Você está na página 1de 1

GENERAL CONTRACTOR-ENGINEERING-TELECOMUNICATION-SUPPLIER

RINCIAN ANGGARAN BIAYA


NAMA PEKERJAAN : STUDI ANALISA KESTABILAN LERENG
NAMA KEGIATAN : ANALISA KESTABILAN LERENG
LOKASI : JENEPONTO
TAHUN ANGGARAN : 2017
VOLUME HARGA JUMLAH
NO ITEM URAIAN BIAYA JUMLAH ORANG SATUAN HARGA Ket
WAKTU
ORANG BULAN (Rp) (Rp)
I BIAYA LANGSUNG PERSONIL
1.1 PERSONIL / TENAGA AHLI
1 Team Leader 1 1 1 4,250,000.00 4,250,000.00
2 Soil & Material Engineering 1 1 1 3,250,000.00 3,250,000.00
-
JUMLAH 7,500,000.00
1.2 BIAYA ASISTEN TENAGA AHLI
1 Surveyor 2 1 2 2,500,000.00 5,000,000.00
2 Soil Investigation 1 1 1 4,500,000.00 4,500,000.00
3 Drafmant 1 1 1 2,500,000.00 2,500,000.00
4 Administrasi / Opertor Komputer 1 1 1 2,000,000.00 2,000,000.00
JUMLAH 14,000,000.00

Você também pode gostar