Materiales:
Hormigón: H-20
Acero: ADN 420
Materiales de fundación:
Hormigón: H-20
Acero: ADN 420
Tipo A.neg. A.pos. A.piel A.est. Total Ø6 Ø8 Ø10 Ø12 Ø16 Ø20 Ø25 V.horm.
kg kg kg kg kg kg kg kg kg kg kg kg m³
Fundación
*Pórtico 1
V-001(C14-C23) Cim. 16.4 18.4 2.0 6.0 42.8 8.0 34.8 0.356
V-002(C23-C2) Cim. 1.5 3.1 4.6 4.6 0.248
V-003(C2-C9) Cim. 6.8 4.8 1.7 6.5 19.8 8.2 6.7 4.9 0.293
Total Pórtico 1 23.2 23.2 5.2 15.6 67.2 20.8 41.5 4.9 0.897
*Pórtico 2
V-004(<-C21) Cim. 1.7 2.2 3.9 2.2 1.7 0.103
V-005(C21-C7) Cim. 6.7 6.7 3.9 17.3 3.9 13.4 0.195
Total Pórtico 2 8.4 6.7 6.1 21.2 6.1 15.1 0.298
*Pórtico 3
V-006(<-C20) Cim. 3.8 4.1 7.9 4.1 3.8 0.110
V-007(C20-C6) Cim. 6.8 7.1 3.9 17.8 3.9 13.9 0.195
Total Pórtico 3 10.6 7.1 8.0 25.7 8.0 17.7 0.305
*Pórtico 4
V-008(C1-C22) Cim. 17.6 15.1 1.9 8.2 42.8 10.1 32.7 0.360
V-009(C22-C4) Cim. 1.2 1.5 5.7 8.4 7.2 1.2 0.243
V-010(C4-C5) Cim. 6.6 3.0 1.7 5.4 16.7 7.1 1.1 3.4 5.1 0.293
Total Pórtico 4 24.2 19.3 5.1 19.3 67.9 24.4 1.1 37.3 5.1 0.896
*Pórtico 5
V-011(C13-A0) Cim. 6.7 6.7 4.9 18.3 4.9 13.4 0.217
V-012(A0-C14) Cim. 2.8 2.9 5.7 2.9 2.8 0.080
Total Pórtico 5 6.7 9.5 7.8 24.0 7.8 16.2 0.297
*Pórtico 6
V-013(C1-A1) Cim. 4.5 7.2 11.7 7.2 4.5 0.070
V-014(A1-C11) Cim. 11.8 10.0 8.6 30.4 8.6 21.8 0.342
V-015(C11-C13) Cim. 7.5 7.8 7.2 22.5 7.2 15.3 0.321
Total Pórtico 6 19.3 22.3 23.0 64.6 15.8 7.2 37.1 4.5 0.733
*Pórtico 7
V-016(C22->) Cim. 20.5 2.0 0.7 9.1 32.3 0.7 9.1 2.0 20.5 0.123
*Pórtico 8
V-017(C18-C19) Cim. 34.3 6.4 1.4 22.1 64.2 3.7 26.2 7.3 27.0 0.346
*Pórtico 9
V-018(<-C23) Cim. 9.1 1.9 0.7 6.5 18.2 7.2 4.1 6.9 0.114
*Pórtico 10
V-019(C4->) Cim. 18.6 2.0 0.7 9.1 30.4 0.7 9.1 2.0 6.9 11.7 0.123
*Pórtico 11
V-020(<-C2) Cim. 18.7 2.8 0.6 7.5 29.6 0.6 7.5 2.8 18.7 0.103
*Pórtico 12
V-021(C5-A2) Cim. 2.5 2.5 2.5 0.070
V-022(A2-C6) Cim. 8.9 15.9 11.0 35.8 11.0 24.8 0.406
Total Pórtico 12 8.9 15.9 13.5 38.3 13.5 24.8 0.476
*Pórtico 13
V-023(C6-C7) Cim. 2.9 2.9 2.9 0.171
V-024(C7-A5) Cim. 12.7 12.7 10.5 35.9 10.5 25.4 0.393
Total Pórtico 13 12.7 12.7 13.4 38.8 13.4 25.4 0.564
*Pórtico 14
V-025(A5-C9) Cim. 4.5 4.5 3.7 12.7 3.7 9.0 0.107
Total Fundación 219.7 136.3 14.4 164.7 535.1 126.4 34.0 261.2 21.8 53.0 11.7 27.0 5.382
Tipo A.neg. A.pos. A.piel A.est. Total Ø6 Ø8 Ø10 Ø12 Ø16 Ø20 Ø25 V.horm.
kg kg kg kg kg kg kg kg kg kg kg kg m³
Losa 1
*Pórtico 1
V-101(A10-C19) Desc. 12.4 5.3 5.2 22.9 5.2 7.4 2.0 8.3 0.163
V-102(C19-A0) Desc. 5.3 2.1 7.4 2.1 2.4 2.9 0.053
Total Pórtico 1 12.4 10.6 7.3 30.3 7.3 7.4 4.4 2.9 8.3 0.216
*Pórtico 2
V-103(C18-A1) Desc. 26.6 17.6 5.8 50.0 5.8 2.6 7.7 9.9 24.0 0.052
*Pórtico 3
V-104(A4-C18) Desc. 0.309
*Pórtico 4
V-105(C19-C15) Desc. 2.7 1.0 2.6 6.3 2.6 2.7 1.0 0.113
V-106(C15-A7) Desc. 25.2 7.2 7.4 39.8 2.6 10.3 7.4 19.5 0.155
Total Pórtico 4 27.9 8.2 10.0 46.1 5.2 13.0 8.4 19.5 0.268
*Pórtico 5
V-107(A5-C20) Desc. 31.6 14.9 10.5 57.0 8.4 7.3 8.1 6.8 26.4 0.264
*Pórtico 6
V-108(C21-A8) Desc. 23.1 15.1 10.5 48.7 10.5 5.9 8.2 4.5 6.9 12.7 0.268
Total Losa 1 121.6 66.4 44.1 232.1 31.4 39.4 31.7 4.5 24.3 37.7 63.1 1.377
Losas 2 a 5
*Pórtico 1
V-201(C14-C23) Desc. 15.4 10.4 7.7 33.5 7.7 16.4 3.0 6.4 0.178
V-202(C23-C2) Desc. 3.2 3.2 3.2 0.124
V-203(C2-C9) Desc. 0.5 4.1 4.6 4.1 0.5 0.146
Total Pórtico 1 15.9 10.4 15.0 41.3 15.0 16.9 3.0 6.4 0.448
*Pórtico 2
V-204(C19-A0) Desc. 2.3 3.5 1.7 7.5 1.7 1.4 4.4 0.057
*Pórtico 3
V-205(C18-A1) Desc. 7.8 11.7 2.6 22.1 2.6 1.3 11.7 6.5 0.052
*Pórtico 4
V-206(C1-C22) Desc. 12.7 9.3 4.9 26.9 4.9 17.5 0.9 3.6 0.180
V-207(C22-C4) Desc. 0.5 3.2 3.7 3.2 0.5 0.122
V-208(C4-C5) Desc. 4.1 4.1 4.1 0.146
Total Pórtico 4 13.2 9.3 12.2 34.7 12.2 18.0 0.9 3.6 0.448
*Pórtico 5
V-209(A7-C11) Desc. 25.1 10.4 8.0 43.5 8.0 15.6 5.3 14.6 0.257
V-210(C11-C13) Desc. 11.1 8.3 5.8 25.2 5.8 15.4 4.0 0.220
V-211(C13-A2) Desc. 0.5 3.9 4.4 3.9 0.5 0.143
Total Pórtico 5 36.7 18.7 17.7 73.1 17.7 31.5 4.0 5.3 14.6 0.620
*Pórtico 6
V-212(A6-C18) Desc. 40.9 18.6 2.9 13.2 75.6 11.5 4.6 19.6 14.1 25.8 0.395
*Pórtico 7
V-213(C19-C15) Desc. 2.5 2.6 5.1 2.6 2.5 0.108
V-214(C15-A3) Desc. 21.9 6.4 7.8 36.1 3.0 11.2 5.6 16.3 0.155
Total Pórtico 7 24.4 6.4 10.4 41.2 5.6 13.7 5.6 16.3 0.263
*Pórtico 8
V-215(A8-C20) Desc. 31.9 16.7 2.9 9.9 61.4 10.5 11.9 8.3 4.1 26.6 0.395
*Pórtico 9
V-216(C21-A4) Desc. 25.3 15.6 11.0 51.9 7.2 9.2 8.4 7.2 6.0 13.9 0.357
*Pórtico 10
V-217(A9-C6) Desc. 17.3 12.2 7.4 36.9 7.4 10.6 6.9 12.0 0.348
*Pórtico 11
V-218(C7-A5) Desc. 22.9 11.8 8.2 42.9 8.2 9.9 1.9 10.2 12.7 0.251
Total Losas 2 a 5 954.4 539.6 23.2 437.2 1954.4 398.4 516.0 208.4 72.8 174.4 210.0 374.4 14.536
Losas 6 a 10
*Pórtico 1
V-301(C14-C23) Desc. 15.7 10.2 7.6 33.5 2.8 21.2 2.0 1.3 6.2 0.178
V-302(C23-C2) Desc. 3.2 3.2 3.2 0.124
V-303(C2-C9) Desc. 4.1 4.1 4.1 0.146
Total Pórtico 1 15.7 10.2 14.9 40.8 10.1 21.2 2.0 1.3 6.2 0.448
*Pórtico 2
V-304(C19-A0) Desc. 1.9 1.7 1.7 5.3 1.7 3.6 0.057
*Pórtico 3
V-305(C18-A1) Desc. 2.4 2.5 1.5 6.4 1.5 4.9 0.052
Tipo A.neg. A.pos. A.piel A.est. Total Ø6 Ø8 Ø10 Ø12 Ø16 Ø20 Ø25 V.horm.
kg kg kg kg kg kg kg kg kg kg kg kg m³
*Pórtico 4
V-306(C1-C22) Desc. 11.8 9.2 4.7 25.7 4.7 19.6 1.4 0.180
V-307(C22-C4) Desc. 3.2 3.2 3.2 0.122
V-308(C4-C5) Desc. 4.1 4.1 4.1 0.146
Total Pórtico 4 11.8 9.2 12.0 33.0 12.0 19.6 1.4 0.448
*Pórtico 5
V-309(A9-C11) Desc. 25.2 12.1 8.0 45.3 8.0 10.4 6.9 5.4 14.6 0.257
V-310(C11-C13) Desc. 11.1 8.3 5.8 25.2 5.8 15.4 4.0 0.220
V-311(C13-A2) Desc. 0.5 3.9 4.4 3.9 0.5 0.143
Total Pórtico 5 36.8 20.4 17.7 74.9 17.7 26.3 10.9 5.4 14.6 0.620
*Pórtico 6
V-312(A8-C18) Desc. 48.4 36.0 15.6 100.0 6.0 9.6 12.3 47.1 25.0 0.264
*Pórtico 7
V-313(C19-C15) Desc. 2.7 3.5 6.2 3.5 2.7 0.108
V-314(C15-A3) Desc. 19.6 7.1 8.5 35.2 3.7 9.9 7.5 14.1 0.155
Total Pórtico 7 22.3 7.1 12.0 41.4 7.2 12.6 7.5 14.1 0.263
*Pórtico 8
V-315(A7-C20) Desc. 26.6 14.8 13.0 54.4 5.8 7.2 16.4 6.4 6.8 11.8 0.261
*Pórtico 9
V-316(C21-A4) Desc. 24.3 13.2 12.5 50.0 7.7 15.3 8.0 5.7 13.3 0.266
*Pórtico 10
V-317(A6-C6) Desc. 23.1 12.3 8.2 43.6 8.2 10.3 7.2 5.8 12.1 0.261
*Pórtico 11
V-318(C7-A5) Desc. 22.6 11.8 8.8 43.2 8.8 10.5 4.7 6.9 12.3 0.251
Total Losas 6 a 10 1179.5 696.0 589.5 2465.0 433.5 681.0 154.0 130.5 199.0 480.5 386.5 15.955
Losa 11
*Pórtico 1
V-401(C14-C23) Desc. 12.1 9.5 6.3 27.9 6.3 20.3 1.3 0.178
V-402(C23-C2) Desc. 3.2 3.2 3.2 0.124
V-403(C2-C9) Desc. 4.1 4.1 4.1 0.146
Total Pórtico 1 12.1 9.5 13.6 35.2 13.6 20.3 1.3 0.448
*Pórtico 2
V-404(C19-A0) Desc. 1.8 1.5 1.7 5.0 1.7 3.3 0.057
*Pórtico 3
V-405(C18-A1) Desc. 2.0 1.5 1.9 5.4 1.9 3.5 0.052
*Pórtico 4
V-406(C1-C22) Desc. 9.7 9.1 4.7 23.5 4.7 17.8 1.0 0.180
V-407(C22-C4) Desc. 3.2 3.2 3.2 0.122
V-408(C4-C5) Desc. 4.1 4.1 4.1 0.146
Total Pórtico 4 9.7 9.1 12.0 30.8 12.0 17.8 1.0 0.448
*Pórtico 5
V-409(A2-C11) Desc. 32.4 12.1 8.2 52.7 8.2 10.4 6.9 27.2 0.257
V-410(C11-C13) Desc. 11.4 8.3 5.8 25.5 5.8 15.4 4.3 0.220
V-411(C13-A3) Desc. 3.9 3.9 3.9 0.143
Total Pórtico 5 43.8 20.4 17.9 82.1 17.9 25.8 11.2 27.2 0.620
*Pórtico 6
V-412(A7-C18) Desc. 43.5 22.6 15.6 81.7 6.0 9.6 8.4 7.7 25.7 24.3 0.264
*Pórtico 7
V-413(C19-C15) Desc. 0.4 3.5 3.9 3.5 0.4 0.108
V-414(C15-A6) Desc. 21.2 7.2 7.1 35.5 7.1 10.3 2.1 1.4 14.6 0.155
Total Pórtico 7 21.6 7.2 10.6 39.4 10.6 10.7 2.1 1.4 14.6 0.263
*Pórtico 8
V-415(A8-C20) Desc. 22.8 14.8 12.1 49.7 7.3 4.8 10.4 24.1 3.1 0.261
*Pórtico 9
V-416(C21-A4) Desc. 19.2 13.2 12.1 44.5 7.3 11.2 8.5 6.3 11.2 0.266
*Pórtico 10
V-417(A9-C6) Desc. 29.9 12.3 8.6 50.8 8.6 10.3 7.2 24.7 0.261
*Pórtico 11
V-418(C7-A5) Desc. 16.0 11.7 8.6 36.3 8.6 10.6 4.8 6.8 5.5 0.251
Total Losa 11 222.4 123.8 114.7 460.9 95.5 127.9 31.7 44.3 65.2 5.5 90.8 3.191
Total Obra 2697.6 1562.1 37.6 1350.2 5647.5 1085.2 1398.3 687.0 273.9 515.9 745.4 941.8 40.441
- A.neg.: Armado de negativos
- A.pos.: Armado de positivos
- A.piel: Armado piel
- A.est.: Armado estribos
Listado de cómputo de vigas
Obra: sin efecto del viento
Fecha: 16/04/2020 05:22:50 a.m.
Materiales:
Hormigón: H-20
Acero: ADN 420
Materiales de fundación:
Hormigón: H-20
Acero: ADN 420