5.00 6.00 6.30 8.00 10.00 12.50 16.00 20.00

RESULTADO DAS ARMADURAS DA QUARTA DEZENA


3.40 5.00 6.00 6.30 8.00 10.00 12.50 16.00 20.00

RESULTADO DAS ARMADURAS DA QUINTA DEZENA


3.40 5.00 6.00 6.30 8.00 10.00 12.50 16.00 20.00

3.40 0.00
CA - 60
RESULTADO FINAL AO

5.00 0.00
6.00 0.00
6.30 33.00 kg
8.00 0.00
10.00 338.16 kg
CA - 50

12.50 76.00 kg
16.00 0.00
20.00 0.00
25.00 0.00
CA-50+10 % 492.00
CA-60+10 % 0.00
DADES
25.00
0.00

25.00
0.00

25.00

25.00

25.00

25.00
PLANILHA DE CUSTO UNIDADE QUANTIDADE UNITRIO TOTAL
Perfurao do fuste m 189.00 VAR 13,167.92
TUBULO

Alargamento da base m3 21.87 161.06 3,522.74


Lanamento de concreto m3 111.92 338.44 37,879.25
Armadura longitudinal kg 139.93 6.12 855.77
Armadura tranversal kg 49.62 6.12 303.47
Escavao manual m3 59.15 10.35 612.37
Lanamento e adenamento de
concreto magro m2 1.55 251.78 389.40
Corte e preparo da cabea do
tubulo unidade 9.00 20.39 183.51
Confeco, colocao e remoo de
forma m2 32.72 47.20 1,544.43
BLOCO

Dobramento e colocao de
armadura no bloco kg 642.16 6.12 3,927.26
Lanamento e adenamento de
concreto estrutural m3 7.91 338.44 2,678.10
Reaterro m3 49.57 9.69 480.14
Bota fora m3 121.50 10.35 1,257.92
TOTAL MO DE OBRA + MATERIAL R$ 66,802.27