Você está na página 1de 1

0.

59

0.57
WC TINTAS EM GERAL
Compartimento ll
6.20 5.20 -0,41

1.59

IRA
ADE
3.91
SALA 01 SALA 02 SALA 03

DE M
2.50
1.37 6.38

TAS
TINTAS

TINTAS

TINTAS
CIRCUL.

2.10

POR
4.32 0.50
Rampa

4.03 0.24 3.24 0.24 3.60 0.24 3.75 0.24 2.70

1.00
1.11

1.30
1.02 0.90 1.02 0.90 1.02 0.90 0.47

1.56

0.60

D
P/ PINTURA

0.80

ATEN
2.00 0.15 1.65 0.15
Compartimento ll
1.30
-0,28

2.45

RAMPA
DESCE
RAMPA
DESCE

0.57
0.57 2.81 3.20 Circul.

2.60

1.48
ATENDIM.

1.30
Banho

INE
1.40

2.00
VITR
GABINETES EPI'S

FERRAMENTAS

OS
Sala lll

1.07

1.07

0.60

INAD
1.40

2.60

D
ATEN

ONF
7.80
OS C
GABINETES Circul.
0,00

1.52

1.52

INE
4.60 1.29 3.90 1.16 Sala ll 1.48

2.00
1.36

DUT
2.68 0.24 5.20 0.24 5.06
1.64

RAMPA

VITR
DESCE

0.57

PRO
CADASTRO
1.31

TANQUES
1.40 1.07

1.07

1.07

0.60
RAMPA

D
Compartimento l

DESCE

ATEN
Sala l 0,00

1.40
2.78

1.95
0.26 0.50

5.20 0.24 5.06

ATENDIM.

1.00
3.60
CHECKOUT

0.47 1.92 0.64

1.40
TANQUES

1.52

1.52
3.60 0.64 1.42 1.45 1.16 FERRAMENTAS
1.05

PLANTA BAIXA

1.24

0.57
Escala: 1 : 100
1.80 1.16
0.54 1.00 2.60 0.54 1.07 2.60 1.10 4.00 0.24 5.15 0.15
TOUCADORES 1.30
2.00 2.00 2.36 PISOS CONFINADOS
CARRINHOS 0.80

SOLEIRAS

1.07

1.07
FILETES

1.30
0.95

PISOS
TOUCADORES

1.52

1.52
1.50

RAMPA
DESCE
1.19
0.80

1.80 0.57 5.20 0.57 1.79 1.35 9.45


0.54 3.90 0.54 1.67 1.20 1.16 10.80

FERRAGENS
PISOS CUBAS
SOLEIRAS
FILETES

2.80 1.62

1.07

1.07
1.20

3.00 PISOS CUBAS MATERIAL RECEBIDO PARA O DESENVOLVIMENTO DO PROJETO


ATENDIM.
1.32

2.04

2.04
7.20
PISOS
2.00

3.00 8.50 0.57


1.30
0.90
0.47

0.57

ESCALA 1:75

CONSTRUMAX CU E AMC LTDA

4549450

PORTO SEGURO - BA 487,00m2

PEDRO LUCIANO 23/02/19

1:75

METROS
(34) 3218-1381

Você também pode gostar