Você está na página 1de 1
PIPING MATERIAL SPECIFICATION — SUMMARY SHEET Spec | Coincident Design | Nom Pipe | Fluid Fluid Name Pipe Mat! | Corr | Flange | Pipeline Code Conds. Size | Code Alin, | Class & | Classif- iPag | °c Face | ication ‘ABD 158] 38| #14 |P | Process SStype [15 | 160RF 1.09| 218] 16"~26"| D Drains 316L, osaev} 170 28"| CG | Inert Gas o1/| 250| 52"-64760"} R | RVDischarge | -0.0005 LNA | LP 5% Caustic FV] 200| -#"-22"| sv_| Solvent 0.03) “485 2a} st | siuny | FV) 470 28") V | Vents | AC | Acetic Acid Catalyst Compressed Air Demin Water LP Steam Blowdown Raw Water Chemical dosing B3C 479; 65 Solvent SSTye | Ni | S00RF 275) 235) 3-10") R__| RVDischarge 3041, 221| 235) 12"-48"]D | Drains saz | 205 20°| TW | Demineraised Water FV| 235) %*—18" | LNA | LP5% Caustic st | Surry P| Process sw_ | LP Seal Water INA | IP 5% Caustic M_—_| Support Fuet tsw_ | IP Seal Water HSW | HP Seal Water ‘SWR | Seal Water Return Luc | Very LP Condensate Ha v__| Vent B38D 3e7| 160 #4 | SV _| Sovent ‘sSType | 16 | S00RF 331| 125 6° | INA | IP.5% Caustic, | st6L 232] 218/140-1824) | Drains | 266] 215] — 8°&20"| LX | Paraxylene FV| 240} 1%4'-20",24"| PA _ | Process Air HN | HP Nitrogen R__ | RVDischarge st | Stuny P | Process Vv | Vents LNA | LP5% Caustic TW. | Demin Water LN | LP Nitrogen isw_ | IP Seal Water Z| Chemical Dosing PROJECT No. ISSUE DATE SHEET No. — 51204310 Pt ‘Oct 07 30f4 PetroquimicaSuape AKER KVAERNER’ part of the Aker aroun

Você também pode gostar