Escolar Documentos
Profissional Documentos
Cultura Documentos
M1 - Massa total da amostra (0,1 g) : 3775.0 M1 - Massa total da amostra (0,1 g) : 3401.0
M2 - Massa da amostra após lavagem (0,1 g) : 3771.0 M2 - Massa da amostra após lavagem (0,1 g) : 3398.0
M3 - Massa que passa 0,075mm (1g) 0.4 M3 - Massa que passa 0,075mm (1g) 0.2
37.5 0.0 0.0 0.0 100.0 37.5 0.0 0.0 0.0 100.0 100.0
26.5 0.0 0.0 0.0 100.0 26.5 0.0 0.0 0.0 100.0 100.0
13.2 2715.0 71.9 84.3 15.7 13.2 2430.0 71.4 83.7 16.3 16.0
9.5 537.0 14.2 98.5 1.5 9.5 534.0 15.7 99.4 0.6 1.1
Material que Passa (%)
6.7 45.2 1.2 99.7 0.3 6.7 12.5 0.4 99.8 0.2 0.3
4.75 100 0.6 0.0 99.7 0.3 4.75 0.3 0.0 99.8 0.2 0.3
2.36 1.5 0.0 99.7 0.3 2.36 0.9 0.0 99.8 0.2 0.2
90
1.18 0.8 0.0 99.8 0.2 1.18 0.6 0.0 99.8 0.2 0.2
0.6 80 0.6 0.0 99.8 0.2 0.6 0.5 0.0 99.8 0.2 0.2
0.425 0.3 0.0 99.8 0.2 0.425 0.2 0.0 99.8 0.2 0.2
70
0.3 0.4 0.0 99.8 0.2 0.3 0.3 0.0 99.8 0.2 0.2
0.15 60 0.8 0.0 99.8 0.2 0.15 0.5 0.0 99.8 0.2 0.2
0.075 0.7 0.0 99.8 0.2 0.075 0.4 0.0 99.9 0.1 0.2
50
FUNDO 4.36 0.1 100.0 FUNDO 3.21 0.1 100.0
40
30
20
10
0
6,7 9,5 13,2 19,0 26,5 37,5 53,0 75,0
16
15
14
13
12
11
10
Aberturas (mm)
OBSERVAÇÕES:
Mod.LAB.BM.02.02
LABORATÓRIO TMH 1
Betumes Misturas Betuminosas METHOD
Análise Granulométrica dos B4
PROCESSO: Agregados
PROC_652_LAB_2020(037)_INZAG_CUCHI(MIX-DESIGNER-BETUMINOSO) BOLETIN Nº: 4825 _02 _02
(SATCC)
PROJECTO / OBRA: REABILITAÇÃO DA EN 280 ENTRE CUCHI-CUTATO CLIENTE: INZAG
M1 - Massa total da amostra (0,1 g) : 2257.0 M1 - Massa total da amostra (0,1 g) : 2141.0
M2 - Massa da amostra após lavagem (0,1 g) : 2252.0 M2 - Massa da amostra após lavagem (0,1 g) : 2134.0
M3 - Massa que passa 0,075mm (1g) 0.6 M3 - Massa que passa 0,075mm (1g) 0.3
37.5 0.0 0.0 0.0 100.0 37.5 0.0 0.0 0.0 100.0 100.0
26.5 0.0 0.0 0.0 100.0 26.5 0.0 0.0 0.0 100.0 100.0
13.2 36.0 1.6 1.6 98.4 13.2 30.4 1.4 1.4 98.6 98.5
9.5 597.0 26.5 28.0 72.0 9.5 620.8 29.0 30.4 69.6 70.8
6.7 974.8 43.2 71.2 28.8 6.7 995.3 46.5 76.9 23.1 25.9
4.75 480.8 21.3 92.5 7.5 4.75 395.5 18.5 95.4 4.6 6.0
2.36 135.4 6.0 98.5 1.5 2.36 87.8 4.1 99.5 0.5 1.0
1.18 9.5 0.4 99.0 1.0 1.18 0.8 0.0 99.5 0.5 0.8
0.6 10.1 0.4 99.4 0.6 0.6 0.2 0.0 99.5 0.5 0.5
0.425 0.6 0.0 99.4 0.6 0.425 0.1 0.0 99.5 0.5 0.5
0.3 0.7 0.0 99.5 0.5 0.3 0.2 0.0 99.5 0.5 0.5
0.15 1.6 0.1 99.5 0.5 0.15 0.4 0.0 99.6 0.4 0.5
0.075 1.9 0.1 99.6 0.4 0.075 0.6 0.0 99.6 0.4 0.4
100
90
80
70
60
50
40
30
20
10
0
6,7 9,5 13,2 19,0 26,5 37,5 53,0 75,0
16
15
14
13
12
11
10
Aberturas (mm)
OBSERVAÇÕES:
Mod.LAB.BM.02.02
LABORATÓRIO TMH 1
Betumes Misturas Betuminosas METHOD
Análise Granulométrica dos B4
PROCESSO: Agregados
PROC_652_LAB_2020(037)_INZAG_CUCHI(MIX-DESIGNER-BETUMINOSO) BOLETIN Nº: 0 _02 _02
(SATCC)
PROJECTO / OBRA: REABILITAÇÃO DA EN 280 ENTRE CUCHI-CUTATO CLIENTE: INZAG
M1 - Massa total da amostra (0,1 g) : 2059.0 M1 - Massa total da amostra (0,1 g) : 2241.0
M2 - Massa da amostra após lavagem (0,1 g) : 1904.0 M2 - Massa da amostra após lavagem (0,1 g) : 2067.0
M3 - Massa que passa 0,075mm (1g) 9.1 M3 - Massa que passa 0,075mm (1g) 20.6
37.5 0.0 0.0 0.0 100.0 37.5 0.0 0.0 0.0 100.0 100.0
26.5 0.0 0.0 0.0 100.0 26.5 0.0 0.0 0.0 100.0 100.0
13.2 0.0 0.0 0.0 100.0 13.2 0.0 0.0 0.0 100.0 100.0
9.5 0.0 0.0 0.0 100.0 9.5 0.0 0.0 0.0 100.0 100.0
6.7 0.6 0.0 0.0 100.0 6.7 2.6 0.1 0.1 99.9 99.9
4.75 37.6 1.8 1.9 98.1 4.75 34.0 1.5 1.6 98.4 98.3
2.36 517.4 25.1 27.0 73.0 2.36 521.8 23.3 24.9 75.1 74.1
1.18 378.6 18.4 45.4 54.6 1.18 443.6 19.8 44.7 55.3 55.0
0.6 321.3 15.6 61.0 39.0 0.6 343.4 15.3 60.0 40.0 39.5
0.425 146.9 7.1 68.1 31.9 0.425 152.9 6.8 66.9 33.1 32.5
0.3 155.7 7.6 75.7 24.3 0.3 166.0 7.4 74.3 25.7 25.0
0.15 206.6 10.0 85.7 14.3 0.15 224.2 10.0 84.3 15.7 15.0
0.075 130.8 6.4 92.1 7.9 0.075 154.4 6.9 91.2 8.8 8.4
100
90
80
70
60
50
40
30
20
10
0
6,7 9,5 13,2 19,0 26,5 37,5 53,0 75,0
16
15
14
13
12
11
10
Aberturas (mm)
OBSERVAÇÕES:
Mod.LAB.BM.02.02
LABORATÓRIO TMH 1
Betumes Misturas Betuminosas METHOD
Análise Granulométrica dos B4
PROCESSO: Agregados
PROC_652_LAB_2020(037)_INZAG_CUCHI(MIX-DESIGNER-BETUMINOSO) BOLETIN Nº: 0 _02 _02
(SATCC)
PROJECTO / OBRA: REABILITAÇÃO DA EN 280 ENTRE CUCHI-CUTATO CLIENTE: INZAG
M1 - Massa total da amostra (0,1 g) : 1348.0 M1 - Massa total da amostra (0,1 g) : 1330.0
M2 - Massa da amostra após lavagem (0,1 g) : 1160.0 M2 - Massa da amostra após lavagem (0,1 g) : 1150.0
M3 - Massa que passa 0,075mm (1g) 6.8 M3 - Massa que passa 0,075mm (1g) 3.2
37.5 0.0 0.0 0.0 100.0 37.5 0.0 0.0 0.0 100.0 100.0
26.5 0.0 0.0 0.0 100.0 26.5 0.0 0.0 0.0 100.0 100.0
13.2 0.0 0.0 0.0 100.0 13.2 2.3 0.2 0.2 99.8 99.9
9.5 0.0 0.0 0.0 100.0 9.5 0.0 0.0 0.2 99.8 99.9
6.7 0.0 0.0 0.0 100.0 6.7 0.0 0.0 0.2 99.8 99.9
4.75 2.2 0.2 0.2 99.8 4.75 1.0 0.1 0.2 99.8 99.8
2.36 11.8 0.9 1.0 99.0 2.36 13.3 1.0 1.2 98.8 98.9
1.18 130.1 9.6 10.7 89.3 1.18 135.0 10.2 11.4 88.6 89.0
0.6 362.8 26.9 37.6 62.4 0.6 353.4 26.6 38.0 62.0 62.2
0.425 152.4 11.3 48.9 51.1 0.425 164.8 12.4 50.4 49.6 50.4
0.3 159.5 11.8 60.7 39.3 0.3 151.7 11.4 61.8 38.2 38.7
0.15 226.2 16.8 77.5 22.5 0.15 214.5 16.1 77.9 22.1 22.3
0.075 106.5 7.9 85.4 14.6 0.075 110.5 8.3 86.2 13.8 14.2
100
90
80
70
60
50
40
30
20
10
0
6,7 9,5 13,2 19,0 26,5 37,5 53,0 75,0
16
15
14
13
12
11
10
Aberturas (mm)
OBSERVAÇÕES:
Mod.LAB.BM.02.02
LABORATÓRIO TMH 1
Betumes Misturas Betuminosas METHOD
Análise Granulométrica dos B4
PROCESSO: Agregados
PROC_652_LAB_2020(037)_INZAG_CUCHI(MIX-DESIGNER-BETUMINOSO) BOLETIN Nº: 0 _02 _02
(SATCC)
PROJECTO / OBRA: REABILITAÇÃO DA EN 280 ENTRE CUCHI-CUTATO CLIENTE: INZAG
M1 - Massa total da amostra (0,1 g) : 514.0 M1 - Massa total da amostra (0,1 g) : 563.0
M2 - Massa da amostra após lavagem (0,1 g) : 71.1 M2 - Massa da amostra após lavagem (0,1 g) : 74.1
M3 - Massa que passa 0,075mm (1g) 1.4 M3 - Massa que passa 0,075mm (1g) 1.4
37.5 0.0 0.0 0.0 100.0 37.5 0.0 0.0 0.0 100.0 100.0
26.5 0.0 0.0 0.0 100.0 26.5 0.0 0.0 0.0 100.0 100.0
13.2 0.0 0.0 0.0 100.0 13.2 0.0 0.0 0.0 100.0 100.0
9.5 0.0 0.0 0.0 100.0 9.5 0.0 0.0 0.0 100.0 100.0
6.7 0.0 0.0 0.0 100.0 6.7 0.0 0.0 0.0 100.0 100.0
4.75 0.0 0.0 0.0 100.0 4.75 0.0 0.0 0.0 100.0 100.0
2.36 0.0 0.0 0.0 100.0 2.36 0.0 0.0 0.0 100.0 100.0
1.18 0.1 0.0 0.0 100.0 1.18 0.0 0.0 0.0 100.0 100.0
0.6 0.7 0.1 0.2 99.8 0.6 0.0 0.0 0.0 100.0 99.9
0.425 0.3 0.1 0.2 99.8 0.425 0.0 0.0 0.0 100.0 99.9
0.3 0.5 0.1 0.3 99.7 0.3 0.6 0.1 0.1 99.9 99.8
0.15 15.1 2.9 3.2 96.8 0.15 17.0 3.0 3.1 96.9 96.8
0.075 53.1 10.3 13.6 86.4 0.075 54.9 9.8 12.9 87.1 86.8
100
90
80
70
60
50
40
30
20
10
0
6,7 9,5 13,2 19,0 26,5 37,5 53,0 75,0
16
15
14
13
12
11
10
Aberturas (mm)
OBSERVAÇÕES:
Mod.LAB.BM.02.02
ESTUDO DA COMPOSIÇÃO DE MISTURAS BETUMINOSAS
(CÁLCULO DA COMPOSIÇÃO DA MISTURA)
Percentagens de Materiais
Fuso 100% Total Fuso
Peneiros
(µ) SATCC pPo de pedra2 AGREGADO 2 AGREGADO 1 Pó-de-Pedra Areia Filler Mistura tolerância
3" 76,200 100 100 100 100.0 100.0 100.0 100.0 100.0 100.0
2 1/2" 63,500 100 100 100 100.0 100.0 100.0 100.0 100.0 100.0
2" 50,800 100 100 100 100.0 100.0 100.0 100.0 100.0 100.0
1 1/2" 38,100 100 100 100 100.0 100.0 100.0 100.0 100.0 100.0
1" 26,500 100 100 100 100.0 100.0 100.0 100.0 100.0 100.0
3/4" 19,000 85 100 100 87.7 100.0 100.0 100.0 100.0 100.0
1/2" 13,200 71 84 100 16.0 98.5 100.0 99.9 100.0 100.0
3/8" 9,500 62 76 100 1.1 70.8 100.0 99.9 100.0 100.0
1/4" 6,700 100 0.3 25.9 99.9 99.9 100.0 100.0
4 4,750 42 60 99.7 0.3 6.0 98.3 99.8 100.0 99.7
10 2,360 30 48 64 0.2 1.0 74.1 98.9 100.0 64.0
16 1,180 22 38 28.4 0.2 0.8 55.0 89.0 100.0 28.4
30 600 16 28 17.6 0.2 0.5 39.5 62.2 100.0 17.6
40 425 13.6 0.2 0.5 32.5 50.4 100.0 13.6
50 300 12 20 10.3 0.2 0.5 25.0 38.7 99.9 10.3
100 150 8 15 5.5 0.2 0.5 15.0 22.3 96.9 5.5
200 74 4 10 3.1 0.2 0.4 8.4 14.2 87.1 3.1 1.4
Mod.LAB.BM.10.2
PROCESSO: PROC_652_LAB_2020(037)_INZAG_CUCHI(MIX-DESIGNER-BETUMINOSO)
PROJECTO / OBRA: REABILITAÇÃO DA EN 280 ENTRE CUCHI-CUTATO
TIPO DE AMOSTRA: PÓ DE PEDRA
COORDENADAS:
Nº DA AMOSTRA:
LOCAL DE COLHEITA:
APLICAÇÃO: BETÃO BETUMINOSO
100
90
80
Material que Passa (% )
100
90
80
70
60
50
40
30
20
10
0
16
14
11
15
13
12
10
OBSERVAÇÕES:
% Acumuladas
Peneiros Passadas Fuso Agregado
(Média)
M= LAT =
OORDENADAS:
P= LON=
DATA DE COLHEITA: -
DATA DE ENSAIO:
Análise Granulométrica nº 2
10
Aberturas (mm)
Mod.LAB.BM.02.02
Chart Title
AREIA
FILER GRAVILHA MURRAÇA BRITA
FINA MÉDIA GROSSA
peneiros
100
100 0
90 10
80 20
% DE MATERIAL QUE PASSA NO PENEIR0
60 40
50 50
40 60
30
70
20
80
10
90
2
0
100