Você está na página 1de 2
Response to your FOI Request 2017-341 Inbox a 60 2) Kunkel, Sabina Stina Kunksl@versinca> © BZ PM(t4hous 299) tome, Collen Im response to your request forthe following The most recent cost estimates, in dollars for A the Millennium ine ‘Broadway extension and 6) the Surrey LAT (aka South of Fraser rapid {tanst). lease Incude the date of currency fr the cost estimates. \We have been advised. by M Say Zein, VP Enginoerng & Inastucure Management, tha the raquested records onsttute werkg dai, and infrmation is subject to change as premnaly engnseng actos cornue Mr. Zein has tutor advised that shoul the projet proceed to inelementaton, the maria wilbe used to dove ‘rocurenent documents, ands comprised of commetcaly-sensive Information rt shoud remain conidia a ‘nicipaton of commercial negotiations. “Th infomation i, therefow, boing withhol, pursuant to eoctions 131) & 171) of he Freedom of Infomation & Protection of vey het. Ityou disagree with our decision, you have height to sock a review, by he Ofloe of he Information & Privacy ‘Cammissioner or BC (ntps anc bea) wen 30 cays ‘Sincere. Sebina Kunkel “Manager, Information Access Direct Line: (77B) 375-7702 ante Suto 400-287 Nese Court rRans/ALink INTER-OFFICE MEMO DATE ‘August 3, 2017 To: Sabina Kunkel Manager, Information Access FROM: _Sany Zein, VP Engineering & Infrastructure Management SUBJECT: FOI Request: 2017/341 Please find the attached reports responsive to FO! request 2017/341. ‘The reports are the latest working drafts and information is subject to change as preliminary engineering activities continue. Should the project proceed to implementation, the material will be used to develop procurement documents and is comprised of commercially sensitive information that should remain confidential in anticipation of commercial negotiations.

Você também pode gostar