HOJA DE METRADOS

OBRA: FABRICA DE ESPUMA PLANO REF:

PARTIDA: HECHO POR:

FECHA:
UN N° DIMENSIONES PARCIA
ITEM DESCRIPCION D VECES CANT. L TOTAL
LONG. ANCHO ALTURA

EXCAVACION

Z1 M3 1 1 1.8 1.8 1.3 4.212

Z2 M3 1 1 3.6 1.4 1.3 6.552

Z3 M3 1 1 1.3 1.3 1.3 2.197

Z4 M3 1 1 1.5 1.4 1.3 2.73

Z5 M3 1 1 3.3 0.7 1.3 3.003

18.69

RELLENO

Z1 M3 1 1 1.8 1.8 0.6 1.784

Z2 M3 1 1 3.6 1.4 0.6 2.424

Z3 M3 1 1 1.3 1.3 0.6 0.854

Z4 M3 1 1 1.5 1.4 0.6 1.1

Z5 M3 1 1 3.3 0.7 0.6 0.786

6.95

SOLADO

Z1 M3 1 1 1.8 1.8 0.1 0.324

Z2 M3 1 1 3.6 1.4 0.1 0.504

Z3 M3 1 1 1.3 1.3 0.1 0.169

Z4 M3 1 1 1.5 1.4 0.1 0.21

Z5 M3 1 1 3.3 0.7 0.1 0.231

1.44

FALSO PISO

EJE A-C DE 1-3 M2 1 1 10.42 11.81 1 123.0602


EJE B-C DE 3-5 M2 1 1 10 5.75 1 57.5

180.56
Velim=Vexc(1+E) esponjamiento:30%

E 1.3 Vexc 11.75


Velim (m3) 15.27
METRADO DE ESTRUCTURAS
PARTIDA FABRICA DE ESPUMA

ELEMENTO ACERO DE REFUERZO


FIERRO EN C/ELEMENTO LONGITUD TOTAL
DENOMINACION DIAM. N° VEC CANT. LONG. C/DIAM. 6mm 1/4 3/8 1/2 5/8 3/4
ZAPATAS
Z1
LONGITUDINAL 1 5/8 1 10 1.65 16.50
LONGITUDINAL 2 5/8 1 10 1.65 16.50
Z2
LONGITUDINAL 1 5/8 1 8 2.35 18.80
LONGITUDINAL 1 5/8 1 5 1.25 6.25
LONGITUDINAL 2 5/8 1 8 2.35 18.80
LONGITUDINAL 2 5/8 1 5 1.25 6.25
Z3
LONGITUDINAL 1 5/8 1 6 1.15 6.90
LONGITUDINAL 2 5/8 1 6 1.15 6.90
Z4
LONGITUDINAL 1 5/8 1 8 1.35 10.80
LONGITUDINAL 2 5/8 1 8 1.25 10.00
Z5
LONGITUDINAL 1 5/8 1 4 1.85 7.40
LONGITUDINAL 1 5/8 1 7 0.55 3.85
LONGITUDINAL 2 5/8 1 4 1.85 7.40
LONGITUDINAL 2 5/8 1 7 0.55 3.85
COLUMNAS
C1 1ER PISO
LONGITUDINAL 1 3/4 4 4 5.90 94.40
LONGITUDINAL 2 5/8 4 8 5.40 172.80
ESTRIBO 3/8 4 45 1.60 288.00
C2 1ER PISO
LONGITUDINAL 1 5/8 1 12 5.90 70.80
ESTRIBO 3/8 1 45 1.60 72.00
ALIGERADO
PAÑO 1 AL_25cm
ACERO NEGATIVO

3/8 13 2 1.45 37.70

3/8 13 3 3.50 136.50


ACERO POSITIVO
1/2 13 1 24.00 312.00
3/8 13 4 3.25 169.00
TEMPERATURA 1/4 42 1 12.66 531.72
PAÑO 2 AL_25cm
ACERO NEGATIVO
3/8 14 2 1.45 40.60
3/8 14 1 3.41 47.74
ACERO POSITIVO
1/2 14 1 10.85 151.90
3/8 14 2 3.56 99.68
TEMPERATURA 1/4 40 1 6.48 259.20
PLACAS
PLACA
LONGITUDINAL 1 3/8 8 26 1.90 395.20
LONGITUDINAL 2 3/8 8 5 5.90 236.00
ELEMENTO DE BORDE
LONGITUDINAL 1 1/2 4 6 5.90 141.60
ESTRIBO 3/8 4 30 0.90 108.00

VIGAS
VP
3/4 10 2 1.72 34.40
5/8 4 1 1.72 6.88
3/4 3 2 4.00 24.00
1/2 6 1 5.52 33.12
5/8 2 1 4.51 9.02
LONGITUDINAL 1 5/8 3 4 12.60 151.20
LONGITUDINAL 1 5/8 2 4 6.55 52.40
ESTRIBO 1 3/8 3 77 1.60 369.60
ESTRIBO 2 3/8 2 40 1.60 128.00
VS

5/8 4 1 1.65 6.60


1/2 2 1 1.65 3.30
5/8 1 1 3.55 3.55
1/2 6 1 3.53 21.18
LONGITUDINAL 1 5/8 2 4 21.22 169.76
LONGITUDINAL 1 5/8 1 4 11.22 44.88
ESTRIBO 1 3/8 2 140 1.30 364.00
ESTRIBO 2 3/8 1 35 1.30 45.50

m 790.92 2537.52 663.10 828.09 152.80


PESO ACEROS AREQUIPA S.A. kg/m 0.22 0.40 0.56 0.99 1.55 2.24
Total 0.00 312.41 1421.01 659.12 1285.20 341.51
Cantidad de varillas 0.00 87.88 281.95 73.68 92.01 16.98

DIAMETRO TOTAL KG
1/4 3/8 1/2 5/8 3/4 1/4 3/8 1/2 5/8 3/4
ZAPATAS 0.00 0.00 0.00 140.20 0.00 0.00 0.00 0.00 217.59 0.00
COLUMNAS 0.00 360.00 0.00 243.60 94.40 0.00 201.60 0.00 378.07 210.98
ALIGERADO 790.92 531.22 463.90 0.00 0.00 312.41 297.48 461.12 0.00 0.00
PLACAS 0.00 739.20 141.60 0.00 0.00 0.00 413.95 140.75 0.00 0.00
VIGAS 0.00 907.10 57.60 444.29 58.40 0.00 507.98 57.25 689.54 130.52
TOTAL
PROYECTO:

OBRA:
FECHA: HOJA No: DE:
HECHO POR: CRISTIAN MARCAS SEDANO No PLANO

CONCRETO ENCOFRADO
DIMENSIONES N° VOLUMEN DIMENSIONES N° N° AREA
1 LONG. ANCHO ALTURA VECES m3 LONG. ANCHO CARAS VECES m2

1.80 1.80 0.60 1 1.944

3.60 1.40 0.60 1 3.024

1.30 1.30 0.60 1 1.014

1.50 1.40 0.60 1 1.260

3.30 0.70 0.60 1 1.386

4.00 0.40 0.40 4 2.560 0.40 4.00 4.00 4 25.60

4.00 0.40 0.40 1 0.640 0.40 4.00 4.00 1 6.40

19.02 0.10 0.20 13 4.945 19.02 5.43 1.00 1 103.28


19.02 5.88 0.05 1 5.592

9.67 0.10 0.20 14 2.708 9.67 5.81 1.00 1 56.18


9.67 5.81 0.05 1 2.809

1.10 0.20 4.25 4 3.740 2.40 4.00 1.00 4 38.40

12.01 0.30 0.50 3 5.405 12.80 0.50 6.00 1 38.40


5.95 0.30 0.50 2 1.785 12.80 0.30 3.00 1 11.52
5.88 0.50 4.00 1 11.76
5.88 0.30 2.00 1 3.53

20.62 0.25 0.40 2 4.124 20.62 0.40 4.00 1 32.99

10.62 0.25 0.40 1 1.062 20.62 0.25 2.00 1 10.31


10.62 0.40 2.00 1 8.50
10.62 0.25 1.00 1 2.66

0.00 43.997 349.52


3.97
0.00 4,019
0.00

SUMA KG CONCRETO ENCOFRADO LADRILLO (UND)


ZAPATAS 8.63 M3 0.000 M2
217.59 COLUMNAS 3.200 M3 32.000 M2
790.65 ALIGERADO 16.054 M3 159.461 M2 1328.312629
1071.01 PLACAS 3.740 M3 38.400 M2
554.70 VIGAS 12.376 M3 119.661 M2
1385.29 TOTAL 43.997 M3 349.522 M2
4019.25
HOJA DE RESUMEN
FECHA:

PROYECTO : HECHO POR:CRISTIAN MARCAS SEDA

CLIENTE:

ITEM DESCRIPCION UND METRADO

1 EXCAVACIÓN DE ZANJAS PARA CIMIENTO M3 18.69

2 Eliminación de material M3 15.27

3 CONCRETO PARA CIMIENTO 1:10 + 30% DE PG M3 #REF!

4 CONCRETO PARA SOBRE CIMIENTO 1:8 + 25% de PM M3 #REF!

ENCOFRADO Y DESENCOFRADO EN SOBRECIMIENTO M2 #REF!

8 ASENTADO DE LADRILLO KK 18HH SOGA M2 #REF!

9 TARRAJEO DE PARED e=2cm M2 #REF!

TARRAJEO DE DE COLUMNAS(ARISTAS) e=2cm M2 #REF!

5 CONCRETO EN COLUMNA FC=210KG/CM2 M3 44.00

6 ENCOFRADO Y DESENCOFRADO EN COLUMNAS M2 349.52

7 ACERO EN COLUMNAS FY=4200KG/CM2 KG 4019.25

386982600.xlsResumen 10
HOJA DE RESUMEN
FECHA:

PROYECTO : HECHO POR:CRISTIAN MARCAS SEDA

CLIENTE:

ITEM DESCRIPCION UND METRADO

386982600.xlsResumen 11
HECHO POR:CRISTIAN MARCAS SEDANO

386982600.xlsResumen 12

Você também pode gostar