Você está na página 1de 56

POS 101-TM 3, dp=16+4=20cm, MB 20,

14.00 lo = 4.00 m
Analiza optere}enja:
qu 1) Termoizolacija 0.10 kN/m2
2) TM 3 2.60 kN/m2
A B 3) Plafon 0.30 kN/m2
L = 4.20 g= 3.00 kN/m2

Ag=Bg= 6.30 kN/m' 4) Korisno p= 1.50 kN/m2


Ap=Bp= 3.15 kN/m'
qu=1.6*g+1. 7.50 kN/m'
Au=Bu= 15.75 kN/m' Mmax = 16.538 kNm
k = 5.092 4.049
Aa = 1.033 cm2

Usvojeno: GA 240/360
Aa1 = 2F6
Aa3 = 1F8
Aam= F6/25/25cm

POS 101-TM 3, dp=16+4=20cm, MB 20,


14.00 lo = 4.00 m
Analiza optere}enja:
qu 1) Termoizolacija 0.10 kN/m2
2) TM 3 2.60 kN/m2
A B 3) Plafon 0.30 kN/m2
L = 4.20 g= 3.00 kN/m2
4) Korisno p= 1.50 kN/m2
Ag=Bg= 6.30 kN/m'
Ap=Bp= 3.15 kN/m' qu=1.6*g+1. 7.50 kN/m'
Mmax = 16.538 kNm
Au=Bu= 15.75 kN/m' k = 5.092 2.455
Aa = 0.627 cm2

Usvojeno: GA 240/360
Aa1 = 2F6
Aa3 = 1F8
Aam= F6/25/25cm

POS 101-TM 3,dp=16+4=20cm, MB 20, 14.00 lo = 4.00 m


Analiza optere}enja:
qu 1) Termoizolacija 0.10 kN/m2
2) TM 3 2.60 kN/m2
A B 3) Plafon 0.30 kN/m2
L = 4.20 g= 3.00 kN/m2
4) Korisno p= 1.50 kN/m2
Ag=Bg= 6.30 kN/m'
Ap=Bp= 3.15 kN/m' qu=1.6*g+1. 7.50 kN/m'
Mmax = 16.538 kNm
Au=Bu= 15.75 kN/m' k = 5.092 2.455
Aa = 0.627 cm2

Usvojeno: GA 240/360
Aa1 = 2F6
Aa3 = 1F8
Aam= F6/25/25cm
POS 101-TM 3, dp=16+4=20cm, MB 20,
14.00 lo = 3.00 m
Analiza optere}enja:
qu 1) Podna konstrukcija 1.00 kN/m2
2) TM 3 2.60 kN/m2
A B 3) Plafon 0.30 kN/m2
L = 3.15 g= 3.90 kN/m2
4) Korisno p= 1.50 kN/m2
Ag=Bg= 6.14 kN/m'
Ap=Bp= 2.36 kN/m' qu=1.6*g+1. 8.94 kN/m'
Mmax = 11.088 kNm
Au=Bu= 14.08 kN/m' k = 6.218 3.000
Aa = 0.766 cm2

Usvojeno: GA 240/360
Aa1 = 2F6
Aa3 = 1F8
Aam= F6/25/25cm

POS 101-TM 3, dp=16+4=20cm, MB 20,


14.00 lo = 3.00 m
Analiza optere}enja:
1) Podna konstrukcija 1.00 kN/m2
2) TM 3 2.60 kN/m2
qu 3) Plafon 0.30 kN/m2
g= 3.90 kN/m2
A B 4) Korisno p= 1.50 kN/m2
L = 3.15
qu=1.6*g+1. 8.94 kN/m'
Ag=Bg= 6.14 kN/m' Mmax = 11.088 kNm
Ap=Bp= 2.36 kN/m' k = 6.218 2.455
Aa = 0.627 cm2
Au=Bu= 14.08 kN/m'
Usvojeno: GA 240/360
Aa1 = 2F6
Aa3 = 1F8
Aam= F6/25/25cm

POS 201-TM 3, dp=16+4=20cm, MB 20,


14.00 lo = 4.00 m
Analiza optere}enja:
Gu 1) Podna konstrukcija 1.00 kN/m2
qu 2) TM 3 2.60 kN/m2
3) Plafon 0.30 kN/m2
A 1.40 B g= 3.90 kN/m2
L = 4.20 4) Zid G= 5.46 kN
5) Korisno p= 1.50 kN/m2
Ag= 11.83 kN/m' qu=1.6*g+1.8 8.94 kN/m'
Bg= 10.01 kN/m' Gu= 8.74 kN
Ap=Bp= 3.15 kN/m' Mmax = 27.250 kNm
k = 3.967 2.455
Au= 24.60 kN/m' Aa= 0.627 cm2
Bu= 21.69 kN/m'
Usvojeno: GA 240/360
max T / 0.9 * h *b Aa1 = 2F6
max 0.78 MPa < 0.80MPa Aa3 = 1F8
Aam= F6/25/25cm

POS 104-TM 3, dp=16+4=20cm, MB 20,14.00 lo = 4.50 m


= 45 Analiza optere}enja
1) Termoizolcija 0.10 KN/m2
qu' qu qu' 2) TM 3 2.60 KN/m2
3) Plafon 0.30 KN/m2
g= 3.00 kN/m2
4) Korisno p= 1.50 KN/m2
A
0.85 3.00 0.85 qu = 7.50 KN/m'
L= 4.73 qu' = 10.61 KN/m'

Au= 19.90 KN/m' Mmax = 24.850 KNm


Bu= 19.90 KN/m' k = 4.154 6.149
Aa= 1.569 cm2

Usvojeno: GA 240/360
Aa1 = 2F6
Aa3 = 1F8
Aam= F6/25/25cm

F 12 (A3) F 6/25/25

"DETALJ PRELOMA"
20

2F 6(A1)+ F 12(A3)

2F 6(A1)+ F 12(A3)

Armatura gredica(A1) prati `ljebove monta elemenata,dok se rebra armiraju


prema propisima za kolenaste elemente prepu{tanjem armature(A3)u pritisnutu zonu.
POS 105-TM 3, dp=16+4=20cm, MB 20, 14.00 lo = 4.50 m
= 30 Analiza optere}enja
qu' qu 1) Termoizolcija 0.10 KN/m2
2) TM 3 2.60 KN/m2
B 3) Plafon 0.30 KN/m2
g= 3.00 kN/m2
A 4) Korisno p= 1.50 KN/m2
0.85 3.80
L= 4.73 qu = 7.50 KN/m'
qu' = 8.66 KN/m'
Au= 19.85 KN/m' Mmax = 24.720 KNm
Bu= 21.44 KN/m'
k = 4.165 6.149
Aa= 1.569 cm2

Usvojeno: GA 240/360
Aa1 = 2F6
Aa3 = 1F8
Aam= F6/25/25cm

F12 (A3) F 6/25/25

"DETALJ PRELOMA"
20

2F 6(A1)+ F 12(A3)

2F 6(A1)+ F 12(A3)

Armatura gredica(A1) prati `ljebove monta elemenata,dok se rebra armiraju


prema propisima za kolenaste elemente prepu{tanjem armature(A3)u pritisnutu zonu.
POS 105-TM 3, dp=16+4=20cm, MB 20, 14.00 lo = 4.00 m
= 30 Analiza optere}enja
1) Termoizolcija 0.10 KN/m2
qu 2) TM 3 2.60 KN/m2
3) Plafon 0.30 KN/m2
g= 3.00 kN/m2
B 4) Korisno p= 1.50 KN/m2
L'= 4.85 qu = 7.50 KN/m'
qu' = 8.66 KN/m'
A 4.20 Mmax = 19.096 KNm
k= 4.738 4.725
Ag=Bg= 7.27 kN/m' Aa= 1.206 cm2
Ap=Bp= 3.64 kN/m' Usvojeno: GA 240/360
Aa1 = 2F6
Au=Bu= 18.19 kN/m' Aa3 = 1F8
Aam= F6/25/25cm
POS 1-TM 3, dp=16+4=20cm, MB 20, fb =
14.00 lo = 4.30 m
Analiza optere}enja:
qu 1) Podna konstrukcija 1.00 kN/m2
2) TM 3 2.60 kN/m2
A B 3) Plafon 0.30 kN/m2
L = 4.52 g= 3.90 kN/m2
4) Korisno p= 1.50 kN/m2
Ag=Bg= 8.80 kN/m'
Ap=Bp= 3.39 kN/m' qu=1.6*g+1. 8.94 kN/m'
Mmax = 22.780 kNm
Au=Bu= 20.18 kN/m' k = 4.338 5.426
Aa = 1.385 cm2

Usvojeno: GA 240/360
Aa1 = 2F8
Aa3 = 1F8
Aam= Q 84(MA 500/560)

POS 2-TM 3, dp=16+4=20cm, MB 20, fb =


14.00 lo = 3.10 m
Analiza optere}enja:
1) Podna konstrukcija 1.00 kN/m2
2) TM 3 2.60 kN/m2
qu 3) Plafon 0.30 kN/m2
g= 3.90 kN/m2
A B 4) Korisno p= 1.50 kN/m2
L = 3.26
qu=1.6*g+1. 8.94 kN/m'
Ag=Bg= 6.35 kN/m' Mmax = 11.840 kNm
Ap=Bp= 2.44 kN/m' k = 6.018 2.917
Aa = 0.744 cm2
Au=Bu= 14.55 kN/m'
Usvojeno: GA 240/360
Aa1 = 2F6
Aa3 = 1F8
Aam= Q 84(MA 500/560)

POS 3-TM 3, dp=16+4=20cm, MB 20, fb =


14.00 lo = 3.35 m
Analiza optere}enja:
1) Podna konstrukcija 1.00 kN/m2
2) TM 3 2.60 kN/m2
qu 3) Plafon 0.30 kN/m2
g= 3.90 kN/m2
A B 4) Korisno p= 1.50 kN/m2
L = 3.52
qu=1.6*g+1. 8.94 kN/m'
Ag=Bg= 6.86 kN/m' Mmax = 13.827 kNm
Ap=Bp= 2.64 kN/m' k = 5.569 3.406
Aa = 0.869 cm2
Au=Bu= 15.72 kN/m'
Usvojeno: GA 240/360
Aa1 = 2F6
Aa3 = 1F8
Aam= Q 84(MA 500/560)

POS 4-TM 3, dp=16+4=20cm, MB 20, fb =


14.00 lo = 2.10 m
Analiza optere}enja:
qu 1) Podna konstrukcija 1.00 kN/m2
2) TM 3 2.60 kN/m2
A B 3) Plafon 0.30 kN/m2
L = 2.21 g= 3.90 kN/m2
4) Korisno p= 1.50 kN/m2
Ag=Bg= 4.30 kN/m'
Ap=Bp= 1.65 kN/m' qu=1.6*g+1. 8.94 kN/m'
Mmax = 5.433 kNm
Au=Bu= 9.86 kN/m' k = 8.883 2.571
Aa = 0.656 cm2

Usvojeno: GA 240/360
Aa1 = 2F6
Aa3 = 1F6
Aam= Q 84(MA 500/560)

POS 5-TM 3, dp=16+4=20cm, MB 20, fb =


14.00 lo = 2.05 m
Analiza optere}enja:
1) Podna konstrukcija 1.00 kN/m2
2) TM 3 2.60 kN/m2
qu 3) Plafon 0.30 kN/m2
g= 3.90 kN/m2
A B 4) Korisno p= 1.50 kN/m2
L = 2.15
qu=1.6*g+1. 8.94 kN/m'
Ag=Bg= 4.20 kN/m' Mmax = 5.178 kNm
Ap=Bp= 1.61 kN/m' k = 9.100 2.571
Aa = 0.656 cm2
Au=Bu= 9.62 kN/m'
Usvojeno: GA 240/360
Aa1 = 2F6
Aa3 = 1F6
Aam= Q 84(MA 500/560)

POS 6-TM 3, dp=16+4=20cm, MB 20, fb =


14.00 lo = 2.15 m
Analiza optere}enja:
1) Podna konstrukcija 1.00 kN/m2
2) TM 3 2.60 kN/m2
qu 3) Plafon 0.30 kN/m2
g= 3.90 kN/m2
A B 4) Korisno p= 1.50 kN/m2
L = 2.26
qu=1.6*g+1. 8.94 kN/m'
Ag=Bg= 4.40 kN/m' Mmax = 5.695 kNm
Ap=Bp= 1.69 kN/m' k = 8.677 2.571
Aa = 0.656 cm2
Au=Bu= 10.09 kN/m'
Usvojeno: GA 240/360
Aa1 = 2F6
Aa3 = 1F6
Aam= Q 84(MA 500/560)

POS 7-TM 3, dp=16+4=20cm, MB 20, fb =


14.00 lo = 1.10 m
Analiza optere}enja:
qu 1) Podna konstrukcija 1.00 kN/m2
2) TM 3 2.60 kN/m2
A B 3) Plafon 0.30 kN/m2
L = 1.16 g= 3.90 kN/m2
4) Korisno p= 1.50 kN/m2
Ag=Bg= 2.25 kN/m'
Ap=Bp= 0.87 kN/m' qu=1.6*g+1. 8.94 kN/m'
Mmax = 1.491 kNm
Au=Bu= 5.16 kN/m' k = 16.959 2.571
Aa = 0.656 cm2

Usvojeno: GA 240/360
Aa1 = 2F6
Aa3 = 1F6
Aam= Q 84(MA 500/560)

POS 8-TM 3, dp=16+4=20cm, MB 20, fb =


14.00 lo = 1.30 m
Analiza optere}enja:
1) Podna konstrukcija 1.00 kN/m2
2) TM 3 2.60 kN/m2
qu 3) Plafon 0.30 kN/m2
g= 3.90 kN/m2
A B 4) Korisno p= 1.50 kN/m2
L = 1.37
qu=1.6*g+1. 8.94 kN/m'
Ag=Bg= 2.66 kN/m' Mmax = 2.082 kNm
Ap=Bp= 1.02 kN/m' k = 14.350 2.571
Aa = 0.656 cm2
Au=Bu= 6.10 kN/m'
Usvojeno: GA 240/360
Aa1 = 2F6
Aa3 = 1F6
Aam= Q 84(MA 500/560)
POS 300+ /II SPRAT/

POS 301-TM 3 /16+4=20cm/, MB 20, fb =


14.00 lo = 3.60 m
Analiza optere}enja:
qu 1) Termoizolacija 0.10 kN/m2
2) TM 3 2.60 kN/m2
A B 3) Plafon 0.30 kN/m2
L = 3.78 g= 3.00 kN/m2
4) Korisno p= 1.50 kN/m2
Ag=Bg= 5.67 kN/m'
Ap=Bp= 2.84 kN/m' qu=1.6*g+1. 7.50 kN/m'
Mmax = 13.395 kNm
Au=Bu= 14.18 kN/m' k = 5.658 = 3.281
Aa = 0.837 cm2

Usvojeno: GA 240/360
Aa1 = 2F6
Aa3 = 1F8
Aam= Q 84(MA 500/560)

POS 302-TM 3 /16+4=20cm/, MB 20, fb =


14.00 lo = 2.10 m
Analiza optere}enja:
1) Termoizolacija 0.10 kN/m2
2) TM 3 2.60 kN/m2
qu 3) Plafon 0.30 kN/m2
g= 3.00 kN/m2
A B 4) Korisno p= 1.50 kN/m2
L = 2.21
qu=1.6*g+1. 7.50 kN/m'
Ag=Bg= 3.31 kN/m' Mmax = 4.558 kNm
Ap=Bp= 1.65 kN/m' k = 9.699 min = 2.571
Aa = 0.656 cm2
Au=Bu= 8.27 kN/m'
Usvojeno: GA 240/360
Aa1 = 2F6
Aa3 = 1F6
Aam= Q 84(MA 500/560)

POS 303-TM 3 /16+4=20cm/, MB 20, fb =


14.00 lo = 4.00 m
Analiza optere}enja:
1) Termoizolacija 0.10 kN/m2
2) TM 3 2.60 kN/m2
qu 3) Plafon 0.30 kN/m2
g= 3.00 kN/m2
A B 4) Korisno p= 1.50 kN/m2
L = 4.20
qu=1.6*g+1. 7.50 kN/m'
Ag=Bg= 6.30 kN/m' Mmax = 16.538 kNm
Ap=Bp= 3.15 kN/m' k = 5.092 = 4.182
Aa = 1.067 cm2
Au=Bu= 15.75 kN/m'
Usvojeno: GA 240/360
Aa1 = 2F6
Aa3 = 1F10
Aam= Q 84(MA 500/560)

POS 304 -AB Konzolna plo~a, MB 20, GA 240/360 dpl = 15 cm


lo = 1.25 m Analiza optere}enja:
qu 1) Pokriva~ 0.40 KN/m2
2) Sopstvena te`ina 3.75 KN/m2
A 3) Malter 0.40 KN/m2
L = 1.31 g= 4.55 KN/m'

Ag = 5.97 KN/m'
Ap = 1.31 KN/m' 4) Korisno p= 1.00 KN/m2
qu=1.6g+ 9.08 KN/m'
Au = 11.92 KN/m' k = 5.289 3.788
Mumax= 7.82 KNm Aa= 2.76 cm2
Ap= 0.55 cm2
h= 0.125 m ea= 18 cm
b= 1.00 m ep= 51 cm
fb= 14.0 Mpa USVOJENO: Aa= F 8 /12,5cm
(podeona)Ap= F 6 / 20 cm

POS 305 - AB Greda sa prepustom , MB 20, GA 240/360, b= 25 cm


d= 20 cm

3 F 12

20 uz F6 USVOJENO: Aa = 3F 12
uz = F6 /20 /10
3 F 12
25

POS 306 - AB Greda , MB 20, GA 240/360, b= 25 cm


d= 20 cm

3 F 12

20 uz F6 USVOJENO: Aa = 3F 12
uz = F6 /20 /10
3 F 12
25
POS 307 - AB Greda , MB 20, GA 240/360, b= 25 cm
lo = 4.00 m d= 30 cm
qu1
qu Analiza optere}enja:
1) Sopst. te`ina 1.88 kN/m'
A B 2) Zid 2.10 kN/m'
L = 4.20 3) Zid 4.90 kN/m'

Au= 16.50 kN
Bu= 16.50 kN qu=1.6g+1.8p= 6.36 kN/m'
max 0.28 MPa < 0.80 MPa qu1=1.6g+1.8p= 10.84 kN/m'
Mu = 19.15 kNm
2 F 12 h = 0.265 m
b= 0.25 m
fb = 14.0 MPa
30 uz F6 k = 3.583 = 8.224
Aa = 3.18 cm2
3 F 12
USVOJENO: Aa 3F 12
25 uz =F6 /20 /10

POS 308 - AB Greda sa prepustom, MB 20, GA 240/360, bAB/BC= 35/25 cm


dAB/BC= 20/30 cm

qu qu1 Pu Analiza optere}enja:


1) Sopst. te`ina/AB/ 1.75 kN/m'
A B C 2) Sopst. te`ina/BC/ 1.88 kN/m'
3.85 1.25 3) Krov/AB/ 4.41 kN/m'
4) Krov/BC/ 1.25 kN/m'
Au= 8.79 kN 5) POS 303 18.77 kN/m'
Bu= 75.37 kN 6) POS 307 16.50 kN
qu=1.6g+ 9.86 kN/m'
max 0.79 MPa < 0.80MPa qu1=1.6g+ 23.77 kN/m'
Pu = 16.50 kN
MAB = -1.34 kNm
5 F 14 MB = -39.20 kNm
^VOR B:
h= 0.26 m
30 uz F8 b= 0.25 m
fb= 14.0 MPa
2 F 14 k = 2.457 18.326
Aa= 6.95 cm2
25
USVOJENO: Aa 5F 14
uz = F8 /20 /10
3 F 14 POLJE AB:

20 uz F8 USVOJENO: Aa = 3F 14
3 F 14 uz = F8 /20 /10

35

POS 309 - AB Greda sa prepustom, MB 20, GA 240/360, b= 25 cm


d= 30 cm

qu qu1 Pu Analiza optere}enja:


1) Sopst. te`ina 1.88 kN/m'
A B C 2) Krov/AB/ 4.41 kN/m'
3.85 1.25 3) Krov/BC/ 1.25 kN/m'
4) POS 303 18.77 kN/m'
Au= 9.18 kN 5) POS 307 16.50 kN/m'
Bu= 75.75 kN
qu=1.6g+ 10.06 kN/m'
max 0.79 MPa < 0.80MPa qu1=1.6g+ 23.77 kN/m'
Pu = 16.50 kN
MAB = -0.97 kNm
MB = -39.20 kNm
5 F 14 ^VOR B:
h= 0.26 m
b= 0.25 m
30 uz F8 fb= 14.0 MPa
k = 2.457 18.326
2 F 14 Aa= 6.95 cm2

25 USVOJENO: Aa 5F 14
uz = F8 /20 /10

3 F 14
POLJE AB:

30 uz F8 USVOJENO: Aa = 3F 14
uz = F8 /20 /10
3 F 14

25

POS 310 - AB Greda , MB 20, RA 400/500, b= 25 cm


lo = 4.00 m d= 40 cm
qu1
qu Analiza optere}enja:
1) Sopst. te`ina 2.50 kN/m'
A B 2) Zid 7.00 kN/m'
L = 4.20 3) Zid 12.00 kN/m'
4) POS 301 14.20 kN/m'
Au = 70.14 kN
Bu = 70.14 kN qu=1.6g+1.8p = 29.40 kN/m'
max 0.87 MPa > 0.80 MPa qu1=1.6g+1.8p = 37.40 kN/m'
Mu= 76.59 kNm
2R F 14 h= 0.36 m
b= 0.25 m
fb = 14.0 MPa
40 uz F8 k = 2.434 = 18.70
Aa = 5.89 cm2

4R F 14 USVOJENO: Aa 4RF 14
uz =F8 /20 /10
25

POS 311 - AB Greda , MB 20, GA 240/360, b= 25 cm


lo = 2.15 m d= 20 cm
qu Analiza optere}enja:
1) Sopst. te`ina 1.25 kN/m'
A B 2) POS 301 14.18 kN/m'
L = 2.26 3) POS 302 8.27 kN/m'

Au= 27.60 kN
Bu= 27.60 kN qu=1.6g+ 24.45 kN/m'
max 0.74 MPa < 0.80 MPa Mu = 15.58 kNm
h = 0.165 m
2 F 12 b= 0.25 m
fb = 14.0 MPa
20 uz F6 k = 2.473 = 18.699
Aa = 4.50 cm2
4 F 12
25 USVOJENO: Aa = 4F 12
uz =F6 /20 /10
POS 1+ /PRIZEMLJE/

POS 1-TM 3 /16+4=20cm/, MB 20, fb14.00


= lo = 3.60 m
Analiza optere}enja:
qu 1) Podna konstrukcija 1.00 kN/m2
2) TM 3 2.60 kN/m2
A B 3) Plafon 0.30 kN/m2
L = 3.78 g= 3.90 kN/m2
4) Korisno p= 1.50 kN/m2
Ag=Bg= 7.37 kN/m'
Ap=Bp= 2.84 kN/m' qu=1.6*g+1. 8.94 kN/m'
Mmax = 15.967 kNm
Au=Bu= 16.90 kN/m' k = 5.182 = 3.918
Aa = 1.000 cm2

Usvojeno: GA 240/360
Aa1 = 2F6
Aa3 = 1F10
Aam= Q 84(MA 500/560)

POS 2-TM 3 /16+4=20cm/, MB 20, fb14.00


= lo = 3.60 m
Analiza optere}enja:
1) Podna konstrukcija 1.00 kN/m2
2) TM 3 2.60 kN/m2
3) Plafon 0.30 kN/m2
qu 4) Pregr.zid 1.50 kN/m2
g= 5.40 kN/m2
A B 5) Korisno p= 1.50 kN/m2
L = 3.78
qu=1.6*g+1. 11.34 kN/m'
Ag=Bg= 10.21 kN/m' Mmax = 20.254 kNm
Ap=Bp= 2.84 kN/m' k = 4.601 = 5.003
Aa = 1.277 cm2
Au=Bu= 21.43 kN/m'
Usvojeno: GA 240/360
Aa1 = 2F6
Aa3 = 1F10
Aam= Q 84(MA 500/560)

POS 3-TM 3 /16+4=20cm/, MB 20, fb14.00


= lo = 3.60 m
Analiza optere}enja:
1) Podna konstrukcija 1.00 kN/m2
2) TM 3 2.60 kN/m2
qu 3) Plafon 0.30 kN/m2
g= 3.90 kN/m2
A B 4) Korisno p= 3.00 kN/m2
L = 3.78
qu=1.6*g+1. 11.64 kN/m'
Ag=Bg= 7.37 kN/m' Mmax = 20.790 kNm
Ap=Bp= 5.67 kN/m' k = 4.541 = 5.143
Aa = 1.313 cm2
Au=Bu= 22.00 kN/m'
Usvojeno: GA 240/360
Aa1 = 2F6
Aa3 = 1F10
Aam= Q 84(MA 500/560)

POS 204-TM 3 /16+4=20cm/, MB 20, fb =


14.00 lo = 4.00 m
Analiza optere}enja:
1) Podna konstrukcija 0.80 kN/m2
2) TM 3 2.60 kN/m2
qu 3) Plafon 0.30 kN/m2
g= 3.70 kN/m2
A B 4) Korisno p= 1.50 kN/m2
L = 4.20
qu=1.6*g+1. 8.62 kN/m'
Ag=Bg= 7.77 kN/m' Mmax = 19.007 kNm
Ap=Bp= 3.15 kN/m' k = 4.749 = 4.725
Aa = 1.206 cm2
Au=Bu= 18.10 kN/m'
Usvojeno: GA 240/360
Aa1 = 2F6
Aa3 = 1F10
Aam= Q 84(MA 500/560)

POS 205 -AB Konzolna plo~a, MB 20, GA 240/360 dpl = 15 cm


lo = 1.25 m Analiza optere}enja:
qu Gu 1) Podna konstrukcija 1.00 KN/m2
2) Sopstvena te`ina 3.75 KN/m2
A 3) Malter 0.40 KN/m2
L = 1.31 g= 5.15 KN/m'
4) Ograda 0.70 KN/m'
Ag = 7.46 KN/m' Gu=1.6G 1.12 KN
Ap = 3.94 KN/m' 5) Korisno p= 3.00 KN/m2
qu=1.6g+ 13.64 KN/m'
Au = 19.02 KN/m' k = 4.068 6.296
Mumax= 13.22 KNm Aa= 4.59 cm2
Ap= 0.92 cm2
h= 0.125 m ea= 17 cm
b= 1.00 m ep= 30 cm
fb= 14.0 Mpa USVOJENO: Aa= F 10 /12,5cm
(podeona)Ap= F 6 / 20 cm
POS 206 - AB kontinualna greda , MB20,RA 400/500 b= 25 cm
d= 30 cm

qu qu

A B C D
3.80 2.4 3.8
10.00

Au= 44.20 kN Analiza optere}enja:


Bu= 94.40 kN 1) Sopst.te`ina 1.88 kN/m'
Cu= 94.40 kN 2) Krov 1.80 kN/m'
Du= 44.20 kN 3) Zid 11.40 kN/m'
4) Serkla` 2.25 kN/m'
qu=1.6g+ 27.72 kN/m'
max 1.07 MPa > 0.80MPa
MAB= 35.17 kNm
MB= -32.17 kNm
MBC= -12.21 kNm
M C= -32.17 kNm
MCD= 35.17 kNm

POLJA : AB i CD h= 0.255 m
b= 0.25 m
2R F 12 fb= 14.0 Mpa
k= 2.544 16.926
Aa= 3.78 cm2
30 uz F8
USVOJENO: Aa = 4RF 12
4R F 12 uz =F8 /20 /10

25

OSLONCI : B i C h= 0.255 m
b= 0.25 m
4R F 12 fb= 14.0 Mpa
k= 2.660 15.478
Aa= 3.45 cm2
30 uz F8
USVOJENO: Aa = 4RF 12
2R F 12 uz =F8 /20 /10

25

4RF 12 4RF 12

A B C D
4RF 12 2RF 12 4RF 12

POS 207 - AB Konzolna greda , MB 20, RA 400/500 b= 25 cm


lo = 0.55 m d= 30 cm
Analiza optere}enja:
qu Pu 1) Sopst. te`ina 1.88 kN/m'
2) Zid 11.20 kN/m'
B 3) POS 201 16.29 kN/m'
0.55 4) POS 206 44.20 kN

Bu = 64.67 kN qu =1.6g+1.8p= 37.21 kN/m'


Mu= 29.94 kNm Pu = 44.20 kN
max 1.11 MPa > 0.80 MPa Mu= 29.94 kNm

3R F 12 h= 0.26 m
b= 0.25 m
fb= 14.0 MPa
30 uz F8 k= 2.811 = 13.7
Aa= 3.12 cm2
2R F 12
USVOJENO: Aa 3RF 12
25 uz =F8 /10

POS 208 - AB Konzolna greda , MB 20, RA 400/500 b= 25 cm


lo = 0.55 m d= 30 cm
Analiza optere}enja:
qu Pu 1) Sopst. te`ina 1.88 kN/m'
2) Zid 11.20 kN/m'
B 3) POS 201 16.29 kN/m'
0.55 4) POS 203 9.50 kN/m'
5) POS 206 94.40 kN
Bu = 120.09 kN qu =1.6g+1.8p= 46.71 kN/m'
Mu= 58.98 kNm Pu = 94.40 kN
max 2.05 MPa > 0.80 MPa Mu= 58.98 kNm

6R F 14 h= 0.26 m
b= 0.25 m
fb= 14.0 MPa
30 uz F8 k= 2.003 = 28.62
Aa= 6.51 cm2
3R F 14
USVOJENO: Aa = 6RF 14
25 uz =F8 /7,5

Osiguranje od glavnih napona zatezanja:


maxTu = 120.10 kN r 0.80 MPa (MB 20)
minTu = 0.00 kN r 1.88 MPa
mak uzengija: eu = 8.51 cm
usvojeno: eu = 7.50 m (m=2; F 8; Aa1= 0.5 cm2)
du`ina osiguranja od oslonca: l = 55 cm
odatna podu`. arm.: 1.59 cm2
ukupna podu`na arm 8.10 cm2
u= 0.53 % > 0.20%

POS 209 - AB Greda , MB 20, GA 240/360, b= 40 cm


d= 20 cm

3 F 12

20 uz F6 USVOJENO: Aa = 3F 12
uz = F6 /20 /10
3 F 12
40

POS 210 - AB Greda , MB 20, GA 240/360, b= 25 cm


lo = 4.00 m d= 30 cm
qu Analiza optere}enja:
1) Sopst. te`ina 1.88 kN/m'
A B 2) Zid 8.40 kN/m'
L = 4.20

Au= 34.52 kN
Bu= 34.52 kN qu=1.6g+ 16.44 kN/m'
max 0.58 MPa < 0.80 MPa Mu = 36.25 kNm
h = 0.265 m
2 F 14 b= 0.25 m
fb = 14.0 MPa
30 uz F6 k = 2.604 = 16.143
Aa = 6.24 cm2

4 F 14 USVOJENO: Aa = 4F 14
25 uz =F6 /20 /10

POS 211 - AB Greda sa prepustom , MB 20, GA 240/360, b= 25 cm


d= 20 cm

3 F 12
20 uz F6 USVOJENO: Aa = 3F 12
uz = F6 /20 /10
3 F 12
25

POS 212 - AB Greda sa prepustom, MB 20, RA 400/500, bAB/BC= 40/25 cm


dAB/BC= 20/30 cm

qu qu1 Pu Analiza optere}enja:


1) Sopst. te`ina/AB/ 2.00 kN/m'
A B C 2) Sopst. te`ina/BC/ 1.88 kN/m'
3.85 1.25 3) Zid/AB/ 5.20 kN/m'
4) Zid/BC/ 9.10 kN/m'
Au= 3.73 kN 5) POS 204 18.10 kN/m'
Bu= 119.71 kN 6) POS 210 34.52 kN
qu=1.6g+ 11.52 kN/m'
max 1.35 MPa > 0.80MPa qu1=1.6g+ 35.66 kN/m'
Pu = 34.52 kN
MAB = -14.16 kNm
6R F 14 MB = -71.01 kNm
^VOR B:
h= 0.26 m
30 uz F8 b= 0.25 m
fb= 14.0 MPa
3R F 14 k = 1.825 37.28
Aa= 8.48 cm2
25
USVOJENO: Aa 6RF 14
uz = F8 /10

3R F 14 POLJE AB:

20 uz F8 USVOJENO: Aa = 3RF 14
3R F 14 uz = F8 /20 /10

40
POS ST- AB stepeni{na plo~a , MB 20, RA 400/500, dpl = 15.00 cm
16.5
tg = 0.660
qu1 qu qu1 25

cos = 0.835
F C
Analiza optere}enja: deo E-F
1) Sop.te`.plo~e 4.49 KN/m2
A E 2) Od stepenika 1.88 KN/m2
1.00 2.65 m 1.00 3) Obloga stepenika 0.90 KN/m2
4) Korisno 3.00 KN/m2
qu =1.6g+1 17.03 KN/m'
Au = 34.92 KN/m'
Cu = 34.92 KN/m' Analiza optere}enja:Deo A-E i F-C
1) Sop.te`.plo~e 3.75 KN/m2
3) Obloga stepenika 0.60 KN/m2
4) Korisno 3.00 KN/m2
qu1 =1.6g+ 12.36 KN/m'
Mmax = 43.69 KNm
h= 0.125 m
fb= 14.00 Mpa
b= 1.00 m
k = 2.238 22.850
Aa= 10.00 cm2
Ap= 2.00 cm2
ea= 11.30 cm
ep= 25.01 cm
USVOJENO: Aa= RF 12 /10cm
(podeona)Ap= F 8 /15cm

AB STUBOVI
USVOJENO:RA 400/500 ; MB 20

2R F 14
2025 uz F6 /15/7.5

2R F 14
2025

Zidove objekta d= 20 cm raditi od:


Blokovi od gline(JUS.B.D1.015) b/l/h=25/19/19cm ; M150.
Produ`ni malter MM5
Uslovi za kontrolu materijala za zidanje II kategorije
Kontrola izvo|enja radova B
i u svemu prema Pravilniku o tehni~kim normativima za zidane zidove

Zidove d=12cm, raditi od:


Blokovi od gline(JUS.B.D1.015) b/l/h=25/19/12cm ; M50.
Produ`ni malter MM2.5.
Uslovi za kontrolu materijala za zidanje II kategorije
Kontrola izvo|enja radova B
i u svemu prema Pravilniku o tehni~kim normativima za zidane zidove

G 1 - AB kontinualna greda , MB20,RA 400/500 b= 25 cm


d= 40 cm

qu qu

A B C D E
4.75 2.725 3.44 0.64
10.92

max 0.79 MPa > 0.80MPa


POLJE AB: MAB= 56.46 kNm
^VOR -B: MB= -63.56 kNm
POLJE BC: MBC= 5.68 kNm
^VOR C: M C= -39.10 kNm
POLJE CD: MCD= 27.78 kNm
^VOR -D: M D= -36.00 kNm

G1 POLJE : AB
h= 0.36 m
2R F 14 b= 0.25 m
fb= 14.0 Mpa
k= 2.834 13.56
40 uz F8 Aa= 4.27 cm2

USVOJENO: Aa = 4RF 14
4R F 14 uz =F8 /20 /10
25

G1 OSLONAC : B
h= 0.36 m
4R F 14 b= 0.25 m
fb= 14.0 Mpa
k= 2.671 15.344
40 uz F8 Aa= 4.83 cm2

USVOJENO: Aa = 4RF 14
2R F 14 uz =F8 /20 /10
25

G1 OSLONCI : CiD
h= 0.36 m
2R F 14 b= 0.25 m
fb= 14.0 Mpa
k= 3.406 9.155
40 uz F8 Aa= 2.88 cm2

USVOJENO: Aa = 2RF 14
2R F 14 uz =F8 /20 /10
25

G1 POLJA : BC i CD

2R F 14

40 uz F8
USVOJENO: Aa = 2RF 14
uz =F8 /20 /10
2R F 14
25

2RF 14 4RF 14 2RF 14 2RF 14

A B C D
4RF 14 2RF 14 2RF 14
G 2 - AB kontinualna greda , MB20,RA 400/500 b= 30 cm
d= 50 cm

qu qu

A B C
4.80 5.55 1.2
11.55

max 1.20 MPa > 0.80MPa


POLJE AB: MAB= 96.00 kNm
^VOR -B: MB= -173.75 kNm
POLJE BC: MBC= 120.55 kNm
^VOR C: M C= -128.30 kNm

G2 POLJE : AB
h= 0.45 m
2R F 14 b= 0.30 m
fb= 14.0 Mpa
k= 2.976 12.136
50 2 F 10 Aa= 5.73 cm2

uz F8 USVOJENO: Aa = 5RF 14
uz =F8 /20 /10
5R F 14
30

G2 OSLONAC : B
h= 0.45 m
7R F 14 b= 0.30 m
fb= 14.0 Mpa
k= 2.212 23.224
50 2 F 10 Aa= 10.97 cm2

uz F8 USVOJENO: Aa = 7RF 14
uz =F8 /20 /10
3R F 14
30

G2 POLJE: BC

3R F 14

50 2 F 10

uz F8 USVOJENO: Aa = 5RF 14
uz =F8 /20 /10
5R F 14
30

G2 OSLONAC : C
h= 0.45 m
5R F 14 b= 0.30 m
fb= 14.0 Mpa
k= 2.575 16.667
50 2 F 10 Aa= 7.88 cm2

uz F8 USVOJENO: Aa = 5RF 14
uz =F8 /20 /10
3R F 14
30

2RF 14 7RF 14 3RF 14 5RF 14

A B C
5RF 14 3RF 14 5RF 14 3RF 14
G 3 - AB kontinualna greda , MB20,RA 400/500 b= 25 cm
d= 40 cm

qu qu

A B C D E
4.75 2.725 2.00 2.09
9.48

max 0.96 MPa > 0.80MPa


POLJE AB: MAB= 57.10 kNm
^VOR -B: MB= -64.55 kNm
POLJE BC: MBC= 4.61 kNm
^VOR C: M C= -27.30 kNm
POLJE CD: MCD= 27.78 kNm
^VOR -D: M D= -62.87 kNm

G3 POLJE : AB
h= 0.36 m
2R F 14 b= 0.25 m
fb= 14.0 Mpa
k= 2.819 13.7
40 uz F8 Aa= 4.32 cm2

USVOJENO: Aa = 4RF 14
4R F 14 uz =F8 /20 /10
25
G3 OSLONAC : B
h= 0.36 m
4R F 14 b= 0.25 m
fb= 14.0 Mpa
k= 2.651 15.612
40 uz F8 Aa= 4.92 cm2

USVOJENO: Aa = 4RF 14
2R F 14 uz =F8 /20 /10
25

G3 POLJE : BC

2R F 14

40 uz F8
USVOJENO: Aa = 2RF 14
uz =F8 /20 /10
2R F 14
25

G3 OSLONAC : C
h= 0.36 m
2R F 14 b= 0.25 m
fb= 14.0 Mpa
k= 4.076 6.443
40 uz F8 Aa= 2.03 cm2

USVOJENO: Aa = 2RF 14
2R F 14 uz =F8 /20 /10
25

G3 POLJE : CD

4R F 14

40 uz F8 USVOJENO: Aa = 4RF 14
uz =F8 /20 /10

2R F 14
25

G3 OSLONAC : D
h= 0.36 m
4R F 14 b= 0.25 m
fb= 14.0 Mpa
k= 2.686 15.209
40 uz F8 Aa= 4.79 cm2

USVOJENO: Aa = 4RF 14
2R F 14 uz =F8 /20 /10
25

2RF 14 4RF 14 2RF 14 4RF 14

A B C D
4RF 14 2RF 14 2RF 14 2RF 14

G 4 - AB kontinualna greda , MB20,RA 400/500 b= 25 cm


d= 40 cm

qu qu

A B C
3.80 3.8
7.60

max 0.61 MPa < 0.80MPa


POLJE AB: MAB= 28.55 kNm
^VOR -B: MB= -42.34 kNm
POLJE BC: MBC= 30.95 kNm

G4 OSLONAC : B
h= 0.36 m
3R F 14 b= 0.25 m
fb= 14.0 Mpa
k= 3.273 9.913
40 uz F6 Aa= 3.12 cm2

USVOJENO: Aa = 3RF 14
3R F 14 uz =F6 /20 /10
25
(USVOJENO CELOM DU@INOM GREDE)

G 5 - AB kontinualna greda , MB20,RA 400/500 b= 25 cm


d= 40 cm

qu qu

A B C
3.80 3.8
7.60

POLJE AB: MAB= 40.19 kNm


G5 ^VOR -B: MB= -60.78 kNm
POLJE BC: MBC= 43.50 kNm
3R F 14

40 uz F6

USVOJENO: Aa = 3RF 14
3R F 14 uz =F6 /20 /10
25
(USVOJENO CELOM DU@INOM GREDE)

G 6 - AB kontinualna greda , MB20,RA 400/500 b= 25 cm


d= 70 cm

qu qu

A B C
3.90 3.9
7.80

G6

2R F 14

2 F 10

70 uz F6 USVOJENO: Aa = 3RF 14
uz =F6 /20 /10
2 F 10
(USVOJENO CELOM DU@INOM GREDE)

3R F 14
25
G 7 - AB kontinualna greda , MB20,RA 400/500 b= 20 cm
d= 40 cm

qu qu

A B C
3.80 3.8
7.60

G7

3 F 12

40 uz F6

USVOJENO: Aa = 3F 12
3 F 12 uz =F6 /20 /10
20
(USVOJENO CELOM DU@INOM GREDE)

G 8 - AB Greda , MB 20, GA 240/360, b= 25 cm


d= 20 cm

3 F 12

20 uz F6 USVOJENO: Aa = 3F 12
uz = F6 /20 /10
3 F 12
25

G 9 - AB Greda za ukru}enje/nadprozornik/, MB 20, GA 240/360, b = 25 cm


d= 20 cm

2 F 12

20 uz F6 USVOJENO: Aa = 2F 12
uz = F6 /20 /10
2 F 12
25
AB STUBOVI
USVOJENO:RA 400/500; MB 20

STUB -S1 /S1a/

2R F 14

40 2R F 14
uz F6/15/7,5cm

2R F 14
25

STUB-S2
3R F 14

uz F6
30 2R F 14

3R F 14
30

STUB-S3

2R F 14

25 uz F6
2R F 14

2R F 14
25

STUB-S4 25

30

10R F 14
uz F6

Zidove objekta d= 20 cm raditi od:


Blokovi od gline(JUS.B.D1.015) b/l/h=25/19/19cm ; M150.
Produ`ni malter MM5
Uslovi za kontrolu materijala za zidanje II kategorije
Kontrola izvo|enja radova B
i u svemu prema Pravilniku o tehni~kim normativima za zidane zidove

Zidove d=12cm, raditi od:


Blokovi od gline(JUS.B.D1.015) b/l/h=25/19/12cm ; M50.
Produ`ni malter MM2.5.
Uslovi za kontrolu materijala za zidanje II kategorije
Kontrola izvo|enja radova B
i u svemu prema Pravilniku o tehni~kim normativima za zidane zidove
POS 101+ /SPRAT/

POS 101-TM 3 /16+4=20cm/, MB 20, fb =


14.00 lo = 3.00 m
Analiza optere}enja:
qu 1) Termoizolacija 0.10 kN/m2
2) TM 3 2.60 kN/m2
A B 3) Plafon 0.30 kN/m2
L = 3.15 g= 3.00 kN/m2

Ag=Bg= 4.73 kN/m' 4) Korisno p= 1.50 kN/m2


Ap=Bp= 2.36 kN/m'
qu=1.6*g+1. 7.50 kN/m'
Au=Bu= 11.81 kN/m' Mmax = 9.302 kNm
k = 6.789 min = 2.571
Aa = 0.656 cm2

Usvojeno: GA 240/360
Aa1 = 2F6
Aa3 = 1F8
Aam= Q 84(MA 500/560)
POS 102-TM 3 /16+4=20cm/, MB 20, fb =
14.00 lo = 3.00 m
Analiza optere}enja:
Gu 1) Podna konstrukcija 1.00 kN/m2
qu 2) TM 3 2.60 kN/m2
3) Plafon 0.30 kN/m2
A 1.40 B g= 3.90 kN/m2
L = 3.15 4) Zid+krov G= 7.00 kN
5) Korisno p= 1.50 kN/m2
Ag= 10.03 kN/m' qu=1.6*g+1.8 8.94 kN/m'
Bg= 9.25 kN/m' Gu= 11.20 kN
Ap=Bp= 2.36 kN/m' Mmax = 19.660 kNm
k = 4.670 = 4.863
Au= 20.30 kN/m' Aa= 1.241 cm2
Bu= 19.06 kN/m'
Usvojeno: GA 240/360
max T / 0.9 * h *b Aa1 = 2F6
max 0.64 MPa < 0.80MPa Aa3 = 1F10
Aam= Q 84(MA 500/560)

POS 103-TM 3 /16+4=20cm/, MB 20, fb =


14.00 lo = 3.00 m
Analiza optere}enja:
1) Podna konstrukcija 1.00 kN/m2
2) TM 3 2.60 kN/m2
qu 3) Plafon 0.30 kN/m2
g= 3.90 kN/m2
A B 4) Korisno p= 1.50 kN/m2
L = 3.15
qu=1.6*g+1. 8.94 kN/m'
Ag=Bg= 6.14 kN/m' Mmax = 11.088 kNm
Ap=Bp= 2.36 kN/m' k = 6.218 = 2.638
Aa = 0.673 cm2
Au=Bu= 14.08 kN/m'
Usvojeno: GA 240/360
Aa1 = 2F6
Aa3 = 1F8
Aam= Q 84(MA 500/560)

POS 104-TM 3 /16+4=20cm/, MB 20, fb =


14.00 lo = 1.25 m
Analiza optere}enja:
qu 1) Podna konstrukcija 1.00 kN/m2
2) TM 3 2.60 kN/m2
A B 3) Plafon 0.30 kN/m2
L = 1.31 g= 3.90 kN/m2

Ag=Bg= 2.56 kN/m' 4) Korisno p= 1.50 kN/m2


Ap=Bp= 0.98 kN/m'
qu=1.6*g+1. 8.94 kN/m'
Au=Bu= 5.87 kN/m' Mmax = 1.925 kNm
k = 14.924 min = 2.571
Aa = 0.656 cm2

Usvojeno: GA 240/360
Aa1 = 2F6
Aa3 = 1F6
Aam= Q 84(MA 500/560)
POS 105-TM 3 /16+4=20cm/, MB 20, fb =
14.00 lo = 3.20 m
Analiza optere}enja:
Gu 1) Podna konstrukcija 1.00 kN/m2
qu 2) TM 3 2.60 kN/m2
3) Plafon 0.30 kN/m2
A 1.95 B g= 3.90 kN/m2
L = 3.36 4) Zid G= 6.30 kN
5) Korisno p= 1.50 kN/m2
Ag= 9.20 kN/m' qu=1.6*g+1.8 8.94 kN/m'
Bg= 10.21 kN/m' Gu= 10.08 kN
Ap=Bp= 2.52 kN/m' Mmax = 20.560 kNm
k = 4.567 = 5.003
Au= 19.25 kN/m' Aa= 1.277 cm2
Bu= 20.87 kN/m'
Usvojeno: GA 240/360
max T / 0.9 * h *b Aa1 = 2F6
max 0.66 MPa < 0.80MPa Aa3 = 1F10
Aam= Q 84(MA 500/560)

POS 106-TM 3 /16+4=20cm/, MB 20, fb =


14.00 lo = 3.00 m
Analiza optere}enja:
Gu 1) Podna konstrukcija 1.00 kN/m2
qu 2) TM 3 2.60 kN/m2
3) Plafon 0.30 kN/m2
A 1.55 B g= 3.90 kN/m2
L = 3.15 4) Zid+krov G= 14.00 kN
5) Korisno p= 1.50 kN/m2
Ag= 13.25 kN/m' qu=1.6*g+1.8 8.94 kN/m'
Bg= 13.03 kN/m' Gu= 22.40 kN
Ap=Bp= 2.36 kN/m' Mmax = 28.520 kNm
k = 3.877 = 7.037
Au= 25.46 kN/m' Aa= 1.796 cm2
Bu= 25.10 kN/m'
Usvojeno: GA 240/360
max T / 0.9 * h *b Aa1 = 2F8
max 0.81 MPa = 0.80MPa Aa3 = 1F10
Aam= Q 84(MA 500/560)

POS 107-TM 3 /16+4=20cm/, MB 20, fb =


14.00 lo = 3.00 m
Analiza optere}enja:
qu 1) Podna konstrukcija 1.00 kN/m2
2) TM 3 2.60 kN/m2
A B 3) Plafon 0.30 kN/m2
L = 3.15 g= 3.90 kN/m2

Ag=Bg= 6.14 kN/m' 4) Korisno p= 1.50 kN/m2


Ap=Bp= 2.36 kN/m'
qu=1.6*g+1. 8.94 kN/m'
Au=Bu= 14.08 kN/m' Mmax = 11.088 kNm
k = 6.218 = 2.683
Aa = 0.685 cm2

Usvojeno: GA 240/360
Aa1 = 2F6
Aa3 = 1F8
Aam= Q 84(MA 500/560)
POS 108-TM 3 /16+4=20cm/, MB 20, fb =
14.00 lo = 1.05 m
Analiza optere}enja:
1) Podna konstrukcija 1.00 kN/m2
2) TM 3 2.60 kN/m2
qu 3) Plafon 0.30 kN/m2
g= 3.90 kN/m2
A B 4) Korisno p= 1.50 kN/m2
L = 1.10
qu=1.6*g+1. 8.94 kN/m'
Ag=Bg= 2.15 kN/m' Mmax = 1.358 kNm
Ap=Bp= 0.83 kN/m' k = 17.766 min= 2.571
Aa = 0.656 cm2
Au=Bu= 4.93 kN/m'
Usvojeno: GA 240/360
Aa1 = 2F6
Aa3 = 1F6
Aam= Q 84(MA 500/560)

POS 109 -AB Konzolna plo~a, MB 20, GA 240/360 dpl = 10 cm


lo = 0.90 m Analiza optere}enja:
qu Gu 1) Termoizolacija 0.10 KN/m2
2) Sopstvena te`ina 2.50 KN/m2
A 3) Malter 0.40 KN/m2
L = 0.95 g= 3.00 KN/m'
4) Krov 0.30 KN/m'
Ag = 3.14 KN/m' Gu=1.6G 0.48 KN
Ap = 1.18 KN/m' 5) Korisno p= 1.25 KN/m2
qu=1.6g+ 7.05 KN/m'
Au = 7.14 KN/m' k = 4.676 4.863
Mumax= 3.60 KNm Aa= 2.13 cm2
Ap= 0.43 cm2
h= 0.075 m ea= 13 cm
b= 1.00 m ep= 66 cm
fb= 14.0 Mpa USVOJENO: Aa= F 6 /12,5cm
(podeona)Ap= F 6 / 20 cm

POS 1+ /PRIZEMLJE/

POS 1-TM 3 /16+4=20cm/, MB 20, fb14.00


= lo = 1.25 m
Analiza optere}enja:
qu 1) Podna konstrukcija 1.00 kN/m2
2) TM 3 2.60 kN/m2
A B 3) Plafon 0.30 kN/m2
L = 1.31 g= 3.90 kN/m2

Ag=Bg= 2.56 kN/m' 4) Korisno p= 2.00 kN/m2


Ap=Bp= 1.31 kN/m'
qu=1.6*g+1. 9.84 kN/m'
Au=Bu= 6.46 kN/m' Mmax = 2.119 kNm
k = 14.225 min = 2.571
Aa = 0.656 cm2

Usvojeno: GA 240/360
Aa1 = 2F6
Aa3 = 1F6
Aam= Q 84(MA 500/560)

POS 2-TM 3 /16+4=20cm/, MB 20, fb14.00


= lo = 3.00 m
Analiza optere}enja:
1) Podna konstrukcija 1.00 kN/m2
2) TM 3 2.60 kN/m2
qu 3) Plafon 0.30 kN/m2
g= 3.90 kN/m2
A B 4) Korisno p= 2.00 kN/m2
L = 3.15
qu=1.6*g+1. 9.84 kN/m'
Ag=Bg= 6.14 kN/m' Mmax = 12.205 kNm
Ap=Bp= 3.15 kN/m' k = 5.927 = 3.158
Aa = 0.806 cm2
Au=Bu= 15.50 kN/m'
Usvojeno: GA 240/360
Aa1 = 2F6
Aa3 = 1F8
Aam= Q 84(MA 500/560)

POS 3-TM 3 /16+4=20cm/, MB 20, fb14.00


= lo = 5.00 m
Analiza optere}enja:
1) Podna konstrukcija 1.00 kN/m2
2) TM 3 2.60 kN/m2
qu 3) Plafon 0.30 kN/m2
g= 3.90 kN/m2
A B 4) Korisno p= 1.50 kN/m2
L = 5.25
qu=1.6*g+1. 8.94 kN/m'
Ag=Bg= 10.24 kN/m' Mmax = 30.801 kNm
Ap=Bp= 3.94 kN/m' k = 3.731 = 7.638
Aa = 1.949 cm2
Au=Bu= 23.47 kN/m'
Usvojeno: GA 240/360
Aa1 = 2F8
Aa3 = 1F12
Aam= Q 84(MA 500/560)

POS 4-TM 3 /16+4=20cm/, MB 20, fb14.00


= lo = 3.20 m
Analiza optere}enja:
qu 1) Podna konstrukcija 1.00 kN/m2
2) TM 3 2.60 kN/m2
A B 3) Plafon 0.30 kN/m2
L = 3.36 4) Pregr.zidovi 1.50 kN/m2
g= 5.40 kN/m2
Ag=Bg= 9.07 kN/m' 5) Korisno p= 1.50 kN/m2
Ap=Bp= 2.52 kN/m'
qu=1.6*g+1. 11.34 kN/m'
Au=Bu= 19.05 kN/m' Mmax = 16.003 kNm
k = 5.176 = 3.918
Aa = 1.000 cm2

Usvojeno: GA 240/360
Aa1 = 2F6
Aa3 = 1F10
Aam= Q 84(MA 500/560)

POS 5-TM 3 /16+4=20cm/, MB 20, fb14.00


= lo = 1.80 m
Analiza optere}enja:
1) Podna konstrukcija 1.00 kN/m2
2) TM 3 2.60 kN/m2
qu 3) Plafon 0.30 kN/m2
g= 3.90 kN/m2
A B 4) Korisno p= 1.50 kN/m2
L = 1.89
qu=1.6*g+1. 8.94 kN/m'
Ag=Bg= 3.69 kN/m' Mmax = 3.992 kNm
Ap=Bp= 1.42 kN/m' k = 10.364 = 2.571
Aa = 0.656 cm2
Au=Bu= 8.45 kN/m'
Usvojeno: GA 240/360
Aa1 = 2F6
Aa3 = 1F6
Aam= Q 84(MA 500/560)

POS 6-TM 3 /16+4=20cm/, MB 20, fb14.00


= lo = 3.00 m
Analiza optere}enja:
1) Podna konstrukcija 1.00 kN/m2
2) TM 3 2.60 kN/m2
qu 3) Plafon 0.30 kN/m2
g= 3.90 kN/m2
A B 4) Korisno p= 1.50 kN/m2
L = 3.15
qu=1.6*g+1. 8.94 kN/m'
Ag=Bg= 6.14 kN/m' Mmax = 11.088 kNm
Ap=Bp= 2.36 kN/m' k = 6.218 = 2.799
Aa = 0.714 cm2
Au=Bu= 14.08 kN/m'
Usvojeno: GA 240/360
Aa1 = 2F6
Aa3 = 1F8
Aam= Q 84(MA 500/560)

AB GREDE /TAVAN /

G 1 - AB Greda , MB 20, RA 400/500, b= 20 cm


lo = 4.75 m d= 30 cm
qu Analiza optere}enja:
1) Sopst. te`ina 1.50 kN/m'
A B 2) Krov 8.30 kN/m'
L = 4.99

Au= 40.14 kN
Bu= 40.14 kN qu=1.6g+ 16.10 kN/m'
max 0.84 MPa > 0.80 MPa Mu = 50.05 kNm
h = 0.265 m
2R F 14 b= 0.20 m
fb = 14.0 MPa
30 uz F6 k= 1.982 = 30.142
Aa = 5.59 cm2

4R F 14 USVOJENO: Aa = 4RF 14
20 uz =F6 /20 /10

G 2 - AB Kontinualna greda , MB 20, RA 400/500, b= 20 cm


d= 30 cm
qu Analiza optere}enja:
1) Sopst. te`ina 1.50 kN/m'
A B 2) Krov 8.30 kN/m'
3.40 1.35

Au= 22.20 kN
Bu= 56.55 kN qu=1.6g+ 16.10 kN/m'
Cu= -2.24 kN maxMu = 17.69 kNm
max 0.47 MPa < 0.80 MPa h = 0.265 m
b= 0.20 m
2R F 14 fb = 14.0 MPa
k = 3.334 = 9.61
30 uz F6 Aa = 1.78 cm2

USVOJENO: Aa = 2RF 14
2R F 14 uz =F6 /20 /10
20

G 3 - AB Greda , MB 20, GA 240/360, b= 25 cm


lo = 1.50 m d= 20 cm

2 F 12

20 uz F6 USVOJENO: Aa = 2F 12
uz = F6 /20 /10
2 F 12
25

AB GREDE /SPRAT /
G 4 - AB Greda sa prepustom ,MB 20, RA 400/500,( ram - osa 1 ) b = 25 cm
d= 40 cm
qu

A B C
3.25 1.50

Tmax= 85.73 kN
( u ~voru B) ^VOR B
max 1.04 MPa > 0.80 MPa Mu = -114.01 kNm
h = 0.365 m
^VOR B b= 0.25 m
fb = 14.0 MPa
6R F 14 k= 2.022 = 28.62
Aa = 9.14 cm2

40 uz F8 USVOJENO: Aa = 6RF 14
uz =F8 /20 /10

3R F 14

25

POLJE AB

3R F 14

40 uz F8

3R F 14

25

POLJE BC

3R F 14

40 uz F8

3R F 14

25

G 5 - AB Greda , MB 20, GA 240/360, b= 25 cm


d= 20 cm

3 F 12

20 uz F6 USVOJENO: Aa = 3F 12
uz = F6 /20 /10
3 F 12
25

G 6 - AB Greda sa prepustom , MB 20, RA 400/500,( ram - osa 2 b) = 25 cm


d= 50 cm
qu

A B C
3.50 1.25

Tmax= 248.00 kN
( u ~voru B) ^VOR B
max 2.45 MPa > 0.80 MPa Mu = -220.00 kNm
h= 0.45 m
^VOR B b= 0.25 m
fb = 14.0 MPa
8R F 16 k= 1.795 = 38.288
Aa = 15.08 cm2

uz F8 USVOJENO: Aa = 8RF 16
50 2 F 10 uz =F8 /20 /10

4R F 16

25

POLJE AB

4R F 16

uz F8
50 2 F 10

4R F 16

25

POLJE BC

4R F 16

uz F8
50 2 F 10

4R F 16
25

Osiguranje od glavnih napona zatezanja r 0.80 MPa (MB 20)


maxTu = 182.56 kN u 1.76 MPa
minTu = 175.06 kN u1 1.69 MPa
ru 1.45 MPa ru1 1.34 MPa
du`ina osiguranja od oslonca: l = 125 cm ( levo i desno od ~vora B)
Hv = 434.83 kN
Povr{ina kose arm. : 7.71 cm2 (4RF 16)
G 7 - AB Greda sa prepustom , MB 20, RA 400/500,( ram - osa 3 b) = 25 cm
d= 50 cm
qu

A B C
2.21 1.25

Tmax= 128.00 kN
( u ~voru B) ^VOR B
max 1.24 MPa > 0.80 MPa Mu = -155.41 kNm
h= 0.46 m
^VOR B b = 0.25 m
fb = 14.0 MPa
8R F 14 k = 2.183 = 24.011
Aa = 9.66 cm2

uz F8 USVOJENO: Aa = 8RF 14
50 2 F 10 uz =F8 /20 /10

4R F 14

25

POLJE AB

4R F 14

uz F8
50 2 F 10

4R F 14

25

POLJE BC

4R F 14

uz F8
50 2 F 10

4R F 14
25

G 8 - AB Greda sa prepustom, MB 20, RA 400/500,( ram - osa 4 )b = 25 cm


d= 50 cm
qu

A B C D
1.30 2.21 1.25

Tmax= 128.00 kN
( u ~voru B) ^VOR C
max 1.24 MPa > 0.80 MPa Mu = -50.77 kNm
h= 0.46 m
^VOR C b= 0.25 m
fb = 14.0 MPa
3R F 12 k= 3.819 = 7.337
Aa = 2.95 cm2

uz F8 USVOJENO: Aa = 3RF 12
50 2 F 10 uz =F8 /20 /10

3R F 12

25

POLJE AB i BC

2R F 12

uz F8
50 2 F 10

3R F 12

25

^VOR B

2R F 12

uz F8
50 2 F 10

3R F 12
25

G 9 - AB Greda-nadprozornik , MB 20, GA 240/360, b= 25 cm


lo = 0.90 m d= 60 cm
qu

A B
L = 0.95
2 F 12

uz F6
60 2 F 10

USVOJENO: Aa = 2F 12
2 F 12 uz =F6 /20 /10
25

G 10 - AB Konzolna greda-nadprozornik , MB 20, GA 240/360, b= 25 cm


lo = 0.90 m d= 60 cm
qu

A B
L = 0.95

3 F 12

uz F6
60 2 F 10

USVOJENO: Aa = 3F 12
2 F 12 uz =F6 /20 /10
25

G 11 - AB kontinualna greda , MB20,RA 400/500 b= 25 cm


d(BE)= 40 cm
d(AB i EF)= 25 cm

qu qu

A B C D E F
1.725 5.25 3.45 3.25 0.92
11.95

Tmax= 78.28 kN ^VOR B: MB= -26.86 kNm


( u ~voru C) POLJE BC: MBC= 64.63 kNm
max 0.97 MPa > 0.80 MPa ^VOR C: M C= -72.32 kNm
POLJE CD: MCD= 12.34 kNm
^VOR -D: M D= -14.65 kNm
POLJE DE: MDE= 12.73 kNm
^VOR -E: ME= -10.75 kNm

G 11 POLJE : AB (prepust)
h= 0.25 m
3R F 12 b= 0.25 m
fb= 14.0 Mpa
25 uz F8 k= 2.854 13.279
Aa= 2.90 cm2
2R F 12
25 USVOJENO: Aa = 3RF 12
uz =F8 /20 /10

G 11 OSLONAC : B
h= 0.36 m
3R F 12 b= 0.25 m
fb= 14.0 Mpa
k= 4.109 6.296
40 uz F8 Aa= 1.98 cm2

USVOJENO: Aa = 3RF 12
2R F 12 uz =F8 /20 /10
25

G 11 POLJE : BC
h= 0.36 m
2R F 12 b= 0.25 m
fb= 14.0 Mpa
k= 2.649 15.612
40 uz F8 Aa= 4.92 cm2

USVOJENO: Aa = 5RF 12
5R F 12 uz =F8 /20 /10
25

G 11 OSLONAC : C
h= 0.36 m
5R F 12 b= 0.25 m
fb= 14.0 Mpa
k= 2.504 17.568
40 uz F8 Aa= 5.53 cm2
USVOJENO: Aa = 5RF 12
3R F 12 uz =F8 /20 /10
25

G 11 POLJA : CD , DE , EF ; OSLONCI D i E

2R F 12

40 uz F8
USVOJENO: Aa = 2RF 12
uz =F8 /20 /10
2R F 12
25

G 11 POLJE : EF (prepust)

2R F 12

25 uz F8

2R F 12
25 USVOJENO: Aa = 2RF 12
uz =F8 /20 /10
M-ASPHALATOS
M-ASPHALATOS(Au,Bu)

re(A3)u pritisnutu zonu.


M-ASPHALATOS(Au,Bu)

re(A3)u pritisnutu zonu.


POS 100+ /SPRAT/

POS 101-TM 3 /16+4=20cm/, MB 20, fb =


14.00 lo = 3.60 m
Analiza optere}enja:
qu 1) Termoizolacija 0.10 kN/m2
2) TM 3 2.60 kN/m2
A B 3) Plafon 0.30 kN/m2
L = 3.78 g= 3.00 kN/m2
4) Korisno p= 1.25 kN/m2
Ag=Bg= 5.67 kN/m'
Ap=Bp= 2.36 kN/m' qu=1.6*g+1. 7.05 kN/m'
Mmax = 12.592 kNm
Au=Bu= 13.32 kN/m' k = 5.835 = 3.037
Aa = 0.775 cm2

Usvojeno: GA 240/360
Aa1 = 2F6
Aa3 = 1F8
Aam= Q 84(MA 500/560)

POS 2-TM 3 /16+4=20cm/, MB 20, fb14.00


= lo = 3.60 m
Analiza optere}enja:
1) Podna konstrukcija 1.00 kN/m2
2) TM 3 2.60 kN/m2
3) Plafon 0.30 kN/m2
qu 4) Pregr.zid 1.50 kN/m2
g= 5.40 kN/m2
A B 5) Korisno p= 1.50 kN/m2
L = 3.78
qu=1.6*g+1. 11.34 kN/m'
Ag=Bg= 10.21 kN/m' Mmax = 20.254 kNm
Ap=Bp= 2.84 kN/m' k = 4.601 = 5.003
Aa = 1.277 cm2
Au=Bu= 21.43 kN/m'
Usvojeno: GA 240/360
Aa1 = 2F6
Aa3 = 1F10
Aam= Q 84(MA 500/560)

POS 3-TM 3 /16+4=20cm/, MB 20, fb14.00


= lo = 3.60 m
Analiza optere}enja:
1) Podna konstrukcija 1.00 kN/m2
2) TM 3 2.60 kN/m2
qu 3) Plafon 0.30 kN/m2
g= 3.90 kN/m2
A B 4) Korisno p= 3.00 kN/m2
L = 3.78
qu=1.6*g+1. 11.64 kN/m'
Ag=Bg= 7.37 kN/m' Mmax = 20.790 kNm
Ap=Bp= 5.67 kN/m' k = 4.541 = 5.143
Aa = 1.313 cm2
Au=Bu= 22.00 kN/m'
Usvojeno: GA 240/360
Aa1 = 2F6
Aa3 = 1F10
Aam= Q 84(MA 500/560)
G 102 - AB Greda , MB 20, GA 240/ v (MPa)= 400 b= 25 cm
lo = 4.00 m d= 30 cm
qu Analiza optere}enja:
1) Sopst. te`ina 1.88 kN/m'
A B 2)
L = 4.20 3)
4)
Au = 120.10 kN
Bu = 63.00 kN
max 2.05 MPa > 0.80 MPa qu=1.6g+ 30.00 kN/m'
Mu= 58.98 kNm
2F 14 h= 0.26 m
b= 0.25 m
fb = 14.0 MPa
30 uz F6 k = 2.003 = 28.62
Aa = 6.51 cm2

8F 14 USVOJENO: Aa 8F 14
25 uz =F6 /20 /10

Osiguranje od glavnih napona zatezanja:


maxTu = 120.10 kN r 0.80 MPa (MB 20)
minTu = 0.00 kN r 1.88 MPa
mak uzengija: eu = 8.51 cm
usvojeno: eu = 8 m (m=2; F 8; Aa1= 0.5 cm2)
du`ina osiguranja od oslonca: l = 55 cm
odatna podu`. arm.: 1.59 cm2
ukupna podu`na arm 8.10 cm2
u= 0.53 % > 0.20%
VAZI SAMO AKO JE DEO A-E=DELU F-C
G 4 - AB kontinualna greda , MB20,RA 400/500 b= 25 cm
d= 40 cm

qu qu

A B C
3.80 3.8
7.60

max 0.61 MPa < 0.80MPa


POLJE AB: MAB= 28.55 kNm
^VOR -B: MB= -195.73 kNm
POLJE BC: MBC= 30.95 kNm

G4 OSLONAC : B
h= 0.36 m
3R F 14 b= 0.25 m
fb= 14.0 Mpa
k= 1.522 9.913
40 uz F6 Aa= 3.12 cm2

USVOJENO: Aa = 3RF 14
3R F 14 uz =F6 /20 /10
25
(USVOJENO CELOM DU@INOM GREDE)
G 102 - AB Greda , MB 20, GA 24 v (MPa)= 400 b= 25 cm
lo = 4.00 m d= 50 cm
qu Pu Analiza optere}enja:
A B 1) Sopst. te`ina 3.13 kN/m'
3.20 1.0 2)
4.20 3)
4)
Au= -102.26 kN
Bu= 250.26 kN
max 2.42 MPa > 0.80 MPa qu=1.6g+1.8p= 20.00 kN/m'
Pu= 64.00 kN
maxMu = 223.27 kNm
2 F 12 h= 0.46 m
b= 0.25 m
fb= 14.0 MPa
50 uz F6 k = 1.821 23.035
Aa= 9.27 cm2

USVOJENO: Aa 3F 12
3 F 12 uz =F6 /20 /10
25
M-ASPHALATOS

min = max =

Você também pode gostar