Ing M Merino

PROYECTO GEOMETRICO DE UN CAMINO

CALCULO DE AREAS Y VOLUMENES

VOLUMENES
ESTACION AREAS D/2 VOLUMENES ACUMULADOS
Corte Terraplen Corte Terraplen
(+) (-) CURVA MASA

0+000.00 36.80 00.00 0 0 100,000.00


0+020.00 20.00 10.40 10.00 200.00 472.00 99,728.00
0+040.00 12.40 10.00 324.00 104.00 99,948.00
0+060.00 04.00 02.40 10.00 164.00 24.00 100,088.00
0+080.00 02.80 06.60 10.00 68.00 90.00 100,066.00
0+100.00 01.20 500.00 10.00 40.00 5066.00 95,040.00
0+120.00 80.40 10.00 12.00 5804.00 89,248.00
0+140.00 191.80 10.00 00.00 2722.00 86,526.00
0+160.00 268.40 10.00 00.00 4602.00 81,924.00
0+180.00 273.60 10.00 00.00 5420.00 76,504.00
0+200.00 355.60 10.00 00.00 6292.00 70,212.00
0+220.00 308.00 10.00 00.00 6636.00 63,576.00
0+240.00 290.80 10.00 00.00 5988.00 57,588.00
PC1 0+248.35 221.60 04.18 00.00 2141.83 55,446.17
0+260.00 84.40 05.83 00.00 1783.98 53,662.19
0+280.00 70.00 10.00 00.00 1544.00 52,118.19
0+300.00 00.80 16.40 10.00 08.00 864.00 51,262.19
0+320.00 16.80 10.00 176.00 164.00 51,274.19
0+340.00 38.80 10.00 556.00 0.00 51,830.19
PT1 0+348.35 80.00 04.18 496.58 0.00 52,326.77
0+360.00 132.80 05.82 1238.50 0.00 53,565.27
0+380.00 95.20 10.00 2280.00 0.00 55,845.27
0+400.00 22.80 10.00 1180.00 0.00 57,025.27
0+420.00 02.40 04.80 10.00 252.00 48.00 57,229.27
0+440.00 23.20 10.00 24.00 280.00 56,973.27
0+460.00 31.20 10.00 00.00 544.00 56,429.27
PROYECTO GEOMETRICO DE CAMINOS

CALCULO DE AREAS Y VOLUMENES

ESTACION AREAS D/2 VOLUMENES ACUMULADO


Corte Terraplen Corte Terraplen
(+) (-)
56,429.27
PC2 0+464.61 32.00 02.31 00.00 145.99 56,283.28
0+480.00 00.80 08.40 07.69 06.15 310.68 55,978.75
0+500.00 24.80 10.00 08.00 332.00 55,654.75
0+520.00 25.20 10.00 00.00 500.00 55,154.75
0+540.00 44.80 10.00 00.00 700.00 54,454.75
0+560.00 70.40 10.00 00.00 1152.00 53,302.75
0+580.00 62.00 10.00 00.00 1324.00 51,978.75
0+600.00 107.60 10.00 00.00 1696.00 50,282.75
0+620.00 144.40 10.00 00.00 2520.00 47,762.75
0+640.00 242.00 10.00 00.00 3864.00 43,898.75
PT2 0+644.61 221.60 02.31 00.00 1070.92 42,827.84
0+660.00 216.00 07.69 00.00 3365.14 39,462.69
0+680.00 212.40 10.00 00.00 4284.00 35,178.69
0+700.00 178.80 10.00 00.00 3912.00 31,266.69
0+720.00 107.60 10.00 00.00 2864.00 28,402.69
0+740.00 27.60 10.00 00.00 1352.00 27,050.69
0+760.00 28.80 10.00 288.00 276.00 27,062.69
PC3 0+760.91 32.00 00.45 27.36 0.00 27,090.05
0+780.00 22.00 09.55 515.70 0.00 27,605.75
0+800.00 70.80 10.00 220.00 708.00 27,117.75
0+820.00 114.40 10.00 00.00 1852.00 25,265.75
0+840.00 106.80 10.00 00.00 2212.00 23,053.75
0+860.00 10.00 00.00 1068.00 21,985.75
0+880.00 00.88 03.08 10.00 08.80 30.80 21,963.75
0+900.00 72.00 10.00 728.80 30.80 22,661.75
0+920.00 151.04 10.00 2230.40 0.00 24,892.15
PROYECTO GEOMETRICO DE CAMINOS

CALCULO DE AREAS Y VOLUMENES

ESTACION AREAS D/2 VOLUMENES ACUMULADO


Corte Terraplen Corte Terraplen
(+) (-)
24,892.15
0+940.00 204.10 10.00 3551.40 0.00 28,443.55
0+960.00 237.56 10.00 4416.60 0.00 32,860.15
0+980.00 285.92 10.00 5234.80 0.00 38,094.95
1+000.00 314.92 10.00 6008.40 0.00 44,103.35
1+020.00 209.90 10.00 5248.20 0.00 49,351.55
1+040.00 153.02 10.00 3629.20 0.00 52,980.75
PT3 1+049.51 136.80 04.76 1379.54 0.00 54,360.30
1+060.00 107.18 05.25 1280.90 0.00 55,641.19
1+080.00 118.26 10.00 2254.40 0.00 57,895.59
1+100.00 161.78 10.00 2800.40 0.00 60,695.99
1+120.00 105.22 10.00 2670.00 0.00 63,365.99
PC4 1+132.72 47.16 06.36 969.14 0.00 64,335.13
1+140.00 12.6 03.64 217.53 0.00 64,552.65
1+160.00 21.46 10.00 340.60 0.00 64,893.25
1+180.00 18.16 10.00 396.20 0.00 65,289.45
1+200.00 14.2 10.00 323.60 0.00 65,613.05
1+220.00 16.40 10.00 306.00 0.00 65,919.05
PT4 1+239.39 10.82 09.69 263.76 0.00 66,182.82
1+240.00 20.14 00.31 09.60 0.00 66,192.41
1+260.00 60.32 10.00 804.60 0.00 66,997.01
1+280.00 25.16 10.00 854.80 0.00 67,851.81
1+300.00 00.56 02.90 10.00 257.20 29.00 68,080.01
1+320.00 10.12 10.00 05.60 130.20 67,955.41
1+340.00 22.24 10.00 00.00 323.60 67,631.81
1+360.00 10.60 10.00 00.00 328.40 67,303.41
1+380.00 04.80 10.00 48.00 106.00 67,245.41
1+400.00 03.80 01.50 10.00 86.00 15.00 67,316.41
Perfil del camino y Subra

Cotas Perfil de
Progresiva Terreno Subrasante 3500.00

0+000.00 3441.77 3,441.770 3490.00


0+020.00 3443.09 3,443.480 3480.00
0+040.00 3444.46 3,445.180
3470.00
0+060.00 3446.46 3,446.890
0+080.00 3448.48 3,448.680 3460.00

Cotas (m)
0+100.00 3449.42 3,450.400 3450.00
0+120.00 3451.86 3,452.140
0+140.00 3453.90 3,453.830 3440.00
0+160.00 3456.37 3,455.420 3430.00
0+180.00 3458.00 3,457.130
3420.00
0+200.00 3458.52 3,459.450
0+220.00 3459.95 3,462.150 3410.00
0+240.00 3469.36 3,464.460 0+000 0+100
0+260.00 3465.26 3,466.380
0+280.00 3467.15 3,466.200
0+300.00 3469.04 3,467.900
0+320.00 3471.30 3,469.610
0+340.00 3473.45 3,471.310
0+360.00 3475.21 3,473.010
0+380.00 3477.16 3,474.710
0+400.00 3479.51 3,476.410
0+420.00 3480.18 3,478.090
0+440.00 3481.13 3,479.350
0+460.00 3482.63 3,481.490
0+480.00 3484.65 3,483.660
0+500.00 3486.90 3,485.830
0+520.00 3488.28 3,487.610
0+540.00 3489.63 3,489.360
camino y Subrasante

Perfil del camino (Terreno línea azul y Subrasante línea naranja)


3500.00

3490.00

3480.00

3470.00

3460.00

3450.00

3440.00

3430.00

3420.00

3410.00
0+000 0+100 0+200 0+300 0+400 0+500 0+600

Progresiva
0+600
Curva Masa
Progresiva Volúmenes Acum

0+000.00 100,000.000
0+020.00 99,728.000
0+040.00 99,948.000
0+060.00 100,088.000
0+080.00 100,066.000 32,540.000 m3
0+100.00 99,952.000
0+120.00 99,072.000
0+140.00 96,350.000 DT
DLP
DLT
DLP
0+160.00 91,748.000
0+180.00 86,328.000
0+200.00 80,036.000
0+220.00 73,400.000 120,000.000
0+240.00 67,412.000
0+248.35 65,270.168
0+260.00 63,486.188
0+280.00 61,942.188
Volúmenes acumulados (m3)

100,000.000
0+300.00 61,086.188
0+320.00 61,098.188
0+340.00 61,654.188
0+348.35 62,150.772
0+360.00 63,389.268 80,000.000
0+380.00 65,669.268
0+400.00 66,849.268
0+420.00 67,053.268
0+440.00 66,797.268 60,000.000
0+460.00 66,253.268
0+464.61 66,107.276
0+480.00 65,802.752
0+500.00 65,478.752
40,000.000
0+520.00 64,978.752
0+540.00 64,278.752
0+560.00 63,126.752
0+580.00 61,802.752
0+600.00 60,106.752 20,000.000
0+620.00 57,586.752
0+640.00 53,722.752
0+644.61 52,651.836
0+660.00 49,286.692 0.000
0+000 0+100 0+200
20,000.000

0.000
0+680.00 45,002.692 0+000 0+100 0+200
0+700.00 41,090.692
0+720.00 38,226.692
0+740.00 36,874.692
0+760.00 36,886.692
0+760.91 36,914.052
0+780.00 37,429.752 30 61086.188
0+800.00 36,941.752 42 67053.268 5967.08
0+820.00 35,089.752 58 57586.752 -9466.52
0+840.00 32,877.752
0+860.00 31,809.752
0+880.00 31,787.752
0+900.00 32,485.752
0+920.00 34,716.152
0+940.00 38,267.552
0+960.00 42,684.152
0+980.00 47,918.952
1+000.00 53,927.352
1+020.00 59,175.552
1+040.00 62,804.752
1+049.51 64,184.295
1+060.00 65,465.190
1+080.00 67,719.590
1+100.00 70,519.990
1+120.00 73,189.990
1+132.72 74,159.127
1+140.00 74,376.653
1+160.00 74,717.253
1+180.00 75,113.453
1+200.00 75,437.053
1+220.00 75,743.053
1+239.39 76,006.815
1+240.00 76,016.413
1+260.00 76,821.013
1+280.00 77,675.813
1+300.00 77,904.013
1+320.00 77,779.413
1+340.00 77,455.813
1+360.00 77,127.413
1+380.00 77,069.413
1+400.00 77,140.413
a Masa

Cantera Curva de volúmenes acumu

0+100 0+200 0+300 0+400 0+500 0+600 0+700

Progre
0+100 0+200 0+300 0+400 0+500 0+600 0+700

Progre

64978.752 66849.268 1870.516


úmenes acumulados (Curva Masa)

D
DMT

DLP

0+600 0+700 0+800 0+900 1+000 1+100 1+200

Progresiva
0+600 0+700 0+800 0+900 1+000 1+100 1+200

Progresiva
Botadero

100 1+200 1+300 1+400 1+500


100 1+200 1+300 1+400 1+500
DMT Vol m3/Km
tramo 1 169.88 10211 1734644.68 1793191.07
tramo 2 183.55 7377 1354048.35 1295501.96
17588 3088693.03
DMT 175.613659