GENERAL CONTRACTOR-ENGINEERING-TELECOMUNICATION-SUPPLIER
RINCIAN ANGGARAN BIAYA
NAMA PEKERJAAN : STUDI ANALISA KESTABILAN LERENG NAMA KEGIATAN : ANALISA KESTABILAN LERENG LOKASI : JENEPONTO TAHUN ANGGARAN : 2017 VOLUME HARGA JUMLAH NO ITEM URAIAN BIAYA JUMLAH ORANG SATUAN HARGA Ket WAKTU ORANG BULAN (Rp) (Rp) I BIAYA LANGSUNG PERSONIL 1.1 PERSONIL / TENAGA AHLI 1 Team Leader 1 1 1 4,250,000.00 4,250,000.00 2 Soil & Material Engineering 1 1 1 3,250,000.00 3,250,000.00 - JUMLAH 7,500,000.00 1.2 BIAYA ASISTEN TENAGA AHLI 1 Surveyor 2 1 2 2,500,000.00 5,000,000.00 2 Soil Investigation 1 1 1 4,500,000.00 4,500,000.00 3 Drafmant 1 1 1 2,500,000.00 2,500,000.00 4 Administrasi / Opertor Komputer 1 1 1 2,000,000.00 2,000,000.00 JUMLAH 14,000,000.00