Você está na página 1de 20

Unid QTD H/ HORA T/ HORAS P/UNIT.

TOTAL
UM 188.00 6 1128 208.64 39,224.94
UM 32.00 24 768 834.57 26,706.34
UM 63.00 2 126 69.55 4,381.51
UM 63.00 24 1512 834.57 52,578.11
UM 63.00 8 504 278.19 17,526.04
UM 13.00 86 1118 2,990.55 38,877.20
UM 13.00 120 1560 4,172.87 54,247.26
UM 5.00 128 640 4,451.06 22,255.28
UM 3.00 140 420 4,868.34 14,605.03
UM 10.00 12 120 417.29 4,172.87
UM 19.00 36 684 1,251.86 23,785.34
UM 13.00 140 1820 4,868.34 63,288.47
UM 32.00 24 768 834.57 26,706.34
UM 32.00 64 2048 2,225.53 71,216.91
UM 13.00 16 208 556.38 7,232.97
13,424 466,804.60
Manuteno de banco de bateria estacionrio
TOTAL DE HORAS PLANILHA 1
Manuteno do sistema de ilumino industrial
Manuteno do sistema de ilumino da area administrativa
Manuteno de disjuntores tripolar at 480 v
Manuteno de disjuntores tripolar de 4802v at 13.800 v
Manuteno de contatores tripolar de 220 v at 480 v
Manuteno de contatores tripolar de 480 v at 4.160 v
Manuteno chaves seccionadora tripolar seca imersa em leo at 13,8 Kv
Manuteno de transformadores de 1 Mva at 5 Mva
Manuteno de transformadores trifsicos at 500 Va
Manuteno de transformadores trifsicos de 1 kva at 50 Kva
Manuteno de transformadores trifsicos acima de 5 Mva at 10 Mva
Servio
Reparo em tomadas industriais at 480 v
Instalao de interruptores e tomadas predial
Manuteno de painis, cubculos ou gavetas
Manuteno preventiva e corretiva eltrica
MEMRIA DE CLCULO
Manuteno Preventiva e Corretiva de Eltrica e Instrumentao do Terminal PETROQUIMICO SADAN

Unid QTD H/ HORA T/ HORAS P/UNIT. TOTAL
UM 13.00 10 130 347.74 4,520.60
UM 3.00 36 108 1,251.86 3,755.58
UM 19.00 12 228 417.29 7,928.45
UM 38.00 24 912 834.57 31,713.78
ML 188.00 2 376 69.55 13,074.98
ML 125.00 4 500 139.10 17,386.94
ML 1250.00 1 1250 34.77 43,467.35
ML 313.00 2 626 69.55 21,768.45
UM 19.00 12 228 417.29 7,928.45
ML 32.00 4 128 139.10 4,451.06
UM 13.00 6 78 208.64 2,712.36
UM 150.00 4 600 139.10 20,864.33
UM 25.00 4 100 139.10 3,477.39
UM 19.00 4 76 139.10 2,642.82
UM 13.00 2 26 69.55 904.12
UM 19.00 25 475 869.35 16,517.59
UM 19.00 34 646 1,182.31 22,463.93
6,487.00 225,578.18
Servios de emendas
Substituio de fusiveis e disjuntores termo magnticos
Servio
Manuteno de retificadores, no breaks e estabilizadores
Manuteno no gerador de emergencia
Manuteno no banco de capacitores
Lanamento ou remoo de cabos eletricos at 10mm2
Sistema de aterramento
Manuteno em motores eltricos acima de 10cv at 30cv
TOTAL DE HORAS PLANILHA 2
Manuteno de para-raios tipo franklin e faraday
Instalao provisria de equipamentos
Manuteno de baterias automotivas
Manuteno em motores eltricos at 10cv
Instalao e remoo de caixas de passagem Pull-box/similar
Lanamento ou remoo de cabos eletricos acima de 16mm2 at 35mm2
Manuteno de atuadores eltricos de valvulas
Remoo e instalao de eletrodutos e canaletas X at 2"
Remoo e instalao de eletrodutos e canaletas X acima de 2" at 4"
MEMRIA DE CLCULO

Unid QTD H/ HORA T/ HORAS P/UNIT. TOTAL
UM 19.00 60 1140 2,086.43 39,642.23
UM 25.00 80 2000 2,781.91 69,547.76
UM 2.00 160 320 5,563.82 11,127.64
UM 25.00 4 100 139.10 3,477.39
UM 125.00 3 375 104.32 13,040.21
UM 13.00 6 78 208.64 2,712.36
UM 250.00 3 750 104.32 26,080.41
UM 80.00 4 320 139.10 11,127.64
UM 30.00 5 150 173.87 5,216.08
UM 50.00 4 200 139.10 6,954.78
UM 125.00 3 375 104.32 13,040.21
UM 40.00 4 160 139.10 5,563.82
UM 60.00 4 240 139.10 8,345.73
6,208.00 215,876.26
Manuteno de valvula solenoide - SOB
Manuteno de termometros - TL
Manuteno de transmissores - PT, LT, FT, PDT
Manuteno de transmissores de temperatura - TT
TOTAL DE HORAS
Substituio de lampadas de sinalizao
Substituio de botoeira de acionamento
Manuteno preventiva e corretiva instrumentao no Terminal de Santos
Manuteno de manometros - PI
Manuteno de pressostato - OS
Manuteno de Termostato - TS
Servio
MEMRIA DE CLCULO
Manuteno em motores eletricos acima de 30cv at 125cv
Instalao de plugs a prova de exploso
Manuteno em motores eletricos acima de 125 cv at 900 cv
Manuteno em caldeira

Unid QTD H/ HORA T/ HORAS P/UNIT. TOTAL
UM 4.00 24 96 834.57 3,338.29
UM 30.00 12 360 417.29 12,518.60
UM 5.00 36 180 1,251.86 6,259.30
UM 100.00 3 300 104.32 10,432.16
UM 3.00 4 12 139.10 417.29
UM 5.00 6 30 208.64 1,043.22
UM 4.00 8 32 278.19 1,112.76
UM 3.00 10 30 347.74 1,043.22
UM 2.00 8 16 278.19 556.38
UM 2.00 8 16 278.19 556.38
UM 2.00 16 32 556.38 1,112.76
UM 8.00 6 48 208.64 1,669.15
UM 8.00 8 64 278.19 2,225.53
UM 8.00 12 96 417.29 3,338.29
UM 45.00 16 720 556.38 25,037.20
UM 40.00 6 240 208.64 8,345.73
ML 150.00 4 600 139.10 20,864.33
2,872.00 99,870.59 TOTAL DE HORAS
Manuteno de vlvulas de segurana - PSV/SV 3" X 4"
Manuteno de vlvulas de segurana - PSV/SV 4" X 6"
Manuteno de vlvulas de segurana - PSV/SV 6" X 8"
Manuteno de comando eletro-pneumatico e sinalizao
Manunteno do piloto auxiliar diesel da caldeira
Substituio de tubing de instrumentaoes
Manuteno de vlvulas de segurana - PSV/SV 1/2" X 2"
Manuteno de vlvulas de segurana - PSV/SV 1" X 2"
Manuteno de vlvulas de segurana - PSV/SV 1.1/2" X 2.1/2"
Manuteno de vlvulas de segurana - PSV/SV 2" X 2"
Manuteno de vlvulas de segurana - PSV/SV 2.1/2" X 3"
Manuteno de vlvulas de segurana - PSV/SV 8" X 10"
Manuteno de redutores de presso -RPV
Manunteno de valvula de controle - PCVm LCV, FCV, TCV, PDCV
Manuteno de controladores pneumaticos - TIC, PIC, FIC
Manuteno de vlvulas de segurana - PSV/SV 3/4 X 1"
Manuteno de vlvulas de segurana - PSV/SV 1/2" X 3/4"
Servio
MEMRIA DE CLCULO

Unid QTD H/ HORA T/ HORAS P/UNIT. TOTAL
UM 10.00 16 160.00 556.38 5,563.82
UM 15.00 12 180.00 417.29 6,259.30
UM 150.00 6 900.00 208.64 31,296.49
UM 15.00 8 120.00 278.19 4,172.87
UM 15.00 8 120.00 278.19 4,172.87
51,465.35
1,480.00
30,471.00 1,059,594.97
4
14
EQUIPE
1.12
1.96
3.08
3.92
3.92
14.00
ARREDONDAMENTO
28.00% Eletricista
28.00%
100.00%
Aux. Servios Gerais
TOTAL
14.00%
22.00%
MESES
12
H/MS
184.4
%
Manuteno de sensores de gs
Manuteno em chave de fim de curso
Manuteno em chave de nivel
Servios adicionais de apoio
8.00%
TOTAL DE HORAS PREVISTO
Servio
Manuteno de "UM LOADER" controle de capacidade
MEMRIA DE CLCULO
Manuteno Preventiva e Corretiva de Eltrica e Instrumentao do Terminal PETROQUIMICO SADAN
Manuteno de visor de nivel
TOTAL DE HORAS
30,471
FORMATAR EQUIPE
EQUIPE
13.77
ARREDONDAMENTO
14
1
2
3
4
Encarregado
instrumentista tcnico
instrumentista

CLIENTE: PE N 00/02
SERVIO: REV. 0
PRAZO: DATA 4/15/2004
LOCAL: RESP.: BOROTTA
Peso : Revisado por:
Horas Salrio
184.8 Unitrio Total
SERVIOS POR ITEM
1 12 2,217.60 10.00 22,176.00
2 12 4,435.20 7.00 31,046.40
instrumentista 3 12 6,652.80 5.00 33,264.00
4 12 8,870.40 5.00 44,352.00
Aux. Servios Gerais 4 12 8,870.40 2.50 22,176.00
Total M.O.D. 14
Sub-Total M.O.D. 31,046.40 153,014.40
Adicional de Periculosidade 30% 45,904.32
Sub-Total M.O.D. 198,918.72
Encargos Sociais sobre Salrios 102% 202,897.09
Total M.O.D. " A " 401,815.81
Horas Salrio
184.8 Unitrio Total
1 12 2,217.60 14.00 31,046.40
1 12 2,217.60 12.00 26,611.20
Administrativo 1 12 2,217.60 5.00 11,088.00
Almoxarife 1 12 2,217.60 5.00 11,088.00
Sub-Total M.O.I. 3 79,833.60
Adicional de Periculosidade 30% 23,950.08
Sub-Total M.O.I. 103,783.68
Encargos Sociais sobre Salrios 102% 105,859.35
Total M.O.I " B " 8,870.40 209,643.03
Total M.O.I / M.O.D. "A" + "B" 17 611,458.85
Engenheiro mecanico
Supervisor
Qtde
Encarregado
PETROQUIMICA SADAN
MANUTENCAO PREVENTIVA E CORRETIVA ELTRICA INSTR.
12 MESES
TERMINAL PETROQUIMICO SADAN ( SANTOS)
Fator
Prazo
Mo de Obra Indireta
M.O.D. 001
instrumentista tcnico
Eletricista
Hh/Kg -
Mo de Obra Direta
M.O.I. 002
Qtde

EQUIPAMENTO 003 Unidade Qtde Fator Unitrio Total
Armario Roupeiro 8 portas Un 3.00 12.00 10.00 360.00
aspirador de p industrial Mt 1.00 12.00 40.00 480.00
Carrinho Plataforma 500k Un 1.00 12.00 20.00 240.00
Ciaxa de calibrao eletro- pneumtico Un 1.00 12.00 30.00 360.00
MEGGER de 500 a 5000 V certificado Un 1.00 12.00 15.00 180.00
Bomba de TH. Hidristatico Un 1.00 12.00 50.00 600.00
Esmerilhadeira 7" Un 2.00 12.00 50.00 1,200.00
Esmerilhadeira 4. 1/2 Un 2.00 12.00 30.00 720.00
pontes KELVIM certificado RBC Un 2.00 12.00 100.00 2,400.00
Extenses Eltricas Mt 30.00 12.00 0.80 288.00
Furadeira 1/2 Un 2.00 12.00 15.00 360.00
Furadeira 3/4 Un 2.00 12.00 25.00 600.00
Mangueira de ar 3/4 Mt 80.00 12.00 1.60 1,536.00
Medidor de relao espiras/transformador Un 1.00 12.00 90.00 1,080.00
Un 1.00 12.00 150.00 1,800.00
Un 1.00 12.00 80.00 960.00
ferro de solda portatil 30 W (instrument) Un 5.00 12.00 8.00 480.00
Un 2.00 12.00 150.00 3,600.00
Un 2.00 12.00 60.00 1,440.00
Un 1.00 12.00 40.00 480.00
Tirfor 2000kg Un 1.00 12.00 100.00 1,200.00
Tirfor de 1500kg Un 1.00 12.00 80.00 960.00
Talha Catraca 1500kg Un 1.00 12.00 30.00 360.00
Mora Bancada Un 2.00 12.00 12.00 288.00
Un 1.00 12.00 10.00 120.00
vb 1.00 12.00 150.00 1,800.00
Total de Equipamentos 23,892.00
Bancada
Diversos
dobrador de tubos hidaulico /12" a 4" EL.
Aparelho medio rigidez eltrica e leo is.
Equipamentos/Ferramental
Bomba comparativa p/calibrao manom.
Calibradores portateis p/medio e corrente
par de monofonicos(badisco) com bateria

EQUIPAMENTO TERC. 004 Unidade Qtde Fator Unitrio Total
instrumentista tcnico CX 2.00 12.00 50.00 1,200.00
instrumentista CX 3.00 12.00 50.00 1,800.00
CX 4.00 12.00 50.00 2,400.00
Total de Equipamentos Terc. 5,400.00
CONSUMIVEIS 005 Unidade Qtde Fator Unitrio Total
Unidade 10.00 12.00 5.00 600.00
FITA TEFLON Unidade 4.00 12.00 2.50 120.00
FITA ISOLANTE Unidade 8.00 12.00 6.00 576.00
FITA ISOLANTE ALTA FUSO Unidade 8.00 12.00 10.00 960.00
ANTIGRIPANTE Unidade 8.00 12.00 3.50 336.00
LAMINA DE SERRA Unidade 50.00 12.00 1.50 900.00
PONTA MONTADA Unidade 4.00 12.00 2.50 120.00
LIMADOR DE CONTATOS Unidade 2.00 12.00 35.00 840.00
FITA CLEP Unidade 2.00 12.00 2.50 60.00
FITA LIMPEZA CONTATOS SCOTCH BRITE Unidade 2.00 12.00 14.00 336.00
SILICONE (BISNAGAS DE 300 G) Unidade 6.00 12.00 5.00 360.00
ESTANHO (EM BARRA E FIO) Unidade 2.00 12.00 12.00 288.00
PINCIS ROLOS PICADORES E ESPATULASUnidade 8.00 12.00 4.00 384.00
TOALHAS RECUPERAVEIS CERT.CETESB Unidade 20.00 12.00 3.50 840.00
GS P/AFERIO C3 H8 CL 1.00 6.00 120.00 720.00
BROCA DE 1/16" AT 1/2" JG 2.00 12.00 36.00 864.00
MALHA COSTURADA KG 20.00 12.00 1.50 360.00
COLA 3M BISNAGA 6.00 12.00 7.50 540.00
Total de Consumiveis 9,204.00
E.P.I.'S 006 Unidade Qtde Fator Unitrio Total
un 17.00 4.00 32.00 2,176.00
culos de segurana un 17.00 2.00 6.00 204.00
Bluso de raspa un 2.00 2.00 40.00 160.00
par 17.00 2.00 28.00 952.00
Capacete de segurana un 17.00 1.00 5.00 85.00
par 17.00 12.00 12.00 2,448.00
Luva de raspa cano longo par 2.00 6.00 6.00 72.00
Capa de Chuva un 17.00 1.00 15.00 255.00
Protetor auricular tipo PLUG un 17.00 12.00 1.30 265.20
Mscara contra p un 17.00 6.00 4.70 479.40
Higienizao vb vb 12.00 50.00 600.00
Total de E.P.I's 7,696.60
eletricista
ferramental individual
Luva
Uniforme
Botina
ABRASIVOS
Consumiveis
Equipamento Proteo Individual

DESPESAS GERAIS 007 Unidade Qtde Fator Unitrio Total
Caf da Manha un 17.00 252.00 1.50 6,426.00
Refeio/Almoo M.O.D / M.O.I un 17.00 252.00 6.00 25,704.00
Estadia M.O.I. un 1.00 12.00 300.00 3,600.00
Exames Admissionais un 17.00 2.00 80.00 2,720.00
Total Despesas Gerais 38,450.00
TRANSPORTE 008 Unidade Qtde Fator Unitrio Total
un 1.00 12.00 2,600.00 31,200.00
Vale Transporte un 4.00 252.00 3.00 3,024.00
lt 300.00 12.00 2.50 9,000.00
Total Transporte 43,224.00
DESPESAS 009 Unidade Qtde Fator Unitrio Total
Implantao de Canteiro vb 1.00 12.00 300.00 3,600.00
Micro Computador un 1.00 12.00 200.00 2,400.00
Impressora un 1.00 12.00 50.00 600.00
vb 1.00 12.00 300.00 3,600.00
vb 1.00 12.00 80.00 960.00
Material de Escritrio vb 1.00 12.00 100.00 1,200.00
Total Custo 12,360.00
PREO VENDA 010
DESCRIO CUSTO Dissdio BDI TOT/ B. D. I VENDA
401,815.81 8% 34.5% 170,590.68 572,406.50
209,643.03 8% 34.5% 89,003.85 298,646.88
EQUIPAMENTO/FERRAMENTAL 23,892.00 34.5% 8,231.97 32,123.97
FERRAMENTAL INDIVIDUAL 5,400.00 34.5% 1,860.57 7,260.57
CONSUMIVEIS 9,204.00 34.5% 3,171.23 12,375.23
EQUIPAMENTO INDIVIDUAL 7,696.60 34.5% 2,651.86 10,348.46
VERBA DESPESAS GERAIS 38,450.00 34.5% 13,247.92 51,697.92
CUSTO TRANSPORTE 43,224.00 34.5% 14,892.80 58,116.80
CUSTO ADMINISTRATIVO 12,360.00 34.5% 4,258.63 16,618.63
Total GERAL 751,685.45 307,909.52 1,059,594.97
366,443.77
51,100.00
417,543.77
1,477,138.74
30,471.00
34.77
1.5% 22,157.08
3.5% 51,699.86
1,550,995.67
TAXAS
10% 10%
10% 10%
ENCARGOS FINANCEIRO 4% 4%
IMPOSTO DE RENDA 25% 2.5%
ISS - PREFEITURUA PAULINIA 4% 4.17%
PIS, CONFIS SOCIAL 3.65% 3.79%
34.5%
TOTAL GERAL DA PROPOSTA
PLANILHA PREOS H.H
ADICIONAL COM DESMOBILIZAO
TOTAL GERAL DA PROPOSTA
TOTAL DE HORAS DA PLANILHA
PREO MDIO VENDA PARA OS ITENS
ADICIONAL COM MOBILIZAO
SOBRE O CUSTO
EMOLUMENTOS
SERVIOS ADICIONAIS COM TRANSPORTE
TOTAL DOS SERVIOS ADICIONAIS DA PLANILHA DE PREOS
Xerox
TOTAL DO B. D. I.
TOTAL
SOBRE O CUSTO
SOBRE O LUCRO
SOBRE O FATURAM.
SOBRE O FATURAM.
INCIDNCIA
SOBRE O CUSTO ADINISTRAO CENTRAL
LUCRO LIQUIDO
BENEFICIOS E DESPESAS INDIRETAS
M.O.D.
Gasolina
Fonefax
Custo comTransporte
M.O.I.
Custo de Manuteno Administrativo
RESUMO PARA COMPOSIO DE PREO DE VENDA
micro onibus
Verba de Despesas Gerais
C. T. P.-CENTRO TCNICO PROFISSIONALIZANTE
MS DIA MS MS MS MS MS
30% 102% 80.00 7.00 10.00 100.00 60.00 50.00 20.00 8% 34%

Q
T
D
E
F
U
N

O
S
A
L
A
R
I
O
P
E
R
I
C
.
E
N
C
.
S
O
C
.
T
R
A
N
S
P
A
L
I
M
E
N
T
.
E
.

P

I

s
E
Q
P
T
O
C
A
N
T
.
F
E
R
R
A
M
E
N
T
.E
X
.

M
E
D
.
C
U
S
T
O
C
O
N
S
.
B
.

D

.
I

T
O
T
A
L
1 AUX. ADMINISTRATIVO 4.00 1.20 5.30 0.43 0.80 0.05 0.54 0.32 0.27 0.11 13.03 1.04 4.49 18.56
SUPERVISOR ELTRICA
INSTRUMENTAO 12.00 3.60 15.91 0.43 0.80 0.05 0.54 0.32 0.27 0.11 34.04 2.72 11.73 48.49
1 OPERADOR MAQ. 5.00 1.50 6.63 0.43 0.80 0.05 0.54 0.32 0.27 0.11 15.66 1.25 5.39 22.30
1 ELETRICISTA IND. 4.00 1.20 5.30 0.43 0.80 0.05 0.54 0.32 0.27 0.11 13.03 1.04 4.49 18.56
1 INSTRUMENTISTA TCNICO 7.00 2.10 9.28 0.43 0.80 0.05 0.54 0.32 0.27 0.11 20.91 1.67 7.20 29.79
1 INSTRUMENT. ELETR 7.00 2.10 9.28 0.43 0.80 0.05 0.54 0.32 0.27 0.11 20.91 1.67 7.20 29.79
1 AJUDANTES 2.50 0.75 3.32 0.43 0.80 0.05 0.54 0.32 0.27 0.11 9.09 3.13 12.22
1 PINTOR INDUST. 3.50 1.05 4.64 0.43 0.80 0.05 0.54 0.32 0.27 0.11 11.72 0.94 4.04 16.69
7
-
COMPOSIO PARA FORMATAO DO PREO - CONF. PLANILHA H/H - PETROQUIMICA SADAN
N do Anexo
3
Item Unid QTD Punitrio(R$)
2
2.1 UM 188.00 208.64
2.2 UM 32.00 834.57
2.3 UM 63.00 69.55
2.4 UM 63.00 834.57
2.5 UM 63.00 278.19
2.6 UM 13.00 2,990.55
2.7 UM 13.00 4,172.87
2.8 UM 5.00 4,451.06
2.9 UM 3.00 4,868.34
2.10 UM 10.00 417.29
2.11 UM 19.00 1,251.86
2.12 UM 13.00 4,868.34
2.13 UM 32.00 834.57
2.14 UM 32.00 2,225.53
2.15 UM 13.00 556.38
Manuteno Preventiva e Corretiva de Eltrica e Instrumentao do Terminal
Petroquimico SADAN
Assinatura Preo Total (R$)
CONTRATANTE CONTRATADO
466,804.60
Manuteno chaves seccionadora tripolar seca imersa em leo
at 13,8 Kv
Manuteno de disjuntores tripolar at 480 v
Manuteno de disjuntores tripolar de 4802v at 13.800 v
Manuteno de contatores tripolar de 220 v at 480 v
Manuteno de contatores tripolar de 480 v at 4.160 v
Manuteno de banco de bateria estacionrio
Manuteno de painis, cubculos ou gavetas
Reparo em tomadas industriais at 480 v
Manuteno de transformadores trifsicos at 500 Va
Manuteno de transformadores trifsicos de 1 kva at 50 Kva
Manuteno de transformadores de 1 Mva at 5 Mva
Manuteno de transformadores trifsicos acima de 5 Mva at 10
Mva
Nmero do Contrato
.............
Planilha de Preos Unitrios
Servio
Manuteno preventiva e corretiva eltrica
Manuteno do sistema de ilumino industrial
Manuteno do sistema de ilumino da area administrativa
Instalao de interruptores e tomadas predial
N do Anexo
3
Item Unid QTD Punitrio(R$)
2.16 UM 13.00 347.74
2.17 UM 3.00 1,251.86
2.18 UM 19.00 417.29
2.19 UM 38.00 834.57
2.20 ML 188.00 69.55
2.21 ML 125.00 139.10
2.22 ML 1250.00 34.77
2.23 ML 313.00 69.55
2.24 UM 19.00 417.29
2.25 ML 32.00 139.10
2.26 UM 13.00 208.64
2.27 UM 150.00 139.10
2.28 UM 25.00 139.10
2.29 UM 19.00 139.10
2.30 UM 13.00 69.55
2.31 UM 19.00 869.35
2.32 UM 19.00 1,182.31
Assinatura Preo Total (R$)
CONTRATANTE CONTRATADO
225,578.18
Substituio de fusiveis e disjuntores termo magnticos
Manuteno de para-raios tipo franklin e faraday
Instalao provisria de equipamentos
Manuteno de baterias automotivas
Manuteno em motores eltricos at 10cv
Manuteno em motores eltricos acima de 10cv at 30cv
Remoo e instalao de eletrodutos e canaletas X acima de 2" at 4"
Lanamento ou remoo de cabos eletricos at 10mm2
Lanamento ou remoo de cabos eletricos acima de 16mm2 at
35mm2
Instalao e remoo de caixas de passagem Pull-box/similar
Sistema de aterramento
Servios de emendas
Servio
Manuteno de retificadores, no breaks e estabilizadores
Manuteno no gerador de emergencia
Manuteno no banco de capacitores
Manuteno de atuadores eltricos de valvulas
Remoo e instalao de eletrodutos e canaletas X at 2"
Nmero do Contrato
.............
Planilha de Preos Unitrios
Manuteno Preventiva e Corretiva de Eltrica e Instrumentao do Terminal
Petroquimico SADAN
N do Anexo
3
Item Unid QTD Punitrio(R$)
2.33 UM 19.00 2,086.43
2.34 UM 25.00 2,781.91
2.35 UM 2.00 5,563.82
2.36 UM 25.00 139.10
2.37 UM 125.00 104.32
2.38 UM 13.00 208.64
3
3.1 UM 250.00 104.32
3.2 UM 80.00 139.10
3.3 UM 30.00 173.87
3.4 UM 50.00 139.10
3.5 UM 125.00 104.32
3.6 UM 40.00 139.10
3.7 UM 60.00 139.10
Manuteno Preventiva e Corretiva de Eltrica e Instrumentao do Terminal
Petroquimico SADAN
TOTAL DE HORAS
Assinatura
Manuteno de valvula solenoide - SOB
Manuteno de termometros - TL
Manuteno de transmissores - PT, LT, FT, PDT
Manuteno de transmissores de temperatura - TT
Substituio de lampadas de sinalizao
Preo Total (R$)
CONTRATANTE CONTRATADO
215,876.26
Manuteno preventiva e corretiva instrumentao
Manuteno de manometros - PI
.............
Servio
Manuteno em motores eletricos acima de 30cv at 125cv
Nmero do Contrato
Manuteno de pressostato - OS
Manuteno de Termostato - TS
Substituio de botoeira de acionamento
Manuteno em motores eletricos acima de 125 cv at 900 cv
Manuteno em caldeira
Instalao de plugs a prova de exploso
Planilha de Preos Unitrios
N do Anexo
3
Item Unid QTD Punitrio(R$)
3.8 UM 4.00 834.57
3.9 UM 30.00 417.29
3.10 UM 5.00 1,251.86
3.11 UM 100.00 104.32
3.12 UM 3.00 139.10
3.13 UM 5.00 208.64
3.14 UM 4.00 278.19
3.15 UM 3.00 347.74
3.16 UM 2.00 278.19
3.17 UM 2.00 278.19
3.18 UM 2.00 556.38
3.19 UM 8.00 208.64
3.20 UM 8.00 278.19
3.21 UM 8.00 417.29
3.22 UM 45.00 556.38
3.23 UM 40.00 208.64
3.24 ML 150.00 139.10
Manuteno Preventiva e Corretiva de Eltrica e Instrumentao do Terminal
Petroquimico SADAN
TOTAL DE HORAS
Assinatura
Manuteno de vlvulas de segurana - PSV/SV 6" X 8"
Manuteno de comando eletro-pneumatico e sinalizao
Manunteno do piloto auxiliar diesel da caldeira
Substituio de tubing de instrumentaoes
Manuteno de vlvulas de segurana - PSV/SV 2.1/2" X 3"
Manuteno de vlvulas de segurana - PSV/SV 8" X 10"
Manuteno de vlvulas de segurana - PSV/SV 3" X 4"
Manuteno de vlvulas de segurana - PSV/SV 4" X 6"
Preo Total (R$)
CONTRATANTE CONTRATADO
99,870.59
Manuteno de vlvulas de segurana - PSV/SV 3/4 X 1"
Manuteno de vlvulas de segurana - PSV/SV 1/2" X 3/4"
Manuteno de vlvulas de segurana - PSV/SV 1/2" X 2"
Manuteno de vlvulas de segurana - PSV/SV 1" X 2"
Manuteno de vlvulas de segurana - PSV/SV 1.1/2" X 2.1/2"
Manuteno de vlvulas de segurana - PSV/SV 2" X 2"
.............
Servio
Manuteno de redutores de presso -RPV
Nmero do Contrato
Manunteno de valvula de controle - PCVm LCV, FCV, TCV, PDCV
Manuteno de controladores pneumaticos - TIC, PIC, FIC
Planilha de Preos Unitrios
N do Anexo
3
Item Unid QTD Punitrio(R$)
3.25 UM 10.00 556.38
3.26 UM 15.00 417.29
3.27 UM 150.00 208.64
3.28 UM 15.00 278.19
3.29 UM 15.00 278.19
3.30 HH 2250.00 48.49
3.31 HH 360.00 29.79
3.32 HH 360.00 12.22
3.39 HH 2250.00 48.49
3.40 HH 375.00 18.56
3.41 HH 375.00 12.22
4
4.1 HH 2112.00 16.69
4.2 HH 2112.00 18.56
4.3 HH 2112.00 22.30
4.4 DIA 365.00 50.00
4.5 DIA 365.00 90.00
5 VB 3.5%
1 VB 1.5%
Assinatura Preo Total (R$)
CONTRATANTE CONTRATADO
R$ 1,550,995.67
TOTAL DA PLANILHA
Desmobilizao (minimo 3% do valor global da PPU)
TOTAL COM VEICULOS ADICIONAIS
Mobilizao ( maximo 2% do Valor Total da PPU)
Servios executados por operador de mquinas
Veiculo com motorista
TOTAL DE H.H PLANILHA
Veiculo pick-up capacidade minima 0,6 toneladas
Servios adicionais de apoio
Servios de superviso de atividade de eletrica
Servios adicionais executados por eletricista
Servios adicionais executados ajudante de eletricista
Servios executados por pintor industrial
Servios executados por auxiliar administrativo
Manuteno de sensores de gs
Manuteno em chave de fim de curso
Manuteno em chave de nivel
Servios de superviso na atividade de instrumentao
Servios adicionais executados por instrumentista
Servios adicionais executados por ajudante de instrumentista
.............
Servio
Manuteno de "UM LOADER" controle de capacidade
Manuteno Preventiva e Corretiva de Eltrica e Instrumentao do Terminal
Petroquimico SADAN
Nmero do Contrato
Manuteno de visor de nivel
Planilha de Preos Unitrios
TOTAL GERAL DOS ITENS DE SERVIOS
SUB- TOTAL
N do Anexo
PParcial (R$)
39,224.94
26,706.34
4,381.51
52,578.11
17,526.04
38,877.20
54,247.26
22,255.28
14,605.03
4,172.87
23,785.34
63,288.47
26,706.34
71,216.91
7,232.97
Preo Total (R$)
466,804.60
Nmero do Contrato
.............
N do Anexo
PParcial (R$)
4,520.60
3,755.58
7,928.45
31,713.78
13,074.98
17,386.94
43,467.35
21,768.45
7,928.45
4,451.06
2,712.36
20,864.33
3,477.39
2,642.82
904.12
16,517.59
22,463.93
Preo Total (R$)
225,578.18
Nmero do Contrato
.............
N do Anexo
PParcial (R$)
39,642.23
69,547.76
11,127.64
3,477.39
13,040.21
2,712.36
26,080.41
11,127.64
5,216.08
6,954.78
13,040.21
5,563.82
8,345.73
Preo Total (R$)
215,876.26
.............
Nmero do Contrato
N do Anexo
PParcial (R$)
3,338.29
12,518.60
6,259.30
10,432.16
417.29
1,043.22
1,112.76
1,043.22
556.38
556.38
1,112.76
1,669.15
2,225.53
3,338.29
25,037.20
8,345.73
20,864.33
Preo Total (R$)
99,870.59
.............
Nmero do Contrato
N do Anexo
PParcial (R$)
5,563.82
6,259.30
31,296.49
4,172.87
4,172.87
51,465.35
1,059,594.97
109,103.21
10,722.95
4,400.90
109,103.21
6,961.27
4,584.27
35,255.51
39,205.87
47,106.58
366,443.77
18,250.00
32,850.00
51,100.00
1,477,138.74
51,699.86
22,157.08
Preo Total (R$)
R$ 1,550,995.67
.............
Nmero do Contrato

Você também pode gostar