DESCRIPCION UNIDADES Mon Tue Wen Thu Fri Sat Sun Mon Tue Wen Thu Fri Sat Sun Mon Tue Wen Thu Fri Sat Sun Mon Tue Wen Thu Fri Sat Sun Mon Tue Wen Thu Fri Sat Sun Mon Tue Wen Thu Fri Sat Sun Mon Tue Wen Thu Fri Sat Sun
X 1 SECTOR
17/2 18/2 19/2 20/2 21/2 22/2 23/2 24/2 25/2 26/2 27/2 28/2 1/3 2/3 3/3 4/3 5/3 6/3 7/3 8/3 9/3 10/3 11/3 12/3 13/3 14/3 15/3 16/3 17/3 18/3 19/3 20/3 21/3 22/3 23/3 24/3 25/3 26/3 27/3 28/3 29/3 30/3 31/3 1/4 2/4 3/4 4/4 5/4 6/4
ACERO HORIZONTAL 757.16 KG 1,514.32 A1 B1 3,785.80 C1 D1 E1 F1 A2 3,785.80 B2 C2 D2 E2 F2 3,785.80 A3 B3 C3 D3 E3 3,785.80 F3 A4 B4 C4 D4 3,785.80 E4 F4 A5 B5 C5 2,271.48 D5 E5 F5
IIEE - A1 B1 - C1 D1 E1 F1 A2 - B2 C2 D2 E2 F2 - A3 B3 C3 D3 E3 - F3 A4 B4 C4 D4 - E4 F4 A5 B5 C5 - D5 E5 F5
IISS DESAGUE - A1 B1 C1 D1 E1 F1 A2 B2 C2 D2 E2 F2 A3 B3 C3 D3 E3 F3 A4 B4 C4 D4 E4 F4 A5 B5 C5 D5 E5 F5
IISS AGUA - A1 - B1 C1 D1 E1 F1 - A2 B2 C2 D2 E2 - F2 A3 B3 C3 D3 - E3 F3 A4 B4 C4 - D4 E4 F4 A5 B5 - C5 D5 E5 F5
VACIADO HORIZONTAL 15.40 M3 70.00 A1 B1 C1 D1 E1 70.00 F1 A2 B2 C2 D2 70.00 E2 F2 A3 B3 C3 70.00 D3 E3 F3 A4 B4 70.00 C4 D4 E4 F4 A5 70.00 B5 C5 D5 E5 F5
SEMANA 1 SEMA
D1 D2 D3 D4 D5 D6 D7 D8
METRADO X
DESCRIPCION UND Mon Tue Wen Thu Fri Sat Sun Mon
1 SECTOR
17/2 18/2 19/2 20/2 21/2 22/2 23/2 23/2
A2 B2 C2 D2 E2 F2 A3 B3 C3 D3 E3 F3 A4 B4
A2 B2 C2 D2 E2 F2 A3 B3 C3 D3 E3 F3 A4 B4
A2 B2 C2 D2 E2 F2 A3 B3 C3 D3 E3 F3 A4 B4
F1 A2 B2 C2 D2 E2 F2 A3 B3 C3 D3 E3 F3 A4
F1 A2 B2 C2 D2 E2 F2 A3 B3 C3 D3 E3 F3 A4
E1 F1 A2 B2 C2 D2 E2 F2 A3 B3 C3 D3 E3 F3
D1 E1 F1 A2 B2 C2 D2 E2 F2 A3 B3 C3 D3 E3
D1 E1 F1 A2 B2 C2 D2 E2 F2 A3 B3 C3 D3 E3
C1 D1 E1 F1 A2 B2 C2 D2 E2 F2 A3 B3 C3 D3
C1 D1 E1 F1 A2 B2 C2 D2 E2 F2 A3 B3 C3 D3
B1 C1 D1 E1 F1 A2 B2 C2 D2 E2 F2 A3 B3 C3
PLANOS-ESPECIFICACIONES-ETC
ACTIVIDAD PREDECESORA
MATERIALES
ACTIVIDAD
SEGURIDAD
PERSONAL
EQUIPOS
ESPACIO
VARIOS
ACERO VERTICAL X
Cuadrilla 1 operario X X
1 ayudante X
IISS X
IIEE X
ENCOFRADO VERTICAL X
VACIADO VERTICAL X X
ENCOFRADO HORIZONTAL X
ACERO HORIZONTAL X X
IIEE X
IISS DESAGUE X
IISS AGUA X
Residente
Ingeniero Asistente de Campo
Ingeniero Asistente de Campo
Ingeniero de Oficina Tecnica
Ingeniero de Instalaciones
Administración
Logística, Almacén
Prevencionista de Riesgo
Maestro de Obra
DESCRIPCION DE RESTRICCION
SEGURIDAD 17-Feb
LOGISTICA 10-Feb
CUADRILLA ANTERIOR 16-Feb
SEGURIDAD 17-Feb
SEGURIDAD 17-Feb
ING. RESIDENTE / CAPATAZ 17-Feb
ING. RESIDENTE / CAPATAZ 17-Feb
LOGISTICA 17-Feb
LOGISTICA 17-Feb
ING. RESIDENTE / CAPATAZ 17-Feb
RECURSOS HUMANOS 17-Feb
SEGURIDAD 17-Feb
LOGISTICA 17-Feb
PRODUCCIÓN 17-Feb
ING. RESIDENTE / CAPATAZ 17-Feb
TOPOGRAFO 16-Feb
CALIDAD 16-Feb
LOGÍSTICA 10-Feb
LOGÍSTICA 16-Feb
CALIDAD 16-Feb
LOGÍSTICA 19-Feb
RECURSOS HUMANOS 19-Feb
LOGISTICA 18-Feb
CALIDAD 18-Feb
TOPOGRAFO 18-Feb
PRODUCCIÓN 20-Feb
SEGURIDAD - LOGISTICA 20-Feb
SEGURIDAD - LOGISTICA 20-Feb
LOGISTICA 13-Feb
PRODUCCIÓN 20-Feb
SEGURIDAD 20-Feb
LOGÍSTICA 20-Feb
ING. RESIDENTE / CAPATAZ 21-Feb
ING. RESIDENTE / CAPATAZ 20-Feb
RECURSOS HUMANOS 21-Feb
ING. RESIDENTE / CAPATAZ 21-Feb
SEGURIDAD 21-Feb
PRODUCCIÓN 20-Feb
ING. RESIDENTE / CAPATAZ 21-Feb
ING. RESIDENTE / CAPATAZ 21-Feb
ING. RESIDENTE / CAPATAZ 21-Feb
ING. RESIDENTE / CAPATAZ 21-Feb
LOGISTICA - PRODUCCION 20-Feb
LOGISTICA 20-Feb
LOOK AHEAD SEMANA 4
SEMANA 4 SEM
D22 D23 D24 D25 D26 D27 D28 D29
METRADO X
DESCRIPCION UND Mon Tue Wen Thu Fri Sat Sun Mon
1 SECTOR
10/3 11/3 12/3 13/3 14/3 15/3 16/3 17/3
D4 E4 F4 A5 B5 C5 D5 E5 F5
D4 E4 F4 A5 B5 C5 D5 E5 F5
D4 E4 F4 A5 B5 C5 D5 E5 F5
C4 D4 E4 F4 A5 B5 C5 D5 E5 F5
C4 D4 E4 F4 A5 B5 C5 D5 E5 F5
B4 C4 D4 E4 F4 A5 B5 C5 D5 E5 F5
A4 B4 C4 D4 E4 F4 A5 B5 C5 D5 E5 F5
A4 B4 C4 D4 E4 F4 A5 B5 C5 D5 E5 F5
F3 A4 B4 C4 D4 E4 F4 A5 B5 C5 D5 E5 F5
F3 A4 B4 C4 D4 E4 F4 A5 B5 C5 D5 E5 F5
E3 F3 A4 B4 C4 D4 E4 F4 A5 B5 C5 D5 E5 F5
NA 7
D49
Sun
6/4
PLANOS-ESPECIFICACIONES-ETC
ACTIVIDAD PREDECESORA
MATERIALES
ACTIVIDAD
SEGURIDAD
PERSONAL
EQUIPOS
ESPACIO
VARIOS
ACERO VERTICAL X
Cuadrilla 1 operario X
1 ayudante X X
IISS X
IIEE X
ENCOFRADO VERTICAL X
VACIADO VERTICAL X X
ENCOFRADO HORIZONTAL X
ACERO HORIZONTAL X X
IIEE X
IISS DESAGUE X
IISS AGUA X
VACIADO HORIZONTAL X
Cuadrilla 3 operarios X
5 ayudantes X
PLANOS-ESPECIFICACIONES-ETC
PREDECESORA
MATERIALES
SEGURIDAD
ACTIVIDAD
PERSONAL
EQUIPOS
ESPACIO
VARIOS
Administración
Logística, Almacén
Prevencionista de Riesgo
Maestro de Obra
DESCRIPCION DE RESTRICCION
LOGISTICA 10-Mar
CUADRILLA ANTERIOR 9-Mar
RECURSOS HUMANOS 10-Mar
SEGURIDAD 9-Mar
LOGISTICA 10-Mar
PRODUCCIÓN 10-Mar
Seguridad 10-Mar
TOPOGRAFO 10-Mar
LOGÍSTICA 10-Mar
LOGÍSTICA 10-Mar
CALIDAD 10-Mar
CALIDAD - SEGURIDAD 10-Mar
LOGÍSTICA 10-Mar
LOGISTICA 10-Mar
CALIDAD 10-Mar
TOPOGRAFO 10-Mar
10-Mar
PLANOS-ESPECIFICACIONES-ETC
PRODUCCIÓN 10-Mar
RECURSOS HUMANOS 10-Mar
PREDECESORA
MATERIALES
SEGURIDAD
ACTIVIDAD
PERSONAL
LOGISTICA 10-Mar
EQUIPOS
ESPACIO
ING. RESIDENTE / CAPATAZ 10-Mar
ING. RESIDENTE / CAPATAZ 10-Mar
LOGISTICA 10-Mar
SEGURIDAD 10-Mar
PRODUCCIÓN 10-Mar
ING. RESIDENTE / CAPATAZ 10-Mar
ING. RESIDENTE / CAPATAZ 10-Mar
ING. RESIDENTE / CAPATAZ 10-Mar
LOGISTICA - PRODUCCION 10-Mar
LOGÍSTICA 25-Feb
LOGÍSTICA 25-Feb
INGENIERO DE CAMPO 25-Feb
SEGURIDAD 25-Feb
VARIOS
L
SEMANA 7
D43 D44 D45 D46 D47
METRADO
SEMANAL
METRADO
DESCRIPCION UNIDADES Mon Tue Wen Thu Fri
X 1 SECTOR
31/3 1/4 2/4 3/4 4/4
D48 D49
Sat Sun
5/4 6/4
ANALISIS DE RE
PLANOS-ESPECIFICACIONES-ETC
ACTIVIDAD PREDECESORA
MATERIALES
ACTIVIDAD
SEGURIDAD
PERSONAL
EQUIPOS
ESPACIO
VARIOS
ENCOFRADO VERTICAL X
VACIADO VERTICAL X
ENCOFRADO HORIZONTAL X
ACERO HORIZONTAL X
IIEE X
IISS DESAGUE X
Responsable Sergio Cruzado X
IISS AGUA X
VACIADO HORIZONTAL X
6 ayudantes
Residente
Ingeniero Asistente de Campo
Ingeniero Asistente de Campo
Ingeniero de Oficina Tecnica
Ingeniero de Instalaciones
Administración
Logística, Almacén
Prevencionista de Riesgo
Maestro de Obra
SE REQUIERE UNA PROGRAMACIÓN DIARIA ESPECIFICA POR PAÑOS CON HORAS DE ENTREGA DIARIPRODUCCIÓN
31-Mar
31-Mar
31-Mar RESTRICCIONES
Disponibilidad del acero
Materiales requeridos
31-Mar ACERO DE VERTICALES Herramientas
31-Mar Mano de obra
Disponibilidad de equipos
Ubicacion de salida de puntos en el plano
Disponiblidad y organizacion de las tuberias s
31-Mar
31-Mar
31-Mar
a de puntos en el plano
ganizacion de las tuberias segun diametro
accesorios (valvulas, codos, T, Y,…)
s para realizar las pruebas hidraulidad o de presión
o premezclado
os paneles para el encofrado
puntales para el encofrado
aditivos, ladrillos o casetones
Intalaciones
Concreto
Concreto
Carpintería
Carpintería
1 Acero vertical
5 Vaciado vertical
Instalaciones
7 Acero horizontal
4 Encofrado vertical
11 Vaciado horizontal
6 Enconfrado horizontal
8 Instalaciones eléctricas
Alta presión
Aplastamiento
Atrapamientos
Atropello
Caída de estructuras existentes
Caída de objetos
Caidas a desnivel
Caídas a nivel
Caídas de altura
Derrumbes
Explosión
MATRIZ DE IDENTIFICACIÓN DE PELIGROS
Falta de Experiencia
Golpes
Incendio
Incrustaciones
Proyección de partículas
Radiación
Ruido
Sobreesfuerzos
Tropezones
Volcaduras
Plan de Seguridad, Salud y
IDENTIFICACIÓN DE PELIGROS
Medio Ambiente
1 Acero Vertical
Probabilidad Probabilidad
Consecuencias
Consecuencias
Baja Medio Alto Baja Medio Alto
Leve 1 2 3 Leve 1 2 3
Moderado 2 4 6 Moderado 2 4 6
Severa 3 6 9 Severa 3 6 9
Probabilidad Probabilidad
Consecuencias
Consecuencias
Baja Medio Alto Baja Medio Alto
Leve 1 2 3 Leve 1 2 3
Moderado 2 4 6 Moderado 2 4 6
Severa 3 6 9 Severa 3 6 9
Probabilidad Probabilidad
Consecuencias
Consecuencias
Probabilidad
Baja Medio Alto
Leve 1 2 3
Moderado 2 4 6
Severa 3 6 9
Golpes
Probabilidad Probabilidad
Consecuencias
Consecuencias
Consecuencias
Severa 3 6 9 Severa 3 6 9
Probabilidad Probabilidad
Consecuencias
Consecuencias
Baja Medio Alto Baja Medio Alto
Leve 1 2 3 Leve 1 2 3
Moderado 2 4 6 Moderado 2 4 6
Severa 3 6 9 Severa 3 6 9
Probabilidad Probabilidad
Consecuencias
Consecuencias
Baja Medio Alto Baja Medio Alto
Leve 1 2 3 Leve 1 2 3
Moderado 2 4 6 Moderado 2 4 6
Severa 3 6 9 Severa 3 6 9
Probabilidad Probabilidad
Consecuencias
Consecuencias
Incendio Sobreesfuerzos
Probabilidad Probabilidad
Consecuencias
Consecuencias
Probabilidad Probabilidad
Consecuencias
Consecuencias
Consecuencias
Probabilidad Probabilidad
Consecuencias
Consecuencias
Baja Medio Alto Baja Medio Alto
Leve 1 2 3 Leve 1 2 3
Moderado 2 4 6 Moderado 2 4 6
Severa 3 6 9 Severa 3 6 9
Probabilidad Probabilidad
Consecuencias
Consecuencias
Baja Medio Alto Baja Medio Alto
Leve 1 2 3 Leve 1 2 3
Moderado 2 4 6 Moderado 2 4 6
Severa 3 6 9 Severa 3 6 9
Probabilidad Probabilidad
Consecuencias
Consecuencias
Baja Medio Alto Baja Medio Alto
Leve 1 2 3 Leve 1 2 3
Moderado 2 4 6 Moderado 2 4 6
Severa 3 6 9 Severa 3 6 9
Incendio Sobreesfuerzos
Probabilidad Probabilidad
Consecuencias
Consecuencias
4 Encofrado vertical
Probabilidad Probabilidad
Consecuencias
Consecuencias
Probabilidad Probabilidad
Consecuencias
Consecuencias
Probabilidad Probabilidad
Consecuencias
Consecuencias
Baja Medio Alto Baja Medio Alto
Leve 1 2 3 Leve 1 2 3
Moderado 2 4 6 Moderado 2 4 6
Severa 3 6 9 Severa 3 6 9
Cortes Golpes
Probabilidad Probabilidad
Consecuencias
Consecuencias
Baja Medio Alto Baja Medio Alto
Leve 1 2 3 Leve 1 2 3
Moderado 2 4 6 Moderado 2 4 6
Severa 3 6 9 Severa 3 6 9
Incrustaciones Ruido
Probabilidad Probabilidad
Consecuencias
5 Vaciado vertical
Probabilidad Probabilidad
Consecuencias
Consecuencias
Probabilidad Probabilidad
Consecuencias
Consecuencias
Probabilidad Probabilidad
Consecuencias
Consecuencias
Consecuencias
Moderado 2 4 6 Moderado 2 4 6
Severa 3 6 9 Severa 3 6 9
6 Encofrado horizontal
Probabilidad Probabilidad
Consecuencias
Consecuencias
Baja Medio Alto Baja Medio Alto
Leve 1 2 3 Leve 1 2 3
Moderado 2 4 6 Moderado 2 4 6
Severa 3 6 9 Severa 3 6 9
Probabilidad Probabilidad
Consecuencias
Consecuencias
Baja Medio Alto Baja Medio Alto
Leve 1 2 3 Leve 1 2 3
Moderado 2 4 6 Moderado 2 4 6
Severa 3 6 9 Severa 3 6 9
Probabilidad Probabilidad
Consecuencias
Consecuencias
Cortes Golpes
Probabilidad Probabilidad
Consecuencias
Consecuencias
Incrustaciones Ruido
Probabilidad Probabilidad
Consecuencias
Consecuencias
Probabilidad Probabilidad
Consecuencias
Consecuencias
Baja Medio Alto Baja Medio Alto
Leve 1 2 3 Leve 1 2 3
Moderado 2 4 6 Moderado 2 4 6
Severa 3 6 9 Severa 3 6 9
Probabilidad Probabilidad
Consecuencias
Consecuencias
Baja Medio Alto Baja Medio Alto
Leve 1 2 3 Leve 1 2 3
Moderado 2 4 6 Moderado 2 4 6
Severa 3 6 9 Severa 3 6 9
Probabilidad Probabilidad
Consecuencias
Consecuencias
8 Instalaciones eléctricas
Probabilidad Probabilidad
Consecuencias
Consecuencias
Probabilidad Probabilidad
Consecuencias
Consecuencias
Consecuencias
Consecuencias
Baja Medio Alto Baja Medio Alto
Leve 1 2 3 Leve 1 2 3
Moderado 2 4 6 Moderado 2 4 6
Severa 3 6 9 Severa 3 6 9
Probabilidad Probabilidad
Consecuencias
Consecuencias
Baja Medio Alto Baja Medio Alto
Leve 1 2 3 Leve 1 2 3
Moderado 2 4 6 Moderado 2 4 6
Severa 3 6 9 Severa 3 6 9
Incendio Sobreesfuerzos
Probabilidad Probabilidad
Consecuencias
Consecuencias
Baja Medio Alto Baja Medio Alto
Leve 1 2 3 Leve 1 2 3
Moderado 2 4 6 Moderado 2 4 6
Severa 3 6 9 Severa 3 6 9
Probabilidad Probabilidad
Consecuencias
Consecuencias
Probabilidad Probabilidad
Consecuencias
Consecuencias
Probabilidad Probabilidad
Consecuencias
Consecuencias
Consecuencias
Severa 3 6 9 Severa 3 6 9
Probabilidad Probabilidad
Consecuencias
Consecuencias
Baja Medio Alto Baja Medio Alto
Leve 1 2 3 Leve 1 2 3
Moderado 2 4 6 Moderado 2 4 6
Severa 3 6 9 Severa 3 6 9
Incendio Sobreesfuerzos
Probabilidad Probabilidad
Consecuencias
Consecuencias
Baja Medio Alto Baja Medio Alto
Leve 1 2 3 Leve 1 2 3
Moderado 2 4 6 Moderado 2 4 6
Severa 3 6 9 Severa 3 6 9
Probabilidad Probabilidad
Consecuencias
Consecuencias
Probabilidad Probabilidad
Consecuencias
Consecuencias
Probabilidad Probabilidad
Consecuencias
Consecuencias
Probabilidad Probabilidad
Consecuencias
Consecuencias
Consecuencias
Consecuencias
Baja Medio Alto Baja Medio Alto
Leve 1 2 3 Leve 1 2 3
Moderado 2 4 6 Moderado 2 4 6
Severa 3 6 9 Severa 3 6 9
Incendio Sobreesfuerzos
Probabilidad Probabilidad
Consecuencias
Consecuencias
Baja Medio Alto Baja Medio Alto
Leve 1 2 3 Leve 1 2 3
Moderado 2 4 6 Moderado 2 4 6
Severa 3 6 9 Severa 3 6 9
11 Vaciado horizontal
Probabilidad Probabilidad
Consecuencias
Consecuencias
Probabilidad Probabilidad
Consecuencias
Consecuencias
Probabilidad Probabilidad
Consecuencias
Consecuencias
PROCEDIMIENTOS EXISTENTES
PROBABILIDAD X SEVERIDAD
E
INDICE DE CAPACITACIÓN C
INDICE DE EXPOSICIÓN AL
PROBABILIDAD (A+B+C+D)
INDICE DE SEVERIDAD
RIESGO SIGNIFICATIVO
R
NIVEL DE RIESGO
I
E
RIESGO (D)
S
TAREA PELIGROS RIESGOS REQUISITO LEGAL
G
(A)
(B)
O
caida de objetos SI
Golpes, heridas, daños D.L 42 Art 195 al 199 y
personales. 206 al 224 2 2 2 2 8 2 16 Moderado
Caida a nivel SI
Golpes, contusiones, D.L 42 Art 195 al 199 y
traumatismos. 206 al 225 2 2 2 2 8 2 16 Moderado
caida de altura SI
Golpes, heridas, D.L 42 Art 195 al 199 y
Acero politraumatismos. 206 al 226 2 2 2 2 8 3 24 Importante
vertical
cortes D.L 42 Art 195 al 199 y NO
Heridas punzocortantes 206 al 227 2 2 2 2 8 1 8 Tolerable
Golpes, contusiones,
Caida a nivel D.L 42 F ART. 195 al 2 2 2 2 8 2 16 Moderado SI
traumatismos.
199 y 206 al 224
IIEE Vertical
Golpes, heridas,
Caida de altura D.L 42 F ART. 195 al 2 2 2 2 8 3 24 Importante SI
politraumatismos.
199 y 206 al 224
Quemaduras, asfixia, D.L 42 F ART. 195 al
Explosión 2 2 2 2 8 3 24 Importante SI
conmoción, traumatismo 199 y 206 al 224
Quemaduras, asfixia, paros D.L 42 F ART. 195 al
Incendio 2 2 2 2 8 3 24 Importante SI
cardiacos 199 y 206 al 224
Inflamación de tendones, D.L 42 F ART. 195 al
sobreesfuerzos 1 2 2 2 7 1 7 Tolerable NO
hombros muñecas, manos. 199 y 206 al 224
Golpes, heridas, daños D.L 42 F ART. 195 al
Caida de objetos 2 2 2 2 8 2 16 Moderado SI
personales. 199 y 206 al 224
Golpes, heridas, D.L 42 F ART. 195 al
Caida a desnivel 2 2 2 2 8 3 24 Importante SI
politraumatismos. 199 y 206 al 224
Golpes, contusiones, D.L 42 F ART. 195 al
IISS Vertical Caida a nivel 2 2 2 2 8 2 16 Moderado SI
traumatismos. 199 y 206 al 224
Golpes, heridas, D.L 42 F ART. 195 al
Caida de altura 2 2 2 2 8 3 24 Importante SI
politraumatismos. 199 y 206 al 224
Inflamación de tendones, D.L 42 F ART. 195 al
sobreesfuerzos 1 2 2 2 7 1 7 Tolerable NO
hombros muñecas, manos. 199 y 206 al 224
Golpes, heridas, daños D.L 42 F ART. 195 al
Caida de objetos 2 2 2 2 8 3 24 Importante SI
personales. 199 y 206 al 224
Golpes, heridas, D.L 42 F ART. 195 al
Caida a desnivel 2 2 2 2 8 3 24 Importante SI
politraumatismos. 199 y 206 al 224
Golpes, contusiones, D.L 42 F ART. 195 al
Caida a nivel 2 2 2 2 8 2 16 Moderado SI
traumatismos. 199 y 206 al 224
Golpes, heridas, D.L 42 F ART. 195 al
Caida de altura 2 2 2 2 8 3 24 Importante SI
politraumatismos. 199 y 206 al 224
Encofrado Contacto con sustancias Quemaduras, alergias, D.L 42 F ART. 195 al 2 2 2 2 8 2 16 Moderado SI
Vertical nocivas dermatitis. 199 y 206 al 224
Vertical
Inflamación de tendones,
sobreesfuerzos D.L 42 F ART. 195 al 1 2 2 2 7 1 7 Tolerable NO
hombros muñecas, manos.
199 y 206 al 224
Golpes, heridas, daños
Caida de objetos D.L 42 F ART. 195 al 2 2 2 2 8 2 16 Moderado SI
personales.
199 y 206 al 224
Golpes, contusiones,
Caida a nivel D.L 42 F ART. 195 al 2 2 2 2 8 2 16 Moderado SI
traumatismos.
199 y 206 al 224
Acero
Cortes Heridas punzocortantes D.L 42 F ART. 195 al 2 2 2 2 8 2 16 Moderado SI
Horizontal
199 y 206 al 224
Inflamación de tendones,
Sobreesfuerzos D.L 42 F ART. 195 al 1 2 2 2 7 1 7 Tolerable NO
hombros muñecas, manos.
199 y 206 al 224
Golpes, heridas,
Caida a desnivel D.L 42 F ART. 195 al 2 2 2 2 8 3 24 Importante SI
politraumatismos.
199 y 206 al 224
Golpes, contusiones,
Caida a nivel D.L 42 F ART. 195 al 2 2 2 2 8 2 16 Moderado SI
traumatismos.
199 y 206 al 224
Golpes, heridas,
IIEE Caida de altura D.L 42 F ART. 195 al 2 2 2 2 8 3 24 Importante SI
politraumatismos.
199 y 206 al 224
Quemaduras, asfixia,
Explosión D.L 42 F ART. 195 al 2 2 2 2 8 3 24 Importante SI
conmoción, traumatismo
199 y 206 al 224
Inflamación de tendones,
sobreesfuerzos D.L 42 F ART. 195 al 1 2 2 2 7 1 7 Tolerable NO
hombros muñecas, manos.
199 y 206 al 224
Golpes, heridas,
Caida a desnivel D.L 42 F ART. 195 al 2 2 2 2 8 3 24 Importante SI
politraumatismos.
199 y 206 al 224
IISS Agua y
Desague
IISS Agua y Golpes, contusiones,
Caida a nivel D.L 42 F ART. 195 al 2 2 2 2 8 2 16 Moderado SI
Desague traumatismos.
199 y 206 al 224
Golpes, heridas,
Caida de altura D.L 42 F ART. 195 al 2 2 2 2 8 3 24 Importante SI
politraumatismos.
199 y 206 al 224
Inflamación de tendones,
sobreesfuerzos D.L 42 F ART. 195 al 1 2 2 2 7 1 7 Tolerable NO
hombros muñecas, manos.
199 y 206 al 224
Contusiones, heridas,
Atrapamiento D.L 42 Art 195 al 199 y 3 2 2 2 9 2 18 Importante SI
politraumatismos
206 al 224
Golpes, contusiones,
Caída a nivel 3 2 2 2 9 3 27 Intolerable SI
traumatismos
D.L 42 Art 195 al 199 y
206 al 225
Golpes, heridas,
Vaciado Proyección de partículas D.L 42 Art 195 al 199 y 3 2 2 2 9 1 9 Moderado SI
politraumatismos
horizontal 206 al 227
Golpes, heridas,
Caída a desnivel D.L 42 Art 195 al 199 y 2 2 2 2 8 3 24 Importante SI
politraumatismos
206 al 225
Golpes, heridas,
Caída de altura D.L 42 Art 195 al 199 y 2 2 2 2 8 3 24 Importante SI
politraumatismos
206 al 226
Contusiones, heridas,
Golpes D.L 42 Art 195 al 199 y 2 2 2 2 8 2 16 Moderado SI
traumatismos
206 al 227
PROBABILIDAD
INDICE PERSONAS EXPUESTAS PROCEDIMIENTOS EXISTENTES CAPACITACIÓN EXPOSICIÓN AL RIESGO SEVERIDAD (Consecuencia)
Al menos una vez al año (S) Lesión sin incapacidad (S)
Personal entrenado. Conoce el
1 De 1 a 3
peligro y lo previene
Existen son satisfactorias y suficientes Esporadicamente (SO) Disconfort/Incomodidad (SO)
Personal parcialmente Al menos una vez al mes (S) Lesión con incapacidad temporal (S)
entrenado, conoce el peligro
2 De 4 a 12
Existen parcialmente y no son satisfactorios pero no toma acciones de
o suficientes control Eventualmente (SO) Daño a la salud reversible
Personal no entrenado, no Al menos una vez al día (S) Lesión con incapacidad permanente (S)
3 Mas de 12 conoce el peligro, no toma
No existen acciones de control Permanentemente (S) Daño a la salud irreversible
Tolerable (TO) De 5 a 8
Moderado (M) De 9 a 16
Importante (IM) De 17 a 24
Intolerable (IT) De 25 a 36
SEMANA 1
DESCRIPCION D1 D2 D3 D4 D5
Mon Tue Wen Thu Fri
17/2 18/2 19/2 20/2 21/2
ACERO VERTICAL AE ID ID ID IP
IIEE VERTICAL AE ID ID ID IP
IISS VERTICAL AE ID ID ID IP
ENCOFRADO VERTICAL ID ID ID IP
VACIADO VERTICAL ID ID ID IP
ETAPA 01
ENCOFRADO HORIZONTAL ID ID IP
ACERO HORIZONTAL ID IP
IIEE ID IP
IISS DESAGUE IP
IISS AGUA IP
VACIADO HORIZONTAL
Leyenda ITEM
Inspeccion diaria ID -Las inspecciones diarias son referentes al avance diario de
Inspeccion programada IP -Las inspecciones programadas son hechas por el superviso
Inspecciones especificas IE -Las inspecciones especificas son referidas a una determind
Auditorias internas AI -Las auditorias internas son realizadas cada quincena o men
Auditorias externas AE -Las auditorias externas en este proyecto se considerara un
A1 SEMANA 2 SEMANA 3
D6 D7 D8 D9 D10 D11 D12 D13 D14 D15 D16 D17 D18 D19
Sat Sun Mon Tue Wen Thu Fri Sat Sun Mon Tue Wen Thu Fri
22/2 23/2 24/2 25/2 26/2 27/2 28/2 1/3 2/3 3/3 4/3 5/3 6/3 7/3
ID ID ID ID AI ID ID ID ID IP
ID ID ID ID AI ID ID ID ID IP
ID ID ID ID AI ID ID ID ID IP
ID ID ID ID AI ID ID ID ID IP
ID ID ID ID AI ID ID ID ID IP
ID ID ID ID AI ID ID ID ID IP
ID ID ID ID AI ID ID ID ID IP
ID ID ID ID AI ID ID ID ID IP
ID ID ID ID AI ID ID ID ID IP
ID ID ID ID AI ID ID ID ID IP
ID ID ID ID AI ID ID ID ID IP
ID ID ID ID AI ID ID ID ID
ID ID ID ID AI ID ID ID ID
ID ID ID ID AI ID ID ID ID
ID ID ID ID AI ID ID ID ID
ID ID ID ID AI ID ID ID ID
ID ID ID ID AI ID ID ID ID
ID ID ID ID AI ID ID ID ID
ID ID ID ID AI ID ID ID ID
ID ID ID ID AI ID ID ID ID
ID ID ID ID AI ID ID ID ID
ID ID ID ID AI ID ID ID ID
instalaciones electricas y sanitarias; otro dia lo referido al acero y finalmente un dia mas para encofrado y vaceado de concreto.
NA 5 SEMANA 6 SEMANA 7
D33 D34 D35 D36 D37 D38 D39 D40 D41 D42 D43 D44 D45 D46
Fri Sat Sun Mon Tue Wen Thu Fri Sat Sun Mon Tue Wen Thu
21/3 22/3 23/3 24/3 25/3 26/3 27/3 28/3 29/3 30/3 31/3 1/4 2/4 3/4
IP ID ID ID ID AI
IP ID ID ID ID AI
IP ID ID ID ID AI
IP ID ID ID ID AI IP
IP ID ID ID ID AI IP
IP ID ID ID ID AI IP ID
IP ID ID ID ID AI IP ID ID
IP ID ID ID ID AI IP ID ID
IP ID ID ID ID AI IP ID ID ID
IP ID ID ID ID AI IP ID ID ID
IP ID ID ID ID AI IP ID ID ID
vaceado de concreto.
NA 7
D47 D48 D49
Fri Sat Sun
4/4 5/4 6/4
ID
SEMANA PREVIA
P1 P2 P3 P4
DESCRIPCION
Mon Tue Wen Thu
17/2 18/2 19/2 20/2
ACERO VERTICAL
IIEE VERTICAL
IISS VERTICAL
ENCOFRADO VERTICAL
VACIADO VERTICAL
ETAPA 01
ENCOFRADO HORIZONTAL
ACERO HORIZONTAL
IIEE
IISS DESAGUE
IISS AGUA
VACIADO HORIZONTAL
* CHARLA DIAR
LOS DÍA
Leyenda ITEM
Inducción IND
Charla General CG
Curso Capataz CC
Cursos Especiales CE
Capacitación específica CAE
ANA PREVIA SEMANA 1 SEMANA
P5 P6 P7 D1 D2 D3 D4 D5 D6 D7 D8 D9
Fri Sat Sun Mon Tue Wen Thu Fri Sat Sun Mon Tue
21/2 22/2 23/2 17/2 18/2 19/2 20/2 21/2 22/2 23/2 24/2 25/2
CC CAE CG IND.
CC CAE CG IND.
CC CAE CG IND.
CE CG CAE IND.
CE CG CAE IND.
CE CG CAE IND.
CC CAE CG IND.
CC CAE CG IND.
CC CAE CG IND.
CC CAE CG IND.
CE CG CAE IND.
1 2 3 4 5 6 7 8 9
DESCRIPCION Mon Tue Wen Thu Fri Sat Sun Mon Tue
17/2 18/2 19/2 20/2 21/2 22/2 23/2 24/2 25/2
Casco color 15 18 12 11 8
Barbiquejo 15 18 12 11 8
Lentes luna clara 15 18 12 11 8 15 18
Guantes jebe 4 6 8 8
Guantes dieléctrico 3 3
Guantes cuero 8 12 16 8
tapones descartables 6 6 6 6 14.00 14
Zap. Cat pta de acero 12 18 12 8 8
Zapatos dieléctricos 3 3
Botas jebe c/acero 6 8
uniforme 15 18 12 11 8
cinturón porta herramientas 8 12 12 8
arnés anillos 3D 15 18 12 11 8
Leyenda
Casco color
Barbiquejo
Lentes luna clara
Guantes jebe
Guantes dieléctrico
Guantes cuero
tapones descartables
Zap. Cat pta de acero
Zapatos dieléctricos
Botas jebe c/acero
uniforme
cinturón porta herramientas
arnés anillos 3D
10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29
Wen Thu Fri Sat Sun Mon Tue Wen Thu Fri Sat Sun Mon Tue Wen Thu Fri Sat Sun Mon
26/2 27/2 28/2 1/3 2/3 3/3 4/3 5/3 6/3 7/3 8/3 9/3 10/3 11/3 12/3 13/3 14/3 15/3 16/3 17/3
12 11 8 15 18 12 11 8 15 18 12 11 8 15
14 14 14 14 14.00 14 14 14 14 14 14.00 14 14 14
30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47
Tue Wen Thu Fri Sat Sun Mon Tue Wen Thu Fri Sat Sun Mon Tue Wen Thu Fri
18/3 19/3 20/3 21/3 22/3 23/3 24/3 25/3 26/3 27/3 28/3 29/3 30/3 31/3 1/4 2/4 3/4 4/4
18 12 11 8 15 18 12 11 8 15 18 12 11 8
14 14 14.00 14 14 14 14 14 14.00 14 8 8 8 8
48 49
Sat Sun
5/4 6/4
EDIFICIO ELIT
PRESUPUESTO EQUIPO DE PROTECCIÓN PERSONAL T.C. PROTECCION DE CA
150
COTRATISTA: GOKU
Casco blanco
PERSONAL
FASE/TIEMPO: OBRA COMPLETA
DIAS
SEMANAS:
ITEM
MES Y AÑO:
DIAS/FECHA
1
ACERO VERTICAL 8 40
INSTALACIONES ELECTRICAS VERTICALES 3 40
INSTALACIONES SANITARIAS VERTICALES 4 40
ENCOFRADO VERTICAL 40 40
VACIADO VERTICAL 6 40
ENCOFRADO HORIZONTAL 24 40
ACERO HORIZONTAL 8 40
INSTALACIONES ELECTRICAS 3 40
INSTALACIONES SANITARIAS (DESAGUE) 4 40
INSTALACIONES SANITARIAS (AGUA) 4 40
VACIADO HORIZONTAL 8 40
35
0.00
FACTOR DEMASÍA 1.5 0.00
CANTIDAD REDONDEADA 0.00
PRECIO UNITARIO US$ 7.00
TOTAL US$ 0.00
PROTECCION DE CABEZA PROT. OJOS PROT. VIAS RESPIRATORIAS
150 70 5 5 2 90 8 12 10
sobremontura
Casco color
color negro
lentes luna
barbiquejo
RED LINE
respirador
mascarilla
mascarilla
filtp/polvo
pa/ polvo
cartucho
p/soldar
lentes
8.00 8.00 clara
32.00
3.00 3.00 12.00
4.00 4.00 16.00
40.00 40.00 160.00
6.00 6.00 24.00
24.00 24.00 96.00
8.00 8.00 32.00
3.00 3.00 12.00
4.00 4.00 16.00
4.00 4.00 16.00
8.00 8.00 32.00
zap.CAT pta.
guantes jebe
botas jebe c/
descartables
guantes hilo
dieléctricos
dieléctricos
cuero ref.
pta.acero
uniforme
ptos pvc
guantes
guantes
tapones
zapatos
zapatos
acero
acero
8.00 8.00 8.00
3 3.00 3.00
4 4.00 4.00
40.00 40.00 40.00
6.00 120.00 6.00 6.00 6.00
24.00 24.00 24.00
8 8.00 8.00
3.00 3.00 3.00
4.00 4.00 4.00
4.00 4.00 4.00
8.00 160.00 8.00 8.00 8.00
26.00 0.00 6.00 80.00 280.00 106.00 0.00 6.00 14.00 112.00
39.00 0.00 9.00 120.00 420.00 159.00 0.00 9.00 21.00 336.00
39.00 0.00 9.00 120.00 420.00 159.00 0.00 9.00 21.00 336.00
1.56 0.74 5.36 6.04 2.08 39.60 12.99 13.40 14.10 17.55
60.84 0.00 48.24 724.80 873.60 6,296.40 0.00 120.60 296.10 5,896.80
UNIFORME Ws CON ESMERIL Ws SOLD.A ELECTRICA O AUTOGENA
240 NA 240 30 100 150 150 180 150 240
cinturón porta
policarbonato
herramientas
cuero blando
8" 3 hebillasr
cuero cromo
cuero cromo
cuero cromo
cuerocromo
jean para el
guantes de
mandil de
soldador
escarpín
guantes
chaleco
mandil
careta
visor
staff
14"
8.00
40.00
24.00
8.00
0.00 80.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
0.00 120.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
0.00 120.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
8.01 6.58 12.50 4.25 3.53 6.80 7.26 3.68 6.80 6.80
0.00 789.60 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
RICA O AUTOGENA ANTI CAIDAS
240 180 240 240
amortiguador
chaqueta
anillos D
oxicorte
arnés 3
lentes
cuero
8.00
3.00
4.00
40.00
6.00
24.00
8.00
3.00
4.00
4.00
8.00
Número
Número
Número de
Ratio de horas
de horas 1 2 3 4 5 6 cuadrillas
hombre
a usar
7.4 4 8
3.0 1 3
4.0 2 4
36.0 8 40
4.0 1 6
19.4 6 24
6.9 4 8
3.0 1 3
4.0 2 4
4.0 2 4
2.1 1 8
PARTIDAS TAREAS
SOLAQUEO DE MUROS
REVOQUES/ENLU
CIDOS LIMPIEZA PARA TRAZO / TRAZO DE TABIQUERIA Y SARDINELES
COLOCACION DE ACERO DE ANCLAJE / IIEE E IISS
07/04/2013 08/04/2013 09/04/2013 10/04/2013 11/04/2013 12/04/2013 13/04/2013 14/04/2013 15/04/2013 16/04/2013
A1 B1 C1 D1 E1 F1 A2 B2
A1 B1 C1 D1 E1 F1 A2 B2
A1 B1 C1 D1 E1 F1 A2
A1 B1 C1 D1 E1 F1 A2
A1 B1 C1 D1 E1 F1
A1 B1 C1 D1 E1 F1
A1 B1 C1 D1 E1
A1 B1 C1 D1 E1
A1 B1 C1 D1 E1
A1 B1 C1 D1 E1
A1 B1 C1 D1
A1 B1 C1 D1
A1 B1 C1 D1
A1 B1 C1 D1
A1 B1 C1 D1
A1 B1 C1 D1
A1 B1 C1
A1 B1 C1
A1 B1 C1
A1 B1 C1
A1 B1
A1 B1
A1
A1
A1
TORRE A TORRE B
A5 B5 C5 D5 E5 F5 F5 E5
A4 B4 C4 D4 E4 F4 F4 E4
A3 B3 C3 D3 E3 F3 F3 E3
A2 B2 C2 D2 E2 F2 F2 E2
A1 B1 C1 D1 E1 F1 F1 E1
17/04/2013 18/04/2013 19/04/2013 20/04/2013 ### ### ### ### ### ### ### ### ###
C2 D2 E2 F2 A3 B3 C3 D3 E3
C2 D2 E2 F2 A3 B3 C3 D3 E3
B2 C2 D2 E2 F2 A3 B3 C3 D3
B2 C2 D2 E2 F2 A3 B3 C3 D3
A2 B2 C2 D2 E2 F2 A3 B3 C3
A2 B2 C2 D2 E2 F2 A3 B3 C3
F1 A2 B2 C2 D2 E2 F2 A3 B3
F1 A2 B2 C2 D2 E2 F2 A3 B3
F1 A2 B2 C2 D2 E2 F2 A3 B3
F1 A2 B2 C2 D2 E2 F2 A3 B3
E1 F1 A2 B2 C2 D2 E2 F2 A3
E1 F1 A2 B2 C2 D2 E2 F2 A3
E1 F1 A2 B2 C2 D2 E2 F2 A3
E1 F1 A2 B2 C2 D2 E2 F2 A3
E1 F1 A2 B2 C2 D2 E2 F2 A3
E1 F1 A2 B2 C2 D2 E2 F2 A3
D1 E1 F1 A2 B2 C2 D2 E2 F2
D1 E1 F1 A2 B2 C2 D2 E2 F2
D1 E1 F1 A2 B2 C2 D2 E2 F2
D1 E1 F1 A2 B2 C2 D2 E2 F2
C1 D1 E1 F1 A2 B2 C2 D2 E2
C1 D1 E1 F1 A2 B2 C2 D2 E2
B1 C1 D1 E1 F1 A2 B2 C2 D2
B1 C1 D1 E1 F1 A2 B2 C2 D2
B1 C1 D1 E1 F1 A2 B2 C2 D2
A1 B1 C1 D1 E1 F1 A2 B2 C2
A1 B1 C1 D1 E1 F1 A2 B2 C2
A1 B1 C1 D1 E1 F1 A2 B2 C2
A1 B1 C1 D1 E1 F1 A2 B2
A1 B1 C1 D1 E1 F1 A2 B2
A1 B1 C1 D1 E1 F1 A2 B2
A1 B1 C1 D1 E1 F1 A2
A1 B1 C1 D1 E1 F1 A2
A1 B1 C1 D1 E1 F1 A2
A1 B1 C1 D1 E1 F1
A1 B1 C1 D1 E1 F1
A1 B1 C1 D1 E1
A1 B1 C1 D1 E1
A1 B1 C1 D1 E1
A1 B1 C1 D1
A1 B1 C1 D1
A1 B1 C1 D1
A1 B1 C1 D1
A1 B1 C1 D1
A1 B1 C1
A1 B1 C1
A1 B1 C1
A1 B1 C1
A1 B1 C1
A1 B1
A1 B1
A1 B1
A1
A1
A1
A1
A1
TORRE C
D5 C5 B5 A5
D4 C4 B4 A4
D3 C3 B3 A3
D2 C2 B2 A2
D1 C1 B1 A1
LINEA DE PRODUCCIÓN 2
SEM 5 SEM 6
Mié Jue Vie Sáb Dom Lun Mar Mié Jue Vie Sáb Dom Lun Mar Mié Jue
### ### 02/05/2013 ### ### ### ### ### ### ### ### ### ### ### ### ###
F3 A4 B4 C4 D4 E4 F4 A5 B5 C5 D5 E5
F3 A4 B4 C4 D4 E4 F4 A5 B5 C5 D5 E5
E3 F3 A4 B4 C4 D4 E4 F4 A5 B5 C5 D5
E3 F3 A4 B4 C4 D4 E4 F4 A5 B5 C5 D5
D3 E1 F3 A4 B4 C4 D4 E4 F4 A5 B5 C5
D3 E1 F3 A4 B4 C4 D4 E4 F4 A5 B5 C5
C3 D3 E3 F3 A4 B4 C4 D4 E4 F4 A5 B5
C3 D3 E3 F3 A4 B4 C4 D4 E4 F4 A5 B5
C3 D3 E3 F3 A4 B4 C4 D4 E4 F4 A5 B5
C3 D3 E3 F3 A4 B4 C4 D4 E4 F4 A5 B5
B3 C3 D3 E3 F3 A4 B4 C4 D4 E4 F4 A5
B3 C3 D3 E3 F3 A4 B4 C4 D4 E4 F4 A5
B3 C3 D3 E3 F3 A4 B4 C4 D4 E4 F4 A5
B3 C3 D3 E3 F3 A4 B4 C4 D4 E4 F4 A5
B3 C3 D3 E3 F3 A4 B4 C4 D4 E4 F4 A5
B3 C3 D3 E3 F3 A4 B4 C4 D4 E4 F4 A5
A3 B3 C3 D3 E3 F3 A4 B4 C4 D4 E4 F4
A3 B3 C3 D3 E3 F3 A4 B4 C4 D4 E4 F4
A3 B3 C3 D3 E3 F3 A4 B4 C4 D4 E4 F4
A3 B3 C3 D3 E3 F3 A4 B4 C4 D4 E4 F4
F2 A3 B3 C3 D3 E3 F3 A4 B4 C4 D4 E4
F2 A3 B3 C3 D3 E3 F3 A4 B4 C4 D4 E4
E2 F2 A3 B3 C3 D3 E3 F3 A4 B4 C4 D4
E2 F2 A3 B3 C3 D3 E3 F3 A4 B4 C4 D4
E2 F2 A3 B3 C3 D3 E3 F3 A4 B4 C4 D4
D2 E2 F2 A3 B3 C3 D3 E3 F3 A4 B4 C4
D2 E2 F2 A3 B3 C3 D3 E3 F3 A4 B4 C4
D2 E2 F2 A3 B3 C3 D3 E3 F3 A4 B4 C4
C2 D2 E2 F2 A3 B3 C3 D3 E3 F3 A4 B4
C2 D2 E2 F2 A3 B3 C3 D3 E3 F3 A4 B4
C2 D2 E2 F2 A3 B3 C3 D3 E3 F3 A4 B4
B2 C2 D2 E2 F2 A3 B3 C3 D3 E3 F3 A4
B2 C2 D2 E2 F2 A3 B3 C3 D3 E3 F3 A4
B2 C2 D2 E2 F2 A3 B3 C3 D3 E3 F3 A4
A2 B2 C2 D2 E2 F2 A3 B3 C3 D3 E3 F3
A2 B2 C2 D2 E2 F2 A3 B3 C3 D3 E3 F3
F1 A2 B2 C2 D2 E2 F2 A3 B3 C3 D3 E3
F1 A2 B2 C2 D2 E2 F2 A3 B3 C3 D3 E3
F1 A2 B2 C2 D2 E2 F2 A3 B3 C3 D3 E3
E1 F1 A2 B2 C2 D2 E2 F2 A3 B3 C3 D3
E1 F1 A2 B2 C2 D2 E2 F2 A3 B3 C3 D3
E1 F1 A2 B2 C2 D2 E2 F2 A3 B3 C3 D3
E1 F1 A2 B2 C2 D2 E2 F2 A3 B3 C3 D3
E1 F1 A2 B2 C2 D2 E2 F2 A3 B3 C3 D3
D1 E1 F1 A2 B2 C2 D2 E2 F2 A3 B3 C3
D1 E1 F1 A2 B2 C2 D2 E2 F2 A3 B3 C3
D1 E1 F1 A2 B2 C2 D2 E2 F2 A3 B3 C3
D1 E1 F1 A2 B2 C2 D2 E2 F2 A3 B3 C3
D1 E1 F1 A2 B2 C2 D2 E2 F2 A3 B3 C3
C1 D1 E1 F1 A2 B2 C2 D2 E2 F2 A3 B3
C1 D1 E1 F1 A2 B2 C2 D2 E2 F2 A3 B3
C1 D1 E1 F1 A2 B2 C2 D2 E2 F2 A3 B3
B1 C1 D1 E1 F1 A2 B2 C2 D2 E2 F2 A3
B1 C1 D1 E1 F1 A2 B2 C2 D2 E2 F2 A3
B1 C1 D1 E1 F1 A2 B2 C2 D2 E2 F2 A3
B1 C1 D1 E1 F1 A2 B2 C2 D2 E2 F2 A3
B1 C1 D1 E1 F1 A2 B2 C2 D2 E2 F2 A3
A1 B1 C1 D1 E1 F1 A2 B2 C2 D2 E2 F2
A1 B1 C1 D1 E1 F1 A2 B2 C2 D2 E2 F2
A1 B1 C1 D1 E1 F1 A2 B2 C2 D2 E2 F2
A1 B1 C1 D1 E1 F1 A2 B2 C2 D2 E2 F2
A1 B1 C1 D1 E1 F1 A2 B2 C2 D2 E2 F2
A1 B1 C1 D1 E1 F1 A2 B2 C2 D2 E2
A1 B1 C1 D1 E1 F1 A2 B2 C2 D2 E2
A1 B1 C1 D1 E1 F1 A2 B2 C2 D2 E2
A1 B1 C1 D1 E1 F1 A2 B2 C2 D2 E2
A1 B1 C1 D1 E1 F1 A2 B2 C2 D2 E2
A1 B1 C1 D1 E1 F1 A2 B2 C2 D2 E2
A1 B1 C1 D1 E1 F1 A2 B2 C2 D2 E2
A1 B1 C1 D1 E1 F1 A2 B2 C2 D2
A1 B1 C1 D1 E1 F1 A2 B2 C2 D2
A1 B1 C1 D1 E1 F1 A2 B2 C2 D2
A1 B1 C1 D1 E1 F1 A2 B2 C2 D2
A1 B1 C1 D1 E1 F1 A2 B2 C2 D2
A1 B1 C1 D1 E1 F1 A2 B2 C2 D2
A1 B1 C1 D1 E1 F1 A2 B2 C2
A1 B1 C1 D1 E1 F1 A2 B2 C2
A1 B1 C1 D1 E1 F1 A2 B2
A1 B1 C1 D1 E1 F1 A2 B2
EM 6 SEM 7 SEM 8
Vie Sáb Dom Lun Mar Mié Jue Vie Sáb Dom Lun Mar Mié Jue Vie Sáb
### ### ### ### ### ### ### ### ### ### ### ### ### ### ### 31/05/2013
F5
F5
E5 F5
E5 F5
D5 E5 F5
D5 E5 F5
C5 D5 E5 F5
C5 D5 E5 F5
C5 D5 E5 F5
C5 D5 E5 F5
B5 C5 D5 E5 F5
B5 C5 D5 E5 F5
B5 C5 D5 E5 F5
B5 C5 D5 E5 F5
B5 C5 D5 E5 F5
B5 C5 D5 E5 F5
A5 B5 C5 D5 E5 F5
A5 B5 C5 D5 E5 F5
A5 B5 C5 D5 E5 F5
A5 B5 C5 D5 E5 F5
F4 A5 B5 C5 D5 E5 F5
F4 A5 B5 C5 D5 E5 F5
E4 F4 A5 B5 C5 D5 E5 F5
E4 F4 A5 B5 C5 D5 E5 F5
E4 F4 A5 B5 C5 D5 E5 F5
D4 E4 F4 A5 B5 C5 D5 E5 F5
D4 E4 F4 A5 B5 C5 D5 E5 F5
D4 E4 F4 A5 B5 C5 D5 E5 F5
C4 D4 E4 F4 A5 B5 C5 D5 E5 F5
C4 D4 E4 F4 A5 B5 C5 D5 E5 F5
C4 D4 E4 F4 A5 B5 C5 D5 E5 F5
B4 C4 D4 E4 F4 A5 B5 C5 D5 E5 F5
B4 C4 D4 E4 F4 A5 B5 C5 D5 E5 F5
B4 C4 D4 E4 F4 A5 B5 C5 D5 E5 F5
A4 B4 C4 D4 E4 F4 A5 B5 C5 D5 E5
A4 B4 C4 D4 E4 F4 A5 B5 C5 D5 E5
F3 A4 B4 C4 D4 E4 F4 A5 B5 C5 D5
F3 A4 B4 C4 D4 E4 F4 A5 B5 C5 D5
F3 A4 B4 C4 D4 E4 F4 A5 B5 C5 D5
E3 F3 A4 B4 C4 D4 E4 F4 A5 B5 C5
E3 F3 A4 B4 C4 D4 E4 F4 A5 B5 C5
E3 F3 A4 B4 C4 D4 E4 F4 A5 B5 C5
E3 F3 A4 B4 C4 D4 E4 F4 A5 B5 C5
E3 F3 A4 B4 C4 D4 E4 F4 A5 B5 C5
D3 E3 F3 A4 B4 C4 D4 E4 F4 A5 B5
D3 E3 F3 A4 B4 C4 D4 E4 F4 A5 B5
D3 E3 F3 A4 B4 C4 D4 E4 F4 A5 B5
D3 E3 F3 A4 B4 C4 D4 E4 F4 A5 B5
D3 E3 F3 A4 B4 C4 D4 E4 F4 A5 B5
C3 D3 E3 F3 A4 B4 C4 D4 E4 F4 A5
C3 D3 E3 F3 A4 B4 C4 D4 E4 F4 A5
C3 D3 E3 F3 A4 B4 C4 D4 E4 F4 A5
B3 C3 D3 E3 F3 A4 B4 C4 D4 E4 F4
B3 C3 D3 E3 F3 A4 B4 C4 D4 E4 F4
B3 C3 D3 E3 F3 A4 B4 C4 D4 E4 F4
B3 C3 D3 E3 F3 A4 B4 C4 D4 E4 F4
B3 C3 D3 E3 F3 A4 B4 C4 D4 E4 F4
A3 B3 C3 D3 E3 F3 A4 B4 C4 D4 E4
A3 B3 C3 D3 E3 F3 A4 B4 C4 D4 E4
A3 B3 C3 D3 E3 F3 A4 B4 C4 D4 E4
A3 B3 C3 D3 E3 F3 A4 B4 C4 D4 E4
A3 B3 C3 D3 E3 F3 A4 B4 C4 D4 E4
F2 A3 B3 C3 D3 E3 F3 A4 B4 C4 D4
F2 A3 B3 C3 D3 E3 F3 A4 B4 C4 D4
F2 A3 B3 C3 D3 E3 F3 A4 B4 C4 D4
F2 A3 B3 C3 D3 E3 F3 A4 B4 C4 D4
F2 A3 B3 C3 D3 E3 F3 A4 B4 C4 D4
F2 A3 B3 C3 D3 E3 F3 A4 B4 C4 D4
F2 A3 B3 C3 D3 E3 F3 A4 B4 C4 D4
E2 F2 A3 B3 C3 D3 E3 F3 A4 B4 C4
E2 F2 A3 B3 C3 D3 E3 F3 A4 B4 C4
E2 F2 A3 B3 C3 D3 E3 F3 A4 B4 C4
E2 F2 A3 B3 C3 D3 E3 F3 A4 B4 C4
E2 F2 A3 B3 C3 D3 E3 F3 A4 B4 C4
E2 F2 A3 B3 C3 D3 E3 F3 A4 B4 C4
D2 E2 F2 A3 B3 C3 D3 E3 F3 A4 B4
D2 E2 F2 A3 B3 C3 D3 E3 F3 A4 B4
C2 D2 E2 F2 A3 B3 C3 D3 E3 F3 A4
C2 D2 E2 F2 A3 B3 C3 D3 E3 F3 A4
SEM 9 SEM 10 SEM
Dom Lun Mar Mié Jue Vie Sáb Dom Lun Mar Mié Jue Vie Sáb Dom Lun Mar
### ### ### ### ### ### ### ### ### ### ### ### ### ### ### 16/06/2013 06/17/13
F5
F5
E5 F5
E5 F5
E5 F5
D5 E5 F5
D5 E5 F5
D5 E5 F5
D5 E5 F5
D5 E5 F5
C5 D5 E5 F5
C5 D5 E5 F5
C5 D5 E5 F5
C5 D5 E5 F5
C5 D5 E5 F5
B5 C5 D5 E5 F5
B5 C5 D5 E5 F5
B5 C5 D5 E5 F5
A5 B5 C5 D5 E5 F5
A5 B5 C5 D5 E5 F5
A5 B5 C5 D5 E5 F5
A5 B5 C5 D5 E5 F5
A5 B5 C5 D5 E5 F5
F4 A5 B5 C5 D5 E5 F5
F4 A5 B5 C5 D5 E5 F5
F4 A5 B5 C5 D5 E5 F5
F4 A5 B5 C5 D5 E5 F5
F4 A5 B5 C5 D5 E5 F5
E4 F4 A5 B5 C5 D5 E5 F5
E4 F4 A5 B5 C5 D5 E5 F5
E4 F4 A5 B5 C5 D5 E5 F5
E4 F4 A5 B5 C5 D5 E5 F5
E4 F4 A5 B5 C5 D5 E5 F5
E4 F4 A5 B5 C5 D5 E5 F5
E4 F4 A5 B5 C5 D5 E5 F5
D4 E4 F4 A5 B5 C5 D5 E5 F5
D4 E4 F4 A5 B5 C5 D5 E5 F5
D4 E4 F4 A5 B5 C5 D5 E5 F5
D4 E4 F4 A5 B5 C5 D5 E5 F5
D4 E4 F4 A5 B5 C5 D5 E5 F5
D4 E4 F4 A5 B5 C5 D5 E5 F5
C4 D4 E4 F4 A5 B5 C5 D5 E5 F5
C4 D4 E4 F4 A5 B5 C5 D5 E5 F5
B4 C4 D4 E4 F4 A5 B5 C5 D5 E5 F5
B4 C4 D4 E4 F4 A5 B5 C5 D5 E5 F5
SEM SEM
Mié Jue Vie Sáb Dom Lun Mar Mié Jue Vie Sáb
06/18/13 06/19/13 06/20/13 06/21/13 06/22/13 06/23/13 06/24/13 06/25/13 06/26/13 06/27/13 06/28/13
METRADO 1RA ETAPA - CASCO ESTRUCTURAL
Bloque tipico 1 (Bloque A)
Descripción Und Metrado Total 1er Piso 2do Piso 3ro Piso
MUROS DE CONCRETO Y COLUMNA (placas, elementos verticales)
Concreto premezclado f´c=175 kg/cm2 para muros reforzados (Cemento P-1) m3 1,026.02 68.40 68.40 68.40
Encofrado y desencofrado para muros m2 21,244.19 1,416.28 1,416.28 1,416.28
Acero corrugado fy=4200kg/cm2 grado 60 kg 48,100.34 3,206.69 3,206.69 3,206.69
MUROS DE CONCRETO (parapeto, elementos verticales)
Concreto premezclado f´c=175 kg/cm2 para muros reforzados (Cemento P-1) m3 43.50 2.90 2.90 2.90
Encofrado y desencofrado para muros m2 870.00 58.00 58.00 58.00
Acero corrugado fy=4200kg/cm2 grado 60 kg 1,770.00 118.00 118.00 118.00
VIGAS (Elementos Horizontales)
Concreto premezclado f´c=175 kg/cm2 para vigas (Cemento P-1) m3 31.49 2.10 2.10 2.10
Encofrado y desencofrado para vigas m2 314.91 20.99 20.99 20.99
Acero corrugado fy=4200kg/cm2 grado 60 kg 6,006.85 400.46 400.46 400.46
LOSAS (Elementos Horizontales)
Concreto premezclado f´c=175kg/cm2 para losas (Cemento P-1) e=0.10m, 0.15m, 0.20m m3 828.96 55.26 55.26 55.26
Encofrado y desencofrado m2 8,391.26 559.42 559.42 559.42
Acero corrugado fy=4200kg/cm2 grado 60 kg 39,530.96 2,635.40 2,635.40 2,635.40
ESCALERAS (Elementos Horizontales)
Concreto premezclado f'c=210kg/cm2 para losas (Cemento P-1) m3 56.57 3.77 3.77 3.77
Encofrado y desencofrado m2 139.69 9.31 9.31 9.31
Acero corrugado fy=4200kg/cm2 grado 60 kg 1,509.15 100.61 100.61 100.61
68.40 68.40 68.40 68.40 68.40 68.40 68.40 68.40 68.40 68.40 68.40 68.40 205.20 205.20
1,416.28 1,416.28 1,416.28 1,416.28 1,416.28 1,416.28 1,416.28 1,416.28 1,416.28 1,416.28 1,416.28 1,416.28 4,248.84 4,248.84
3,206.69 3,206.69 3,206.69 3,206.69 3,206.69 3,206.69 3,206.69 3,206.69 3,206.69 3,206.69 3,206.69 3,206.69 9,620.07 9,620.07
2.90 2.90 2.90 2.90 2.90 2.90 2.90 2.90 2.90 2.90 2.90 2.90 8.70 8.70
58.00 58.00 58.00 58.00 58.00 58.00 58.00 58.00 58.00 58.00 58.00 58.00 174.00 174.00
118.00 118.00 118.00 118.00 118.00 118.00 118.00 118.00 118.00 118.00 118.00 118.00 354.00 354.00
2.10 2.10 2.10 2.10 2.10 2.10 2.10 2.10 2.10 2.10 2.10 2.10 6.30 6.30
20.99 20.99 20.99 20.99 20.99 20.99 20.99 20.99 20.99 20.99 20.99 20.99 62.98 62.98
400.46 400.46 400.46 400.46 400.46 400.46 400.46 400.46 400.46 400.46 400.46 400.46 1,201.37 1,201.37
55.26 55.26 55.26 55.26 55.26 55.26 55.26 55.26 55.26 55.26 55.26 55.26 165.79 165.79
559.42 559.42 559.42 559.42 559.42 559.42 559.42 559.42 559.42 559.42 559.42 559.42 1,678.25 1,678.25
2,635.40 2,635.40 2,635.40 2,635.40 2,635.40 2,635.40 2,635.40 2,635.40 2,635.40 2,635.40 2,635.40 2,635.40 7,906.19 7,906.19
3.77 3.77 3.77 3.77 3.77 3.77 3.77 3.77 3.77 3.77 3.77 3.77 11.31 11.31
9.31 9.31 9.31 9.31 9.31 9.31 9.31 9.31 9.31 9.31 9.31 9.31 27.94 27.94
100.61 100.61 100.61 100.61 100.61 100.61 100.61 100.61 100.61 100.61 100.61 100.61 301.83 301.83
POR SECTORES POR PISO (FRENTE 01) METRADO POR SECTORES POR PISO (FRENTE 02)
S4P1 S5P1 S6P1 S1P1 S2P1 S3P1 S4P1 S5P1 S6P1
PREDECESORA
MATERIALES
SEGURIDAD
ACTIVIDAD
PERSONAL
EQUIPOS
ESPACIO
VARIOS
X
REVOQUES Y ENLUCIDOS
Responsable Sr. Chavez
x
X
Cuadrilla 1 operarios
x
3 ayudantes
MUROS Y TABIQUERIA
x
Responsable Sr. Almonacid
X x
Cuadrilla 1 operarios
X
4 ayudantes
X
X
X x
PISO/ PAVIMENTACION
X
Responsable Sr. Pereira
Cuadrilla
x
2 operarios
2 ayudantes
X
PINTURA INTERIORES
X X
4 oficiales
X
MARCOS Y PUERTAS
x
Cuadrilla 1 operarios
2 ayudantes X
MUEBLES x
Responsable Sr. Aramburu x
Cuadrilla 1 operarios x
4 ayudantes x
DESMACHE
X
Cuadrilla 1 operarios
X
3 ayudantes
TECHOS
x
Responsable Sr. Sawada
X
Cuadrilla 1 operario
x
2 ayudante
IIEE-IISS
X
Responsable Sr. Kosarev
x
Cuadrilla
x
2 operarios
x
1 ayudante
VIDRIOS X
Cuadrilla 1 operarios X
2 ayudantes X
X x
x
Cuadrilla 1 operarios x
2 ayudantes X
Cuadrilla 1 operarios x
2 ayudantes
PAPEL MURAL x
Cuadrilla 1 operarios x
4 ayudantes
PISO LAMINADO X
Cuadrilla 2 operarios x
2 ayudantes
Responsable
Cuadrilla 1 operarios
4 ayudantes
Residente
Ingeniero Asistente de Campo
Ingeniero Asistente de Campo
Ingeniero de Oficina Tecnica
Ingeniero de Instalaciones
Administración
Logística, Almacén
Prevencionista de Riesgo
Proveedor
Maestro de Obra
Capataz de IIEE
Capataz de IISS
FECHA: Aprobado por:
Firma:
ANALISIS DE RESTRICCIONES- ACABADOS
DESCRIPCION DE RESTRICCION
Tarrajeo a destiempo
Gran cantidad de polvo por falta de limpieza
EPPS, uso de casco, uniforme, guantes
Adquisición de herramientas: badilejo , balde
Incompatibilidad de planos
Desplome de la ultima hilada
EPPs: uso de casco, uniforme, guantes
Adquisición previa de materiales
Liberación de ambiente
Capacitación al personal
Gran cantidad de desmonte y polvo
Limpieza del ambiente
Contrapiso terminado
Ceramico para piso dañado
RR HH
Medio Ambiente (SSOMA).
PREVENCIONISTA
LOGISTICA
PROYECTISTA
LOGISTICA - SEGURIDAD
PREVENCIONISTA
PROVEEDOR
ING. DE CAMPO
PREVENCIONISTA
ING. DE CAMPO
ARQUITECTO
PREVENCIONISTA
PROVEEDOR
Área de Calidad
LOGISTICA
ING DE CAMPO
PREVENCIONISTA
ARQUITECTO
ARQUITECTO
PREVENCIONISTA
PROVEEDOR
RRHH
ARQUITECTO
PREVENCIONISTA
PREVENCIONISTA
RECURSOS HUMANOS
PREVENCIONISTA
ARQUITECTO
PREVENCIONISTA
LOGISTICA
RRHH
PREVENCIONISTA
PREVENCIONISTA
ING DE CAMPO
CONTRATISTA
PREVENCIONISTA
CONTRATISTA
PREVENCIONISTA / CONTRATISTA
PREVENCIONISTA
CONTRATISTA
CONTRATISTA
PREVENCIONISTA
PREVENCIONISTA
ARQUITECTO
PROVEEDOR
PREVENCIONISTA / CONTRATISTA
PROVEEDOR
ARQUITECTO
PREVENCIONISTA
ARQUITECTO
PROVEEDOR
PREVENCIONISTA
PREVENCIONISTA
x ACTIVIDAD PREDECESORA
ESPECIFICACIONES-ETC
ACTIVIDAD
MATERIALES
SEGURIDAD
PERSONAL
PLANOS -
EQUIPOS
ESPACIO
REVOQUES Y ENLUCIDOS
Responsable Sr. Chavez
X
Cuadrilla
X
1 operarios
3 ayudantes
MUROS Y TABIQUERIA
x
Responsable Sr. Almonacid
x
Cuadrilla
X
1 operarios
4 ayudantes
PISO/ PAVIMENTACION
x
Responsable Sr. Pereira
Cuadrilla 2 operarios
2 ayudantes
PINTURA INTERIORES X
Cuadrilla 1 operarios
4 oficiales
MARCOS Y PUERTAS x
Cuadrilla 1 operarios
2 ayudantes
MUEBLES
Responsable Sr. Aramburu
Cuadrilla 1 operarios
x
4 ayudantes
x
DESMACHE
X
X
Responsable Sr. Sawada
x
Cuadrilla 1 operario
2 ayudante
IIEE-IISS
X
Responsable Sr. Kosarev
x
Cuadrilla
X
2 operarios
X
1 ayudante
VIDRIOS x
x
Cuadrilla 1 operarios
2 ayudantes
x
Cuadrilla 1 operarios
2 ayudantes
CERRAJERIA, PINTURA Y VANOS x
Responsable Sr. Cotrina
Cuadrilla 1 operarios
2 ayudantes
PAPEL MURAL X
Proveedor
Maestro de Obra
Capataz de IIEE
Capataz de IISS
FECHA: Aprobado por:
Firma:
ANALISIS DE RESTRICCIONES- ACABADOS
DESCRIPCION DE RESTRICCION
VARIOS
Tarrajeo a destiempo
Uso de EPPs ( Casco, guantes, uniformes)
Adquisicion de herramientas ( badilejo,espatula,balde o recipiente mediano, etc)
Incompatibilidad de planos
Llegada de material a obra (tabiqueria, bolsas de cemento)
Liberacion de ambiente
Residente
o Asistente de Campo
o Asistente de Campo
ro de Oficina Tecnica
niero de Instalaciones
Administración
Logística, Almacén
vencionista de Riesgo
veedor
Maestro de Obra
Capataz de IIEE
Capataz de IISS
Aprobado por:
Firma:
ADOS
RECURSOS- HUMANOS
PREVENCIONISTA
LOGISTICA
PROYECTISTA
PROVEDOR
INGENIERO DE CAMPO
RECURSOS HUMANOS
LOGISTICA
AREA DE CALIDAD
PROVEEDOR
RECURSOS HUMANOS
RECURSOS HUMANOS
PROVEEDOR
RECURSOS HUMANOS
RECURSOS HUMANOS
PROVEDOR
LOGISTICA
LOGISTICA
RECURSOS HUMANOS
RECURSOS HUMANOS
LOGISTICA - CALIDAD
LOGISTICA- CALIDAD
PROVEDOR
PROVEDOR
PROVEDOR
ANAL
ESPECIFICACIONES-ETC
ACTIVIDAD
PREDECESORA
MATERIALES
SEGURIDAD
ACTIVIDAD
X PERSONAL
PLANOS -
EQUIPOS
ESPACIO
IIEE-IISS
Responsable Sr. Kosarev
Cuadrilla
X
2 operarios
1 ayudante
TECHOS
Responsable Sr. Nuñez
X
Cuadrilla
2 operarios
1 ayudante
VIDRIOS x
x
Cuadrilla 1 operarios
2 ayudantes
Cuadrilla 1 operarios
2 ayudantes
CERRAJERIA, PINTURA Y VANOS
x
PAPEL MURAL X
Responsable
Cuadrilla 1 operarios
4 ayudantes
ENTREGA DE DPTOS. 1RA REVISION
2RA REVISION
3RA REVISION
Residente
Ingeniero Asistente de Campo
Ingeniero Asistente de Campo
Ingeniero de Oficina Tecnica
Ingeniero de Instalaciones
Administración
Logística, Almacén
Prevencionista de Riesgo
Proveedor
Maestro de Obra
Capataz de IIEE
Capataz de IISS
FECHA: Aprobado por:
Firma:
ANALISIS DE RESTRICCIONES- ACABADOS-SEMANA 10
DESCRIPCION DE RESTRICCION
VARIOS
Falta de personal
Uso adecuado de EPPs ( Casco, guantes dielectricos,gafas de seguridad, botas de jebe, etc)
Residente
o Asistente de Campo
o Asistente de Campo
ro de Oficina Tecnica
niero de Instalaciones
Administración
Logística, Almacén
vencionista de Riesgo
veedor
Maestro de Obra
Capataz de IIEE
Capataz de IISS
Aprobado por:
Firma:
SEMANA 10
RECURSOS HUMANOS
LOGISTICA
LOGISTICA
RECURSOS HUMANOS
LOGISTICA - CALIDAD
LOGISTICA- CALIDAD
PROVEDOR
PROVEDOR
PROVEDOR
RECURSOS HUMANOS
LOGISTICA
PROCESO/SUB PROCESO/LUGAR …………………………………………………………
ACTIVIDAD DE TRABAJO …………………………………………………………
PROBABIL
Pintura
interiores Exposicion a sustancias D.L 42 Art 195 al 199 y
nocivas Afecciones respiratorias 206 al 227 1
Marcos y Lesiones musculares, D.L 42 Art 195 al 199 y
puertas Golpe, choques golpes en el cuerpo 206 al 228 1
Muebles
D.L 42 Art 195 al 199 y
Golpes.caida de objetos Golpes, fracturas 206 al 229 2
Cerrajeria,
Laceraciones e
pintura Cortes. Golpes 1
infecciones D.L 42 F ART. 195 al
vanos
199 y 206 al 224
Piso Laceraciones e
Golpe,corte 2
laminado infecciones
D.L 42 F ART. 195 al
199 y 206 al 224
PROBABILIDAD
PROCEDIMIENTOS
INDICE PERSONAS EXPUESTAS EXISTENTES CAPACITACIÓN EXPOSICIÓN AL RI
Personal entrenado. Conoce el Al menos una vez al a
1 De 1 a 3 Existen son satisfactorias y peligro y lo previene
suficientes Esporadicamente (S
Personal parcialmente
entrenado, conoce el peligro Al menos una vez al
2 De 4 a 12 Existen parcialmente y no son pero no toma acciones de
satisfactorios o suficientes control
Eventualmente (
Personal no entrenado, no Al menos una vez al d
3 Mas de 12 conoce el peligro, no toma
No existen acciones de control Permanentement
2
2
2
2
2
2
1
INDICE DE CAPACITACIÓN C
1
1
1
1
1
1
PROBABILIDAD
2
2
1
1
1
2
1
INDICE DE EXPOSICIÓN AL RIESGO (D)
7
7
5
5
5
7
5
INDICE DE PROBABILIDAD (A+B+C+D)
………………………………………………….
………………………………………………….
1
INDICE DE SEVERIDAD
2
2
1
1
1
2
2 1 2 2
7
2 1 2 1
7
2 1 2 2
2 1 1 1
5
2 1 1 2
2 1 1 2
2 1 1 1
2 1 2 1
7
EXPOSICIÓN AL RIESGO SEVERIDAD (Consecuencia)
Al menos una vez al año (S) Lesión sin incapacidad (S)
Esporadicamente (SO) Disconfort/Incomodidad (SO)
Al menos una vez al mes (S) Lesión con incapacidad temporal (S)
Eventualmente (SO) Daño a la salud reversible
Al menos una vez al día (S) Lesión con incapacidad permanente (S)
Permanentemente (S) Daño a la salud irreversible
5
5
5
5
PROBABILIDAD X SEVERIDAD
14
14
14
M
M
M
TO
TO
TO
NIVEL DE RIESGO
TO
SI
SI
SI
NO
NO
NO
RIESGO SIGNIFICATIVO
NO
M SI
14
TO NO
7
M SI
14
TO NO
5
M SI
10
M SI
10
TO NO
TO NO
7
SEVERIDAD (Consecuencia)
Lesión sin incapacidad (S)
Disconfort/Incomodidad (SO)
Lesión con incapacidad temporal (S)
Daño a la salud reversible
Lesión con incapacidad permanente (S)
Daño a la salud irreversible
MEDIDAS DE CONTROL
Uso adecuado de
EPPs, uso de
mascarrillas
EPPs ( casco, botas
punta de acero,
guantes), SRCTR,
capitación, ATS
Uso de guantes de
cuero o jebe
Uso adecuado de
EPPs, uso de
mascarrillas
Uso de EPPs,
capacitacion
EPPs ( lentes de
seguridad, guantes de
cuero), SRCTR,
Capacitación,
procedimiento de
trabajo, permiso de
trabajo, supervisión
permanente, ATS,
simulacros
Caída de estructuras
Falta de Experiencia
y Medio Ambiente
Caidas a desnivel
Caída de objetos
Aplastamiento
Caídas de altura
Atrapamientos
Caídas a nivel
Alta presión
Derrumbes
existentes
Explosión
Atropello
extremas
Choques
nocivas
Cortes
Actividades
Movimiento de Tierras
1 Excavación manual y perfilado
2 Excavación masiva
3 Eliminación de desmonte
4 Anclaje para muro pantalla
Acero
5 Acero horizontal
6 Acero vertical
Carpintería
7 Encofrado y desencofrado
8 Armado de andamio
9 Colocación de ladrillos de techo
Concreto
10 Preparación de concreto
11 Vaciado de concreto con bomba
Mampostería
12 Muros de ladrillo
13 Tarrajeo de muros y cielos rasos
14 Solaqueos
Acabados
15 Colocación de enchapes y pisos
16 Colocación de vidrios y accesorios
17 Pintura
Instalaciones
18 Instalaciones eléctricas y sanitarias
19 Instalaciones mecánicas
Trabajos en caliente
20 Soldadura eléctrica
21 Corte, esmerilado y desbaste
22 Operaciones oxicoacetilénicas
Transporte vertical de material
23 Izaje con elevador de plataforma
ELIGROS
Inhalación de sustancias
Proyección de partículas
Ingestión de sustancias
Sobreesfuerzos
Incrustaciones
Tropezones
Volcaduras
Radiación
Incendio
Ruido
nocivas
nocivas
Golpes
Acero vertical
IIEEv
IISS v
Encofrado vertical
Concreto vertical
Encofrado de viga
Acero horizontal v
Encofrado de losa
Ladrillos de techo
Acero horizontal l
IIEE h
Concreto horizontal
Plan de Seguridad y EVALUACION DE RIESGOS
Ocupacional
19 Muros de Ladrillo
Consecuencias
Probabilidad Probabilidad
Baja Medio Alto Baja Medio Alto
Leve Tri To Mo Leve Tri To Mo
Moderado To Mo Imp Moderado To Mo Imp
Severa Mo Imp In Severa Mo Imp In
Consecuencias
Probabilidad Probabilidad
Baja Medio Alto Baja Medio Alto
Leve Tri To Mo Leve Tri To Mo
Moderado To Mo Imp Moderado To Mo Imp
Severa Mo Imp In Severa Mo Imp In
Consecuencias
Probabilidad Probabilidad
Baja Medio Alto Baja Medio Alto
Leve Tri To Mo Leve Tri To Mo
Moderado To Mo Imp Moderado To Mo Imp
Severa Mo Imp In Severa Mo Imp In
Consecuencias
EVALUACION DE RIESGOS
Consecuencias
Probabilidad Probabilidad
Baja Medio Alto Baja Medio Alto
Leve Tri To Mo Leve Tri To Mo
Moderado To Mo Imp Moderado To Mo Imp
Severa Mo Imp In Severa Mo Imp In
Consecuencias
Probabilidad Probabilidad
Baja Medio Alto Baja Medio Alto
Leve Tri To Mo Leve Tri To Mo
Moderado To Mo Imp Moderado To Mo Imp
Severa Mo Imp In Severa Mo Imp In
Consecuencias
Probabilidad Probabilidad
Baja Medio Alto Baja Medio Alto
Leve Tri To Mo Leve Tri To Mo
Consecuencias
Consecuencias
Moderado To Mo Imp Moderado To Mo Imp
Severa Mo Imp In Severa Mo Imp In
Inhalación de sustancias nocivas Proyección de partículas
Consecuencias
Consecuencias
Probabilidad Probabilidad
Baja Medio Alto Baja Medio Alto
Leve Tri To Mo Leve Tri To Mo
Moderado To Mo Imp Moderado To Mo Imp
Severa Mo Imp In Severa Mo Imp In
Tropezones
Consecuencias
Probabilidad
Baja Medio Alto
Leve Tri To Mo
Moderado To Mo Imp
Severa Mo Imp In
21 Solaqueos
Consecuencias
Probabilidad Probabilidad
Baja Medio Alto Baja Medio Alto
Leve Tri To Mo Leve Tri To Mo
Moderado To Mo Imp Moderado To Mo Imp
Severa Mo Imp In Severa Mo Imp In
Consecuencias
Probabilidad Probabilidad
Baja Medio Alto Baja Medio Alto
Leve Tri To Mo Leve Tri To Mo
Moderado To Mo Imp Moderado To Mo Imp
Severa Mo Imp In Severa Mo Imp In
Consecuencias
Probabilidad Probabilidad
Baja Medio Alto Baja Medio Alto
Leve Tri To Mo Leve Tri To Mo
Moderado To Mo Imp Moderado To Mo Imp
Severa Mo Imp In Severa Mo Imp In
Consecuencias
Probabilidad Probabilidad
Baja Medio Alto Baja Medio Alto
Leve Tri To Mo Leve Tri To Mo
Moderado To Mo Imp Moderado To Mo Imp
Severa Mo Imp In Severa Mo Imp In
Ruido Tropezones
Consecuencias
Consecuencias
Probabilidad Probabilidad
Baja Medio Alto Baja Medio Alto
Leve Tri To Mo Leve Tri To Mo
Moderado To Mo Imp Moderado To Mo Imp
Severa Mo Imp In Severa Mo Imp In
22 Colocación de enchapes y pisos
Consecuencias
Probabilidad Probabilidad
Baja Medio Alto Baja Medio Alto
Leve Tri To Mo Leve Tri To Mo
Moderado To Mo Imp Moderado To Mo Imp
Severa Mo Imp In Severa Mo Imp In
Cortes Golpes
Consecuencias
Consecuencias
Probabilidad Probabilidad
Baja Medio Alto Baja Medio Alto
Leve Tri To Mo Leve Tri To
Moderado To Mo Imp Moderado To Mo Imp
Severa Mo Imp In Severa Mo Imp In
Consecuencias
Probabilidad Probabilidad
Baja Medio Alto Baja Medio Alto
Leve Tri To Mo Leve Tri To Mo
Moderado To Mo Imp Moderado To Mo Imp
Severa Mo Imp In Severa Mo Imp In
Ruido Tropezones
Consecuencias
Consecuencias
Probabilidad Probabilidad
Baja Medio Alto Baja Medio Alto
Leve Tri To Mo Leve Tri To Mo
Moderado To Mo Imp Moderado To Mo Imp
Severa Mo Imp In Severa Mo Imp In
Consecuencias
Probabilidad Probabilidad
Baja Medio Alto Baja Medio Alto
Leve Tri To Mo Leve Tri To Mo
Moderado To Mo Imp Moderado To Mo Imp
Severa Mo Imp In Severa Mo Imp In
Consecuencias
Probabilidad Probabilidad
Baja Medio Alto Baja Medio Alto
Leve Tri To Mo Leve Tri To Mo
Moderado To Mo Imp Moderado To Mo Imp
Severa Mo Imp In Severa Mo Imp In
EVALUACIÓN DE RIESGOS
Consecuencias
Probabilidad Probabilidad
Baja Medio Alto Baja Medio Alto
Leve Tri To Mo Leve Tri To Mo
Moderado To Mo Imp Moderado To Mo Imp
Severa Mo Imp In Severa Mo Imp In
Tropezones
Consecuencias
Probabilidad
Baja Medio Alto
Leve Tri To Mo
Moderado To Mo Imp
Severa Mo Imp In
24 Pintura
Consecuencias
Probabilidad Probabilidad
Baja Medio Alto Baja Medio Alto
Leve Tri To Mo Leve Tri To Mo
Moderado To Mo Imp Moderado To Mo Imp
Severa Mo Imp In Severa Mo Imp In
Consecuencias
Probabilidad Probabilidad
Baja Medio Alto Baja Medio Alto
Leve Tri To Mo Leve Tri To Mo
Moderado To Mo Imp Moderado To Mo Imp
Severa Mo Imp In Severa Mo Imp In
Contacto con sustancias nocivas Golpes
Consecuencias
Consecuencias
Probabilidad Probabilidad
Baja Medio Alto Baja Medio Alto
Leve Tri To Mo Leve Tri To Mo
Moderado To Mo Imp Moderado To Mo Imp
Severa Mo Imp In Severa Mo Imp In
Consecuencias
Probabilidad Probabilidad
Baja Medio Alto Baja Medio Alto
Leve Tri To Mo Leve Tri To Mo
Moderado To Mo Imp Moderado To Mo Imp
Severa Mo Imp In Severa Mo Imp In
Consecuencias
Probabilidad Probabilidad
Ruido Tropezones
Consecuencias
Consecuencias
Probabilidad Probabilidad
Baja Medio Alto Baja Medio Alto
Leve Tri To Mo Leve Tri To Mo
Moderado To Mo Imp Moderado To Mo Imp
Severa Mo Imp In Severa Mo Imp In
Consecuencias
Probabilidad Probabilidad
Baja Medio Alto Baja Medio Alto
Leve Tri To Mo Leve Tri To Mo
Moderado To Mo Imp Moderado To Mo Imp
Severa Mo Imp In Severa Mo Imp In
Consecuencias
Probabilidad Probabilidad
Baja Medio Alto Baja Medio Alto
Leve Tri To Mo Leve Tri To Mo
Moderado To Mo Imp Moderado To Mo Imp
Severa Mo Imp In Severa Mo Imp In
EVALUACION DE RIESGOS
ConsecuenciasConsecuencias
Probabilidad Probabilidad
Baja Medio Alto Baja Medio Alto
Leve Tri To Mo Leve Tri To Mo
Moderado To Mo Imp Moderado To Mo Imp
Severa Mo Imp In Severa Mo Imp In
Probabilidad Probabilidad
Baja Medio Alto Baja Medio Alto
Leve Tri To Mo Leve Tri To Mo
Moderado To Mo Imp Moderado To Mo Imp
Severa Mo Imp In Severa Mo Imp In
Consecuencias Incendio Sobreesfuerzos
Consecuencias
Probabilidad Probabilidad
Baja Medio Alto Baja Medio Alto
Leve Tri To Mo Leve Tri To Mo
Moderado To Mo Imp Moderado To Mo Imp
Severa Mo Imp In Severa Mo Imp In
Tropezones
Consecuencias
Probabilidad
Baja Medio Alto
Leve Tri To Mo
Moderado To Mo Imp
Severa Mo Imp In
26 Instalaciones mecánicas
Consecuencias
Probabilidad Probabilidad
Baja Medio Alto Baja Medio Alto
Leve Tri To Mo Leve Tri To Mo
Moderado To Mo Imp Moderado To Mo Imp
Severa Mo Imp In Severa Mo Imp In
Consecuencias
Probabilidad Probabilidad
Baja Medio Alto Baja Medio Alto
Leve Tri To Mo Leve Tri To Mo
Moderado To Mo Imp Moderado To Mo Imp
Severa Mo Imp In Severa Mo Imp In
EVALUACION DE RIESGOS
Consecuencias
Probabilidad Probabilidad
Baja Medio Alto Baja Medio Alto
Leve Tri To Mo Leve Tri To Mo
Moderado To Mo Imp Moderado To Mo Imp
Severa Mo Imp In Severa Mo Imp In
Consecuencias
Probabilidad Probabilidad
Baja Medio Alto Baja Medio Alto
Leve Tri To Mo Leve Tri To Mo
Moderado To Mo Imp Moderado To Mo Imp
Severa Mo Imp In Severa Mo Imp In
Incendio Sobreesfuerzos
Consecuencias
Consecuencias
Probabilidad Probabilidad
Baja Medio Alto Baja Medio Alto
Leve Tri To Mo Leve Tri To Mo
Moderado To Mo Imp Moderado To Mo Imp
Severa Mo Imp In Severa Mo Imp In
Tropezones
Consecuencias
Probabilidad
Baja Medio Alto
Leve Tri To Mo
Moderado To Mo Imp
Severa Mo Imp In
PARTIDAS
REVOQUES/ENLU
CIDOS
MUROS /
TABIQUERIA
TREN 01 SSHH,COCINA,LAVANDERIA,PATIO,TERRAZA
MUROS /
TABIQUERIA
PISOS /
PAVIMENT.
PINTURA
INTERIORES
MARCOS Y
PUERTAS
MUEBLES
IIEE IISS
MUEBLES
DESMANCHE
PISOS /
PAVIMENT.
PINTURA
INTERIORES
MARCOS Y
PUERTAS
IIEE IISS
TECHOS
CERRAJERIA,
PINTURA VANOS
VIDRIOS
DESMANCHE
PLACAS LLAVES
TERMICAS
PAPEL MURAL
PISO LAMINADO
ITEM
IND
CG
CC
CUE
CAE
CD
TAREAS
SOLAQUEO DE MUROS
ASENTADO DE LADRILLO
SOLAQUEO DE TECHOS
CABLEADO ELECTRICO DE DPTOS. / INST. DE MARCOS DE PUERTAS / INST. DE MARCOS DE ALUMINIO DE VENTANAS / COLOCACION DE BISAGRAS Y
PROTOCOLO DE MEGADO
PRUEBAS Y REPARACIONES
COLOCACION DE TABLERO POST.FORMADO / COLOCACION DE TABLERO DURO DE MARMOL
SOLAQUEO EN TECHOS
CABLEADO ELECTRICO DE DPTOS. / INST. DE MARCOS DE PUERTAS / INST. DE MARCOS DE ALUMINIO DE VENTANAS / COLOCACION DE BISAGRAS Y
PROTOCOLO DE MEGADO
PRUEBAS Y REPARACIONES
ESCARCHADO DE TECHOS
PROTOCOLO DE PILOTAJE
Leyenda
Inducción
Charla General
Curso Capataz
Curso Especial
Capacitación Específica
Charla Diaria
Lun Mar Mié Jue
IND CC CUE
IND CC CUE
IND CC CUE
IND CC CUE
IND CC CUE
IND CC CUE
IND CC CUE
IND CC CUE
IND CC CUE
IND CC CUE
IND CC
IND CC
IND CC
IND CC
IND CC
IND CC
IND CC
IND CC
IND CC
IND CC
IND CC CUE
IND CC CUE
IND CC CUE
IND CC CUE
IND CC CUE
IND CC CUE
IND CC CUE
IND CC CUE
IND CC
IND CC
IND CC CUE
IND CC CUE
IND CC CUE
IND CC CUE
IND CC CUE
IND CC
IND CC
IND CC
IND CC
IND CC
IND CC CUE
IND CC CUE
IND CC CUE
IND CC CUE
IND CC CUE
IND CC CUE
IND CC CUE
IND CC
IND CC
IND CC
IND CC
IND CC
IND CC
IND CC CUE
IND CC CUE
IND CC CUE
IND CC
IND CC
IND CC CUE
IND CC CUE
IND CC CUE
IND CC
IND CC
IND CC CUE
IND CC CUE
IND CC CUE
IND CC CUE
IND CC CUE
IND CC CUE
CAE CG IND
CAE CG IND
CAE CG IND
CAE CG IND
CAE CG IND
CAE CG IND
CAE CG IND
CAE CG IND
CAE CG IND
CAE CG IND
CG CAE IND CUE
CG CAE IND CUE
CG CAE IND CUE
CG CAE IND CUE
CG CAE IND CUE
CG CAE IND CUE
CG CAE IND CUE
CG CAE IND CUE
CG CAE IND CUE
CG CAE IND CUE
CAE CG IND
CAE CG IND
CAE CG IND
CAE CG IND
CAE CG IND
CAE CG IND
CAE CG IND
CAE CG IND
CG CAE IND CUE
CG CAE IND CUE
CAE CG IND
CAE CG IND
CAE CG IND
CAE CG IND
CAE CG IND
CG CAE IND CUE
CG CAE IND CUE
CG CAE IND CUE
CG CAE IND CUE
CG CAE IND CUE
CG CAE IND
CG CAE IND
CG CAE IND
CAE CG IND
CAE CG IND
CAE CG IND
CAE CG IND
CG CAE IND CUE
CG CAE IND CUE
CG CAE IND CUE
CG CAE IND CUE
CG CAE IND CUE
CG CAE IND CUE
CAE CG IND
CAE CG IND
CAE CG IND
CG CAE IND CUE
CG CAE IND CUE
CAE CG IND
CAE CG IND
CAE CG IND
CG CAE IND CUE
CG CAE IND CUE
CAE IND
CAE IND
CAE IND
CAE IND
CAE IND
CAE IND
SEM 3
Mié Jue Vie Sáb Dom Lun Mar
CAE CG IND
CAE CG IND
CAE CG IND
CAE CG IND
CG CAE IND
CG CAE IND
CG CAE IND
CG CAE IND
CG CAE IND
CG CAE IND
CAE CG IND
CAE CG IND
CAE CG IND
CAE CG IND
CAE CG IND
CAE CG IND
CAE CG IND
CAE CG IND
CAE CG IND
CAE CG IND
CAE CG IND
CAE CG IND
CAE CG IND
CAE CG IND
CAE CG IND
CAE CG IND
CAE CG IND
CAE CG IND
CG CAE IND
CG CAE IND
CAE CG IND
CAE CG IND
CAE CG IND
CAE CG IND
CAE CG IND
CG CAE IND
CG CAE IND
CG CAE IND
CG CAE IND
CG CAE IND
CG CAE IND
CG CAE IND
CG CAE IND
CAE CG IND
CAE CG IND
CAE CG IND
CAE CG IND
CAE CG IND
CAE CG IND
CG CAE IND
CG CAE IND
CG CAE IND
CG CAE IND
CAE CG IND
CAE CG IND
CAE CG IND
CG CAE IND
CG CAE IND
CAE CG IND
CAE CG IND
CAE CG IND
CG CAE IND
CG CAE IND
CAE CG IND
CAE CG IND
CAE CG IND
CAE CG IND
CAE CG IND
CAE CG IND
SEM 4
Mié Jue Vie Sáb Dom Lun Mar
CG CAE IND
CG CAE IND
CAE CG IND
CAE CG IND
CAE CG IND
CAE CG IND
CAE CG IND
CAE CG IND
CAE CG IND
CAE CG IND
CAE CG IND CUE
CAE CG IND CUE
CAE CG IND CUE
CAE CG IND CUE
CAE CG IND CUE
CAE CG IND CUE
CAE CG IND CUE
CAE CG IND CUE
CAE CG IND CUE
CAE CG IND CUE
CAE CG IND
CAE CG IND
CAE CG IND
CAE CG IND
CAE CG IND
CAE CG IND
CAE CG IND
CAE CG IND
CG CAE IND CUE
CG CAE IND CUE
CAE CG IND
CAE CG IND
CAE CG IND
CAE CG IND
CAE CG IND
CAE CG IND CUE
CAE CG IND CUE
CAE CG IND CUE
CAE CG IND CUE
CAE CG IND CUE
CAE CG IND
CAE CG IND
CAE CG IND
CAE CG IND
CAE CG IND
CAE CG IND
CAE CG IND
CAE CG IND CUE
CAE CG IND CUE
CAE CG IND CUE
CAE CG IND CUE
CAE CG IND CUE
CAE CG IND CUE
CAE CG IND
CAE CG IND
CAE CG IND
CAE CG IND CUE
CAE CG IND CUE
CAE CG IND
CAE CG IND
CAE CG IND
CAE CG IND CUE
CAE CG IND CUE
CG CAE IND
CG CAE IND
CG CAE IND
CG CAE IND
CG CAE IND
CG CAE IND
SEM 6 SEM 7
Jue Vie Sáb Dom Lun Mar Mié
CAE CG IND
CAE CG IND
CAE CG IND
CAE CG IND
CAE CG IND
CAE CG IND
CAE CG IND
CAE CG IND
CAE CG IND
CAE CG IND
CAE CG IND
CAE CG IND
CAE CG IND CUE
CAE CG IND CUE
CAE CG IND CUE
CAE CG IND CUE
CAE CG IND
CAE CG IND
CAE CG IND CAE
CAE CG IND CAE
CAE CG IND CAE
CAE CG IND CAE
CAE CG IND CAE
CAE CG IND CAE
CAE CG IND CUE CG
CAE CG IND CUE CG
CG IND
CG IND
CG IND
CAE IND CC
CAE IND CC
CG IND CC
CG IND CC
CG IND CC
CG IND CC CUE
CG IND CC CUE
CG IND CC
CG IND CC
CG IND CC
CG IND CC CAE
CG IND CC CAE
CG IND CC CUE CAE
CG IND CC CUE CAE
CG IND CC CUE CAE
CG IND CC CUE CAE CG
CG IND CC CUE CAE CG
CG IND CC CUE CAE CG
CG IND CC CUE CAE CG
CG IND CC CG CAE
CG IND CC CG CAE
CG IND CC CAE CG
CG IND CC CAE CG
CG IND CC CAE CG
CG IND CC CAE CG
CG IND CC CUE CAE CG
CG IND CC CUE CAE CG
CG IND CC CUE CAE CG
CAE IND CC CAE CG
CAE IND CC CAE CG
CAE IND CC CUE CAE CG
CAE IND CC CUE CAE CG
CAE IND CC CUE CAE CG
CAE IND CC CAE CG
CAE IND CC CAE CG
CG IND CC CUE CAE CG
CG IND CC CUE CAE CG
CG IND CC CUE CAE CG
CG IND CC CUE CAE CG
CG IND CC CUE CAE CG
CG IND CC CUE CAE CG
SEM 10
Sáb Dom Lun Mar Mié Jue Vie Sáb
Casco color 3 8 8 8 3 4 4 4 3 3
Barbiquejo 3 8 8 8 3 4 4 4 3 3
Lentes luna clara 3 8 8 8 3 7 12 12 11 6
Guantes jebe 3 8 8 8 3 4 4 4 3 3
Guantes dieléctrico 3
tapones descartables
Mascarilla 4 4 4 4 4
Zap. Cat pta de acero 3 8 8 8 3 4 4 4 3 3
uniforme 3 8 8 8 3 4 4 4 3 3
Arnés
Leyenda
Casco color
Barbiquejo
Lentes luna clara
Guantes jebe
Guantes dieléctrico
tapones descartables
Mascarilla
Zap. Cat pta de acero
uniforme
Arnés
15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33
Mon Tue Wen Thu Fri Sat Sun Mon Tue Wen Thu Fri Sat Sun Mon Tue Wen Thu Fri
21/4 22/4 23/4 24/4 25/4 26/4 27/4 28/4 29/4 30/4 1/5 2/5 3/5 4/5 5/5 6/5 7/5 8/5 9/5
3 2 3 4 4 3 7 2 9 4
3 2 3 4 4 3 7 2 9 4
10 14 15 15 10 13 21 17 24 14 13 21 17 24 14
3 2 3 4 4 3 7 2 9 4 3 8 8 8 3
3 5
4 4 4 8 8 8 8 8 8 8 8 8 8 8 8
3 2 3 4 4 3 7 2 9 4
3 2 3 4 4 3 7 2 9 4
34 35 36 37 38 39 40 41 42 43 44 45 46 47 48 49 50 51 52 53
Sat Sun Mon Tue Wen Thu Fri Sat Sun Mon Tue Wen Thu Fri Sat Sun Mon Tue Wen Thu
10/5 11/5 12/5 13/5 14/5 15/5 16/5 17/5 18/5 19/5 20/5 21/5 22/5 23/5 24/5 25/5 26/5 27/5 28/5 29/5
13 21 17 24 14 13 21 17 24 14 10 17 13 21
4 4 4 3 3 3 2 3 4 4 3 7 2 9
3 3 5
8 8 8 8 8 8 8 8 8 8 8 8 8 8
54 55 56 57 58 59 60 61 62 63 64 65 66 67
Fri Sat Sun Mon Tue Wen Thu Fri Sat Sun Mon Tue Wen Thu
30/5 31/5 1/6 2/6 3/6 4/6 5/6 6/6 7/6 8/6 9/6 10/6 11/6 12/6
11 7 13 10 14 8 3 10 3 4
4 3 8 8 8 3 4 4 4 3
8 4 4 4 4 4
PARTIDAS
REVOQUES/ENLU
CIDOS
MUROS /
TABIQUERIA
TREN 01 SSHH,COCINA,LAVANDERIA,PATIO,TERRAZA
MUROS /
TABIQUERIA
PISOS /
PAVIMENT.
PINTURA
INTERIORES
MARCOS Y
PUERTAS
MUEBLES
IIEE IISS
MUEBLES
DESMANCHE
PISOS /
PAVIMENT.
PINTURA
INTERIORES
MARCOS Y
PUERTAS
IIEE IISS
TECHOS
CERRAJERIA,
PINTURA VANOS
VIDRIOS
DESMANCHE
PLACAS LLAVES
TERMICAS
PAPEL MURAL
PISO LAMINADO
ITEM
ID
IP
IE
AI
AE
TAREAS
SOLAQUEO DE MUROS
ASENTADO DE LADRILLO
SOLAQUEO DE TECHOS
CABLEADO ELECTRICO DE DPTOS. / INST. DE MARCOS DE PUERTAS / INST. DE MARCOS DE ALUMINIO DE VENTANAS / COLOCACION DE BISAGRAS Y
PROTOCOLO DE MEGADO
PRUEBAS Y REPARACIONES
COLOCACION DE TABLERO POST.FORMADO / COLOCACION DE TABLERO DURO DE MARMOL
SOLAQUEO EN TECHOS
CABLEADO ELECTRICO DE DPTOS. / INST. DE MARCOS DE PUERTAS / INST. DE MARCOS DE ALUMINIO DE VENTANAS / COLOCACION DE BISAGRAS Y
PROTOCOLO DE MEGADO
PRUEBAS Y REPARACIONES
ESCARCHADO DE TECHOS
PROTOCOLO DE PILOTAJE
Leyenda
Inspeccion diaria
Inspeccion programada
Inspecciones especificas
Auditorias internas
Auditorias externas
SEM 1
Dom Lun Mar Mié Jue Vie
LA LEYENDA SE
ENCUENTRA EN LA ID IP
PARTE FINAL DE LA
HOJA ID IP
ID IP
ID IP
IP
IP
IP
IP
IP
IP
SEM 2
Sáb Dom Lun Mar Mié Jue
ID ID ID IE
ID ID ID IE
ID ID ID IE
ID ID ID IE
ID ID ID ID
ID ID ID ID
ID ID ID ID
ID ID ID ID
ID ID ID ID
ID ID ID ID
ID ID ID ID
ID ID ID ID
ID ID ID ID
ID ID ID ID
ID ID ID
ID ID ID
ID ID
ID ID
ID ID
ID
ID
ID
SEM 3
Vie Sáb Dom Lun Mar Mié Jue Vie
IP ID ID ID ID IP
IP ID ID ID ID IP
IP ID ID ID ID IP
IP ID ID ID ID IP
IE ID ID ID ID IP
IE ID ID ID ID IP
IE ID ID ID ID IP
IE ID ID ID ID IP
IE ID ID ID ID IP
IE ID ID ID ID IP
IP IE ID ID ID IP
IP IE ID ID ID IP
IP IE ID ID ID IP
IP IE ID ID ID IP
IP ID IE ID ID IP
IP ID IE ID ID IP
IP ID ID IE ID IP
IP ID ID IE ID IP
IP ID ID IE ID IP
IP ID ID ID IE IP
IP ID ID ID IE IP
IP ID ID ID IE IP
IP ID ID ID ID IE
IP ID ID ID ID IE
IP ID ID ID ID IE
ID ID ID ID IP
ID ID ID ID IP
ID ID ID ID IP
ID ID ID IP
ID ID ID IP
ID ID IP
ID ID IP
ID ID IP
ID IP
ID IP
ID IP
ID IP
ID IP
IP
IP
IP
IP
IP
SEM 4
Sáb Dom Lun Mar Mié Jue Vie Sáb
ID IE ID ID IP
ID IE ID ID IP
ID IE ID ID IP
ID IE ID ID IP
ID ID IE ID IP
ID ID IE ID IP
ID ID IE ID IP
ID ID IE ID IP
ID ID IE ID IP
ID ID IE ID IP
ID ID ID IE IP
ID ID ID IE IP
ID ID ID IE IP
ID ID ID IE IP
ID ID ID ID IE
ID ID ID ID IE
ID ID ID ID IP
ID ID ID ID IP
ID ID ID ID IP
ID ID ID ID IP
ID ID ID ID IP
ID ID ID ID IP
ID ID ID ID IP
ID ID ID ID IP
ID ID ID ID IP
IE ID ID ID IP
IE ID ID ID IP
IE ID ID ID IP
ID IE ID ID IP
ID IE ID ID IP
ID ID IE ID IP
ID ID IE ID IP
ID ID IE ID IP
ID ID ID IE IP
ID ID ID IE IP
ID ID ID IE IP
ID ID ID IE IP
ID ID ID IE IP
ID ID ID ID IE
ID ID ID ID IE
ID ID ID ID IE
ID ID ID ID IE
ID ID ID ID IE
ID ID ID ID IP
ID ID ID ID IP
ID ID ID ID IP
ID ID ID IP
ID ID ID IP
ID ID ID IP
ID ID ID IP
ID ID ID IP
ID ID IP
ID ID IP
ID ID IP
ID ID IP
ID ID IP
ID ID IP
ID IP
ID IP
ID IP
ID IP
ID IP
ID IP
IP
IP
IP
IP
IP
IP
SEM 5
Dom Lun Mar Mié Jue Vie Sáb Dom
AI ID ID ID IE
AI ID ID ID IE
AI ID ID ID IE
AI ID ID ID IE
AI ID ID ID IP
AI ID ID ID IP
AI ID ID ID IP
AI ID ID ID IP
AI ID ID ID IP
AI ID ID ID IP
AI ID ID ID IP
AI ID ID ID IP
AI ID ID ID IP
AI ID ID ID IP
AI ID ID ID IP
AI ID ID ID IP
IE ID ID ID IP
IE ID ID ID IP
IE ID ID ID IP
AI IE ID ID IP
AI IE ID ID IP
AI IE ID ID IP
AI ID IE ID IP
AI ID IE ID IP
AI ID IE ID IP
AI ID ID IE IP
AI ID ID IE IP
AI ID ID IE IP
AI ID ID ID IE
AI ID ID ID IE
AI ID ID ID IP
AI ID ID ID IP
AI ID ID ID IP
AI ID ID ID IP
AI ID ID ID IP
AI ID ID ID IP
AI ID ID ID IP
AI ID ID ID IP
AI ID ID ID IP
AI ID ID ID IP
AI ID ID ID IP
AI ID ID ID IP
AI ID ID ID IP
IE ID ID ID IP
IE ID ID ID IP
IE ID ID ID IP
AI IE ID ID IP
AI IE ID ID IP
AI IE ID ID IP
AI IE ID ID IP
AI IE ID ID IP
AI ID IE ID IP
AI ID IE ID IP
AI ID IE ID IP
AI ID IE ID IP
AI ID IE ID IP
AI ID ID IE IP
AI ID ID IE IP
AI ID ID IE IP
AI ID ID IE IP
AI ID ID IE IP
AI ID ID IE IP
AI ID ID IE IP
AI ID ID ID IE
AI ID ID ID IE
AI ID ID ID IE
AI ID ID ID IE
AI ID ID ID IE
AI ID ID ID IE
SEM 6
Lun Mar Mié Jue Vie Sáb Dom Lun
ID ID ID ID IP ID
ID ID ID ID IP ID
ID ID ID ID IP ID
ID ID ID ID IP ID
IE ID ID ID IP ID
IE ID ID ID IP ID
IE ID ID ID IP ID
IE ID ID ID IP ID
IE ID ID ID IP ID
IE ID ID ID IP ID
ID IE ID ID IP ID
ID IE ID ID IP ID
ID IE ID ID IP ID
ID IE ID ID IP ID
ID ID IE ID IP ID
ID ID IE ID IP ID
ID ID ID IE IP ID
ID ID ID IE IP ID
ID ID ID IE IP ID
ID ID ID ID IE ID
ID ID ID ID IE ID
ID ID ID ID IE ID
ID ID ID ID IP IE
ID ID ID ID IP IE
ID ID ID ID IP IE
ID ID ID ID IP ID
ID ID ID ID IP ID
ID ID ID ID IP ID
ID ID ID ID IP ID
ID ID ID ID IP ID
IE ID ID ID IP ID
IE ID ID ID IP ID
IE ID ID ID IP ID
ID IE ID ID IP ID
ID IE ID ID IP ID
ID IE ID ID IP ID
ID IE ID ID IP ID
ID IE ID ID IP ID
ID ID IE ID IP ID
ID ID IE ID IP ID
ID ID IE ID IP ID
ID ID IE ID IP ID
ID ID IE ID IP ID
ID ID ID IE IP ID
ID ID ID IE IP ID
ID ID ID IE IP ID
ID ID ID ID IE ID
ID ID ID ID IE ID
ID ID ID ID IE ID
ID ID ID ID IE ID
ID ID ID ID IE ID
ID ID ID ID IP IE
ID ID ID ID IP IE
ID ID ID ID IP IE
ID ID ID ID IP IE
ID ID ID ID IP IE
ID ID ID ID IP ID
ID ID ID ID IP ID
ID ID ID ID IP ID
ID ID ID ID IP ID
ID ID ID ID IP ID
ID ID ID ID IP ID
ID ID ID ID IP ID
ID ID ID ID IP ID
ID ID ID ID IP ID
ID ID ID ID IP ID
ID ID ID ID IP ID
ID ID ID ID IP ID
ID ID ID ID IP ID
SEM 7 SEM 8
Mar Mié Jue Vie Sáb Dom Lun Mar
ID
ID
IE ID
IE ID
IE ID
IE ID
ID IE ID
ID IE ID
ID IE ID
ID IE ID
ID IE ID
ID IE ID
ID ID IE IP
ID ID IE IP
ID ID IE IP
ID ID IE IP
ID ID ID IE ID
ID ID ID IE ID
ID ID ID IP IE ID
ID ID ID IP IE ID
ID ID ID IP IE ID
ID ID ID IP ID IE
ID ID ID IP ID IE
ID ID ID IP ID IE
ID ID ID IP ID ID
ID ID ID IP ID ID
ID ID ID IP ID ID
IE ID ID IP ID ID
IE ID ID IP ID ID
IE ID ID IP ID ID
ID IE ID IP ID ID
ID IE ID IP ID ID
ID ID IE IP ID ID
ID ID IE IP ID ID
ID ID IE IP ID ID
ID ID ID IE ID ID
ID ID ID IE ID ID
ID ID ID IE ID ID
ID ID ID IE ID ID
ID ID ID IE ID ID
ID ID ID IP IE ID
ID ID ID IP IE ID
ID ID ID IP IE ID
ID ID ID IP IE ID
ID ID ID IP IE ID
ID ID ID IP ID IE
ID ID ID IP ID IE
ID ID ID IP ID IE
ID ID ID IP ID ID
ID ID ID IP ID ID
ID ID ID IP ID ID
ID ID ID IP ID ID
ID ID ID IP ID ID
ID ID ID IP ID ID
ID ID ID IP ID ID
ID ID ID IP ID ID
ID ID ID IP ID ID
ID ID ID IP ID ID
IE ID ID IP ID ID
IE ID ID IP ID ID
IE ID ID IP ID ID
IE ID ID IP ID ID
IE ID ID IP ID ID
IE ID ID IP ID ID
IE ID ID IP ID ID
ID IE ID IP ID ID
ID IE ID IP ID ID
ID IE ID IP ID ID
ID IE ID IP ID ID
ID IE ID IP ID ID
ID IE ID IP ID ID
SEM 8 SEM 9
Mié Jue Vie Sáb Dom Lun Mar
ID
ID
ID
IE ID
IE ID
IE ID
ID IE IP
ID IE IP
ID IE IP
ID ID IE AI
ID ID IE AI
ID ID IP IE ID
ID ID IP IE ID
ID ID IP IE ID
ID ID IP AI IE
ID ID IP AI IE
ID ID IP AI IE
ID ID IP AI IE
ID ID IP AI IE
ID ID IP AI ID
ID ID IP AI ID
ID ID IP AI ID
ID ID IP AI ID
ID ID IP AI ID
ID ID IP AI ID
ID ID IP AI ID
ID ID IP AI ID
IE ID IP AI ID
IE ID IP AI ID
IE ID IP AI ID
IE ID IP AI ID
IE ID IP AI ID
ID IE IP AI ID
ID IE IP AI ID
ID IE IP AI ID
ID IE IP AI ID
ID IE IP AI ID
ID ID IE AI ID
ID ID IE AI ID
ID ID IE AI ID
ID ID IE AI ID
ID ID IE AI ID
ID ID IE AI ID
ID ID IE AI ID
ID ID IP IE ID
ID ID IP IE ID
ID ID IP IE ID
ID ID IP IE ID
ID ID IP IE ID
ID ID IP IE ID
SEM 9
Mié Jue Vie Sáb Dom Lun
COTRATISTA: YYYYYYYY
FASE/TIEMPO: OBRA COMPLETA
SEMANAS:
ITEM MES Y AÑO:
DIAS/FECHA
1 REVOQUES / ENLUCIDOS
2 MUROS / TABIQUERIA
3 PISO / PAVIMENTACIÓN
4 PINTURAS INTERIORES
5 MARCOS Y PUERTAS
6 MUEBLES
7 DESMACHE
8 TECHOS
9 IIEE IISS
10 VIDRIOS
14 PISO LAMINADO
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
FACTOR DEMASÍA
CANTIDAD REDONDEADA
PRECIO UNITARIO US$
TOTAL US$
Revoques / Enlucidos
Muros / Tabiquería
Piso / Pavimentación
Pinturas Interiores
Marcos y Puertas
Muebles
Desmache
Techos
IIEE y IISS
VIDRIOS
LLAVES TERMICAS / PLACAS
CERRAJERIA, PINTURAS , VANOS
PAPEL MURAL
PISO LAMINADO
T.C. 2.78 PROTECCION DE CABEZA PROT. OJOS
150 150 70 5
PROVEEDOR
Casco blanco
PERSONAL
Casco color
lentes luna
barbiquejo
DIAS
DIAS
clara
9 25 9.00 9.00 45.00
2 25 6 6 30
4 25 4 4.00 20
6 25 6 6.00
25
6 25 6 6.00
8 25 8 8.00
6 25
25 6 6.00
2 25 6 6 30
6 2 4 4.00 20
TOTAL UNIDADES 0.00 55 55.00 145.00
1.5 0.00 82.50 82.50 217.50
0.00 83 83.00 218.00
7.00 5.20 0.45 0.72
0.00 431.60 37.35 156.96
Cálculo de cuadrilla por ratio Número
Número de horas de
Ratio
hombre trabajad
ores
3.0
8.0
3.0
4.2
4.2
3.0
2.0
2.0
3.0
1.4
4.0
5.0
3.0
4.2
PROT. OJOS
5
lentes
sobremontura
2
mascarilla pa/
polvo
90
respirador
8
filtp/polvo
RED LINE
12
cartucho color
PROT. VIAS RESPIRATORIAS
negro
10
mascarilla
p/soldar
4
30
guantes jebe
45
guantes hilo
ptos pvc
6
guantes
200
PROT. MANOS
dieléctricos
6
50
guantes cuero
ref.
9
6
4
43.5 0.00 0.00 0.00 0.00 0.00 8.00 0.00 12.00 21.00
65.25 0.00 0.00 0.00 0.00 0.00 12.00 0.00 18.00 31.50
65 0.00 0.00 0.00 0.00 0.00 12.00 0.00 18.00 32.00
2.29 0.82 3.56 2.43 8.76 6.65 1.56 0.74 5.36 6.04
148.85 0.00 0.00 0.00 0.00 0.00 18.72 0.00 96.48 193.28
1
tapones
OIDOS
descartables
240
zap.CAT pta.
acero 240
zapatos
pta.acero
6
6
240
zapatos
PROTECCIÓN DE PIES
dieléctricos
240
6.00
6.00
9.00
botas jebe c/
acero
240
4.00
6.00
9.00
6.00
uniforme
240
chaleco
UNIFORME
NA
cinturón porta
herramientas
240
jean para el
staff
6.00 6.00
8.00 8.00
6.00 6.00
6 6.00
4.00
0.00 0.00 0.00 18.00 41.00 6.00 6.00 0.00 0.00
0.00 0.00 0.00 27.00 61.50 18.00 9.00 0.00 0.00
0.00 0.00 0.00 27.00 62.00 18.00 9.00 0.00 0.00
2.08 39.60 12.99 13.40 14.10 17.55 8.01 6.58 12.50
0.00 0.00 0.00 361.80 874.20 315.90 72.09 0.00 0.00
30
visor
policarbonato
100
guantes cuero
blando Ws CON ESMERIL
150
mandil
cuerocromo
150
careta
soldador
guantes de
180
cuero cromo
14"
150
mandil de
cuero cromo
escarpín
240
cuero cromo
8" 3 hebillasr
240
chaqueta
Ws SOLD.A ELECTRICA O AUTOGENA
cuero
180
lentes oxicorte
6
9
240
arnés 3 anillos
D
ANTI CAIDAS
240
amortiguador
6
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
4.25 3.53 6.80 7.26 3.68 6.80 6.80 23.53 5.35 86.30 33.45
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
2,707.23