Você está na página 1de 1

NM

W
32 33 34
31 0° 310° 320° 35 3
30 ° 290° 30 330° 6

N
0 340 0
29 0° 28 ° 35 1
27 0°

0 2 ° 10
50° 28

0
26

03 ° 20° 30
40° 2 7
22 0° 220° 230° 2 26 2

04
05 06 07
23 24 25

° 40° 50° 60 09
06

24
21 ° 200° 21

0
° 7
8
0

0° 1 0
20 0° 19

80
18

°
90 °
11 ° 10 70
0 0° 1 19
12 ° 110° 120° 0° 16
130° 140° 15 7 18

S
13 1
14 15 16

E
TABELA DE COORDENADAS

PONTOS NORTE(m) ESTE(m)


P1 9.703.936,663 523.886,344
P2 9.705.087,412 525.091,479
P3 9.705.406,717 525.283,381
P4 9.705.275,695 525.411,584
P5 9.705.343,623 525.483,146
P6 9.705.004,075 525.691,501
P7 9.704.954,581 525.642,039
P8 9.704.890,914 525.576,486
P9 9.704.822,659 525.505,392
P10 9.704.914,749 525.417,461
P11 9.703.683,554 524.128,078
P12 9.703.745,201 524.069,201
P13 9.703.695,140 524.016,518
P14 9.703.824,606 523.893,427
P15 9.703.874,474 523.945,738

LEGENDA

CERCA OPERACIONAL EXISTENTE A SER REMOVIDA


1 ESC.: 1/2500

P3

P1

P2

P 14 P 15 P4 P5

P 13 P 12

P 11 P10

PARINTINS-AM
DIVISÃO DE ENGENHARIA (DE) REFORMA E AMPLIAÇÃO DO TPS E ADEQUAÇÃO DO LADO AR DO AEROPORTO
SUBDIVISÃO DE PROJETOS INFRAESTRUTURA
CERCA OPERACIONAL
PLANO GERAL
UNIDADE DATA ESCALA VISTO: CREA:
RICARDO SALGADO FADUL Cap Eng ELT 150644534-9 RNP
m JUN/2021 INDICADAS AUTOR: CREA:
ÁLVARO GONÇALVES CAMPOS 1º Ten Eng CIV 151944429-0 RNP
Nº DO ARQUIVO TÉCNICO CONFERIDO: CREA:
P6 ANDRÉ AUGUSTO DE V. CARVALHO 1º Ten Eng CIV 151850964-9 RNP
AM006.52-AM.033-000.CO002/02 DESENHO:
MARCOS ROBERTO FARIAS 2º Sgt SDE
P9 P8 P7
SUBSTITUI A:

CERCA OPERACIONAL A SER CONSTRUÍDA


2 ESC.: 1/2500
SUBSTITUIDO POR:

MODIFICAÇÃO DATA RESPONSABILIDADE

Você também pode gostar