Você está na página 1de 1

MURO/WALL H = 3,00m

LEGENDADEPAVM
I ENTAÇÃO
PA
/VNIGLEGEND LEGENDA DE ALVENARIAS MANSORY LEGEND

S ASFALTO/ ASPHALT ALVENARIA TRADICIONAL h=1,00 + DRY


S WALL 90 MIN. DE RESISTENCIA AO FOGO/
TRADITIONAL MANSORY h = 1.00 + DRY WALL 90 MIN. FIRE
CONCRETO/ CONCRETE RESISTANCE
W
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 LADRILHO HIDRAULICO PESADO/
BLOCO DE CONCRETO/ CONCRETE BLOCK 90 MIN.
FIRE RESISTANCE
24 VAGAS 593,00
HEAVY DUTY HYDRAULIC TILE
24 SPACES LADRILHO HIDRAULICO PASSEIO/ ALVENARIA CORTA FOGO 90 MINUTOS/
FIRE FIGHT WALL 90 MINUTES
WATER HYDRAULIC TILE

ACESSO À SUMARÉ 04 E GRAMA/ GRAM


FECHAMENTO EM TELA METÁLICA h=1,00 +
DRY WALL 90 MIN. DE RESISTENCIA AO
ACCESS TO SUMARÉ 04
593,00
NM FOGO/
METAL SCREEN CLOSING h = 1.00 + DRY WALL 90 MIN.
FIRE RESISTANCE

PAINEL DE CONCRETO 90 MIN. DE


RESISTENCIA AO FOGO/ CONCRETE PANEL 90
MIN. FIRE RESISTANCE

GRADIL METÁLICO h=3,20, DIRETO NO PISO/


METALLIC GRADILE h = 3.20, DIRECT ON THE FLOOR

ARRIMO/ CONTENTION

ALVENARIA h=1,00m SOB PISO ELEVADO/


MASONRY h = 1.00m UNDER HIGH FLOOR
590
POSIÇÃO E QUANTIDADE DE GRADIL METÁLICO h=2,20 SOBRE
CHILLERS EM DEFINIÇÃO ALVENARIA h=0,40m (h total =2,60m)/ METALLIC
POSITION AND QUANTITY OF CHILLERS IN DEFINITION GRADILE h = 2.20 ON MANSORY h = 0.40m (total h =
2.60m)

LEGENDA DE PISOS INTERNOS


INTERNAL FLOOR LEGEND
SALA DE AUTOMAÇÃO 01
AUTOMATION ROOM 01 PISO ELEVADO COM CAPACIDADE NOMINAL
15.00m² BASE DE NIVEL POR PLACA 1000 lbs (453,6 kg) - 1259,98 kg/m²
P -1,00 (P.A) P LEVEL BASE
4 4 H=10cm RAISED FLOOR WITH NOMINAL CAPACITY PER PLATE 1000
593,20 (CT) lbs (453.6 kg) - 1259.98 kg/m²/
PISO ELEVADO COM CAPACIDADE NOMINAL

bms/cftv
RACK 9
BASE DE NIVEL POR PLACA 2000 lbs (907,18 kg) - 2519,94
LEVEL BASE UE-02
H=10cm
UE-01
UC-02 kg/m² RAISED FLOOR WITH NOMINAL CAPACITY PER
PLATE 2000 lbs (907.18 kg) - 2519.948 kg/m²
UC-01
PISO PORCELANATO MUNARI CONCRETO
CASA DE VÁLVULAS CASA DE VÁLVULAS QAUT-01 QAUT-02 QAUT-03 QAUT-04 QAUT-05 QAUT-06 QAUT-07 QAUT-08 QAUT-09
VALVE HOUSE
2.28m²
VALVE HOUSE
2.28m²
BOLD/ BOLD CONCRETE MUNARI PORCELAIN FLOOR
-1,00 (P.A) -1,00 (P.A)
593,20 (CT) 2.59 2.68 1.27 1.35 2.61 1.29 1.44 1.38 593,20 (CT) SALA DE AUTOMAÇÃO 02 1.26
ESCADA MÓVEL / 1.25 AUTOMATION ROOM 02 PISO DE CONCRETO POLIDO/ POLISHED
MOVING STAIR ESCADA MÓVEL / ESCADA MÓVEL / ESCADA MÓVEL / ESCADA MÓVEL / ESCADA MÓVEL / ESCADA MÓVEL / ESCADA MÓVEL / ESCADA MÓVEL / ESCADA MÓVEL / ESCADA MÓVEL / ESCADA MÓVEL / ESCADA MÓVEL / 15.00m² ESCADA MÓVEL / ESCADA MÓVEL /
MOVING STAIR MOVING STAIR MOVING STAIR MOVING STAIR MOVING STAIR MOVING STAIR MOVING STAIR MOVING STAIR MOVING STAIR MOVING STAIR MOVING STAIR MOVING STAIR MOVING STAIR MOVING STAIR CONCRETE FLOOR
-1,00 (P.A)
593,20 (CT)

s
ÍNICIO DA PAGINAÇÃO/ START OF PAGINATION
QAC-A-1.1 QAC-E-1.1 URC-01 URC-02 DATA HALL 01 URC-01 URC-04 QAC-C-1.1 QAC-E-1.2 QAC-A.1-2.1 QAC-D.1-2.1 URC-05 URC-06
DATA HALL 02 URC-07 URC-08 QAC-D.1-2.2 QAC-A.2-3.1 QAC-E.2-3.1 URC-09 URC-10
DATA HALL 03 URC-11 URC-12 QAC-C.2-3.1 QAC-E.2-3.2
QAC-B-1.1 660 RACKS QAC-D-1.1 QAC-B.1-2.1 660 RACKS QAC-E.1-2.1 QAC-B.2-3.1 660 RACKS QAC-D.2-3.1 PLACA DE INSUFLAMENTO DO AR

1.78

1.82
1257.28m² 1257.28m² 1257.28m²
+0,00 (P.A) +0,00 (P.A) +0,00 (P.A) CONDICIONADO/ AIR CONDITIONING INSULATION
S.A.P S.A.P S.A.P PLATE
CRAH-DH01-01 CRAH-DH01-01 CRAH-DH02-01 CRAH-DH02-01 CRAH-DH03-01 CRAH-DH03-01
(OPERANTE) (OPERANTE) (OPERANTE) (OPERANTE) (OPERANTE) (OPERANTE)
SALA TÉCNICA 01 (OPERANT) (OPERANT) SALA TÉCNICA 02 SALA TÉCNICA 03 (OPERANT) (OPERANT) SALA TÉCNICA 04 SALA TÉCNICA 05 (OPERANT) (OPERANT) SALA TÉCNICA 06 SOLEIRA/ SILL
TECHNICAL ROOM 01 TECHNICAL ROOM 02 TECHNICAL ROOM 03 TECHNICAL ROOM 04 TECHNICAL ROOM 05 TECHNICAL ROOM 06 SOLEIRA DE INOX/ STAINLESS STEEL
348.81m² S.A.P 348.81m² 348.81m² S.A.P 348.81m² 348.81m² S.A.P 348.81m²

1.28

1.28
+0,00 (P.A) +0,00 (P.A) +0,00 (P.A) +0,00 (P.A) +0,00 (P.A) +0,00 (P.A)
S.A.P S.A.P S.A.P
CRAH-DH01-02 CRAH-DH02-02 CRAH-DH02-02 CRAH-DH02-02 CRAH-DH03-02 CRAH-DH03-02 NOTA: SEGUIR ESPECIFICAÇÕES DA TABELA DE ACABAMENTOS
(OPERANTE) (OPERANTE) (OPERANTE) (OPERANTE) (OPERANTE) (OPERANTE) NOTE: FOLLOW SPECIFICATIONS OF THE FINISHING TABLE

PDU/RPP-A.1-2.1

PDU/RPP-A.1-2.3

PDU/RPP-A.2-3.1

PDU/RPP-A.2-3.3
(OPERANT) (OPERANT) (OPERANT) (OPERANT) (OPERANT) (OPERANT)

PDU/RPP-A-1.1

PDU/RPP-A-1.3
S.A.P S.A.P S.A.P

1.28

1.28
S.A.P S.A.P S.A.P

TETO VENTILADO

ODALITNEV OTET

TETO VENTILADO

ODALITNEV OTET

TETO VENTILADO

ODALITNEV OTET
CRAH-DH01-03 CRAH-DH01-03 CRAH-DH02-03 CRAH-DH02-03 CRAH-DH03-03 CRAH-DH03-03
(OPERANTE) (OPERANTE) (OPERANTE) (OPERANTE) (OPERANTE) (OPERANTE)
593,00

TETO VENTILADO

ODALITNEV OTET

TETO VENTILADO

ODALITNEV OTET

TETO VENTILADO

ODALITNEV OTET
(OPERANT) (OPERANT) (OPERANT) (OPERANT) (OPERANT) (OPERANT)
S.A.P S.A.P S.A.P

1.28

1.28
PDU/RPP-B.1-2.1

PDU/RPP-B.1-2.3

PDU/RPP-B.2-3.1

PDU/RPP-B.2-3.3
S.A.P S.A.P S.A.P

PDU/RPP-B-1.1

PDU/RPP-B-1.3
CRAH-DH01-04 CRAH-DH01-04 CRAH-DH02-04 CRAH-DH02-04 CRAH-DH03-04 CRAH-DH03-04
(OPERANTE) (OPERANTE) (OPERANTE) (OPERANTE) (OPERANTE) (OPERANTE)
(OPERANT) (OPERANT) (OPERANT) (OPERANT) (OPERANT) (OPERANT)
ARMAZÉN CLIENTE 01 S.A.P S.A.P S.A.P

TETO VENTILADO

ODALITNEV OTET

TETO VENTILADO

ODALITNEV OTET

TETO VENTILADO

ODALITNEV OTET
1.24

1.28
CUSTOMER STORAGE 01
336.24m² S.A.P S.A.P S.A.P

TETO VENTILADO

ODALITNEV OTET

TETO VENTILADO

ODALITNEV OTET

TETO VENTILADO

ODALITNEV OTET
+0,00 (P.A)
CRAH-DH01-05 CRAH-DH01-05 CRAH-DH02-05 CRAH-DH02-05 CRAH-DH03-05 CRAH-DH03-05
(OPERANTE) (OPERANTE) (OPERANTE) (OPERANTE) (OPERANTE) (OPERANTE)
(OPERANT) (OPERANT) (OPERANT) (OPERANT) (OPERANT) (OPERANT)

PDU/RPP-C.1-2.1

PDU/RPP-C.1-2.3

PDU/RPP-C.2-3.1

PDU/RPP-C.2-3.3
PDU/RPP-C-1.1

PDU/RPP-C-1.3
S.A.P S.A.P S.A.P

1.32

1.28
S.A.P S.A.P S.A.P
CRAH-DH01-06 CRAH-DH01-06 CRAH-DH02-06 CRAH-DH02-06 CRAH-DH03-06 CRAH-DH03-06

TETO VENTILADO

ODALITNEV OTET

TETO VENTILADO

ODALITNEV OTET

TETO VENTILADO

ODALITNEV OTET
(RESERVA) (RESERVA) (RESERVA) (RESERVA) (RESERVA) (RESERVA)
(BACKUP) (BACKUP) (BACKUP) (BACKUP) (BACKUP) (BACKUP)

TETO VENTILADO

ODALITNEV OTET

TETO VENTILADO

ODALITNEV OTET

TETO VENTILADO

ODALITNEV OTET
S.A.P S.A.P S.A.P

1.28

1.28
S.A.P S.A.P S.A.P

PDU/RPP-D.1-2.1

PDU/RPP-D.1-2.3

PDU/RPP-D.2-3.1

PDU/RPP-D.2-3.3
CRAH-DH01-07 CRAH-DH02-07 CRAH-DH03-07

PDU/RPP-D-1.1

PDU/RPP-D-1.3
CRAH-DH01-07 CRAH-DH02-07 CRAH-DH03-07
(OPERANTE) (OPERANTE) (OPERANTE) (OPERANTE) (OPERANTE) (OPERANTE)
(OPERANT) (OPERANT) (OPERANT) (OPERANT) (OPERANT) (OPERANT)
S.A.P S.A.P S.A.P

1.28

1.28
TETO VENTILADO

ODALITNEV OTET

TETO VENTILADO

ODALITNEV OTET

TETO VENTILADO

ODALITNEV OTET
S.A.P S.A.P S.A.P
590

TETO VENTILADO

ODALITNEV OTET

TETO VENTILADO

ODALITNEV OTET

TETO VENTILADO

ODALITNEV OTET
CRAH-DH01-08 CRAH-DH01-08 CRAH-DH02-08 CRAH-DH02-08 CRAH-DH03-08 CRAH-DH03-08
(OPERANTE) (OPERANTE) (OPERANTE) (OPERANTE) (OPERANTE) (OPERANTE)
(OPERANT) (OPERANT) (OPERANT) (OPERANT) (OPERANT) (OPERANT)

PDU/RPP-E.1-2.1

PDU/RPP-E.1-2.3

PDU/RPP-E.2-3.1

PDU/RPP-E.2-3.3
S.A.P S.A.P S.A.P

1.28

1.28
PDU/RPP-E-1.1

PDU/RPP-E-1.3
S.A.P S.A.P S.A.P
CRAH-DH01-09 CRAH-DH01-09 CRAH-DH02-09 CRAH-DH02-09 CRAH-DH03-09 CRAH-DH03-09
(OPERANTE) (OPERANTE) (OPERANTE) (OPERANTE) (OPERANTE) (OPERANTE)
(OPERANT) (OPERANT) (OPERANT)

TETO VENTILADO

ODALITNEV OTET

TETO VENTILADO

ODALITNEV OTET

TETO VENTILADO

ODALITNEV OTET
(OPERANT) (OPERANT) (OPERANT)
S.A.P S.A.P S.A.P

TETO VENTILADO

ODALITNEV OTET

TETO VENTILADO

ODALITNEV OTET

TETO VENTILADO

ODALITNEV OTET
1.28

1.28
S.A.P S.A.P S.A.P
CRAH-DH01-10 CRAH-DH01-10 CRAH-DH02-10 CRAH-DH02-10 CRAH-DH03-10 CRAH-DH03-10

PDU/RPP-A.1-2.2

PDU/RPP-A.1-2.4

PDU/RPP-A.2-3.2

PDU/RPP-A.2-3.4
(OPERANTE) (OPERANTE) (OPERANTE) (OPERANTE) (OPERANTE) (OPERANTE)

PDU/RPP-A-1.2

PDU/RPP-A-1.4
(OPERANT) (OPERANT) (OPERANT) (OPERANT) (OPERANT) (OPERANT)
S.A.P S.A.P S.A.P

1.28

1.28
S.A.P S.A.P S.A.P

TETO VENTILADO

ODALITNEV OTET

TETO VENTILADO

ODALITNEV OTET

TETO VENTILADO

ODALITNEV OTET
CRAH-DH01-11 CRAH-DH01-11 CRAH-DH02-11 CRAH-DH02-11 CRAH-DH03-11 CRAH-DH03-11

TETO VENTILADO

ODALITNEV OTET

TETO VENTILADO

ODALITNEV OTET

TETO VENTILADO

ODALITNEV OTET
(OPERANTE) (OPERANTE) (OPERANTE) (OPERANTE) (OPERANTE) (OPERANTE)
(OPERANT) (OPERANT) (OPERANT) (OPERANT) (OPERANT) (OPERANT)
S.A.P S.A.P S.A.P RESERVATÓRIO DE ÁGUA

1.28

1.28
PDU/RPP-B.1-2.2

PDU/RPP-B.1-2.4

PDU/RPP-B.2-3.2

PDU/RPP-B.2-3.4
SPRINKLER

PDU/RPP-B-1.2

PDU/RPP-B-1.4
S.A.P S.A.P S.A.P
CRAH-DH01-12 CRAH-DH01-12 CRAH-DH02-12 CRAH-DH02-12 CRAH-DH03-12 CRAH-DH03-12 SPRINKLER
(OPERANTE) (OPERANTE) (OPERANTE) (OPERANTE) (OPERANTE) (OPERANTE)
(OPERANT) (OPERANT) (OPERANT) (OPERANT) (OPERANT) (OPERANT) WATER TANK

TETO VENTILADO

ODALITNEV OTET

TETO VENTILADO

ODALITNEV OTET

TETO VENTILADO

ODALITNEV OTET
S.A.P S.A.P S.A.P

1.28

1.28

1.00
TETO VENTILADO

ODALITNEV OTET

TETO VENTILADO

ODALITNEV OTET

TETO VENTILADO

ODALITNEV OTET
S.A.P S.A.P S.A.P
CRAH-DH01-13 CRAH-DH01-13 CRAH-DH02-13 CRAH-DH02-13 CRAH-DH03-13 CRAH-DH03-13
(OPERANTE) (OPERANTE) (OPERANTE) (OPERANTE) (OPERANTE) (OPERANTE) SALA DE SPRINKLERS

PDU/RPP-C.1-2.2

PDU/RPP-C.1-2.4

PDU/RPP-C.2-3.2

PDU/RPP-C.2-3.4
(OPERANT) (OPERANT) (OPERANT) (OPERANT) (OPERANT) (OPERANT) SPRINKLERS ROOM

PDU/RPP-C-1.2

PDU/RPP-C-1.4
9.00m²
S.A.P S.A.P S.A.P

1.28

1.28
-1,00 (P.A)
ESCRITÓRIO CLIENTE 01
CUSTOMER OFFICE 01 593,20 (CT)
S.A.P S.A.P S.A.P
331.67m² P
CRAH-DH01-14 CRAH-DH02-14 CRAH-DH03-14

TETO VENTILADO

ODALITNEV OTET

TETO VENTILADO

ODALITNEV OTET

TETO VENTILADO

ODALITNEV OTET
+0,00 (P.A) CRAH-DH01-14 CRAH-DH02-14 CRAH-DH03-14 4
(OPERANTE) (OPERANTE) (OPERANTE) (OPERANTE) (OPERANTE) (OPERANTE)

TETO VENTILADO

ODALITNEV OTET

TETO VENTILADO

ODALITNEV OTET

TETO VENTILADO

ODALITNEV OTET
(OPERANT) (OPERANT) (OPERANT) (OPERANT) (OPERANT) (OPERANT)
S.A.P S.A.P S.A.P

1.28
CASA DE BOMBAS

1.28
PUMP HOUSE
S.A.P S.A.P S.A.P

PDU/RPP-D.1-2.2

PDU/RPP-D.1-2.4

PDU/RPP-D.2-3.2

PDU/RPP-D.2-3.4
9.00m²

PDU/RPP-D-1.2

PDU/RPP-D-1.4
CRAH-DH01-15 CRAH-DH01-15 CRAH-DH02-15 CRAH-DH02-15 CRAH-DH03-15 CRAH-DH03-15 -1,00 (P.A)
(OPERANTE) (OPERANTE) (OPERANTE) (OPERANTE) (OPERANTE) (OPERANTE) 593,20 (CT)
(OPERANT) (OPERANT) (OPERANT) (OPERANT) (OPERANT) (OPERANT) P
4
S.A.P S.A.P S.A.P

1.28
ESCADA MÓVEL /

1.28
TETO VENTILADO

ODALITNEV OTET

TETO VENTILADO

ODALITNEV OTET

TETO VENTILADO

ODALITNEV OTET
MOVING STAIR
S.A.P S.A.P S.A.P

TETO VENTILADO

ODALITNEV OTET

TETO VENTILADO

ODALITNEV OTET

TETO VENTILADO

ODALITNEV OTET

1.00
CRAH-DH01-16 CRAH-DH01-16 CRAH-DH02-16 CRAH-DH02-16 CRAH-DH03-16 CRAH-DH03-16
(OPERANTE) (OPERANTE) (OPERANTE) (OPERANTE) (OPERANTE) (OPERANTE)
(OPERANT) (OPERANT) (OPERANT) (OPERANT) (OPERANT) (OPERANT)

PDU/RPP-E.1-2.2

PDU/RPP-E.1-2.4

PDU/RPP-E.2-3.2

PDU/RPP-E.2-3.4
PDU/RPP-E-1.2

PDU/RPP-E-1.4
S.A.P S.A.P S.A.P

1.28

1.28
S.A.P S.A.P S.A.P
CRAH-DH01-17 CRAH-DH01-17 CRAH-DH02-17 CRAH-DH02-17 CRAH-DH03-17 CRAH-DH03-17 RESERVATÓRIO
(OPERANTE) (OPERANTE) (OPERANTE) (OPERANTE) (OPERANTE) (OPERANTE) WATER TANK

TETO VENTILADO

ODALITNEV OTET

TETO VENTILADO

ODALITNEV OTET

TETO VENTILADO

ODALITNEV OTET
(OPERANT) (OPERANT) (OPERANT) (OPERANT) (OPERANT) (OPERANT)

TETO VENTILADO

ODALITNEV OTET

TETO VENTILADO

ODALITNEV OTET

TETO VENTILADO

ODALITNEV OTET
S.A.P S.A.P S.A.P

1.28

1.28
S.A.P S.A.P S.A.P
CRAH-DH01-18 CRAH-DH01-18 CRAH-DH02-18 CRAH-DH02-18 CRAH-DH03-18 CRAH-DH03-18
(OPERANTE) (OPERANTE) (OPERANTE) (OPERANTE) (OPERANTE) (OPERANTE)
(OPERANT) (OPERANT) (OPERANT) (OPERANT) (OPERANT) (OPERANT)
S.A.P S.A.P S.A.P

1.28

1.28
S.A.P S.A.P S.A.P
CRAH-DH01-19 CRAH-DH01-19 CRAH-DH02-19 CRAH-DH02-19 CRAH-DH03-19 CRAH-DH03-19
(OPERANTE) (OPERANTE) (OPERANTE) (OPERANTE) (OPERANTE) (OPERANTE)
(OPERANT) (OPERANT) (OPERANT) (OPERANT) (OPERANT) (OPERANT)

.79

.73
S.A.P S.A.P S.A.P

ESCADA MÓVEL /
MOVING STAIR
CORRE

.72

.60
URC-1
.54 URC-2 URC-4 URC-5 URC-6 URC-7 URC-9 URC-10 WC FEM. URC-11 URC-12 URC-14 URC-15
FEMALE WC

FRENTE/FRONT

FRENTE/FRONT

FRENTE/FRONT

FRENTE/FRONT

FRENTE/FRONT

FRENTE/FRONT

FRENTE/FRONT

FRENTE/FRONT

FRENTE/FRONT

FRENTE/FRONT

FRENTE/FRONT

FRENTE/FRONT
COPA 10.99m²

BATERY

BATERY

BATERY

BATERY

BATERY

BATERY

BATERY

BATERY

BATERY

BATERY

BATERY

BATERY
HALL KITCHEN DML +0,00 (P.A)
UPS-A-1.1 UPS-B-1.1 UPS-D-1.1 UPS-E-1.1 UPS-A.1-2.1 UPS-B.1-2.1 UPS-D.1-2.1 UPS-E.1-2.1 UPS-A.2-3.1 UPS-B.2-3.1 UPS-D.2-3.1 UPS-E.2-3.1 s
9.75m²
WC FEM. 6.73m² WC MASC. FRENTE/FRONT FRENTE/FRONT
UE-AR01-01 UE-AR01-02 FRENTE/FRONT FRENTE/FRONT
+0,00 (P.A)
FRENTE/FRONT FRENTE/FRONT
UE-AR01-01 UE-AR01-02 FRENTE/FRONT FRENTE/FRONT 5.83m² WC MASC.
FRENTE/FRONT FRENTE/FRONT
UE-AR01-01 UE-AR01-02 FRENTE/FRONT FRENTE/FRONT
CABINETS

CABINETS
(OPERANTE) (OPERANTE) (OPERANTE)
AM 12P

AM 12P
FEMALE WC +0,00 (P.A) MALE WC (OPERANTE) (OPERANTE) +0,00 (P.A) MALE WC (OPERANTE)

1.33
10.99m² 10.99m² (OPERANT) (OPERANT) (OPERANT) (OPERANT) 10.99m² (OPERANT) (OPERANT)
+0,00 (P.A)
(OPERANTE)

+0,00 (P.A) +0,00 (P.A)


UE-CLB-02
UE-CLB-01

(RESERVA)
(OPERANT)

(BACKUP)

QGBT-AIR-ROOM-1

QGBT-AIR-ROOM-2

QGBT-AIR-ROOM-3
CORE LINK A SALA DE AR 01 SALA DE AR 02 SALA DE AR 03

FRENTE/FRONT

FRENTE/FRONT

FRENTE/FRONT

FRENTE/FRONT

FRENTE/FRONT

FRENTE/FRONT

FRENTE/FRONT

FRENTE/FRONT

FRENTE/FRONT

FRENTE/FRONT

FRENTE/FRONT

FRENTE/FRONT
PNE UNISSEX .60 FRENTE/FRONT FRENTE/FRONT AIR ROOM 01 FRENTE/FRONT FRENTE/FRONT FRENTE/FRONT FRENTE/FRONT AIR ROOM 02 FRENTE/FRONT FRENTE/FRONT FRENTE/FRONT FRENTE/FRONT AIR ROOM 03 FRENTE/FRONT FRENTE/FRONT

BATERY

BATERY

BATERY

BATERY

BATERY

BATERY

BATERY

BATERY

BATERY

BATERY

BATERY

BATERY
UPS-A-1.2 UPS-B-1.2 UPS-D-1.2 UPS-E-1.2 UPS-A.1-2.2 UPS-B.1-2.2 UPS-D.1-2.2 UPS-E.1-2.2 UPS-A.2-3.2 UPS-B.2-3.2 UPS-D.2-3.2 UPS-E.2-3.2
101.69m² 121.94m² 121.94m² 121.94m²
5.39m² 1 2 3 1 2 3
+0,00 (P.A) +0,00 (P.A) +0,00 (P.A) +0,00 (P.A)
+0,00 (P.A) CORE LINK B
593,00

.77
SALA BUS A SALA BUS B SALA BUS D SALA BUS E SALA BUS A SALA BUS B SALA BUS D SALA BUS E SALA BUS A SALA BUS B SALA BUS D SALA BUS E

QB-D.1-BOMBA-5

QB-D.2-BOMBA-8
QB-D-BOMBA-2
QB-B-BOMBA-1
APERTE

101.70m²
A BUS ROOM B BUS ROOM D BUS ROOM E BUS ROOM A BUS ROOM B BUS ROOM D BUS ROOM E BUS ROOM A BUS ROOM B BUS ROOM D BUS ROOM E BUS ROOM

(OPERANTE)

UE-CLB-02
UE-CLB-01
5 6 5 6

(RESERVA)
4 4

(OPERANT)
+0,00 (P.A)

(BACKUP)
113.07m² Q-AR-CHILLER- 113.07m² UE-AR01-03 UE-AR01-04 113.07m² 113.07m² 113.07m² Q-AR-CHILLER- 113.07m² UE-AR01-03 UE-AR01-04 113.07m² 113.07m² 113.07m² Q-AR-CHILLER- 113.07m² UE-AR01-03 UE-AR01-04 113.07m² 113.07m²

RPP-D-MMR-B
A-RL-1 (RESERVA) A.1-RL-5 (RESERVA) A.2-RL-8 (RESERVA)
120x50

+0,00 (P.A) +0,00 (P.A) (OPERANTE) +0,00 (P.A) +0,00 (P.A) +0,00 (P.A) +0,00 (P.A) (OPERANTE) +0,00 (P.A) +0,00 (P.A) +0,00 (P.A) +0,00 (P.A) (OPERANTE) +0,00 (P.A) +0,00 (P.A)
RPP-D-MMR-A

WATER

QB-D-BOMBA-3
COFFE

QB-B-BOMBA-4
.42
COZINHA E DESCOMPRESSÃO (OPERANT) (BACKUP) (OPERANT) (BACKUP) (OPERANT) (BACKUP)
KITCHEN AND DECOMPRESSION 7 8 9 7 8 9
ERROC

28.87m²
REFRIGERATOR

RPP-B-MMR-B
+0,00 (P.A)
RPP-B-MMR-A

Q-AR-CHILLER- Q-AR-CHILLER- Q-AR-CHILLER- Q-AR-CHILLER-


B-RL-2 D-RL-4 B.1-RL-6 B.2-RL-9
WET AREA

DML
WET AREA

10 11 12 10 11 12
TR-A-1.1 TR-B-1.1 TR-D-1.1 TR-E-1.1 TR-A.1-2.1 TR-B.1-2.1 TR-D.1-2.1 TR-E.1-2.1 TR-A.2-3.1 TR-B.2-3.1 TR-D.2-3.1 TR-E.2-3.1
SINK
SINK

101.69m²
.80

UPS-C.1-2.1

UPS-C.2-3.1
+0,00 (P.A)

UPS-C.1-2.2

UPS-C.2-3.2
FRENTE/FRONT

FRENTE/FRONT

FRENTE/FRONT

FRENTE/FRONT

FRENTE/FRONT

FRENTE/FRONT
UPS-C-1.1
13 14 15 13 14 15

UPS-C-1.2
DRY AREA

1.60
MICRO

120x80

120x80

595

QGBT-PDU-D-1
QGBT-PDU-B-1
TR-C-1.1 TR-C.1-2.1 TR-C.2-3.1
QGBT-ADM

QGBT-C.1-2.1

QGBT-C.2-3.1
16 17 18 16 17 18
RAMPA/RAMP i = 10%

QGBT-C-1.1
80x50

1.33
1,40X0,80m

1,40X0,80m

QGBT-D.1-2.1

QGBT-D.2-3.1
QGBT-A.1-2.1

QGBT-B.1-2.1

QGBT-E.1-2.1

QGBT-A.2-3.1

QGBT-B.2-3.1

QGBT-E.2-3.1
TV
80x50

QGBT-D-1.1
19 20 19 20
QGBT-A-1.1

QGBT-B-1.1

QGBT-E-1.1
21 21

FRENTE/FRONT

FRENTE/FRONT

FRENTE/FRONT
SALA BUS C SALA BUS C SALA BUS C

BATERY

BATERY

BATERY
FRENTE/FRONT

FRENTE/FRONT

FRENTE/FRONT
QD-UPS-C.1-2.1

QD-UPS-C.2-3.1
BATERY

BATERY

BATERY
C BUS ROOM C BUS ROOM C BUS ROOM
CG1

CG1

QD-UPS-C-1.1
80x50

121.94m² 121.94m² 121.94m²


TV

QD-UPS-D.1-2.1

QD-UPS-D.2-3.1
QD-UPS-A.1-2.1

QD-UPS-B.1-2.1

QD-UPS-E.1-2.1

QD-UPS-A.2-3.1

QD-UPS-B.2-3.1

QD-UPS-E.2-3.1
1,40X0,80m

1,40X0,80m

+0,00 (P.A) +0,00 (P.A) +0,00 (P.A)

QD-UPS-D-1.1
QD-UPS-A-1.1

QD-UPS-B-1.1

QD-UPS-E-1.1
80x50
TV
CG1

CG1

DOCA DOCA 02

.56
80x50
1,40X0,80m

1,40X0,80m

DOCK DOCK 02
95.02m² 94.57m²
TV

Q-AR-CHILLER- +0,00 (P.A) Q-AR-CHILLER- +0,00 (P.A) Q-AR-CHILLER-


80x50

C-RL-3 C.1-RL-7 C.2-RL-10


CG1

CG1

QB-C.1-BOMBA-6

QB-C.2-BOMBA-9
A

1,40X0,80m

1,40X0,80m

TV
80x50

QB-C.2-BOMBA-10
URC

QB-C.1-BOMBA-7
80x50
CG1

CG1

.60
TV

.66

.60
1,40X0,80m

1,40X0,80m

.14
QT-ATS-UPS-A-1.1 QT-ATS-UPS-B-1.1 QGBT-ILUMINAÇÃO QT-ATS-UPS-C-1.1 QT-ATS-UPS-D-1.1 QT-ATS-UPS-E-1.1 QT-ATS-UPS-A.1-2.1 QT-ATS-UPS-B.1-2.1 QT-ATS-UPS-C.1-2.1 QT-ATS-UPS-D.1-2.1 QT-ATS-UPS-E.1-2.1 QT-ATS-UPS-A.2-3.1 QT-ATS-UPS-B.2-3.1 QT-ATS-UPS-C.2-3.1 QT-ATS-UPS-D.2-3.1 QT-ATS-UPS-E.2-3.1
BMS E ESCRITÓRIO PMT-TRANSFER- PMT-TRANSFER- PMT-TRANSFER- PMT-TRANSFER- PMT-TRANSFER- PMT-TRANSFER- PMT-TRANSFER- PMT-TRANSFER- PMT-TRANSFER- PMT-TRANSFER- PMT-TRANSFER- PMT-TRANSFER- PMT-TRANSFER- PMT-TRANSFER- PMT-TRANSFER-
BMS AND OFFICE A-1.1 B-1.1 C-1.1 D-1.1 E-1.1 A.1-2.1 B.1-2.1 C.1-2.1 D.1-2.1 E.1-2.1 A.2-3.1 B.2-3.1 C.2-3.1 D.2-3.1 E.2-3.1
28.87m² URC-3 URC URC-8 URC-13

+0,00 (P.A)
ERROC

1,60x0,80m
s

s
5 5
ARMAZÉN ASCENTY 01 ESCADA MÓVEL / ESCADA MÓVEL / ESCADA MÓVEL / ESCADA MÓVEL / ESCADA MÓVEL / 4
ESCADA MÓVEL / ESCADA MÓVEL / ESCADA MÓVEL / ESCADA MÓVEL / ESCADA MÓVEL / 4
ESCADA MÓVEL / ESCADA MÓVEL / ESCADA MÓVEL / ESCADA MÓVEL /
ASCENTY STORAGE 01 PASSA DOC. 3 CASA DE VÁLVULAS 3
MOVING STAIR MOVING STAIR CASA DE VÁLVULAS MOVING STAIR MOVING STAIR MOVING STAIR MOVING STAIR MOVING STAIR MOVING STAIR MOVING STAIR MOVING STAIR MOVING STAIR MOVING STAIR MOVING STAIR MOVING STAIR
48.34m² 2 VALVE HOUSE 2
+0,00 (P.A)
SALA DE REUNIÃO 1.30 VALVE HOUSE
2.28m² 2.65 1
s 1.52 2.28m²
-1,00 (P.A)
3.83 2.65 1
s CASA DE VÁLVULAS
2.65
MEETING ROOM -1,00 (P.A) VALVE HOUSE
593,20 (CT)
28.87m²
593,20 (CT)
02. 02. 1.14m²
RECEPÇÃO -1,00 (P.A)
FRONT DESK +0,00 (P.A) 593,20 (CT)
TV

45.17m²
+0,00 (P.A) 3.70
TV

NIVELADORA/LEVELER NIVELADORA/LEVELER

QDCA-2 QDCA-1 QDCA-3 QDCA-4


APERTE
C2 C1

C2 C1
PNE UNISSEX
COFFE
11
12
13
14
15
16
17
18
19
.17s

WATER

4.63m²
C3

C3
B B +0,00 (P.A)
10

1
9
8
7
6
5
4
3
2

MURO/ WALL H = 3,00m


C4

C4
A

4.15
C5

C5
595
C6

C6
RAMPA/RAMP i= 8,33 %

RAMPA/RAMP i= 8,33 %
5
4 PROJEÇÃO DA COBERTURA
5.15
C7

C7
3 ROOF PROJECTION
2
C8

C8
1
s

.20
C9

C9
DEPOSÍTO DE RESÍDUOS
GR-UPS-A-1.1 GR-UPS-B-1.1 GR-UPS-C-1.1 GR-UPS-D-1.1 GR-UPS-E-1.1 GR-UPS-A.1-2.1 GR-UPS-B.1-2.1 GR-UPS-C.1-2.1 GR-UPS-D.1-2.1 GR-UPS-E.1-2.1 GR-UPS-A.2-3.1 GR-UPS-B.2-3.1 WASTE DEPOSIT GR-UPS-C.2-3.1 GR-UPS-D.2-3.1 GR-UPS-E.2-3.1
C16 C15 C14 C13 C12 C11 C10

C16 C15 C14 C13 C12 C11 C10


12.00m²
-1,00 (P.A)
593,20 (CT)

s s

PMT 01 PMT 02
113.07m² 113.07m²
+0,00 (P.A) +0,00 (P.A)
UE-07 UE-07

593,00
S
PORTÃO DE CORRER PORTÃO DE CORRER
598,00 593,00

P
1
14 s
13 15
12 16 P
1
11 17
10 18 30
09 19 29 PROJEÇÃO DA COBERTURA
08 20 28 ROOF PROJECTION
07 21 27
06 22 26
05 23 25

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 19 20 21 22 23 24 25 26 27 28 29 30 31 32
04 24 s PLATAFORMA
03 ELEVATÓRIA IDOSO IDOSO IDOSO IDOSO IDOSO
02

CLIENT'S PARKING SPACE

CLIENT'S PARKING SPACE

CLIENT'S PARKING SPACE

CLIENT'S PARKING SPACE


CLIENT'S PARKING SPACE

CLIENT'S PARKING SPACE

CLIENT'S PARKING SPACE

CLIENT'S PARKING SPACE

CLIENT'S PARKING SPACE

CLIENT'S PARKING SPACE

CLIENT'S PARKING SPACE

CLIENT'S PARKING SPACE

CLIENT'S PARKING SPACE

CLIENT'S PARKING SPACE

CLIENT'S PARKING SPACE

CLIENT'S PARKING SPACE


01
VAGA DO CLIENTE

VAGA DO CLIENTE

VAGA DO CLIENTE

VAGA DO CLIENTE

VAGA DO CLIENTE

VAGA DO CLIENTE

VAGA DO CLIENTE

VAGA DO CLIENTE

VAGA DO CLIENTE

VAGA DO CLIENTE

VAGA DO CLIENTE

VAGA DO CLIENTE

VAGA DO CLIENTE

VAGA DO CLIENTE

VAGA DO CLIENTE

VAGA DO CLIENTE
D IDOSO IDOSO IDOSO IDOSO IDOSO
ELDERLY ELDERLY ELDERLY ELDERLY ELDERLY

IN HOLD

COMANDO-02
COMMAND HOUSE-02

CASA DE
SPDA
AGUARDANDO DEFINIÇÃO PARA

RACK
PORTARIA

QDCA-02
SPDA
WAITING FOR DEFINITION FOR ORDER

COMANDO-01
COMMAND HOUSE-01

CASA DE
CUB.5

QDL-01

QDCC-03
P

CUB.4
1

QDCC-04
UTR
CUB.3
CABINET

UE-03

PSPC
CUB.2
REFRIGERATOR

CUB.1

01
595
APERTE

UC-03
UC-03 PM
2
Brastemp (BMS45)
32 L

Microwave

598,00

RACK 10
Water

bms/cftv
RACK 11
bms/cftv

X0

X0

X0
VRA-01
33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48

X0

4800

4800
X1

X1

X1
PMF

X1
P

X2

X2

X2
H2 H2

X2
H2

UE-05
H2
1
TOTEM
H3 H1 H3 H1 H3 H1

X3

X3
H1

X3
H3

X3
RACK 12

210

210
P UE-04
bms/cftv
1

ESTACIONAMENTO 69 VAGAS
PSA-CA
UC-04 593,00 IL. EXTERNA
QLT-15

598,00 7330 7330


PARKING 69 SPACES

B1
B2
UC-05

B3
B4
B5
UC-05

B1
B2
B3
B4
B5

future bay
bay futuro
MURO/WALL H = 3,00m/

future
futuro
PORTARIA/ORDER 49 50 51 53 54 55 56 57 58 59 60

SO
LY

O
ER

ID
D
EL

AREA DOADA PARA RUAS PUBLICAS CONFORME 1 2 3 4 5 6 7 8 9 10 11 12


593,00

COMMAND HOUSE-03
COMANDO-03
CASA DE
PLANO DIRETOR A PFM SUMARE - ACESSO À SUMARÉ 03 12 VAGAS PARA VISITANTES
ACCESS TO SUMARÉ 03 12 SEATS FOR VISITORS 69
ÁREA:22.732,00m² 598,00

future
futuro
MU
RO
VIA MARGINAL E VIAS COLETORAS 40-41-51

future
futuro
/W
AL
68 67 66 65 64 63 62 61
AREA DONATED FOR PUBLIC STREETS LH
=
3,0
ACCORDING TO PFM SUMARE MASTER VAGA CARRETA
TRUCK VACANCY VAGA CARRETA
0m
TRUCK VACANCY 595
PLAN - AREA: 22,732.00m²
MARGINAL ROAD AND COLLECTOR ROADS 598,00 futuro
40-41-51 future

SPDA
REV DATA/ date DESCRIÇÃO/ description REV. Revised APR. Approved:

SPDA
CASA DE
COMANDO-04
COMMAND HOUSE-04
futuro
future

CALÇA 595

DA/SID
EWAL
K (L=2
,50m)
R00 12/12/2023 INICIAL EMISSION / EMISSÃO INICIAL CAMILA RODRIGO H.

MURO
/WALL
H = 3,0
0m

VIA MA
A

1 PLANTA DE LAYOUT
LAYOUT PLAN
ESCALA 1:250
Telha a definir/ Roof to be defined

PERFILADO
Telha a definir/ Roof to be defined

PERFILADO
RGINA
L
SUMARÉ 03
ARQUIVO
/ FILE ARQ 003 R00
3.90

3.90

ROLL FORMING ROLL FORMING

ARMAZÉM ASCENTY MENDES HOLLER ENGENHARIA E COMÉRCIO LTDA.


ASCENTY STORAGE
ARMAZÉM ASCENTY ARMAZÉM ASCENTY AVENIDA DAS NAÇÕES UNIDAS, Nº 19.561
ASCENTY STORAGE ASCENTY STORAGE
JARDIM PROMISSÃO - SÃO PAULO/SP
3,40 3,40 FONE: (11) 5687-8133
E-MAIL: mendesholler@mendesholler.com.br
.23

.23

PERFILADO
PERFILADO ROLL FORMING
ROLL FORMING
LOCAL/PLACE: FASE/PHASE:
3.17

3.17

ARMAZÉM ASCENTY
D

ESTUDO
ASCENTY STORAGE

SUMARÉ 03
0,00 0,00 STUDY
B B
CONTEÚDO/CONTENT: ARQUITETOS/ARCHITECTS: QR CODE
PLANTA DE LAYOUT-
A

2 PLANTA 1° PAVIMENTO ARMAZÉM ASCENTY


ASCENTY STORAGE 1st FLOOR PLAN
ESCALA 1:50
3 CORTE A
SECTION A
ESCALA 1:50 4 CORTE B
SECTION B
ESCALA 1:50

OPÇÃO 18 MW CARMEN BIRINDELLI


LAYOUT PLANT - 18 MW OPTION
1189x841

ESCALA/SCALE: DATA/DATE:
INDICADA/INDICATED 27/10/2023

Você também pode gostar