Marcos A y H; a 0

A1
A1 = (2.03) (5.425)
A1 = 11.01 m2
Pe = Cpe KA KL qz
Pe = (-0.7) (0.9) (1.5) (111.25) = -105.131 kg / m2
F = Pe * A
F = (-105.131 kg / m2) (11.01 m2) = -1157.49 kg
W = F / L = -1157.49/ 5.425 = -213.36 kg / m Succin

A2
A2 = (2.03) (5.425)
A2 = 11.01 m2
Pe = Cpe KA KL qz
Pe = (-1.3) (0.9) (1.5) (111.25) = -195.24 kg / m2
F = Pe * A
F = (-195.24 kg / m2) (11.01m2) = -2149.59 kg
W = F / L = -2149.59/ 5.425 = -396.23 kg / m Succion

A3
A3 = (1.85) (10.75)
A3 = 19.89 m2
Pe = Cpe KA KL qz
Pe = (0.8) (0.9) (1.25) (111.25) = 100.125 kg / m2
F = Pe * A
F = (100.125 kg / m2) (19.89 m2) = 1991.48 kg
W = F / L = 1991.48 / 10.75 = 185.25 kg / m Empuje
A4
A4 = (1.85) (10.75)
A4 = 19.89 m2
Pe = Cpe KA KL qz
Pe = (-0.65) (0.9) (1.50) (111.25) = -97.62 kg / m2
F = Pe * A
F = (-97.62 kg / m2) (19.89 m2) = -1941.66 kg
W = F / L = -1941.66 / 10.75 = -180.62 kg / m Succion

Representacion grafica de las cargas por viento:


Marcos A y H
Analizando cuando = 90
Relacin d / b = 25.35 / 7.15 = 3.54
Relacin H / d = 10.75 / 25.35 = 0.424
Cpe:
De techo para barlovento = -0.3
De techo para sotavento = -0.3
De pared para barlovento = 0.8
De pared para sotavento = -0.3
De muros laterales para barlovento = -0.3
De muros laterales para sotavento = -0.3

Marcos A y H; a 90
A1
A1 = (2.03) (5.425)
A1 = 11.01 m2
Pe = Cpe KA KL qz
Pe = (-0.3) (0.9) (1.5) (111.25) = -45.05 kg / m2
F = Pe * A
F = (-45.05 kg / m2) (11.01 m2) = -496.0005kg
W = F / L = -496.0005/ 5.425 = -91.42 kg / m Succin

A2
A2 = (2.03) (5.425)
A2 = 11.01 m2
Pe = Cpe KA KL qz
Pe = (-0.3) (0.9) (1.5) (111.25) = -45.05 kg / m2
F = Pe * A
F = (-45.05 kg / m2) (11.01m2) = -496.0005 kg
W = F / L = -496.0005/ 5.425 = -91.42kg / m Succion
A3
A3 = (1.85) (10.75)
A3 = 19.89 m2
Pe = Cpe KA KL qz
Pe = (-0.3) (0.9) (1.25) (111.25) = -37.54 kg / m2
F = Pe * A
F = (-37.54 kg / m2) (19.89 m2) = -746.67
W = F / L = -746.67 / 10.75 = -69.45 kg / m Succion

A4
A4 = (1.85) (10.75)
A4 = 19.89 m2
Pe = Cpe KA KL qz
Pe = (0.8) (0.9) (1.50) (111.25) = 120.15 kg / m2
F = Pe * A
F = (120.15 kg / m2) (19.89 m2) = 2389.78 kg
W = F / L = 2389.78 / 10.75 = 222.305 kg / m Empuje

Marcos B, C, D, E, F y G a 90
A1
A1 = (3.55) (5.425)
A1 = 19.26 m2
Pe = Cpe KA KL qz
Pe = (-0.3) (0.9) (1.5) (111.25) = -45.05 kg / m2
F = Pe * A
F = (-45.05 kg / m2) (19.26 m2) = -867.66 kg
W = F / L = -867.66 / 5.425 = -159.93 kg / m Succion
A2
A2 = (3.55) (5.425)
A2 = 19.26 m2
Pe = Cpe KA KL qz
Pe = (-0.3) (0.9) (1.5) (111.25) = -45.05 kg / m2
F = Pe * A
F = (-45.05 kg / m2) (19.26 m2) = -867.66 kg
W = F / L = -867.66 / 5.425 = -159.93 kg / m Succion

A3
A3 = (3.55) (10.75)
A3 = 38.16 m2
Pe = Cpe KA KL qz
Pe = (-0.3) (0.9) (1.25) (111.25) = -37.54 kg / m2
F = Pe * A
F = (-37.54 kg / m2) (38.16 m2) = -1432.52 kg
W = F / L = -1432.52 / 10.75 = -133.25 kg / m Succion

A4
A4 = (3.55) (10.75)
A4 = 38.16 m2
Pe = Cpe KA KL qz
Pe = (0.8) (0.9) (1.50) (111.25) = 120.15 kg / m2
F = Pe * A
F = (120.15 kg / m2) (38.16 m2) = 4584.924 kg
W = F / L = 4584.924/ 10.75 = 426.50 kg / m Empuje