Você está na página 1de 1

P-09 P-10 P-11 P-12 P-13 P-14 P-15 P-16 P-17 P-18 P-19 P-20 P-21 P-22 P-23

P-24 P-25 P-26 P-27 P-28 P-29 P-30 P-31 P-32 P-33
PE-K
P-27

P-09 P-10 P-11 P-12 P-13 P-14 P-15

9.00 9.00 9.00 9.00 9.00 9.00 9.00 2.23


P-24 P-25 P-26 P-27 P-28 P-29 P-30 P-31
9.00 9.00 9.00 9.00 9.00 9.00 9.00
P-16 P-17 P-18 P-19 P-20 P-21 P-22 P-23
PE-J 9.00 9.00 9.00 9.00 9.00 9.00 9.00

PE-J
1.30

2.20
PE-J PE-J PE-J F PE-J PE-J

5.00
1.80

2110-B-AAC-3NA0-000000-003

CONTINÚA PLANO EN LÁMINA: 2110-B-AAC-1P10-P05100-001


CONTINÚA PLANO EN LÁMINA: 2110-B-AAC-1P10-P05100-001

2.25
0

0
1.8

1.6

1.6
CONTINÚA PLANO EN LÁMINA: 2110-B-AAC-1P10-P08100-001

1.8

0
2.00
1.75 7.25 1.75
9.00
P10-D3
G
2.60

2110-B-AAC-3NA0-000000-004

9.75
1.75 7.25 1.75

10.50

10.50

10.50
P-24 P-17 P-18

7.27
Césped
1.80

0.65 3.10 8.20 6.05 43.50 1.50 Junta sísmica - Suelo exterior
4.00 0.25 8.75 0.65 3.00 7.45 6.15 0.75 4.50 4.50 0.60 2.26 1.99 7.91 3.44 1.80 9.00 1.06
0.12 0.12 2.28 5.65 0.15 2.40
9.28 0.12 0.12 2.46 2.12 0.12 2.63 0.15 3.61 2.25 0.14
N.P.T. +0.00 N.P.T. +0.00

2.00
4.00 Césped Césped 1.50 3.00 5.10 0.14 2.00 0.12 1.87 0.12 4.75 3.16 3.32 0.12 11.40 0.46
JSP_55_A2
2.00

0.38 0.57 2.95 0.80 P-P10-011-V P-P10-011-V P-P10-011-V 0.61 1.80 0.61 0.12 2.67 0.14 3.33 0.14 1.96 0.14 3.02 0.15 0.31
E JS-P2D
P-P10-149
JS-P2D P-P10-255
PV - FV03B 0.60 FV03B 0.60 N.P.T. -0.10 FV03B 0.60 P-P10-245
PV -
FO02B 0.88 P-P10-256 0.28 P-P30-312 0.30 P-P10-266 2.00 2.65 43.50 2.85 43.50 2.85 43.50 2.85 Estructura metálica P-P10-255 Estructura metálica P-P10-146 1.80 4.00 2.58 2.42 0.60

1.95
2110-B-AAC-3NA0-000000-002 ZONA DIQUE DOMÉSTICO P-P10-021-V PA - ZONA DIQUE DOMÉSTICO Estructura metálica Estructura metálica 2.00 2.65
PM -

0.23
0.15
1.07

1.07
FV04B 0.45 PM - PM - PM RF90 FO02B PM -
FO02B FO02B 1.80 2.10 FO02B FO02B FO02B FO02B N.P.T. +0.60 N.P.T. +0.60 FO02B FO02B FO02B 1.80 2.10 FO02B FO02B
Junta sísmica 1.80 2.10 1.80 2.10 1.80 2.10 Junta in situ 1.80 2.10

0.23

0.90
7.50 2.25 Ver detalle típico de bajante de agua en

PE-I
Junta sísmica AC13 B04-7 FO02B

0.23
lámina 2110-B-AAV-2NA0-000000-001
0.76

0.38
0.14

0.14

0.15
0.98

0.12

0.12
0.75

0.75

0.75

0.75

0.75

0.75
2.42 0.75

0.60

0.60
AC07 AC05

0.15
0.50

0.98
NC_10_007_B AC05 Sardinel de concreto Estructura metálica Sardinel de concreto S13 Sardinel de concreto NC_10_005_B D04-3 AC05 D04-3 Sardinel de concreto
1.05

0.59
P-P10-269 P-P10-24

1.34
26.71 m² P-P10-XXX-V PE-I
P-P10-69
PE-I 18.68 m² P-P10-267 D04-3 D04-3 PE-I PE-I D04-3
PE-I
PM RF90 D04-3

1.76
NC_10_007_C NC_10_006 D01-4 N.P.T. +0.30 D04-3 Sardinel de Sardinel de Sardinel de PM - D04-3
0.75

0.73
Núcleo D04-3 D04-4 AP_10_052_K 0.90 Núcleo PM RF90 Sardinel de concreto NC_10_002_B
1.87 D04-2

0.14 1.01
PF - AP_10_019_C

1.74

1.74
1.20 2.10 17.43 m² 18.08 m² P-P10-262 D01-4 AC06 concreto concreto concreto 0.16 D04-3 1.00 2.10 AP_10_019_B P-P10-18-MC

2.57

0.12
Comunicación AC07 10.04 m² 0.90 1.80 D01-4 Comunicación 1.00 2.10 19.93 m² AP_10_019_D

2.78
P-P10-253 S9 Núcleo PM RF90 0.90 2.10 2.00 AP_10_019_A 6.13 m²

3.28
Núcleo 10.43 m² FV01B 0.45

3.13
S9 CCO Módulos D01-4 S9 D04-2 Núcleo S.A.Int_Jefatura y 8.42 m²
1.00 2.10 AC07 7.73 m²
2.25

PM RF90 D04-3 Comunicación D04-7 Rodapié metálico Rodapié metálico Rodapié metálico Césped

0.10
Comunicación AC05 D04-3 S.A.Int_Administración 20.65 2.25

2.41
AC_10_013

2.53

2.53

2.53

2.53

2.53
N.P.T. +0.00 P-P10-001-V AC04 oficinas N.P.T. +0.01 Comunicación D04-3 S.A.Int_Servicios secretaría S.A.Int_Descanso
S5 1.80 2.10 Ver lámina: 2110-B- S7 P-P10-85 P-P10-49 h=0.15m h=0.15m h=0.15m AC06
FV05B 0.90 1.58 AC07 D04-4 4.00 m² D04-2

0.10
S9 Staff

1.51
Estructura 1.50 AAU-5NA0-000000-021 AC05 PF - AC05 Video Wall AC07 PF - AC05 Generales

2.74
AC07
AC07 AC05

0.74
Ver lámina: 2110-B-AAU-5NA0-000000-024 1.50 1.80 1.00 2.10 Parapeto AP_10_052_A Videowall 0.90 2.10
ATM y máquinas 3.92 N.P.T. +0.00
metálica D04-7 D04-3 AP_10_052_A 197.49 m² D04-3
B04-7 Piso podotáctil H=1.00m D04-7 vending
S1.1 D04-2 AC07 AC07 N.P.T. -0.10

0.14

3.10

3.10

3.10
0.12

2.35
2.67 3.33 1.96

3.22
197.49 m² CCO Personal 30 0.82
AC07 AC05 P-P10-184

0.14
AC13 PA01 Piso CCO Personal 30 puestos CMA_10_017 P-P10-193
PA01 CMA_10_019 AC07 S1.1

0.86
PM RF90

1.42
D01-4 P-P10-XXX-V podotáctil puestos N.P.T. +0.30 D04-3 PM RF90 AP_10_019_F
D04-7 5.25 m² 5.00 m² D04-3 1.60 AP_10_019_G

3.39
D04-7 D04-7 0.90 NC_10_005_A 1.80 2.10 0.80 1.80

1.34
7.17
AP_10_052_J N.P.T. +0.30 CMA_Ascensor_Privado 18.76 m²

1.20

1.20
CMA_Ascensor_Público S13 S13 AC07 AP_10_034 AP_10_018 2.14 m²

6.83
0.90 1.80 44.50 m²

4.59
9.42 m² Ducto de D04-3 S.A.Int_Circulación

0.56
FO02E

2.61

0.80 0.10 0.14


D04-4 Núcleo 23.28 m² 25.08 m² S.A.Int_W.C.Staff
8.58

CMA_10_021 CMA_10_022 Sardinel de concreto D04-7 CCO Módulos D01-4 AE_10_009 0.14 3.41 0.14 Instalaciones operativa

0.12

0.69 0.14

0.14
PA01 PA01 Comunicación Circulación Privada Control de
7.98

oficinas S1.1 D04-2

5.43

2.93
7.56 m² 7.56 m² P-P10-84 332.94 m² P-P10-271

1.23
D04-7

1.84
empleados 2.55
CMA_Ascensor_Privado CMA_Ascensor_Privado AP_10_065_A PF - N.P.T. +0.00 Área Espera D04-3 PM RF90 NC_10_002_A P-P10-154 S5 AP_10_019_G

0.10
D01-2 N.P.T. +0.00
4.50

S7 D04-3 AP_10_019_E

1.10
CS_10_003 AP_10_019_H
8%
10.46

D04-7

2.25
AC07 D01-2 AC06 25.16 m² PM RF90 S7 2.14 m²
4.50

94.34 m² 1.00 2.10 AC07 S1.1 1.00 2.10 N.P.T. +0.00


VEREDA AP_10_019_I

1.59

1.59
56.07 m² AC07 1.30 2.10 4.69 m² 4.06 m²

9.89
10.00

COE Oficinas S1.1 Ver detalle de Dog House en lámina: 2.32 1.00 Núcleo 5.54 S.A.Int_W.C.Staff

0.14
D04-7 B04-7 S.A.Int_Residuos

0.80 0.34 0.80


Control VVIP N.P.T. +0.00 S.A.Int_Farmacia 3.15 m²
5.61

S14
5.85

3.35

0.14
10.50
Ver lámina: 2110-B-AAU-5NA0-000000-018

10.50

10.50
Comunicación
D01-2

S13 CMA_10_018 2110-B-AAM-000000-004


sólidos S.A.Int_W.C.Hombres

0.10

8.61
Estructura metálica CMA_10_020

11.06
P-P10-83

1.42

1.42
N.P.T. +0.00 AC07 D01-4 Rodapié

9%
5.00 m² S5

3.46
N.P.T. +0.35 AC07 D04-2

0.14

3.32
AP_10_019_J

1.52
5.25 m² N.P.T. +0.00 D04-4 PF - CMA_Ascensor_Privado metálico
D04-7 CMA_Ascensor_Público AP_10_052_I 1 1 Ver lámina: 2110-B-AAU-5NA0-000000-004 11.10 m²
P-P10-161 Ducto de 1.00 2.10 h=0.15m P-P10-41 AC07 AP_10_019_L
P-P10-86
AC07

2.29
D04-4
? 9.42 m² D01-4 PM RF90 AP_10_019_K AP_10_019_M S.A.Int_Comedor

2.61
CMA_10_320 CMA_10_319 0.98 PM RF90 Instalaciones D04-4 CCO Módulos D01-4 Piso PM RF90 Ducto de D04-4 2.70 1.42 1.23 1.42 2.09 4.06 m²

0.58

0.62
D04-7 CS_10_004 D04-3 2.54 m²

1.59

1.59

1.59
1.80 2.10 3.15 m²

1.75
1.76
7.28 m² 7.28 m² 0.80 1.80 P-P10-XXX-V AC05 podotáctil 0.80 1.80 Instalaciones S.A.Int_Almacén
2.38 m² oficinas S13 S.A.Int_Cuarto frío

0.80 0.34 0.80


S13 S.A.Int_W.C.Mujeres

0.13
CMA_Ascensor_Privado CMA_Ascensor_Privado

0.14 0.69
Control de S7 0.90 N.P.T. +0.45 AC05 D04-3 AC07 1.60 2.55 3.32
VÍA EXTERIOR N.P.T. +0.45

0.91
4.18 pasaportes 0.90 1.80 8.77 5.69 D04-7
P-P10-002-V

0.14
AC07 D01-4 AC07

0.14
Baranda H=0.90m D01-4 AC07 0.12 D04-7 AC07 D04-3 D04-3

16.60
D04-7 AP_10_052_L
AC05 D04-4

4.69
Estructura metálica FV05B 0.90 Piso D04-4 AC07 N.P.T. +0.00 1 1 0.12 14.22 0.12

0.14
S14 CMA_10_005 CMA_10_006 0.58 1.87 0.58 3.30 0.80 0.09 3.26
1.50 1.80 31.30 m² AP_10_076 D04-2 AC07 AP_10_019_P AP_10_019_Q

2.00

2.00
N.P.T. +0.00 podotáctil AP_10_071 D04-7
0.12

0.12

D01-4
AC05 AC07 D01-4 CCO IT D01-4 5.00 m² 5.00 m² D04-4
P-P10-73 19.18 m² 0.75 6.94 m² 10.99 m²

2.90

2.93
AC07 39.14 m² AC07
AC07

2.80
S13 AC06
0.10

2.91

3.20
T06C P-P10-169 P-P10-XXX-V PF - AC07 N.P.T. +0.60 Almacén carteles CMA_Ascensor_Privado
2.50 CMA_Ascensor_Privado
2.50

2.42
AC07 D04-3 Circulación Privada S13
N.P.T. +0.60 AC07 D04-1 D04-1 Ducto de AP_10_019_N AP_10_019_O S.A.Int_Salud S.A.Int_Reposo y

2.44
0.90

1.80
NC_10_007_A PM RF90 1.30 2.10 N.P.T. +0.60 0.12 0.09 contingencia AC16 ambiental observación
2.91

P-P10-252 Cambio de piso Cambio de piso 0.10 P-P10-102 COE, CCS y Crisis AP_10_052_H 0.90 1.80 P-P10-74 S1.1 Instalaciones D04-7 D04-7 14.58 m² 9.94 m²

3.03
1.80 2.10 0.06 1.36 3.22 0.09

0.11
D04-4 18.28 m² 0.14 4.69 0.14 2.69 7.32 0.12 1.57 0.12 D04-1 AC16

2.61

0.15
2.55 0.10 0.14 3.00 S7 S.A.Int_Vacunación S.A.Int_Triaje y
1.75

PM RF90 S5 9.42 m²

3.48

3.48

3.48

3.48
PF - PM -
2.52

1.50 1.55 1.45 0.14 1.45 1.10 N.P.T. +0.00

0.15
P-P10-18-MC

2.28
0.10 D04-4 D01-4

PE-H
Núcleo T01-1 D04-2 tópico

3.81
1.80 2.10 1.30 2.10 ? D03-2 CCO Módulos AC07 D01-4 AC07 D03-2 1.00 2.10 AC07 T01-1 T01-1
B04-7 AC07 D01-4 0.46 1.22 0.14 FV01B 0.45
3.01

Comunicación Video Wall D01-2 P-P10-103 P-P10-201 AC07 D01-4 P-P10-145 N.P.T. +0.00

2.58
oficinas P-P10-77 D04-2

0.12
P-P10-10

0.13

0.14
20.65 2.25

1.30
S5 S7 PF - PF - PM -
0.14 1.00 0.14

AC07 PM RF90
0.10

0.10

0.14
PM -
0.56

0.74

1.58
AC13

1.85
AC07 1.00 2.10 1.00 2.10 D01-4 1.00 2.10
1.00 2.10 AT_10_059 0.60 1.80 D04-1 0.14 0.14 2.00 2.72 0.75
0.50 0.50

Ver lámina: 2110-B-AAU-5NA0-000000-024 P-P10-42 D03-2 1.30 2.10 D01-4 AC07 AC07 T02-1 T01-1 T01-1 P-P10-111
SH_10_021_A D01-4 AC07 AC07 D04-1 D04-1 D04-1 2.02 0.28 6.28

0.08 1.09
268.83 m²
1.00

0.14

1.21
AP_10_052_M
1.11

PM -

0.12
PM - 10.62 m² T01-6 AP_10_052_B AP_10_052_M PE-H AC07 Reclaim Belt PE-H PE-H PE-H

0.45
P-P10-152 T01-1 D04-1 AC07 D01-4

0.10
5.07 m² D04-1 1.00 2.10 D01-2

0.10
0.90 2.10 D03-2 D04-2

2.00

2.00
T1 Aseos Personal S4 AC07 AC07 D01-4 AP_10_052_C P-P10-98

2.15
5.07 m² AC075.07Megafonía

0.14
D01-4 P-P10-81

0.14
PM - 2.70 D04-1 0.46

0.14
T02-1 T02-1
0.14

COE, CCS y Crisis 0.10 CCO Camarote Megafonía S13 0.10 18.16 m² PM RF90

1.53

0.11
PF -

0.12
1.00 2.10 ? AC04 AC07 AP_10_052_G S13 CCO Descanso y 0.60 1.80 AP_10_019_S

3.43
Ver lámina: 2110-B-AAT-5NA0-000000-010 3.09 1.00 0.43 1.13 1.00 1.04 1.00 0.51 1.00 1.14 1.00 2.36
AC07integrado 2 puestos
6.86

1.00 2.10

AC05
8.44 m² AC07 AC07 +0.60+0.60 AC07
N.P.T.N.P.T. P-P10-199 Rodapié metálico
3.30

AP_10_052_N SH_10_006_A 0.05 0.12 AC07

2.28

1.00
AP_10_070 AC07 AC07 T01-1 P-P10-191 P-P10-25

1.29
Video Wall AC07 D01-2 D03-2 AC04 S13 AP_10_052_D kitchenette 12.97 m²

1.00
M04-2 AC08 D01-4 CCO Módulos AC07 AC05 0.05 3.31 1.36 0.06
1.75

PF - T02-1 104.29 m² T02-1 h=0.15m

0.14

0.14
7.62 m² D01-2 PM -

2.86
27.92 m² 12.20 m² N.P.T. +0.00 PM - 3.18 1.00 2.56 S.A.Int_Circulación
1.00 2.45

1.50
AP_10_005 D03-2 SH_10_011_B D02-1

1.90
Oficina supervisor Ventanilla de AC07 oficinas 0.90 2.10 Aseos D04-1 1.00 2.10 1.80 2.10 AP_10_019_R
FO02E 0.11
1.80

P-P10-XXX-V CCO Sala reuniones D01-4 interna

0.33
6.07 m² D01-4 AC07 AP_10_052_E D01-4 D02-1 AC07 AP_10_024 1.78

0.14
S7 S7 20.02 m²

2.85
AP_10_052_E S3 21.54 m²

0.42
BHS AP_10_061_A recepción de D04-4 0.90 SH_10_007_B AC16

3.12
M04-2 D03-2 D02-1 D02-1 S7

3.14

0.66
S7 AC08 AC13 11.27 m² 16.73 m² D01-4

3.00
documentos S7 Almacén Ver lámina: 2110-B-AAT-5NA0-000000-001 Aseos Personal S.A.Int_Sala de
4.60

85.01 m² 11.27 m²

4.65
AC07 AP_10_099 1.50 1.80 11.30 m²
N.P.T. +0.00 AC08 SH_10_021_C S7 CCO4 Oficina 4 SH_10_006_B SENASA Oficina AC07 Ver lámina: 2110-B-AAT-5NA0-000000-010 espera AP_10_019_T

4.02

1.00
CCS Centro de CCO Oficina AC07
3.71

3.99

2.15

2.15
24.20 m² B04-7 P-P10-003-V D01-4 AC07 Aseos Personal

2.28

2.29
personas y 8.49 m² NAC

0.15
4.91 m² 0.15 2.40 0.15 S4 P-P10-189 S7 4.67 m²
0.12

1.59
Cuarto cableado FV05B 0.90 operaciones de personas y N.P.T. +0.00 AC07 CCO D04-1 D04-1 P-P10-30

1.00
monitores S7

0.14
seguridad P-P10-144 Aseos Personal D01-4 monitores D01-4 D02-1 Aseos Family room PM - N.P.T. +0.00 S.A.Int_W.C.Público
0.15

1.10
1.50 1.80 D01-4 D01-4 AC07 P-P10-124 S4 0.12 14.34 PM -

0.14
S8 PFC - COE, CCS y Crisis P-P10-168 S7 AC07 D01-4 D02-1 S3 1.00 2.10 H 2.94

2.35
AC05 S7 AC07 AC07 1.00 2.10 AC07 D01-4

0.14
AC07 0.90 2.10 PMR PM RF90 0.14 3.09 P-P10-90 P-P10-75 AC07 PM - D02-1 5.69 8.77
D03-2 AP_10_019_V AP_10_019_W

1.24

3.33
S13 D02-1 D02-1 SH_10_011_C

0.14

0.14
D02-1 1.00 2.10

0.34
D01-2 11.40 m² 11.42 m²

2.29
8.70

N.P.T. +0.35 S4 1.80 2.10 PF - PF -

0.31
D01-4 AP_10_052_F 4.63 m²
?

0.25
AC07 N.P.T. +0.00 AC08 B04-7 D04-4 AC05 P-P10-91 P-P10-XXX-V P-P10-58 S.A.Int_Consulta S.A.Int_Consulta
D04-3 1.00 2.10 0.90 1.00 2.10 AP_10_052_O
1.18

AC05 Aseos Personal

3.18
PM RF90 40.86 m² AC07 D01-4 PF - 0.12 AC07 P-P10-228 P-P10-38 D02-1 Externa 1 Externa 2

0.12
AC07 P-P10-76 0.10 0.90 P-P10-110 AC07 AC16 AP_10_019_U
2.84
0.14

0.14

1.41

1.40
Circulación Privada 23.40 m² PMR

2.23
1.80 2.10 PM -

1.56

1.56
1.95 1.50 1.80 1.00 2.10 PM - N.P.T. +0.00

2.32
D02-1 SH_10_021_B PF - 0.14 5.24 Circulación Privada PM - 4.70 m² N.P.T. +0.00

0.10 1.00
CCO 0.14 1.00 2.10 D03-2 D01-4

0.10
P-P10-256 P-P10-238 AC05 AC05 AC07 D01-4 1.00 2.10 S4 S.A.Int_W.C.Público
B04-7 1.00 2.10 1.00 2.10 P-P10-210

0.65
Sardinel de concreto P-P10-150 S4 9.39 m² S5 AC07 S7 CCO T02-1 T02-1 ?
?

0.15

0.10
PM - PM - AC13

11.70

10.50

10.50
9.21

10.50
3.00

FO02E PM - AE_10_009 M

0.14

0.16
PM - Aseos Personal D02-1 SH_10_011_A

0.16
1.00 2.10 1.30 2.10 D02-1 T02-1 0.60 1.80 332.94 m² D03-2
3.36 1.00 2.10 COE, CCS y Crisis 11.94 m²

2.10
0.10 0.10 D01-4 AC07 Espacio técnico D02-1 Área Espera D01-4 D02-1
AP_10_052_O AC07 P-P10-116 AC07 D01-4

0.14
D01-4 AC07 Aseos Personal
0.36

0.12

AC05 P-P10-197

1.44
0.14 4.33 0.14 6.59 0.14 23.40 m² SH_10_007_A AC01 AC07 S4 PM -

1.00
SH_10_021_D Circulación Privada 15.37 m² S1.1 S1.1 D01-2 AP_10_031 PM -
1.00 2.10 4.52 0.14 2.80 0.14 1.50 0.24 1.00 4.36
P-P10-109 4.48 1.77 1.00 2.10
2.34

D04-4 Aseos Personal 32.92 m²

2.29
6.25 m² CCO P-P10-229

6.05

1.74
1.50 3.12 5.88 PM - AC07
1.57

SERFOR 4.35 2.51 1.00 0.10 2.47 1.00 0.10 1.97 1.00 0.19

0.33
Aseos Personal CCO N.P.T. +0.00 P-P10-18-MC
1.00 2.10 ? AP_10_047 PM -
?

4.75 2.83 COE, CCS y Crisis AC07 S4 FV01B 0.45


P-P10-004-V 283.24 m² 1.00 2.10 D04-2 AP_10_062

4.81
D03-2 AC08 AC07 AP_10_088 20.65 2.25
0.59

ducha
5.90

FV05B 0.90 Circulación Privada AP_10_060 Ver lámina: 2110-B-


D02-1 13.57 m² 80.39 m²
1.50 1.80 209.07 m² D03-2 AAT-5NA0-000000-011 S7 Almacén P-P10-139
Oficinas

5.12

2.03
S5 AC16 D01-2

1.87
Parapeto H=1.00m AC07 D01-2 Centro de control D04-2 PM RF90
AC07 AC08 mantenimiento proovedores AVP
0.14

4.08 AP_10_060

5.56
1.71 remoto de SH_10_006_C AC07 1.80 2.10
P-P10-95 manlift S8 service office
209.07 m² CI_10_013

3.75
1.87

Piso podotáctil Piso PM RF90 S7 plataforma 8.04 m² AC06 AC08


T01-1 P-P10-96 Centro de control SH_10_006_A Aseos Cuarto
6.70 1368.59 m²
FO02E podotáctil 1.80 2.10 N.P.T. +0.00 D02-1 T02-1 104.29 m² D02-1 S7
7% S7 D03-2
1.50

remoto de Circulación
1.75

PF - N.P.T. +0.00 limpieza


AP_10_061_B Aseos Ver detalle típico de bajante de agua en

PE-G
2.30

0.10

3.47
1.30 2.10 plataforma S7 T02-1 AC07 D01-4
AC07 S3 S4 AC08 AC08 S1.1
18.04 m² lámina 2110-B-AAV-2NA0-000000-001

8.81

8.80
?

0.14

1.40
AC05 AC07

8.94

8.94
M04-2
4.56

Ver lámina: 2110-B-AAT-5NA0-000000-001

2.00
Descanso y Ver lámina: 2110-B-AAT-5NA0-000000-010 N.P.T. +0.00
0.15

Rodapié metálico
0.92
0.75

kitchenette COE, ? D04-4 T02-1 T02-1 h=0.15m


AC07 D01-4 D01-4 T02-1 AC07 AT_10_004
CCS y Crisis
1.00

PE-G PE-G PE-G 20.30 m² PE-G


0.51

S7 AC07 M04-2 D01-4 AC07 AC07 D01-4 AC07

0.72
Cuarto cableado
AC08

0.14

0.16
D03-2 AC07
P-P10-87 P-P10-97 AC07 S8

1.75
AP_10_075B AP_10_072 AP_10_073 AP_10_074 P-P10-122
AP_10_013_C AP_10_013_D
0.15

1.36
PF - PF - D03-2 P-P10-106 AC07 PM RF90

0.08
D03-2 10.20 m² 10.20 m² 10.20 m² 10.20 m² AC07 D01-4 AC07 D01-4
1.00 2.10 0.15 D01-4 AC07 AP_10_051_A AP_10_051_B AP_10_051_C M04-2 AC08
1.75

1.00 2.10 PM RF90 Aparcamiento de Aparcamiento de Aparcamiento de Aparcamiento de D01-2 M04-2 1.30 2.10 D01-4 7.20 m² 4.88 m² D01-4
P-P10-88

4.41
3.54 m² 3.42 m² 3.52 m² 0.14 3.66 5.40 0.80 2.10 INDECOPI_Sala INDECOPI_Archivos
0.14

Sardinel de concreto D01-4 carritos OOG carritos carritos carritos AC06 AC07

3.68
PF - LAP Meeting room LAP Meeting room LAP Meeting room AP_10_043 conciliaciones
AP_10_055_A AC07 AC16

5.65
1.00 2.10 Operaciones Operaciones Operaciones Sardinel de concreto

2.87
50.87 m² S1.1 S1.1 S1.1 S1.1 30.05 m²
AC07 M04-2 M04-2
5.67

AC07 AC08

1.18
D04-3 L&F baggage
Sala de crisis AT_10_005 AC07 0.15 0.10
P-P10-005-V 0.14 2.36 0.14 2.43 0.14 3.44 0.14 AC08
S7 2.44 CMA_10_317

4.21
22.78 m² S7 5.05

4.35
FV05B 0.90 N.P.T. +0.00 30.53 m² M04-2 AT_10_003 1.70
1.50 1.80
AP_10_055_B D01-4 D01-4 AC07
Cuarto cableado
20.27 m²
2.51
D01-4 CMA_Ascensor_Privado

3.01
D01-4 AC07 D01-4 AC07 P-P10-121
3.37

20.00 m² S8 Cuarto eléctrico AC07

1.36

0.14
AC07 Sala de negociación P-P10-105 PM RF90 P-P10-19
0.14

0.14
AC07 S8 AC07
0.27

S7 AC05 D01-4 PM RF90 1.30 2.10 PM - 1.56 AP_10_013_B 1.08 0.11


FO02E D01-4 ? AC07
AC07 AC07 AC07 P-P10-52 6.70 D01-4
AC07
? AC07 AC07 0.80 2.10 1.00 2.10

1.20
1.48
AC07 PM - 5.22 m²

0.12
D04-4

0.10
S7 S7 S7 AC08 M04-2
1.45

0.10 0.10
AC07 D04-4 AC08 S1.1 1.00 2.10 D01-4 AC07 INDECOPI_Circulación P-P10-17-MC
1.88

AC07
? D01-4 AP_10_058_D AP_10_084 0.10
D04-4 AP_10_017
2.04

1.17
M04-2

9.90
AP_10_084 AP_10_086 AE_10_005 Ver detalle de Dog House en lámina: FV01B 0.45

0.34
AC07

0.14
AC07 AC07 AC07 5.52 m² D01-4 AP_10_015

0.10
20.41 m² 51.37 m²

10.50

10.50

10.50
10.35 2.25
0.14

20.41LAP
m² Oficinas Sala 2110-B-AAM-000000-004

0.41
24.02 m² 332.80 m²

1.50
P-P10-68 P-P10-44 P-P10-70 Kitchenette D01-4 D04-3 3.25 P-P10-20 Servicio de
3.14

3.14
51.84 m²

0.10
3.28

3.28
LAP Oficinas Sala LAP Oficinas Mto. Rodapié P-P10-31 AC07

9.93
PF - PF - PF - Reunión AC07 AC07 Área Espera P-P10-18 PF - LATAM / L&F guardianía de
4.00 AC07 AC07 AC07 Reunión 4.14 PM - AC04
Cambio de piso ? 1.00 2.10 1.00 2.10 D01-4 1.00 2.10 AP_10_058_E AC07 Sala Reunión metálico P-P10-17 PM -

10.37
AT_10_072 S7 1.00 2.10 Aerolíneas equipajes

1.72
1.00
9.46 0.14 P-P10-72 S7 1.36 h=0.15m 1.00 2.10 PM - 1.00 2.10
3771.64 m² 17.14 m² P-P10-79 S7
PM RF90 Circulación privada N.P.T. +0.00
1.30 P-P10-100 1.00 2.10 0.10 S7 S7
PF -

0.60
BHS VÍA EXTERIOR VEREDA

0.97
P-P10-234 AP_10_047 1.30 2.10 D01-4 AC07 AC07 D01-4 AC08 P-P10-123 D04-3 PM RF90 D01-2 D01-4
3.00

AC07 AC07 1.00 2.10 AC07 AT_10_022 AC06


3.16

1.43
S14 S14 S14 PM RF20 283.24 m² P-P10-71 P-P10-82 PM RF90 0.80 2.10

0.14
AC07 AP_10_025 AP_10_012
0.09

34.81 m² D01-4 N.P.T. +0.00


0.14

0.14

N.P.T. +0.00 2.20 2.10 Circulación Privada PF - 0.14 PF - 1.30 2.10 N.P.T. +0.00 Césped
N.P.T. +0.00 N.P.T. +0.00 Cambio de piso OOG 8.77 5.69 26.23 m² AC07 31.47 m² 2.11
S5 1.00 2.10 1.00 2.10
1.44

8.78 0.14 2.85 0.14 3.62 0.14 AC07 D01-4 AC07 PROMPERU Baby care. Sala de
AC07 D01-4 D01-4 AC07 P-P10-XXX-V AC08 M04-2
M04-2 AC05 S7 AC04

5.60
D04-4 AP_10_051 AC07 D01-4 AC06 0.12 14.22 0.12 Llegadas NAC lactancia

5.43
AC05 AC05 D04-4 AC04

1.40
AC05 D01-4 AC05

3.61

3.61
0.90 AC16 AP_10_013_A

0.12

0.12
AP_10_05117.20 m²

3.29

3.29
AC07

6.16
0.22 1.50 1.80 2.14 2.87 S7 S3 D01-2
0.16

0.14

27.19 m²
17.20 LAP
m² Meeting room
2.50

2.50

2.76
0.61 1.29 D01-4
2.64

2.64

7.51 INDECOPI_Ventanillas D01-4 N.P.T. -0.10


Operaciones 1.02 0.14 7.65
D04-4 AC07
LAP Meeting room AP_10_081 D04-1 D04-1 de atención
2.17

1.50
D04-4 AC07 AC07 AC07 AP_10_038_A Operaciones S7 14.99 m² AC07 P-P10-129 D04-1

4.46

4.16
AC07 5.57 6.70 S7 D01-4
FO02E T01-1 36.65 m² D01-4 M04-2 M04-2 AC08 PM - 0.12 0.09

2.48
Circulación Privada

2.29
S7 AC07 D01-4 AC07

PE-F
D01-4 D01-4 Centro de control Video Wall AC07 1.30 2.10 0.12 1.30 3.22 0.09 D01-4 AC07 AC04 AC07
4.88

AC08 P-P10-167 S5 N.P.T. +0.00


0.14

0.14

AC07

0.12
técnico (CCM) AT_10_006 P-P10-148

0.14

0.14

0.14
PM RF90 0.12 0.46 D04-1
S13 AP_10_063_B 14.04 m² PM RF90
D01-4 AC07 1.30 2.10

0.60
AP_10_058_B AP_10_085_C D01-4 AP_10_063_B D01-4 AC07 Cuarto eléctrico T01-1 D04-1 D04-1 D04-1 T01-1 0.60 1.80 AC07 D01-4 AC07 P-P10-3 P-P10-23
N.P.T. +0.35 15.48 m² P-P10-159 AC06 AT_10_053
1.00

4.38

0.12

0.12
12.23 m² 15.88 m² PM - PM -

1.35
0.03 15.48 m²Shift Technician PE-F S8 PM RF90 268.83 m² PE-F PE-F AC07 D01-2
PE-F
M04-2 AC08 D01-2 AC07 1.00 2.10 1.00 2.10

0.57

0.60

0.60
Landside Descanso LAP Oficinas Sala Shift Technician T01-1 D04-1
2.25

2.25

S7 S7 0.14 2.81 2.76 0.14 6.10 0.60


2.39

2.39

1.20 4.46 Room Descanso y 1.30 2.10 P-P10-151 D04-1 Reclaim Belt D04-1
y Kitchenette Reunión Room Descansokitchenette
y 0.10 AP_10_030 D04-1 0.46

0.14
0.10 0.10 PM RF90

0.12
1.62

0.21
S7 S7 AC07 D04-4 kitchenette 0.14 AC07 100.91 m² 2.95 2.83 6.17 0.60
AC07 D01-4 0.60 1.80
2.50 T01-1
2.34

P-P10-80 Departamento de AC16

2.28
AC16

2.47
AC07 AC07 N.P.T. +0.00 AP_10_091 AC07 AC06 AC06 FO02B
1.75

PM RF90 mantenimiento LAP P-P10-XXX-V AC07

4.17

4.17
0.14

0.14

0.14

1.50
11.97 m² 0.09 0.12
0.07

AC07 1.30 2.10 P-P10-155 N.P.T. +0.00 0.90 D01-4 P-P10-033-M D04-1 0.09 3.22 1.30 0.12
AP_10_011 Rodapié metálico
D01-4 AC07 P-P10-155

2.26
LAP Oficinas Mto. AC07 Sardinel de concreto

2.51
P-P10-93 P-P10-113 Piso PA01 AC05 Piso podotáctil AC07 PF - D01-4 AC07 0.90 1.80 MPV07 0.30 51.27 m² h=0.15m
D01-4

4.27
PF - PF - P-P10-78 PF - S7 Despacho Aduanas. Atención
0.14

podotáctil 1.00 2.10 P-P10-34 4.94 2.40 D01-2 7.51 4.10 1.00 0.39 1.00 3.86
1.50

0.12
S7 1.00 2.10 1.00 2.10 N.P.T. +0.34 PM RF90 1.00 0.10
2.10 AP_10_094 S7 público
P-P10-XXX-V P-P10-XXX-V AC07 PF -
PA01 1.30 2.10 8.64 m² 1.00 2.10 D01-4 AC07 AC06 S7 P-P10-16
P-P10-006-V 0.19 0.90 D01-4 AC07 0.90 0.52 AC05 LAP Oficinas Mto. D01-4 D04-1 D04-1 4.52 4.48

0.10
D04-4 PM -
0.14

0.14
FV05B 0.90 1.50 1.80 1.50 1.80 P-P10-43 Área impresión 0.12 14.22 0.12 AC07 D01-2 1.00 2.10
3.45

1.50 1.80 AP_10_058_A D01-4 AC07


PM RF90 S7 5.69 8.77

0.14

0.14
85.85 m²
11.92

11.92

CONTINÚA PLANO EN LÁMINA: 2110-B-AAC-1P10-P01100-001


AP_10_063_A

1.41
LAP Oficinas AC05 AC05 D04-4 AC07 1.30 2.10 AC07 AP_10_092 AC07
AP_10_058_C 27.58 m² D01-4
Landside 11.97 m² CI_10_004 0.14 5.57 0.14 4.45 1.00 1.25
3.80

AC07 ? 21.28 m² Shift Technician P-P10-37 AC06


AP_10_063_A AC07 LAP Oficinas Mto.

2.37
CI_10_017
0.10

7.51 0.14 5.06 0.14 5.24

2.51
AP_10_047 Espacio técnico Room PF - D01-4 D01-4 1233.96 m²
D04-4 0.03 27.58Mto.
m² LAP Despacho 9.00 0.60

2.08
videowall 1.00 2.10 P-P10-117 483.09 m² Circulación

11.03
6.50

9.80
D04-4 283.24 m² S7 Shift N.P.T. +0.00
Technician 7.51 5.20 4.55
6.65

S7 Circulación P-P10-205
1.09
T1 PF - P-P10-016-M
0.14

Circulación Privada

10.50
10.50

10.50
3.00

4.50
FO02E Room Mto. LAP D01-4 AC07 S1.1
0.10

T01-1 AP_10_038_B N.P.T. +0.00 S7 1.00 2.10 N.P.T. +0.00 PV - MPV06 0.00 S15
S5 36.61 m² N.P.T. +0.00 2.00 2.70 JSP_55_A2
AC07 N.P.T. +0.00 2.15 3.00 P-P10-240
4.87

0.14
0.52 AC07 D01-4 P-P10-36 S1.1 N.P.T. +0.00
N.P.T. +0.00 Centro de control D01-4 PV -
Sardinel de concreto D01-4 D01-4 PF -
8.86

técnico (CCIT) P-P10-118 AE_10_005 P-24 P-25 P-26 P-27 P-28


4.30 2.50 P-29 P-30 P-31 P-32
1.25

AC07 AC07 AP_10_095 1.00 2.10 AP_10_093 AC07


AP_10_056_A PF - 332.80 m² 9.00 9.00 9.00 9.00 9.00 9.00 9.00 9.00

1.60
P-P10-XXX-V P-P10-92 S13 7.28 m² 11.92 m²
2.90

56.11 m² 1.00 2.10

Junta sísmica - Suelo Exterior


6.10
Área Espera CI_10_004 CI_10_006
1.28

P-09 P-10 P-11 P-12 P-13 P-P10-89 0.90 PM RF90 P-14 Video Wall P-15 LAP Oficinas Mto. AC07 LAP Oficinas Mto.
0.16

2.37
LAP Oficinas Airside

2.51
N.P.T. +0.35 D01-4
9.00 9.00 20.33 m² 9.00
PF - AC07 1.50 1.80 1.30 2.10 AC07 H Almacén
P-P10-XXX-V
Despacho S1.1
G 6.05 2.95
1233.96 m²
Circulación 9.70
128.57 m²
MEET-GREET
18.36
E 9.00 P-P10-007-V 9.00
S7 1.00 2.10 9.00 AC07 9.00 S7 AC07 S7 D01-4
0.14

CM_Escalera_Pública D04-4 D04-4 0.90 2110-B-AAC-3NA0-000000-004 S1.4


T02-1 FV05B 0.90 2110-B-AAC-3NA0-000000-005
AC07 D04-4 D01-4 D04-4 0.90 1.80 AC07 1.85 S1.1
12.51 Baranda Flexible 17.90 Rodapié metálico 0.46
2110-B-AAC-3NA0-000000-002 SH_10_003_B 1.50 1.80 D01-4 AC07
AC07 AC07 AC07 N.P.T. +0.00
0.11 15.72 AC05 2.17 0.75 1.54 1.58 2.84 1.54 0.60 5.60 P-P10-156 P-17 P-18 P-19 P-20 P-21 P-22 P-23 P-24 N.P.T. +0.00 N.P.T. +0.00 h=0.15m
0.14

0.14

0.14

0.14
8.55 m² AP_10_056_B CONTINÚAPMPLANO
RF90 EN LÁMINA: 2110-B-AAC-1P10-P05100-001

0.39
D01-4 0.08 P-P10-33 P-P10-016-M
Aseos Family room CONTINÚA PLANO EN LÁMINA: 2110-B-AAC-1P10-P01100-001 F
2.18

P-P10-156

2.57
0.23 0.15 7.89 m² AC05 1.30 2.10 AC05 D04-4 D04-4 P-P10-082-M Rodapié metálico MPV06 0.00
S3 15.53 0.15 2.76 0.16 1.55 0.12 1.46 0.12 2.58 AP_10_047
0.14 1.54 0.15 6.08 PM RF90 0.12 PM RF90 Sardinel de concreto
CONTINÚA PLANO EN LÁMINA: 2110-B-AAC-1P10-P09100-001

0.10 LAP Oficinas Airside AC05

3.00
1.80 2.10 MPV07 0.30 h=0.15m Rodapié metálico 2.15 3.00
1.75

D02-1 AC07 S7 0.12 0.10 283.24 m² 0.12 1.30 2.10 0.14 2.50
3.52 0.14 4.12 8.80 4.88 5.18 4.43 4.57 2.80 3.48 2.40 6.20 9.00 9.00 9.00 9.00 9.00 2110-B-AAC-3NA0-000000-003 JSP_55_A2
AP_10_047 h=0.15m AC06 D01-2

PE-E
D04-4 P-P10-141 Ver detalle típico de bajante de agua en
0.14

CONTINÚA PLANO EN LÁMINA: 2110-B-AAC-1P10-P06100-001


Ver lámina: AC07 AC07 Circulación Privada P-P10-59 P-P10-142 AC06 Junta sísmica - Suelo Exterior
0.12

0.64 AP_10_047

0.14
283.24 m² 0.08 P-P10-080-M PV - P-P10-081-M P-P10-035-M P-P10-034-M P-P10-061-M P-P10-062-M P-P10-063-M P-P10-043-M P-P10-042-M P-P10-058-M P-P10-059-M P-P10-060-M P-P10-045-M P-P10-044-M P-P10-074-M P-P10-075-M lámina 2110-B-AAV-2NA0-000000-001
0.48

2.82

2.82
2110-B-AAT- S5 PM RF90 PV - FO02B
Circulación Privada 0.12 7.40 0.12 0.98 0.14 3.02 0.14 2.10 0.14 7.23
0.14

283.24 m² MPV07 0.30 MPV07 0.30

0.14
MPV07 0.30 2.00 2.70 MPV07 0.30 MPV07 0.30 MPV07 0.30 MPV07 0.30 MPV07 0.30 MPV07 0.30 MPV07 0.30 MPV07 0.30 MPV07 0.30 MPV07 0.30 MPV07 0.30 MPV07 0.30 MPV07 0.30
5NA0-000000-005 P-00 N.P.T. +0.00 Circulación Privada 1.80P-P10-59
2.10 1.50 2.40 1.50 2.40
2.00 2.70
1.50 2.40
D01-4 1.50 2.40 2.50 2.40 2.50 2.40 1.50 2.40 2.00 2.40 1.50 2.40 2.50 2.40 2.50 2.40 1.50 2.40 2.00 2.40 1.50 2.40 2.50 2.40 2.50 2.40
0.58

0.56

0.56
0.50 0.50

D01-4 AC07 AC07 D01-4 N.P.T. +0.00 P-P10-50 PM RF90


CI_10_005
? AC07 D01-4 P-P10-195 P-P10-196 P-P10-22 P-P10-204

1.00
AC16 PE-EPE-E PM RF90 1.80 2.10 PE-E PE-E JS-P2D Baja montante de drenaje pluvial PE-E PE-E
? m² D03-2 PM - PM - AC05 D03-2 PM - D03-2 PM - AC05
Estructura D04-3
metálica Estructura
S5 metálica D04-4 AC05 D04-4AC05 3.10
381.26 AC05 D04-4 D04-3 AC05 AC05 1.30 2.10 AC06 AC06 D01-2 AC10
0.71

D03-2 D02-1 1.00 2.10 1.00 2.10 1.00 2.10 1.00 2.10 2.20 2.00
?
Circulación P-P10-080-M P-P10-141 P-P10-081-M P-P10-035-M P-P10-034-M P-P10-061-M P-P10-062-M P-P10-063-M P-P10-043-M P-P10-042-M P-P10-058-M P-P10-060-M P-P10-045-M P-P10-044-M P-P10-074-M P-P10-142 P-P10-075-M
CONTINÚA PLANO EN LÁMINA: 2110-B-AAC-1P10-P06100-001
0.16

0.14

0.14

0.12

0.14
P-P10-39
0.13

MPV07 0.30 PV - MPV07 0.30 MPV07 0.30 MPV07 0.30 MPV07 0.30 MPV07 0.30 MPV07 0.30 MPV07 0.30 MPV07 0.30 MPV07 0.30 MPV07 0.30 MPV07 0.30 MPV07 0.30 MPV07 0.30 PV - MPV07 0.30
1.87

S1.1 0.15 11.77 0.14 3.62 0.14 PM RF90 2.77 0.16 0.14 1.90 0.14 4.24 Ducto de 0.14 1.50 2.40 2.00 2.70 1.50 2.40 2.50 2.40 2.50 2.40 1.50 2.40 2.00 2.40 1.50 2.40 2.50 2.40 2.50 2.40 1.50 2.40 1.50 2.40 2.50 2.40 2.50 2.40 CONTINÚA PLANO EN1.50
LÁMINA:
2.40 2110-B-AAC-1P10-P02100-001
2.00 2.70 1.50 2.40 0.14 12.41 0.15
SH_10_003_C 0.77
0.87

N.P.T. +0.00 Junta sísmica 1.80 2.10 SH_10_009_B


0.23 SH_10_001_B D04-4 Instalaciones D04-4 D04-4 AC07 AC07 D04-4 AC06 CONTINÚA PLANO EN LÁMINA: 2110-B-AAC-1P10-P06100-001 0.31
1.75

2.57 m² 4.72 m² D04-4 NC_10_004_B


1.51

0.23 12.15 3.75 3.08 2.67 m² 7.50 2.18 4.24 0.78 4.43 0.14 7.24 0.34
0.14 1.50
1.85 2.00 1.50
1.75 0.25 0.90 0.25 2.50 2.60
8.05 2.50 0.20 1.00 0.20 1.50 1.30 2.00
8.05 1.30 1.50 0.25 0.90 0.25 2.50 2.60
8.05 2.50 0.20 1.00 0.20 1.50 1.30 2.00
8.05 1.30 1.50 0.250.45 0.450.25 2.50 2.60
8.05 2.50 0.200.50
Aseos Cuarto T01-1 Aseos Personal D04-3 23.97 m² D01-4
Aseos Cuarto AC07
D03-2 limpieza S4 T02-1 PMR Núcleo 7.05 4.50 D01-4 9.00 9.00 9.00 9.00 9.00 9.00 9.00
P-P10-226 limpieza
Ducto de Instalaciones Comunicación
3.24

AT_10_072 PM - D02-1 S4 S4 D02-1


3771.64 m² VÍA EXTERIOR P-P10-51 S9 P-23 P-24
1.00 2.10 Sardinel de concreto
4.45

P-P10-008-V P-P10-008-V PM RF90 Ver lámina: 2110-B-AAU-5NA0-000000-012


4.31

BHS
1.50

S14 FV05B 0.90 FV05B 0.90 P-P10-214 0.80 1.80 S17


S14 D02-1 D02-1
AP_10_041_A AP_10_041_H AP_10_041_F
N.P.T. +0.00 1.50 1.80 1.50 1.80 PM - P-P10-264 AC10
21.73 m² 24.27 m² 20.07 m²
N.P.T. +0.00 AC05 AC05 0.60 1.80 PM RF90 Oficinas Circulación Privada
AC07 Oficinas AC06
1.20 2.10 CI_10_006
6.54

0.12

Proveedores BHS Oficinas Proveedores D01-2


6.74

D04-4 D03-2 CI_10_003 AC_10_002 128.57 m²


Rodapié metálico h=0.15m
S7 Proveedores Equipos detección
7.20

SH_10_001_A SH_10_009_A 569.98 m² 128.05 m²

10.45
D01-4 MEET-GREET

10.31
FO02E S13 contra incendios Circulación Retail
17.20 m² T02-1 17.20 m² D04-7 D04-4 N.P.T. +0.00
N.P.T. +0.00 S7 CI_10_017 CI_10_003 AE_10_004
N.P.T. +0.00 N.P.T. +0.00 N.T.C. -0.10
Aseos Personal Aseos Personal AC11 Ver detalle de Dog House en lámina:
0.20

483.09 m² 569.98 m² 333.04 m²

10.50

10.50

10.50
S1.4
3.00

S4 S4 AC07 D01-4 2110-B-AAM-000000-004


Circulación ? Circulación Área Espera S1.1 S11
VEREDA Sardinel de concreto T02-1 D04-4 D04-7 D04-7 D04-7
3.18

CMA_10_025 CMA_10_313 AC07 S1.1 S1.1


S14 AP_10_032 Ver lámina: 2110-B- Ver lámina: 2110-B- CMA_10_013 CMA_10_014 7.28 m² 7.28 m² AC05
2.20

200.25 m² AAT-5NA0-000000-011 AAT-5NA0-000000-011 AC05


2.00

N.P.T. +0.00 5.00 m² 5.00 m² CMA_Ascensor_Privado CMA_Ascensor_Privado N.P.T. +0.00 N.P.T. +0.00
HCC Rampa
CMA_Ascensor_Privado CMA_Ascensor_Privado
S7
AC03 D03-2 D03-2 D03-2 D04-7
0.10

N.P.T. +0.00 D01-4 3.40


P-P10-7 P-P10-143 1.54 0.98 14.46
10.84

0.10

P-P10-009-V P-P10-009-V
0.16

0.20

0.20

AC07 D01-4 PF - PF - 0.12 0.12 0.09 0.12


1.50

FV05B 0.90 FV05B 0.90 AC07 1.30 0.09 3.22 14.22 0.12
0.52

1.00 2.10 1.00 2.10 AC05


1.50 1.80 1.50 1.80 0.16 3.12 0.13 1.02 0.12 3.12 1.42 1.42 1.23 1.42 0.74
0.74 1.70 0.67 1.62 1.33 1.62 1.43 2.81 9.70
0.14

0.12
3.03 2.80 0.84
0.33

AC05 D04-3 AC05


0.10

AC07 P-P10-45 AC07 AC07 D04-1


NC_10_004_A NC_10_004_OOG P-P10-48 D04-1 3.20 1.20
AP_10_047 P-P10-180 NC_10_004_A PF -
3.25

1.50
2.11 0.12 1.17 0.12 4.48 0.12 1.80 0.12 2.35 0.14
3.05

PM RF90 34.61 m² 24.30 m² D04-4 1.00 2.10 PF - D04-1


283.24 m² 34.61 m²
1.75

Núcleo Núcleo P-P10-173


3.65

3.64

2.28

2.52
1.80 2.10 1.00 2.10

PE-D
Junta sísmica Circulación Privada Núcleo D03-2 D03-2 D03-2 D01-4
PM RF90 0.42 AC05

0.09
Comunicación Comunicación OOG AC07 T01-1
S5 Comunicación AP_10_041_E

0.12
0.60 1.80

0.09

0.14

0.14
N.P.T. +0.00 S5 S5 S5 AP_10_041_B 12.62 m² AC05
D04-3

0.75
Ver lámina: 2110-B-AAU-5NA0-000000-012 13.67 m² AC07

0.59
N.P.T. +0.00 Oficinas D04-1

0.66
AC05 AC05 D04-1
0.50 0.50

Ver lámina: 2110-B-AAU-5NA0-000000-012 D04-1


4.52

AC05 Oficinas AT_10_054 T01-1 D04-1

21.00

20.00
P-P10-183 Proveedores HVAC D01-4
1.27

D02-1 T02-1

1.28

1.26

1.25
PE-D PM RF90 Proveedores PBB 268.83 m² PE-D PE-D
P-P10-107 P-P10-108 AC05 S7
0.59

0.59 3.08 0.57 1.58 1.87

0.56
1.42 T01-1 T02-1 T02-1
0.74

1.86

0.67
D04-1 D04-1 Reclaim Belt

0.12
D04-1

0.12
Cambio de piso Cambio de piso PM - PM - 1.80 2.10 S7 AC07 AC05 T02-1
0.14

0.15

0.09

0.12
1.30 2.10 1.30 2.10 AC05 AC05
AC05 P-P10-160 D01-4 T02-1

3.26
D01-4

0.65

0.74
0.12
1.36 T01-1

2.52
2.28
AC03 D03-2 D03-2 AC07 D04-4 PM RF90 D03-4
D04-1
1.59

FO02E P-P10-46 P-P10-47 0.60 1.80 2.11 1.40 4.48 0.12 1.80
2.20

D04-4 AC07 AP_10_068 D04-4


D01-4 AC07 PF - PF - AC07 D01-4 D04-1 AC16
2.35

D02-1
2.20

2.20

2.20

0.42 SH_10_002_A

5.25
AP_10_069

0.09
9.79 m²

5.11
S17 D04-4 0.90 2.10 0.90 2.10 AC07 AC05
D04-4
0.15

VEREDA Servicios de 9.42 m² D04-1 D04-1 103.13 m²


D02-2 SH_10_002_B

4.65
D03-2

0.12
P-P10-57 limpieza AC07 Almacén AC07 AC05 AC05 0.12 Aseos
Ducto de 0.09 8.61 m²

3.76
S7 AC03 S7 AP_10_041_C AP_10_041_D N.P.T. +1.30
AC05 PM - D04-4 Instalaciones 11.67 m² 11.03 m² AC07 AC06 AC05 0.09 3.22 S3 Aseos Family room
CI_10_019 0.12 14.22 0.12 1.30 0.12
0.14

0.14

2.20 2.10 N.P.T. +0.00


116.70 m² Oficinas Oficinas D01-4 Ver lámina: 2110-B-AAT-5NA0-000000-001 P-P10-14-MC
S14 AC05 D04-4 P-P10-163 3.37 Proveedores Otros Proveedores 14.46 0.98 3.40 1.54 FV01A 0.45
0.38 15.53 0.14 2.49 0.29
0.14 4.44 0.14 4.28 0.14 CI_10_019 5.68 AC05 Circulación Privada 0.06 0.06
2.82

D04-4 AC05 PM RF90 Saneamiento 7.99 1.80 S21 18.05 3.45

2.31
2.20

116.70 m² S5 AC07 S7
9.23 9.60 4.58 3.82 0.74 0.60 1.80 AC07 ambiental
2.26

1.98

1.98

P-P10-254 Circulación Privada N.P.T. +0.00


D04-4 D01-4 S7
CI_10_019 D02-1 P-P10-222

0.12
PM RF20 S5 D04-4 AC05
116.70 m² AC05 AC07 AC07 D01-4 PM -
2.20 2.10
Circulación Privada T02-1 P-P10-211 1.00 2.10
0.14

0.14

D01-4 D02-1

10.50

10.50

10.50
1.51

0.60
1.28

1.28
Sardinel de concreto S5 D04-4 AC05 AC06 PM - 2.60
T02-1 0.60 1.80
AC06

2.10
D04-4 AC06 AE_10_004

Junta in situ
P-P10-026-M Espacio técnico
1.85

D04-4 AC16 P-P10-026-M

0.12
AC16 MPV06 0.00 MPV06 0.00 333.04 m² 2.60
P-P10-162 9.21 0.14 4.14 0.14 3.91 0.14 Área Espera
0.80

FO02E AC16 PM RF90 1.66 3.00 1.66 3.00 P-P10-223


0.40 13.05 D02-1
PM -

2.31
2.20 2.10
7.56

0.12
3.76 0.52 4.05 1.00 2.10
D01-2 D02-1
?
CI_10_009 CI_10_009
? CI_10_017
Ver lámina: 2110-B-AAT-5NA0-000000-001
? m² 483.09 m²
5.30

P-P10-246
229.25 229.25
? m² Circulación SH_10_002_C
5.99

?
5.85

Circulación ?
Circulación SH_10_002_A 7.91 m²
3.00

PV RF20

2.88
S1.1 103.13 m² Aseos Cuarto
Rodapié metálico

5.04
1.95 2.60 S1.1 S1.1

5.18

3.75
N.P.T. +0.00 h=0.15m Aseos limpieza AC16
N.P.T. +0.00 N.P.T. +0.00 N.P.T. +0.00
Rodapié metálico 2.11 1.40 4.48 0.12 1.80 N.P.T. +0.00 D03-4
h=0.15m

PE-C

3.20
P-P10-071-M P-P10-070-M S3 S4 T02-1
0.25

P-P10-025-M P-P10-041-M P-P10-040-M P-P10-053-M P-P10-054-M P-P10-037-M P-P10-036-M P-P10-055-M P-P10-056-M P-P10-057-M P-P10-073-M P-P10-072-M T02-1 D02-1
1.95 2.20

0.12
0.20 MPV06 0.00 3.90 0.14 2.12 0.14 2.80 MPV07 0.30 MPV07 0.30
0.25

T01-1 0.20 MPV07 0.30 MPV07 0.30 MPV07 0.30 MPV07 0.30 MPV07 0.30 MPV07 0.30 MPV07 0.30 MPV07 0.30 MPV07 0.30 MPV07 0.30 MPV07 0.30
1.50 2.40 1.50 2.40 1.86
2.50 2.40 2.50 2.40 2.00 2.40 1.50 2.40 2.50 2.40 2.50 2.40 1.50 2.40 2.00 2.40 1.50 2.40
1.69

0.20 2.00 0.44 1.64 3.00 1.50 2.40 1.50 2.40


0.50

P-P10-025-M T02-1 T02-1

1.20

1.18
T02-1

1.00
MPV06 0.00 PE-C PE-C D02-1 PE-C
D01-4 AC06

0.71
0.55

0.55
0.55

0.55
AC16 AC06

0.69
0.75

1.64 3.00 P-P10-137 P-P10-039-M P-P10-038-M P-P10-202


P-P10-052-M Baja montante de drenaje pluvial
0.14

0.14
AC16
1.40

1.40

0.20 PV - MPV07 0.30 MPV07 0.30 PV -


0.40

MPV07 0.30
0.25

0.75 2.00 0.20 5.00 0.14 2.00 2.70 2.50 2.40 2.50 2.40 2.00 2.70
AC07 AC07 AC07 1.50 2.40
D04-7 AC07D01-4 AC07 P-P10-26 P-P10-27 D03-2 AC10
0.35 1.50 2.00 1.50 0.25 0.25 2.50 2.60 2.50 0.20 0.20 1.50 1.30 2.00 1.30 1.50 0.25 0.25 2.50 2.60 2.50 0.20 0.20 1.50 1.30 2.00 1.30 1.50 0.25 0.25 2.50 2.60 2.50 0.20
0.20

D01-4 PM - PM - 2.10 1.40 4.48 0.12 1.79 0.14 1.02 0.12 1.19 0.14
CMA_10_012 D04-7
0.60

1.00 2.10 1.00 2.10


1.42

D04-7 AC16 D01-4 5.00 m²


CMA_Ascensor_Público AC07 AP_10_045
7.01 P-P10-031-M
3.47

CMA_10_015 ? 21.42 m²
AP_10_045 AP_10_007 AP_10_021
MPV07 0.30
1.42

D04-7 Almacén
? m² carteles de
4.63

4.63

4.63

D04-7 11.94 m²
4.77

4.49

5.00 m² 21.42 9.52 m² 3.56 2.40 AC06


CMA_Ascensor_Público ? contingencia
Almacén carteles de Almacén letreros Oficina Supervisor
3.78

AC16 D01-4 AP_10_096

5.32
D01-4 contingencia S7 contingencia de Terminal
66.55 m²
FO02E AC16 CM_10_005 S7 S7 S7 Disponible
AC07
2.47

N.P.T. +0.00
5.15

1.23

22.57 m² N.T.C. -0.10


CM_Escalera_Pública D01-4 D01-4
AC16
CI_10_017 CI_10_002 AE_10_003 AC10 S11
Cambio de piso Cambio de piso Ver lámina: 2110-B-AAU-5NA0-000000-040 D01-4 AC16 D01-4
D01-4 AC07
AC07 AC07 AC07 JS-P2D
483.09 m² 569.91 m² N.P.T.
332.93+0.00

CMA_10_016 Circulación P-P10-200 Circulación Área Espera Ver detalle de Dog House en lámina: AP_10_066

10.50

10.50

10.50
2.00

CMR_10_001
0.14

0.14

5.00 m² PV - 2110-B-AAM-000000-004 12.00 m²


P-P10-54 S1.1 S1.1
1.42

CMA_Ascensor_Público 2.00 2.70 97.24 m²


P-P10-027-M P-P10-027-M PM - D01-4 AC06 CI_10_002 AC10 Punto de
CMR_Rampa_Pública

10.37
AC16 D01-4 AC06 D01-4MPV06 0.00 N.P.T. +0.00 N.P.T. +0.00 569.91 m² Información
MPV06 0.00 1.30 2.10 S1.4

0.14
0.14 2.12 0.14 2.66 0.14 Circulación S1.4 Ver lámina:
0.41 3.00 0.41 3.00
D04-7 N.P.T. +0.00 2110-B-AAU-5NA0-000000-031 P-P10-11-MC
0.74

4.16 1.51 2.94 S1.1 D01-4 FV01A 0.45


0.60 0.20

AC16 P-P10-031-M 1.54 3.40 0.98 14.46 N.P.T. +0.00


S14 CI_10_017_A MPV07 0.30 0.12 0.09 16.55 3.45
AC_10_001
0.60

38.81 m² 3.56 2.40 0.12 1.30 3.22 0.09 0.12 14.22 0.12
AT_10_072 60.15 m²
4.48

T01-1 AC16
4.62

Circulación AC05
3771.64 m² VÍA EXTERIOR VEREDA Retail - Premium
S1.1
3.56

taxi

0.12

0.12
BHS
S14 S14 CI_10_010 CI_10_010 1.95 1.40 4.03 3.57 0.74 2.24 6.02 0.53
N.T.C. -0.10
S14 P-P10-232

4.91
N.P.T. +0.00 N.P.T. +0.00 347.06 m² 347.06 m² AC07 D04-1 D04-1
2.20

PM RF20 Circulación S1.1 Circulación 0.14 3.21 0.14 3.89 0.14 4.03 0.14 2.10 0.14 6.55 0.14 2.14 0.14 S11

1.50
N.P.T. +0.00 P-P10-028-M
2.20 2.10 3.05 1.74 P-P10-028-M D04-1
N.P.T. +0.00 MPV06 0.00 P-P10-182 2.81 9.00

2.29

2.53
MPV06 0.00 AC06

PE-B
AC06 D01-4 0.42
0.32AC163.00 PM RF90 AC05 T01-1
0.09

0.32 3.00
0.25

0.12
0.60 1.80 AC05 11.17 1.34
0.14

P-P10-127 P-P10-175
0.68
0.75

21.00
AC07
0.59

D04-1 AC07 D04-1 D04-1


0.50 0.50

0.12
D01-4 AC07 AC08 PM RF90 PM RF90 AC08 D03-2 D01-4 AC07 D01-4 AC07 T01-1

20.00
AT_10_055 D04-1 AC10
1.15

AC07 D01-4 D03-2


PE-B 1.30 2.10 1.30 2.10 PE-B PE-B PE-B
M04-2 AP_10_027 268.83 m² AC06
0.12

0.56
D04-1 AC07

0.67
D01-4 AC07 T01-1 D04-1 D04-1 AC05
2.00

AC16 T01-0 4.29 m² D04-1 Reclaim Belt

0.14

0.14
D01-4
0.14

AP_10_049_A SH_10_010_D Almacén P-P10-179


AC05

0.49
AP_10_049_A
13.59 m² AC07 M04-2 7.28 m² D03-2 S7 D01-4

0.65
AC07 AC06 T01-1 PM RF90 CI_10_015

0.12

0.74
M04-2 AC06
2.25

Junta sísmica AT_10_010 AP_10_080 AC07


3.52

3.50

2.52

2.28

Sala13.59
de Pasajeros T01-0 Aseos Cuarto AC05 0.60 1.80 D01-4 AC05
3.66

m² SH_10_022 AT_10_009 17.87 m²


1.75

AC08 32.01 m²

1.74
CM_10_004_B
2.95

12.67 m² P-P10-157
0.14

1.60

1.60
D01-4 SalanodeAdmitidos
Pasajeros 7.02 m² 13.69 m² limpieza
Circulación
AC05 P-P10-158
0.10

0.11 1.00
FO02E 22.48 m² no Admitidos Cuarto eléctrico M04-2 BOH Lado Tierra P-P10-28 PM - PM -
2.21

0.09
S7 Aseos Sala de Cuarto cableado
S8 S8 S4 AC07 D04-1 N.P.T. +0.00
T01-1 CM_Escalera_Pública Pasajeros no S7 PM - AC05 T01-1 1.00 2.10 S1.1 D01-4 AC05 1.00 2.10
S7 P-P10-140 D01-4 AC05 0.42
4.43

AC08

0.11
Ver lámina: 2110-B-AAU-5NA0-000000-038 AC08 N.P.T. +0.00 1.00 2.10 D01-4

0.14

0.14
Admitidos
0.12

AC07 D01-4 PM -
D01-4 AC07 1.00 2.10 S4 D03-2 M04-2 M04-2 AC08 AC08 P-P10-56 AC07
P-P10-61 PM - AP_10_023
AC05 D04-1
2.84

AC06
0.14

0.16

6.24 m²
0.20

PF - 1.00 2.10 0.12 14.22 0.12 0.09 3.22 1.30 0.12 AC10
P-P10-250 CI_10_010 1.00 2.10 Punto de 0.09 0.12
AC07
AC07 AC07 Información P-P10-29
PV RF20 347.06 m² 5.21 1.80 4.63 0.14 1.62 P-P10-112 14.46 0.98 3.40 1.54
3.00

0.10

AC07 P-P10-15 S7 PM -
2.00 2.60 Circulación AP_10_049_B SH_10_023 PM -
D01-4 AC07 AC07 AC20
S1.1 AP_10_049_E 14.74 m² AP_10_049_B SH_10_010_B D02-1 PM - 1.00 2.10 1.00 2.10 4.75
7.06 m² D02-1 AC06
0.10

9.04 m² 1.00 2.10


2.98

Sala de Pasajeros 14.74 m²


2.83

0.14

S7
2.82

N.P.T. +0.00 Aseos Sala de 18.16 m² D01-4


Circulación Sala de no Admitidos Sala de Pasajeros
3.38

Pasajeros no Aseos Personal AC05


Pasajeros no no Admitidos
3.92

P-P10-62
P-P10-62 P-P10-63 Admitidos AP_10_046 AC07

10.50

10.50

10.50
Admitidos S7 S7 S4 D03-2
PF --
PF PF - S4 D02-1 31.14 m² P-P10-55
0.10

2.24

SH_10_010_C AC20
2.10

AC16 1.00
1.00 2.10
2.10 D01-4 1.00 2.10 Circulación Privada AC20
CM_10_004_A PM - AC_10_007 CMA_10_001B CMA_10_001B
0.10

0.10

Sardinel de 4.60 m² P-P10-203


0.14

0.14

P-P10-147 1.30 2.10


5.97

concreto 22.94 m² Aseos Personal PFC - N.P.T. +0.00 S5 137.21 m² 13.41 m² 13.41 m²

2.99
AC05
2.18

2.18

CM_Escalera_Pública PM - 2.18

8.20
PMR 0.90 2.10 QSR / Food Market CMA_Ascensor_Público CMA_Ascensor_Público

7.99
AC07
0.35

1.80 2.10 AC07 AC07 S4


0.14

D01-4 D03-2 N.T.C. -0.10


0.10

AP_10_049_C P-P10-218 AC10


D02-1 D03-2
0.95

AC16 AP_10_049_C
1.17
0.10

AC16 D01-4 D01-4 14.90 m² T02-1 T02-1 PM - AE_10_003 S11


AC07 P-P10-11 D01-4 AC07
3.00

Sala de Pasajeros 14.90 m² Espacio técnico 0.60 1.80 332.93 m²


0.14

2.86

2.86

no Admitidos Sala de Pasajeros D02-1 PM - Área Espera


1.30 2.10 D01-4 JSP_55_A2
AC16 P-P10-66 S7 no Admitidos AP_10_008
P-P10-64
P-P10-64 S7 P-P10-138 D02-1 P-P10-206
1.36

PM - 41.61 m²
3.91

FO02E PF PF - - PM - PM - D01-4 AC06 4.75 4.55


T01-1 1.00 2.10 2.10 2.10 D01-4 AC07 D01-4 SH_10_010_A Almacén equipajes JS-P2D
0.88

1.00 1.00 AC07


0.10

CM_10_003_B 1.00 2.10 D02-1 1.00 2.10 AC05 Rodapié metálico Rodapié metálico
2.43

en custodia
0.10

0.10

P-P10-65 19.78 m²
4.29

4.57

h=0.15m
0.14

0.14

0.14

22.94 m² SH_10_024 h=0.15m


2.93

2.80
PF - Aseos Personal S7 Baja montante de drenaje pluvial
CM_Escalera_Pública 7.06 m² AC20

PE-A
1.00 2.10 AP_10_049_D
3.40

Junta sísmica S4 T02-1 2.24 P-P10-067-M P-P10-068-M P-P10-069-M P-P10-047-M P-P10-046-M P-P10-064-M P-P10-065-M P-P10-066-M P-P10-049-M P-P10-048-M
Ver lámina: 2110-B-AAU-5NA0-000000-034 AP_10_049_D
13.22 m² AC07 D03-2 Aseos Sala de P-P10-078-M P-P10-136 P-P10-079-M P-P10-051-M P-P10-050-M P-P10-076-M P-P10-077-M
1.57

13.22de m² AC07 Pasajeros no Ver lámina: 2110-B- MPV07 0.30 MPV07 0.30 MPV07 0.30 MPV07 0.30 MPV07 0.30 MPV07 0.30 MPV07 0.30 MPV07 0.30 MPV07 0.30 MPV07 0.30 MPV07 0.30 MPV07 0.30 2.81 3.40
Baranda metálica AC16 Oficina D02-1 MPV07 0.30 PV - MPV07 0.30 MPV07 0.30 MPV07 0.30 Sardinel de concreto
AAT-5NA0-000000-012 1.50 2.40 2.00 2.40 1.50 2.40 2.50 2.40 2.50 2.40 1.50 2.40 2.00 2.40 1.50 2.40 2.50 2.40 2.50 2.40
2.01
2.03

Oficina no
de Admitidos 1.50 2.40 1.50 2.40
2.17
2.17

2.17

H=0.90m 0.16 Pasajeros AC07 1.50 2.40 2.00 2.70 1.50 2.40 2.50 2.40 2.50 2.40
0.50 0.50

Pasajeros no S4 AC03

1.00
D01-4 Admitidos PE-A PE-A PE-A PE-A
Admitidos
S7 D03-2 T02-1 D03-2 D01-4 AC07
AC07 S7 D03-2 P-P10-135 P-P10-9-MC
D01-4 D01-4
0.14

0.14

?
CI_10_005 PV - FV01A 0.45

1.53
2.00 2.70 D01-4
? m²
381.26 1.55 3.45
? D03-2 D03-2 SH_10_003_A
AC01 D03-2 1.46
AC07
0.14 5.06 AC07 0.12 1.24 0.14 AC07 AC07 11.07
AC07 AC07 AC07 2.00 1.50 0.25 0.25 2.50 2.60 2.50 1.50 1.30 2.00 1.30 1.50 2.50 2.60 2.50 1.50 1.30 2.00 1.30 1.50 0.25 2.50 2.60 2.50 0.20
Circulación AP_10_042_D AP_10_042_E
1.80

53.92 m² AP_10_042_B AP_10_042_C


Sardinel de concreto Aseos S3 AC07 10.29 D01-4 10.51 8.26
m² D01-4 10.46 m²
S1.1 1.60 5.06 0.75m² 0.74 D01-4
2.11

10.24 m²

CONTINÚA PLANO EN LÁMINA: 2110-B-AAC-1P10-P02100-001


L&F baggage L&F baggage L&F baggage L&F baggage
N.P.T. +0.00 ? AC06
Almacén Almacén Almacén Almacén
? ? S7 S7
D02-1 ? ?
P-P10-227 SH_10_003_A AC07 S7 S7 AC07 AC07 D01-4 AC07 ?
PM - ?
5.76

?
0.14

5.90
53.92 m²

5.83
6.04
6.24

6.24

6.24
1.00 2.10 ? Aseos ?
5.03

P-P10-126 P-P10-130
F

5.74
? P-16 P-P10-128 P-P10-125 P-17 P-18 P-19 P-20 P-21 P-22 P-23 P-24 P-P10-241
CM_10_003_A S3 AC05 D01-4 PM - PM - D01-4 AC05 PM - PM - AC05 D01-4 N.T.C. -0.10
1.00 2.10 1.00 2.10 D01-4 PV -
P-09 P-10 P-11 P-12 P-13 P-14 P-15 Ver lámina: 2110-B- 1.00 2.10 1.00 2.10 S11 2110-B-AAC-3NA0-000000-003 4.30 2.50
AAT-5NA0-000000-005
9.00 9.00 9.00 9.00 9.00 9.00 9.00 9.00 S1.4
T02-1 AC01 P-24 S1.1 P-25 P-26 P-27 P-28 P-29 P-30 P-31 P-32
H N.P.T. +0.00

P-00
9.00 9.00 9.00 9.00 9.00 9.00 9.00 D03-2
6.05
G N.P.T. +0.00 6.35
4.52

2110-B-AAC-3NA0-000000-005 AC01 9.00 9.00 9.00 9.00 9.00 S15 9.00 9.00 9.00
D02-1
2110-B-AAC-3NA0-000000-004 D01-4 D01-4
1.25 0.15 8.15 0.70 9.00 0.70 6.05 2.25

0.14
7.37

CONTINÚA PLANO EN LÁMINA: 2110-B-AAC-1P10-P06100-001 CONTINÚA PLANO EN LÁMINA: 2110-B-AAC-1P10-P02100-001


10.00 4.00 8.30 0.14 10.11 0.15 6.05 0.15 5.15 P-00 P-00 P-00
AC01

CONTINÚA PLANO EN LÁMINA: 2110-B-AAC-1P10-P07100-001

CONTINÚA PLANO EN LÁMINA: 2110-B-AAC-1P10-P03100-001


AC01 AC05 AC_10_009 AC_10_010
SH_10_003_A AC_10_009 D01-4 AC_10_010 P-P10-242
4.94 0.98 14.46
CONTINÚA PLANO EN LÁMINA: 2110-B-AAC-1P10-P10100-001

D03-2 D01-4 AP_10_042_A 32.68 m² 33.39 m²


D02-1
D02-1 53.92 m²
SH_10_003_A 0.12 0.09 AE_10_002 PV -
AC16 D03-2 D01-4 AP_10_042_A
158.99 m² N.P.T. +0.00 Retail - 32.68
Moneym² 33.39
Retail m²
- Money 4.30 2.50
Aseos
53.92 m² 158.99 m² S1.1 0.12 1.30 3.22 0.09 332.92 m² 14.34 0.12 Retail - Money
Exchange RetailExchange
- Money CI_10_013
E S3 Aseos AC05 L&F baggage
L&F baggage N.P.T. +0.00
Área Espera N.P.T.Exchange
-0.10 Exchange
N.P.T. -0.10
1368.59 m² P-P10-242 S15
0.12

SH_10_003_A
T02-1 Ver lámina:
N.P.T. +0.00 AC10 N.P.T. +0.00 N.T.C. -0.10 D01-4 N.T.C. -0.10 Circulación PV - N.P.T. +0.00
2110-B-AAC-3NA0-000000-002 53.92 m²T02-1 2110-B- S1.1
AAT-5NA0-000000-005 S7 S11 S11S11 0.70 N.P.T. +0.00 4.30 2.50
Sardinel de concreto Aseos S3 N.P.T. +0.00 S1.1 T01-1 D04-1 D04-1 D04-1
FO02E S1.1 D03-2 N.P.T. +0.00 S1.4
S3 Rodapié metálico 0.14 7.10 0.14 5.13 0.14
1.83

N.P.T. +0.00 P-P10-4


1.10

P-P10-188 h=0.15m
2.29

2.53

D01-4 AC16 Ver lámina: 2110-B-AAT-5NA0-000000-005


2.33

Ver lámina: PM - D01-4 AC05 0.42 CONTINÚA PLANO EN LÁMINA: 2110-B-AAC-1P10-P03100-001


0.09

Junta sísmica T01-1 AC16 T01-1 D01-2 AC10 D01-2 AC10 P-P10-1-MC JSP_55_A2
2110-B-AAT-5NA0-000000-005 0.60 1.80 PM RF90 CONTINÚA PLANO EN LÁMINA: 2110-B-AAC-1P10-P07100-001
Rodapié metálico

1.53
0.60 1.80 6.05 6.21 0.14 6.30 FV01A 0.45
0.14

0.14

0.14

0.14
0.12 4.33 0.14 0.75 0.14 19.36 Rodapié metálico h=0.15m
1.55 3.45
0.68

P-P10-32 D04-1 D04-1 Rodapié metálico


0.70

0.70

0.70

0.59

0.70
h=0.15m AT_10_058 D04-1
0.50 0.50

AC16
1.25

AC07 D01-4 PM - AC07 AC07 AC10 AC10


D03-2 3.75 D03-2 0.56 1.03 T01-1 D04-1 AC07 h=0.15m
PO-A PO-A 268.54 m² PO-A PO-A AC07 D01-2 PO-A
1.00 2.10
0.12

Reclaim Belt
0.12

1.95
1.39 1.42 1.23 1.42 0.59 P-P10-2-MC
0.56

T01-1 D04-1

PO-A
AC10
0.67

AP_10_054 D01-4 D04-1 AP_10_010_D FV01A 0.45


D04-1 S1.1 D04-1 ? AC07
AP_10_028
AP_10_028 AP_10_009 14.01 m²

3.05
CI_10_005_A 32.55 m² 1.40 3.45

2.91

2.91
0.12
0.85

P-P10-018-V AC07 21.81 21.81


m² m² 4.86 0.75 19.36 T01-1
T01-1 P-P10-186 20.02 m² Aduanas. Área
3.50

0.65

0.74
3.37

3.37

336.84m 2 Dirección General

2.35
Sardinel de concreto
2.52

2.28

FV04B 0.45 D04-7 D04-7 Requisitorias PM RF90 Sala de monitoreo descanso 0.30
D04-7 Requisitorias 0.14 0.14

2.80
de Migraciones y D01-4
2.95

2.95

0.85 2.25 Circulación llegadas INT INT 0.60 1.80 P-P10-12 de cámaras N.P.T. +0.00 Ver detalle típico de bajante de agua en
llegadas
0.09

Naturalización AC07 D01-4 PM - 4.75 3.35 1.20


D01-4 CMA_10_010 CMA_10_011 D04-1 T01-1 N.P.T. +0.00 lámina 2110-B-AAV-2NA0-000000-001
2.95

S1.1 S7 D01-4 S7 0.42 1.00 2.10 S7


P-P10-244 AC16 5.00 m² 5.00 m² AC10 AC10
S7

0.10
N.P.T. +0.00 AC07 D01-4 N.P.T. +0.00 N.P.T. +0.00
0.12

0.14
PV RF20 D01-4 AC07 CMA_Ascensor_Público CMA_Ascensor_Público AC07 D01-4

0.14
1.45 2.65
0.15

0.14

0.14

P-P10-2 D04-1 D04-1 0.09 0.12 JSP_55_A2


P-P10-8-MC
AC16 PM - AC16 D04-7 0.12 14.34 0.09 3.22 1.30 0.12 FV01A 0.45
3.45 M04-2 AC16 AC10
AC10 AP_10_010_B
P-P10-017-V 1.00 2.10 0.20 14.46 0.98 3.40 1.54 1.40 3.45
FV04B 0.45 0.15 10.69 m²
Cambio de piso Cambio de piso 0.14 0.14 0.20

3.15
3.01
5.66 1.00 3.46 0.65 2.50 2.50 0.14 1.00 5.66 Aduanas. Oficina 1
1.20 2.25
N.P.T. +0.00
CMA_10_002B CMA_10_002A

3.00
AC20 6.73 m² 6.73 m² AC20
D01-2 S7 CMA_Ascensor_Público CMA_Ascensor_Público
9.25

AC11
10.50

10.50

10.50
P-P10-243 AP_10_010_A
PV RF20 AE_10_002 Ver detalle de Doq House en lámina 28.98 m²
1.45 2.65 2100-B-AAM-5NA0-000000-004

0.14
332.92 m² Aduanas. Área
Área Espera N_E Administrativa
S1.1 N.P.T. +0.00
Rodapié metálico AC20
D01-2 AP_10_010_C S7
Vereda Vía exterior Vereda h=0.15m
CI_10_027 AC06
14.91 m² 0.30 AP_10_010_F
S14 S14 S14 CI_10_005_A AE_10_007 118.92m 2 AC_10_003 Aduanas. Oficina 2 43.43 m²
P-P10-016-V

4.26
336.69 m² 88.41 m² 801.00 m² N.P.T. +0.00 Almacén Aduanas

4.12
N.P.T. +0.00 N.P.T. +0.00 N.P.T. +0.00 Circulación
FV04B 0.45 Circulación Área Espera Duty Free D01-4 AC07
00 S7 N.P.T. +0.00
10.38

3.60 2.25

11.94
11.80
S1.1 S1.1 S1.1 S1.1

0.14
S7

0.15
N.P.T. +0.00 N.P.T. +0.00 N.P.T. +0.00 N.P.T. +0.00 P-P10-14 P-P10-134
PM - AC07 AC07
Junta sísmica PM - AC16
1.00 2.10
0.25

AC07 1.00 2.10 D01-2

0.26
Sardinel de concreto
AP_10_075A AP_10_075 AP_10_079 AP_10_077

0.14
10.20 m² 10.20 m² 10.20 m² 10.20 m²

0.74
0.50
0.50

Aparcamiento de Aparcamiento de Aparcamiento de Aparcamiento de D01-2 AC06


PO-B PO-B carritos OOG carritos carritos carritos PO-B PO-B AC07 D01-4 PO-B

PO-B
S1.1 S1.1 S1.1 S1.1
CI_10_001
0.25

1552.82 m² N.P.T. +0.00 N.P.T. +0.00 N.P.T. +0.00 N.P.T. +0.00 P-P10-7-MC
Rodapié metálico FV01A 0.45
Circulación
h=0.15m
AP_10_064 D01-4 Rodapié metálico
15.13 m² AC07 h=0.15m 16.55 3.45
2.83

AC07
Atención Banco
4.55

llegadas INT
N.P.T. +0.00
PBP-08 CMR_10_002
S7 97.24 m²
S11 S1.1
0.10

0.10

P-P10-013-V CMR_Rampa_Pública
FV04B 0.45 N.T.C. -0.10 N.P.T. +0.00
9.00 2.25 D01-4 AC07 Ver lámina: 2110-B-AAU-5NA0-000000-031
0.75 14.25 AC07

0.14
0.14

Ver nota 3 CI_10_001 AP_10_10_E


1552.82 m² Aduanas, Área AC07
AC_10_003 Circulación Inspección Manual
D01-4 AC07
801.00 m²
9.90

Ver detalle de Dog House en lámina: 61.02 m²


Duty Free
10.50

10.50

10.50
9.00

2110-B-AAM-000000-004 N.P.T. +0.00


S1.1
AP_10_029 AC07 AP_10_059
27.80

18.85 m² AC07 21.78 m²


AE_10_008 CI_10_011 CS_10_002 Atención a D01-4 Equipo de Body

5.97
5.83
3.40 0.98 14.46
5.67

213.45 m² 56.22 m² 79.03 m² contribuyentes Scan llegadas

5
Área Espera Circulación Control de 0.09 0.09 llegadas INT

0.7
3.22 14.34 0.12 N.P.T. +0.00
pasaportes Llegada N.P.T. +0.00
S7
S7
0.12

AC07
1.37 7.57 1.57 2.18 T01-1 D04-1 D04-1 D04-1 AC16
0.09

D01-2
0.14 1.23 0.12 7.34 0.12 1.57 0.12 1.92 0.14 Rodapié metálico
Junta sísmica 0.42 h=0.15m
2.28

2.52

AC07 AC07
0.65

AC10 D03-2 D03-2


0.09

T01-1 1.16
Rodapié metálico
0.14

0.14
0.25 0.50 0.500.25

0.14

Sardinel de concreto Rodapié metálico D04-1 D04-1 h=0.15m


0.12
0.13 0.14

0.68

T01-1 D04-1 D04-1 P-P10-94


0.69

0.59
0.49

0.76

h=0.15m AC06 D01-2 AC06


AT_10_057 PM -
1.33

1.19

PO-C PO-C 268.53 m² PO-C PO-C 1.00 2.10 PO-C


0.12

0.09
42.75

0.14 1.58

PO-C
0.58

0.67

T02-1 T02-1 D04-1 P-P10-192 D04-1 T01-1 D04-1 Reclaim Belt S1.1 D04-1 Ver detalle típico de bajante de agua en
T02-1 PM RF90 AP_10_006_B
0.12

lámina 2110-B-AAV-2NA0-000000-001
0.60 1.80 P-P10-190 26.66 m²
17.32

0.09
0.65

T01-1
0.74

T01-1

3.74
AP_10_053_A
3.60

3.60
T02-1 T02-1 D02-1 AC16 PM RF90 Control de
17.91 m²
SH_10_005_A 0.60 1.80 pasajeros llegadas
Revisión equipajes
D01-2
102.50 m² D03-2 INT
D04-1 T01-1 de bodega
I Aseos 0.41 S1.1 N.P.T. +1.50 AC06
4.43

N.P.T. +0.00
4.59

N.P.T. +0.00
SH_10_005_B Baranda flexible
3.84

N.P.T. +0.00
3.75

Vereda Vía exterior Vereda 2110-B-AAC-3NA0-000000-006 S3 S1.1 S1.1


AC_10_003 D03-2 D02-1 8.40 m² D04-1 D04-1 H=0.90m
S14 S14 S14 Ver lámina: 2110-B-AAT-5NA0-000000-001 Aseos Family room
801.00 m²
00 N.P.T. +0.00 N.P.T. +0.00 N.P.T. +0.00 Duty Free N.P.T. +0.00
0.09 3.22 0.09
0.41 0.66 0.47 12.51 0.14
S14 S1.1 S1.1 S1.1 S11

1.49
S1.1
2.31

S3
Cambio de piso Cambio de piso N.P.T. +0.00 N.P.T. +0.00 N.P.T. +0.00 N.P.T. +0.00 N.P.T. +0.00 N.P.T. -0.10 T02-1
3.40 1.54
CI_10_001
0.12

P-P10-5-MC
0.16

P-P10-014-V P-P10-215 1552.82 m² CI_10_007


FV01A 0.45
9.75

3.76
FV04B 0.45 D03-2 T02-1 P-P10-217 PM - Circulación 242.72 m²
1.00 2.10 0.16 CI_10_020 MEET-GREET 1.40 3.45
10.50

10.50

10.50
9.00 2.25 D02-1
9.00

1.28

1.49
PM - 56.47 m²
T02-1 0.60 1.80 S1.1 N.P.T. +0.00
Espacio técnico Circulación
2.08

2.24

AE_10_001 N.P.T. +0.00 S1.4


0.12

N.P.T. +0.00
Sardinel de concreto P-P10-216 333.01 m²
D02-1 Área Espera S1.1
PM - 0.16
S1.1
2.31

1.49
1.00 2.10
0.16

N.P.T. +0.00
5.27

0.75 3.16 D03-2 T02-1 D02-1


AP_10_006_A
SH_10_005_A AP_10_053_B
3.75

0.99 2.93 3.11 S1.1 25.45 m²


102.43 m 2 Control de 17.78 m²
AC06
3.00

3.00

0.74 6.43 2.57 0.84 S1.1 Revisión equipajes AC06


Aseos pasajeros llegadas
0.12

T01-1 AC10 Ducto de montantes de bodega D01-2


D02-1 D03-2
3.60

N.P.T. +0.00 SH_10_005_C INT


0.14 7.03 0.12 3.15 0.14 S1.1
3.01

3.65 4.59 1.82 2.45


4.19

7.92 m² AC16 S1.1


Junta sísmica S3 Aseos Cuarto
AC13 B04-7 0.14 7.96 0.14 1.82 0.14 2.31
0.14

0.14

D01-4 AC10 AC10 D01-4 T02-1 T02-1


0.14 0.70

Ver lámina: 2110-B-AAT-5NA0-000000-001 limpieza Rodapié metálico Rodapié metálico 0.12 1.17 0.12
N.P.T. +0.00
0.14
0.14

0.14

0.14

0.14
0.50 0.50 0.25

h=0.15m h=0.15m
0.74

0.74

0.75

0.75

P-P10-268
0.70

Estructura T02-1 T02-1 S4


Ducto de Instalaciones Estructura metálica Estructura metálica
metálica
1.16

1.16

1.16

1.16

PM RF90
1.26

1.25
1.35

PO-D PO-D AC03 PO-D PO-D Rodapié metálico AC06 D04-2 PO-D
0.80 1.80

Você também pode gostar