Você está na página 1de 244

TREN DE ACTIVIDADES - FASE DE ESTRUCTURAS - ETAPA 1

SEMANA 1 SEMANA 2 SEMANA 3 SEMANA 4 SEMANA 5 SEMANA 6 SEMANA 7


D1 D2 D3 D4 D5 D6 D7 D8 D9 D10 D11 D12 D13 D14 D15 D16 D17 D18 D19 D20 D21 D22 D23 D24 D25 D26 D27 D28 D29 D30 D31 D32 D33 D34 D35 D36 D37 D38 D39 D40 D41 D42 D43 D44 D45 D46 D47 D48 D49

METRADO

METRADO

METRADO

METRADO

METRADO

METRADO

METRADO
SEMANAL

SEMANAL

SEMANAL

SEMANAL

SEMANAL
SEMANAL

SEMANAL
METRADO
DESCRIPCION UNIDADES Mon Tue Wen Thu Fri Sat Sun Mon Tue Wen Thu Fri Sat Sun Mon Tue Wen Thu Fri Sat Sun Mon Tue Wen Thu Fri Sat Sun Mon Tue Wen Thu Fri Sat Sun Mon Tue Wen Thu Fri Sat Sun Mon Tue Wen Thu Fri Sat Sun
X 1 SECTOR
17/2 18/2 19/2 20/2 21/2 22/2 23/2 24/2 25/2 26/2 27/2 28/2 1/3 2/3 3/3 4/3 5/3 6/3 7/3 8/3 9/3 10/3 11/3 12/3 13/3 14/3 15/3 16/3 17/3 18/3 19/3 20/3 21/3 22/3 23/3 24/3 25/3 26/3 27/3 28/3 29/3 30/3 31/3 1/4 2/4 3/4 4/4 5/4 6/4

ACERO VERTICAL 923.07 KG 4,615.37 A1 B1 C1 D1 E1 4,615.37 F1 A2 B2 C2 D2 4,615.37 E2 F2 A3 B3 C3 4,615.37 D3 E3 F3 A4 B4 4,615.37 C4 D4 E4 F4 A5 4,615.37 B5 C5 D5 E5 F5 -


IIEE VERTICAL - A1 B1 C1 D1 E1 - F1 A2 B2 C2 D2 - E2 F2 A3 B3 C3 - D3 E3 F3 A4 B4 - C4 D4 E4 F4 A5 - B5 C5 D5 E5 F5 -
IISS VERTICAL - A1 B1 C1 D1 E1 - F1 A2 B2 C2 D2 - E2 F2 A3 B3 C3 - D3 E3 F3 A4 B4 - C4 D4 E4 F4 A5 - B5 C5 D5 E5 F5 -
ENCOFRADO VERTICAL 395.88 M2 1,583.53 A1 B1 C1 D1 1,979.41 E1 F1 A2 B2 C2 1,979.41 D2 E2 F2 A3 B3 1,979.41 C3 D3 E3 F3 A4 1,979.41 B4 C4 D4 E4 F4 1,979.41 A5 B5 C5 D5 E5 395.88 F5
VACIADO VERTICAL 20.11 M3 80.46 A1 B1 C1 D1 100.57 E1 F1 A2 B2 C2 100.57 D2 E2 F2 A3 B3 100.57 C3 D3 E3 F3 A4 100.57 B4 C4 D4 E4 F4 100.57 A5 B5 C5 D5 E5 20.11 F5
ENCOFRADO HORIZONTAL 145.46 M2 436.39 A1 B1 C1 727.31 D1 E1 F1 A2 B2 727.31 C2 D2 E2 F2 A3 727.31 B3 C3 D3 E3 F3 727.31 A4 B4 C4 D4 E4 727.31 F4 A5 B5 C5 D5 290.92 E5 F5
ETAPA 01

ACERO HORIZONTAL 757.16 KG 1,514.32 A1 B1 3,785.80 C1 D1 E1 F1 A2 3,785.80 B2 C2 D2 E2 F2 3,785.80 A3 B3 C3 D3 E3 3,785.80 F3 A4 B4 C4 D4 3,785.80 E4 F4 A5 B5 C5 2,271.48 D5 E5 F5
IIEE - A1 B1 - C1 D1 E1 F1 A2 - B2 C2 D2 E2 F2 - A3 B3 C3 D3 E3 - F3 A4 B4 C4 D4 - E4 F4 A5 B5 C5 - D5 E5 F5
IISS DESAGUE - A1 B1 C1 D1 E1 F1 A2 B2 C2 D2 E2 F2 A3 B3 C3 D3 E3 F3 A4 B4 C4 D4 E4 F4 A5 B5 C5 D5 E5 F5
IISS AGUA - A1 - B1 C1 D1 E1 F1 - A2 B2 C2 D2 E2 - F2 A3 B3 C3 D3 - E3 F3 A4 B4 C4 - D4 E4 F4 A5 B5 - C5 D5 E5 F5
VACIADO HORIZONTAL 15.40 M3 70.00 A1 B1 C1 D1 E1 70.00 F1 A2 B2 C2 D2 70.00 E2 F2 A3 B3 C3 70.00 D3 E3 F3 A4 B4 70.00 C4 D4 E4 F4 A5 70.00 B5 C5 D5 E5 F5

B.1 METRADOS - ETAPA 1 (120 DEPARTAMENTOS)


MOVIMIENTO DE TIERRAS
glb 1.00
CONCRETO NO ESTRUCTURAL m3 198.03
CONCRETO ESTRUCTURAL -
CIMENTACIONES m3 514.88
CONCRETO ESTRUCTURAL - VERTICALES TORRE A TORRE B TORRE C
m3 1,206.87
CONCRETO ESTRUCTURAL -
HORIZONTALES m3 923.99 A5 B5 E5 F5 C5 D5 G5 H5 I5 J5 K5 L5
CURADO A4 B4 E4 F4 C4 D4 G4 H4 I4 J4 K4 L4
m2 30,220.72
ENCOFRADO - CIMENTACIONES m2 1,072.48 A3 B3 E3 F3 C3 D3 G3 H3 I3 J3 K3 L3
ENCOFRADO - VERTICALES A2 B2 E2 F2 C2 D2 G2 H2 I2 J2 K2 L2
m2 23,752.94
ENCOFRADO - HORIZONTALES m2 8,727.73 A1 B1 E1 F1 C1 D1 G1 H1 I1 J1 K1 L1
ACERO DE REFUERZO - CIMENTACIONES kg 27,610.42
ACERO DE REFUERZO - VERTICALES kg 55,384.49
ACERO DE REFUERZO - HORIZONTALES
kg 45,429.63
LINEA DE PRODUCCIÓN 1 LINEA DE PRODUCCIÓN 2
LOOK AHEAD SEMANA 1 (17/2- 11/03)

SEMANA 1 SEMA
D1 D2 D3 D4 D5 D6 D7 D8
METRADO X
DESCRIPCION UND Mon Tue Wen Thu Fri Sat Sun Mon
1 SECTOR
17/2 18/2 19/2 20/2 21/2 22/2 23/2 23/2

ACERO VERTICAL 923.07 KG A1 B1 C1 D1 E1 F1


IIEE VERTICAL A1 B1 C1 D1 E1 F1
IISS VERTICAL A1 B1 C1 D1 E1 F1
ENCOFRADO VERTICAL 395.88 M2 A1 B1 C1 D1 E1
VACIADO VERTICAL 20.11 M3 A1 B1 C1 D1 E1
ENCOFRADO HORIZONTAL 145.46 M2 A1 B1 C1 D1
ETAPA 01

ACERO HORIZONTAL 757.16 KG A1 B1 C1


IIEE A1 B1 C1
IISS DESAGUE A1 B1
IISS AGUA A1 B1
VACIADO HORIZONTAL 15.40 M3 A1
/2- 11/03)

SEMANA 2 SEMANA 3 SEMANA 4


D9 D10 D11 D12 D13 D14 D15 D16 D17 D18 D19 D20 D21 D22 D23 D24 D25 D26 D27 D28
Tue Wen Thu Fri Sat Sun Mon Tue Wen Thu Fri Sat Sun Mon Tue Wen Thu Fri Sat Sun
24/2 25/2 26/2 27/2 28/2 1/3 1/3 2/3 3/3 4/3 5/3 6/3 7/3 7/3 8/3 9/3 10/3 11/3 12/3 13/3

A2 B2 C2 D2 E2 F2 A3 B3 C3 D3 E3 F3 A4 B4
A2 B2 C2 D2 E2 F2 A3 B3 C3 D3 E3 F3 A4 B4
A2 B2 C2 D2 E2 F2 A3 B3 C3 D3 E3 F3 A4 B4
F1 A2 B2 C2 D2 E2 F2 A3 B3 C3 D3 E3 F3 A4
F1 A2 B2 C2 D2 E2 F2 A3 B3 C3 D3 E3 F3 A4
E1 F1 A2 B2 C2 D2 E2 F2 A3 B3 C3 D3 E3 F3
D1 E1 F1 A2 B2 C2 D2 E2 F2 A3 B3 C3 D3 E3
D1 E1 F1 A2 B2 C2 D2 E2 F2 A3 B3 C3 D3 E3
C1 D1 E1 F1 A2 B2 C2 D2 E2 F2 A3 B3 C3 D3
C1 D1 E1 F1 A2 B2 C2 D2 E2 F2 A3 B3 C3 D3
B1 C1 D1 E1 F1 A2 B2 C2 D2 E2 F2 A3 B3 C3
PLANOS-ESPECIFICACIONES-ETC

ACTIVIDAD PREDECESORA
MATERIALES
ACTIVIDAD

SEGURIDAD

PERSONAL

EQUIPOS

ESPACIO

VARIOS
ACERO VERTICAL X

Responsable William Ortiz X

Cuadrilla 1 operario X X

1 ayudante X

IISS X

Responsable Sergio Cruzado X


X
X
X
X
X

IIEE X

Responsable Sebastian Ruiz X


X
X
X

ENCOFRADO VERTICAL X

Responsable Fredy Meneses X


X
X
X

VACIADO VERTICAL X X

Responsable Miguel Mou X


X
X

ENCOFRADO HORIZONTAL X

Responsable Gerardo Linares X


X
X
X

ACERO HORIZONTAL X X

Responsable Luis Castro X


X
X

IIEE X

Responsable Sebastian Ruiz X


X
X

IISS DESAGUE X

Responsable Sergio Cruzado X


X
X
X
X
X

IISS AGUA X

Responsable Walter Fernandez X


X
X
X
X
X
X

Residente
Ingeniero Asistente de Campo
Ingeniero Asistente de Campo
Ingeniero de Oficina Tecnica
Ingeniero de Instalaciones
Administración
Logística, Almacén
Prevencionista de Riesgo
Maestro de Obra

Capataz de Acero frente 1


Capataz de Acero frente 2
Capataz de Encofrados
Capataz de IIEE
Capataz de IISS
Capataz de Vaciados
Capataz de Topografia
FECHA: Aprobado por:
Firma:
ANALISIS DE RESTRICCIONES

DESCRIPCION DE RESTRICCION

PARA EL EPP SE REQUIERE ESCALERA + LINEA DE VIDA


ADQUISICIÓN DE ACERO DE ACUERDO AL METRADO SEMANAL
SE REQUIERE EL AREA DE TRABAJO CON 01 DIA DE ANTICIPACION
EPI BÁSICO: GUANTES DE CUERO, CASCO, UNIFORME

APROBACION DE ESCALERAS Y LINEA DE VIDA


VERIFICAR COMPATIBILIDAD DE PLANO DE DETALLE DE IISS CON EL PLANO DE ARQUITECTURA
UBICACIÓN DE PUNTOS DE SALIDA EN EL PLANO
DISPONIBILIDAD DE EQUIPOS PARA REALIZAR LAS PRUEBAS HIDRÁULICAS O PRESIÓN
DISPONIBILIDAD DE ACCESORIOS
INTERPRETACIÓN CORRECTA DE LOS DETALLES DEL PLANO
PERSONAL PARA LA HABILITACIÓN DE AGUA Y DESAGUE

INTERPRETACIÓN CORRECTA DE LOS DETALLES DEL PLANO DE CABLEADO


DISPONIBILIDAD DE MATERIALES NECESARIOS
VERIFICAR COMPATIBILIDAD DE PLANO DE DETALLE DE IIEE CON EL PLANO DE ARQUITECTURA
UBICACIÓN DE PUNTOS DE SALIDA EN EL PLANO
EPI: GUANTES DIELÉCTRICOS

TRAZO DE NIVEL DE LAS COLUMNAS O PLACAS


REVISIÓN DE LOS ACCESORIOS DEL ENCOFRADO
ADQUISICIÓN DEL ENCOFRADO DE ACUERDO AL METRADO SEMANAL
VERIFICAR QUE LOS ACCESORIOS DEL ENCOFRADO ESTEN COMPLETOS
CONTROL DE CALIDAD DE LOS PANELES DE ENCOFRADO

AREA LIBERADA Y LIMPIA PARA ENTRAR A TRABAJAR


APROBACION HECHA PARA LAS ACTIVIDADES ANTES DE ENTRAR
COLOCACIÓN PREVIA DEL ACERO Y ENCOFRADO
PEDIDOS DE CONCRETO PREMEZCLADO

VERIFICAR QUE LOS ACCESORIOS DEL ENCOFRADO ESTEN COMPLETOS


INASISTENCIA DE PERSONAL IMPREVISTO
DISPONIBILIDAD DE ADITIVOS, LADRILLOS O CASETONES
CONTROL DE CALIDAD DE LOS PANELES DE ENCOFRADO
TRAZO DE NIVEL DE LAS COLUMNAS O PLACAS

SE REQUIERE EL AREA DE TRABAJO LIBERADA POR EL ENCOFRADO


PARA EL EPP SE REQUIERE ESCALERA + LINEA DE VIDA
EPI BÁSICO: GUANTES DE CUERO, CASCO, UNIFORME
ADQUISICIÓN DE ACERO DE ACUERDO AL METRADO SEMANAL

UBICACIÓN DE PUNTOS DE SALIDA EN EL PLANO


INTERPRETACIÓN CORRECTA DE LOS DETALLES DEL PLANO DE CABLEADO
DISPONIBILIDAD DE MATERIALES NECESARIOS
VERIFICAR COMPATIBILIDAD DE PLANO DE DETALLE DE IIEE CON EL PLANO DE ARQUITECTURA

LIBERAR ACTIVIDAD DE ACERO


DISPONIBILIDAD DE EQUIPOS PARA REALIZAR LAS PRUEBAS HIDRÁULICAS O PRESIÓN
VERIFICAR LA DISPONIBILIDAD DE ACCESORIOS
UBICACIÓN DE SALIDA DE PUNTOS EN EL PLANO
DISPONIBILIDAD Y ORGANIZACIÓN DE LAS TUBERÍAS SEGÚN DIÁMETRO
PERSONAL PARA LA HABILITACIÓN DE DESAGUE
INTERPRETACIÓN CORRECTA DE LOS DETALLES DEL PLANO

PERSONAL PARA LA HABILITACIÓN DE AGUA Y DESAGUE


LIBERAR ACTIVIDAD DE ACERO
VERIFICAR COMPATIBILIDAD DE PLANO DE DETALLE DE IISS CON EL PLANO DE ARQUITECTURA
INTERPRETACIÓN CORRECTA DE LOS DETALLES DEL PLANO
VERIFICAR COMPATIBILIDAD DE PLANO DE DETALLE DE IISS CON EL PLANO DE ARQUITECTURA
UBICACIÓN DE PUNTOS DE SALIDA EN EL PLANO
DISPONIBILIDAD DE EQUIPOS PARA REALIZAR LAS PRUEBAS HIDRÁULICAS O PRESIÓN
DISPONIBILIDAD DE ACCESORIOS
FECHA DE
RESPONSABLE
ENTREGA

SEGURIDAD 17-Feb
LOGISTICA 10-Feb
CUADRILLA ANTERIOR 16-Feb
SEGURIDAD 17-Feb

SEGURIDAD 17-Feb
ING. RESIDENTE / CAPATAZ 17-Feb
ING. RESIDENTE / CAPATAZ 17-Feb
LOGISTICA 17-Feb
LOGISTICA 17-Feb
ING. RESIDENTE / CAPATAZ 17-Feb
RECURSOS HUMANOS 17-Feb

SEGURIDAD 17-Feb
LOGISTICA 17-Feb
PRODUCCIÓN 17-Feb
ING. RESIDENTE / CAPATAZ 17-Feb

TOPOGRAFO 16-Feb
CALIDAD 16-Feb
LOGÍSTICA 10-Feb
LOGÍSTICA 16-Feb
CALIDAD 16-Feb

CUADRILLA ANTERIOR 18-Feb


CALIDAD 18-Feb
CUADRILLA ANTERIOR 17-Feb
LOGISTICA 10-Feb

LOGÍSTICA 19-Feb
RECURSOS HUMANOS 19-Feb
LOGISTICA 18-Feb
CALIDAD 18-Feb
TOPOGRAFO 18-Feb

PRODUCCIÓN 20-Feb
SEGURIDAD - LOGISTICA 20-Feb
SEGURIDAD - LOGISTICA 20-Feb
LOGISTICA 13-Feb

ING. RESIDENTE / CAPATAZ 20-Feb


ING. RESIDENTE / CAPATAZ 20-Feb
LOGISTICA 17-Feb
ING. RESIDENTE / CAPATAZ 20-Feb

PRODUCCIÓN 20-Feb
SEGURIDAD 20-Feb
LOGÍSTICA 20-Feb
ING. RESIDENTE / CAPATAZ 21-Feb
ING. RESIDENTE / CAPATAZ 20-Feb
RECURSOS HUMANOS 21-Feb
ING. RESIDENTE / CAPATAZ 21-Feb

SEGURIDAD 21-Feb
PRODUCCIÓN 20-Feb
ING. RESIDENTE / CAPATAZ 21-Feb
ING. RESIDENTE / CAPATAZ 21-Feb
ING. RESIDENTE / CAPATAZ 21-Feb
ING. RESIDENTE / CAPATAZ 21-Feb
LOGISTICA - PRODUCCION 20-Feb
LOGISTICA 20-Feb
LOOK AHEAD SEMANA 4

SEMANA 4 SEM
D22 D23 D24 D25 D26 D27 D28 D29
METRADO X
DESCRIPCION UND Mon Tue Wen Thu Fri Sat Sun Mon
1 SECTOR
10/3 11/3 12/3 13/3 14/3 15/3 16/3 17/3

ACERO VERTICAL 923.07 KG D3 E3 F3 A4 B4 C4


IIEE VERTICAL D3 E3 F3 A4 B4 C4
IISS VERTICAL D3 E3 F3 A4 B4 C4
ENCOFRADO VERTICAL 395.88 M2 C3 D3 E3 F3 A4 B4
VACIADO VERTICAL 20.11 M3 C3 D3 E3 F3 A4 B4
ENCOFRADO HORIZONTAL 145.46 M2 B3 C3 D3 E3 F3 A4
ETAPA 01

ACERO HORIZONTAL 757.16 KG A3 B3 C3 D3 E3 F3


IIEE A3 B3 C3 D3 E3 F3
IISS DESAGUE F2 A3 B3 C3 D3 E3
IISS AGUA F2 A3 B3 C3 D3 E3
VACIADO HORIZONTAL 15.40 M3 E2 F2 A3 B3 C3 D3
MANA 4

SEMANA 5 SEMANA 6 SEMANA 7


D30 D31 D32 D33 D34 D35 D36 D37 D38 D39 D40 D41 D42 D43 D44 D45 D46 D47 D48
Tue Wen Thu Fri Sat Sun Mon Tue Wen Thu Fri Sat Sun Mon Tue Wen Thu Fri Sat
18/3 19/3 20/3 21/3 22/3 23/3 24/3 25/3 26/3 27/3 28/3 29/3 30/3 31/3 1/4 2/4 3/4 4/4 5/4

D4 E4 F4 A5 B5 C5 D5 E5 F5
D4 E4 F4 A5 B5 C5 D5 E5 F5
D4 E4 F4 A5 B5 C5 D5 E5 F5
C4 D4 E4 F4 A5 B5 C5 D5 E5 F5
C4 D4 E4 F4 A5 B5 C5 D5 E5 F5
B4 C4 D4 E4 F4 A5 B5 C5 D5 E5 F5
A4 B4 C4 D4 E4 F4 A5 B5 C5 D5 E5 F5
A4 B4 C4 D4 E4 F4 A5 B5 C5 D5 E5 F5
F3 A4 B4 C4 D4 E4 F4 A5 B5 C5 D5 E5 F5
F3 A4 B4 C4 D4 E4 F4 A5 B5 C5 D5 E5 F5
E3 F3 A4 B4 C4 D4 E4 F4 A5 B5 C5 D5 E5 F5
NA 7
D49
Sun
6/4
PLANOS-ESPECIFICACIONES-ETC

ACTIVIDAD PREDECESORA
MATERIALES
ACTIVIDAD

SEGURIDAD

PERSONAL

EQUIPOS

ESPACIO

VARIOS
ACERO VERTICAL X

Responsable William Ortiz X

Cuadrilla 1 operario X

1 ayudante X X

IISS X

Responsable Sergio Cruzado X


X
X
X X

IIEE X

Responsable Sebastian Ruiz X


X X

ENCOFRADO VERTICAL X

Responsable Fredy Meneses X


X
X
X X

VACIADO VERTICAL X X

Responsable Miguel Mou X


X

ENCOFRADO HORIZONTAL X

Responsable Gerardo Linares X


X
X

ACERO HORIZONTAL X X

Responsable Luis Castro X


X

IIEE X

Responsable Sebastian Ruiz X


X

IISS DESAGUE X

Responsable Sergio Cruzado X X


X

IISS AGUA X

Responsable Walter Fernandez X


X
X
X
X

VACIADO HORIZONTAL X

Responsable Edgar Alarcon X

Cuadrilla 3 operarios X
5 ayudantes X

PLANOS-ESPECIFICACIONES-ETC

PREDECESORA
MATERIALES
SEGURIDAD

ACTIVIDAD
PERSONAL

EQUIPOS

ESPACIO

VARIOS
Administración
Logística, Almacén
Prevencionista de Riesgo
Maestro de Obra

Capataz de Acero frente 1


Capataz de Acero frente 2
Capataz de Encofrados
Capataz de IIEE
Capataz de IISS
Capataz de Vaciados
Capataz de Topografia
FECHA: Aprobado por:
Firma:
ANALISIS DE RESTRICCIONES

DESCRIPCION DE RESTRICCION

ADQUISICIÓN DE ACERO DE ACUERDO AL METRADO SEMANAL


SE REQUIERE EL AREA DE TRABAJO CON 01 DIA DE ANTICIPACION
REDISTRIBUCION DE CUADRILLA, SE REQUIERE UN OPERARIO MÁS PARA LA HABILITACIÓN Y SE PUEDE OBVIAR AL OFICIAL
SE REQUIERE APROBACION DE ESCALERA CON UN DÍA DE ANTICIPACIÓN

VERIFICAR COMPATIBILIDAD DE PLANO DE DETALLE DE IISS CON EL PLANO DE ARQUITECTURA


DISPONIBILIDAD DE EQUIPOS PARA REALIZAR LAS PRUEBAS HIDRÁULICAS O PRESIÓN
DISPONIBILIDAD DE ACCESORIOS
INTERPRETACIÓN CORRECTA DE LOS DETALLES DEL PLANO
APROBACION DE ESCALERAS Y LINEA DE VIDA

DISPONIBILIDAD DE MATERIALES NECESARIOS


VERIFICAR COMPATIBILIDAD DE PLANO DE DETALLE DE IIEE CON EL PLANO DE ARQUITECTURA
EPP: GUANTES DIELÉCTRICOS

TRAZO DE NIVEL DE LAS COLUMNAS O PLACAS


ADQUISICIÓN DEL ENCOFRADO DE ACUERDO AL METRADO SEMANAL
VERIFICAR QUE LOS ACCESORIOS DEL ENCOFRADO ESTEN COMPLETOS
CONTROL DE CALIDAD DE LOS PANELES DE ENCOFRADO
APROBACION DE ESCALERAS Y LINEA DE VIDA

AREA LIBERADA Y LIMPIA PARA ENTRAR A TRABAJAR


COLOCACIÓN PREVIA DEL ACERO Y ENCOFRADO
PEDIDOS DE CONCRETO PREMEZCLADO

VERIFICAR QUE LOS ACCESORIOS DEL ENCOFRADO ESTEN COMPLETOS


DISPONIBILIDAD DE ADITIVOS, LADRILLOS O CASETONES
CONTROL DE CALIDAD DE LOS PANELES DE ENCOFRADO
TRAZO DE NIVEL DE LAS COLUMNAS O PLACAS

SE REQUIERE EL AREA DE TRABAJO LIBERADA POR EL ENCOFRADO


SE REQUIERE UN OPERARIO MÁS EN LA CUADRILLA
ADQUISICIÓN DE ACERO DE ACUERDO AL METRADO SEMANAL

UBICACIÓN DE PUNTOS DE SALIDA EN EL PLANO


VERIFICAR COMPATIBILIDAD DE PLANO DE DETALLE DE IIEE CON EL PLANO DE ARQUITECTURA
DISPONIBILIDAD DE MATERIALES NECESARIOS

DISPONIBILIDAD Y ORGANIZACIÓN DE LAS TUBERÍAS SEGÚN DIÁMETRO


DISPONIBILIDAD DE EPP PARA REALIZAR LAS PRUEBAS HIDRÁULICAS O PRESIÓN
INTERPRETACIÓN CORRECTA DE LOS DETALLES DEL PLANO

PERSONAL PARA LA HABILITACIÓN DE AGUA Y DESAGUE


LIBERAR ACTIVIDAD DE ACERO
VERIFICAR COMPATIBILIDAD DE PLANO DE DETALLE DE IISS CON EL PLANO DE ARQUITECTURA
INTERPRETACIÓN CORRECTA DE LOS DETALLES DEL PLANO
UBICACIÓN DE PUNTOS DE SALIDA EN EL PLANO
DISPONIBILIDAD DE EQUIPOS PARA REALIZAR LAS PRUEBAS HIDRÁULICAS O PRESIÓN

COORDINACIÓN CON EL ING. SUPERVISOR PARA LA PRUEBA DE ESTANQUEIDAD


DISPONIBILIDAD DEL VIBRADOR
ILUMINACION DEL AREA
APROBACIÓN DE ANDAMIOS
FECHA DE
RESPONSABLE
ENTREGA

LOGISTICA 10-Mar
CUADRILLA ANTERIOR 9-Mar
RECURSOS HUMANOS 10-Mar
SEGURIDAD 9-Mar

ING. RESIDENTE / CAPATAZ 10-Mar


LOGISTICA 10-Mar
LOGISTICA 10-Mar
ING. RESIDENTE / CAPATAZ 10-Mar
CALIDAD - SEGURIDAD 10-Mar

LOGISTICA 10-Mar
PRODUCCIÓN 10-Mar
Seguridad 10-Mar

TOPOGRAFO 10-Mar
LOGÍSTICA 10-Mar
LOGÍSTICA 10-Mar
CALIDAD 10-Mar
CALIDAD - SEGURIDAD 10-Mar

CUADRILLA ANTERIOR 10-Mar


CUADRILLA ANTERIOR 10-Mar
LOGISTICA 10-Mar

LOGÍSTICA 10-Mar
LOGISTICA 10-Mar
CALIDAD 10-Mar
TOPOGRAFO 10-Mar
10-Mar

PLANOS-ESPECIFICACIONES-ETC
PRODUCCIÓN 10-Mar
RECURSOS HUMANOS 10-Mar

PREDECESORA
MATERIALES
SEGURIDAD

ACTIVIDAD
PERSONAL
LOGISTICA 10-Mar

EQUIPOS

ESPACIO
ING. RESIDENTE / CAPATAZ 10-Mar
ING. RESIDENTE / CAPATAZ 10-Mar
LOGISTICA 10-Mar

ING. RESIDENTE / CAPATAZ 10-Mar


SEGURIDAD 10-Mar
ING. RESIDENTE / CAPATAZ 10-Mar

SEGURIDAD 10-Mar
PRODUCCIÓN 10-Mar
ING. RESIDENTE / CAPATAZ 10-Mar
ING. RESIDENTE / CAPATAZ 10-Mar
ING. RESIDENTE / CAPATAZ 10-Mar
LOGISTICA - PRODUCCION 10-Mar

LOGÍSTICA 25-Feb
LOGÍSTICA 25-Feb
INGENIERO DE CAMPO 25-Feb
SEGURIDAD 25-Feb
VARIOS
L

SEMANA 7
D43 D44 D45 D46 D47

METRADO
SEMANAL
METRADO
DESCRIPCION UNIDADES Mon Tue Wen Thu Fri
X 1 SECTOR
31/3 1/4 2/4 3/4 4/4

ACERO VERTICAL 923.07 KG -


IIEE VERTICAL -
IISS VERTICAL -
ENCOFRADO VERTICAL 395.88 M2 395.88 F5
VACIADO VERTICAL 20.11 M3 20.11 F5
ENCOFRADO HORIZONTAL 145.46 M2 290.92 E5 F5
ETAPA 01

ACERO HORIZONTAL 757.16 KG 2,271.48 D5 E5 F5


IIEE - D5 E5 F5
IISS DESAGUE C5 D5 E5 F5
IISS AGUA - C5 D5 E5 F5
VACIADO HORIZONTAL 15.40 M3 70.00 B5 C5 D5 E5 F5
LOOK AHEAD SEMANA 7 (31/3 - 4/4 )

D48 D49
Sat Sun
5/4 6/4
ANALISIS DE RE

PLANOS-ESPECIFICACIONES-ETC

ACTIVIDAD PREDECESORA
MATERIALES
ACTIVIDAD

SEGURIDAD

PERSONAL

EQUIPOS

ESPACIO

VARIOS
ENCOFRADO VERTICAL X

Responsable Fredy Meneses X


x

VACIADO VERTICAL X

Responsable Miguel Mou X

ENCOFRADO HORIZONTAL X

Responsable Gerardo Linares X

ACERO HORIZONTAL X

Responsable Luis Castro X


X

IIEE X

Responsable Sebastian Ruiz

IISS DESAGUE X
Responsable Sergio Cruzado X

IISS AGUA X

Responsable Walter Fernandez X

VACIADO HORIZONTAL X

Responsable Edgar Alarcon X


Cuadrilla 3 operarios X

6 ayudantes

Residente
Ingeniero Asistente de Campo
Ingeniero Asistente de Campo
Ingeniero de Oficina Tecnica
Ingeniero de Instalaciones
Administración
Logística, Almacén
Prevencionista de Riesgo
Maestro de Obra

Capataz de Acero frente 1


Capataz de Acero frente 2
Capataz de Encofrados
Capataz de IIEE
Capataz de IISS
Capataz de Vaciados
Capataz de Topografia
FECHA: Aprobado por:
Firma:
ANALISIS DE RESTRICCIONES

DESCRIPCION DE RESTRICCION RESPONSABLE

ADQUISICIÓN DEL ENCOFRADO DE ACUERDO AL METRADO SEMANAL LOGÍSTICA


REVISIÓN DE LOS ACCESORIOS DEL ENCOFRADO CALIDAD
TRAZO DE NIVEL DE LAS COLUMNAS CAPATAZ

AREA LIBERADA Y LIMPIA PARA ENTRAR A TRABAJAR PRODUCCIÓN


APROBACION HECHA PARA LAS ACTIVIDADES ANTES DE ENTRAR CALIDAD

VERIFICAR QUE LOS ACCESORIOS DEL ENCOFRADO ESTEN COMPLETOS LOGÍSTICA


INASISTENCIA DE PERSONAL IMPREVISTO RECURSOS HUMA

SE REQUIERE EL AREA DE TRABAJO LIBERADA POR EL ENCOFRADO PRODUCCIÓN


PARA EL EPP SE REQUIERE ESCALERA + LINEA DE VIDA SEGURIDAD - LO
ADQUISICIÓN DE ACERO DE ACUERDO AL METRADO SEMANAL LOGÍSTICA

SE REQUIERE UNA PROGRAMACIÓN DIARIA ESPECIFICA POR PAÑOS CON HORAS DE ENTREGA DIARIPRODUCCIÓN

LIBERAR ACTIVIDAD DE ACERO PRODUCCIÓN


APROBACION DE ESCALERAS Y LINEA DE VIDA SEGURIDAD
VERIFICAR LA DISPONIBILIDAD DE ACCESORIOS LOGÍSTICA

APROBACION DE ESCALERAS Y LINEA DE VIDA SEGURIDAD


LIBERAR ACTIVIDAD DE ACERO PRODUCCIÓN

AREA LIBERADA Y LIMPIA PARA ENTRAR A TRABAJAR PRODUCCIÓN


APROBACION DE ANDAMIOS Y ESCALERAS SEGURIDAD
EQUIPOS : VIBRADORA, REGLAS, EXTENSIONES, COMPRESOR DE AIRE LOGISTICA - PR
FECHA
DE
ENTREG
A

31-Mar
31-Mar
31-Mar RESTRICCIONES
Disponibilidad del acero
Materiales requeridos
31-Mar ACERO DE VERTICALES Herramientas
31-Mar Mano de obra
Disponibilidad de equipos
Ubicacion de salida de puntos en el plano
Disponiblidad y organizacion de las tuberias s

31-Mar Disponibilidad de accesorios (valvulas, codos


IIEE - IISS
31-Mar Equipos necesarios para realizar las pruebas h
Malos rendimientos
Interpretacion correcta de los detalles del plan
Trazo del nivel las columnas o placas
Materiales requeridos
ENCOFRADO DE VERTICALES
Mano de obra para el encofrado

31-Mar Verificar plomada del encofrado

31-Mar Colocacion del Acero


26-Mar CONCRETO DE VERTICALES Colocacion del encofrado
Pedidos de concreto premezclado
Disponiblidad de los paneles para el encofrado
Disponibilidad de puntales para el encofrado
Disponibilidad de aditivos, ladrillos o caseton
31-Mar ENCOFRADO DE LOSA MACIZA Correcto diseño de los planos
Control de calidad de los paneles de encofrado
Elementos extructurales de apoyo necesarios p
Verificacion del armado del acero
Disponiblidad del acero corrugado de acuerdo
Acceso a las herramientas necesarias para la h
ACERO DE LOSA MACIZA - IIEE - IISS
31-Mar Cumplimiento de lo requerido en los planos
ACERO DE LOSA MACIZA - IIEE - IISS

31-Mar Falta de cancha


31-Mar Pedido de cemeto
Pedido de agregados
Aditivos requeridos
CONCRETO DE LOSA MACIZA
31-Mar Disponibilidad de equipos (equipo vibrador, c
31-Mar Disponibilidad de herramientas
Metodo de curado

31-Mar
31-Mar
31-Mar
a de puntos en el plano
ganizacion de las tuberias segun diametro
accesorios (valvulas, codos, T, Y,…)
s para realizar las pruebas hidraulidad o de presión

ecta de los detalles del plano de cableado


olumnas o placas

o premezclado
os paneles para el encofrado
puntales para el encofrado
aditivos, ladrillos o casetones

de los paneles de encofrado


urales de apoyo necesarios para soportar la carga solicitada
mado del acero
acero corrugado de acuerdo al diametro requerido
mientas necesarias para la habilitación del acero
o requerido en los planos
equipos (equipo vibrador, compactador)
herramientas
Acero
Acero

Intalaciones

Concreto
Concreto

Carpintería
Carpintería
1 Acero vertical

5 Vaciado vertical

Instalaciones
7 Acero horizontal
4 Encofrado vertical

11 Vaciado horizontal
6 Enconfrado horizontal

8 Instalaciones eléctricas

10 Instalaciones sanitarias agua


2 Instalaciones eléctricas vertical
3 Instalaciones sanitarias vertical
Actividades

9 Instalaciones sanitarias desague


y Medio Ambiente
Plan de Seguridad, Salud

Alta presión
Aplastamiento
Atrapamientos
Atropello
Caída de estructuras existentes

Caída de objetos
Caidas a desnivel
Caídas a nivel
Caídas de altura

Contacto con energía electrica

Contacto con sustancias nocivas

Contacto con temperaturas


extremas
Cortes
Choques

Derrumbes

Explosión
MATRIZ DE IDENTIFICACIÓN DE PELIGROS

Falta de Experiencia

Golpes

Inhalación de sustancias nocivas

Incendio
Incrustaciones

Ingestión de sustancias nocivas

Proyección de partículas

Radiación
Ruido
Sobreesfuerzos
Tropezones
Volcaduras
Plan de Seguridad, Salud y
IDENTIFICACIÓN DE PELIGROS
Medio Ambiente

1 Acero Vertical

Probabilidad Probabilidad
Consecuencias

Consecuencias
Baja Medio Alto Baja Medio Alto
Leve 1 2 3 Leve 1 2 3
Moderado 2 4 6 Moderado 2 4 6
Severa 3 6 9 Severa 3 6 9

Sobreesfuerzos Caída de objetos

Probabilidad Probabilidad
Consecuencias

Consecuencias
Baja Medio Alto Baja Medio Alto
Leve 1 2 3 Leve 1 2 3
Moderado 2 4 6 Moderado 2 4 6
Severa 3 6 9 Severa 3 6 9

Caídas a desnivel Caídas a nivel

Probabilidad Probabilidad
Consecuencias

Consecuencias

Baja Medio Alto Baja Medio Alto


Leve 1 2 3 Leve 1 2 3
Moderado 2 4 6 Moderado 2 4 6
Severa 3 6 9 Severa 3 6 9

Caídas de altura Cortes


Consecuencias

Probabilidad
Baja Medio Alto
Leve 1 2 3
Moderado 2 4 6
Severa 3 6 9

Golpes

2 Instalaciones eléctricas verticales

Probabilidad Probabilidad
Consecuencias

Consecuencias

Baja Medio Alto Baja Medio Alto


Leve 1 2 3 Leve 1 2 3
Moderado 2 4 6 Moderado 2 4 6
Consecuencias

Consecuencias
Severa 3 6 9 Severa 3 6 9

Atrapamientos Caída de objetos

Probabilidad Probabilidad
Consecuencias

Consecuencias
Baja Medio Alto Baja Medio Alto
Leve 1 2 3 Leve 1 2 3
Moderado 2 4 6 Moderado 2 4 6
Severa 3 6 9 Severa 3 6 9

Caídas de altura Contacto con temperaturas extremas

Probabilidad Probabilidad
Consecuencias

Consecuencias
Baja Medio Alto Baja Medio Alto
Leve 1 2 3 Leve 1 2 3
Moderado 2 4 6 Moderado 2 4 6
Severa 3 6 9 Severa 3 6 9

Explosión Inhalación de sustancias nocivas

Probabilidad Probabilidad
Consecuencias

Consecuencias

Baja Medio Alto Baja Medio Alto


Leve 1 2 3 Leve 1 2 3
Moderado 2 4 6 Moderado 2 4 6
Severa 3 6 9 Severa 3 6 9

Incendio Sobreesfuerzos

Probabilidad Probabilidad
Consecuencias

Consecuencias

Baja Medio Alto Baja Medio Alto


Leve 1 2 3 Leve 1 2 3
Moderado 2 4 6 Moderado 2 4 6
Severa 3 6 9 Severa 3 6 9

Caídas a nivel Tropezones

3 Instalaciones sanitarias verticales

Probabilidad Probabilidad
Consecuencias

Consecuencias

Baja Medio Alto Baja Medio Alto


Leve 1 2 3 Leve 1 2 3
Moderado 2 4 6 Moderado 2 4 6
Severa 3 6 9 Severa 3 6 9

Atrapamientos Caída de objetos


Consecuencias

Consecuencias

Probabilidad Probabilidad
Consecuencias

Consecuencias
Baja Medio Alto Baja Medio Alto
Leve 1 2 3 Leve 1 2 3
Moderado 2 4 6 Moderado 2 4 6
Severa 3 6 9 Severa 3 6 9

Caídas de altura Contacto con temperaturas extremas

Probabilidad Probabilidad
Consecuencias

Consecuencias
Baja Medio Alto Baja Medio Alto
Leve 1 2 3 Leve 1 2 3
Moderado 2 4 6 Moderado 2 4 6
Severa 3 6 9 Severa 3 6 9

Explosión Inhalación de sustancias nocivas

Probabilidad Probabilidad
Consecuencias

Consecuencias
Baja Medio Alto Baja Medio Alto
Leve 1 2 3 Leve 1 2 3
Moderado 2 4 6 Moderado 2 4 6
Severa 3 6 9 Severa 3 6 9

Incendio Sobreesfuerzos

Probabilidad Probabilidad
Consecuencias

Consecuencias

Baja Medio Alto Baja Medio Alto


Leve 1 2 3 Leve 1 2 3
Moderado 2 4 6 Moderado 2 4 6
Severa 3 6 9 Severa 3 6 9

Caídas a nivel Tropezones

4 Encofrado vertical

Probabilidad Probabilidad
Consecuencias

Consecuencias

Baja Medio Alto Baja Medio Alto


Leve 1 2 3 Leve 1 2 3
Moderado 2 4 6 Moderado 2 4 6
Severa 3 6 9 Severa 3 6 9

Caída de objetos Caídas a nivel

Probabilidad Probabilidad
Consecuencias

Consecuencias

Baja Medio Alto Baja Medio Alto


Leve 1 2 3 Leve 1 2 3
Moderado 2 4 6 Moderado 2 4 6
Severa 3 6 9 Severa 3 6 9
Caídas de altura Contacto con sustancias nocivas

Probabilidad Probabilidad
Consecuencias

Consecuencias
Baja Medio Alto Baja Medio Alto
Leve 1 2 3 Leve 1 2 3
Moderado 2 4 6 Moderado 2 4 6
Severa 3 6 9 Severa 3 6 9

Cortes Golpes

Probabilidad Probabilidad
Consecuencias

Consecuencias
Baja Medio Alto Baja Medio Alto
Leve 1 2 3 Leve 1 2 3
Moderado 2 4 6 Moderado 2 4 6
Severa 3 6 9 Severa 3 6 9

Incrustaciones Ruido

Probabilidad Probabilidad
Consecuencias

Baja Medio Alto Consecuencias Baja Medio Alto


Leve 1 2 3 Leve 1 2 3
Moderado 2 4 6 Moderado 2 4 6
Severa 3 6 9 Severa 3 6 9

Sobreesfuerzos Caídas a desnivel

5 Vaciado vertical

Probabilidad Probabilidad
Consecuencias

Consecuencias

Baja Medio Alto Baja Medio Alto


Leve 1 2 3 Leve 1 2 3
Moderado 2 4 6 Moderado 2 4 6
Severa 3 6 9 Severa 3 6 9

Alta de presión Atrapamiento

Probabilidad Probabilidad
Consecuencias

Consecuencias

Baja Medio Alto Baja Medio Alto


Leve 1 2 3 Leve 1 2 3
Moderado 2 4 6 Moderado 2 4 6
Severa 3 6 9 Severa 3 6 9

Atropello Caída de objetos

Probabilidad Probabilidad
Consecuencias

Consecuencias

Baja Medio Alto Baja Medio Alto


Leve 1 2 3 Leve 1 2 3
Consecuencias

Consecuencias
Moderado 2 4 6 Moderado 2 4 6
Severa 3 6 9 Severa 3 6 9

Caídas de altura Cortes

6 Encofrado horizontal

Probabilidad Probabilidad
Consecuencias

Consecuencias
Baja Medio Alto Baja Medio Alto
Leve 1 2 3 Leve 1 2 3
Moderado 2 4 6 Moderado 2 4 6
Severa 3 6 9 Severa 3 6 9

Caída de objetos Caídas a nivel

Probabilidad Probabilidad
Consecuencias

Consecuencias
Baja Medio Alto Baja Medio Alto
Leve 1 2 3 Leve 1 2 3
Moderado 2 4 6 Moderado 2 4 6
Severa 3 6 9 Severa 3 6 9

Caídas de altura Contacto con sustancias nocivas

Probabilidad Probabilidad
Consecuencias

Consecuencias

Baja Medio Alto Baja Medio Alto


Leve 1 2 3 Leve 1 2 3
Moderado 2 4 6 Moderado 2 4 6
Severa 3 6 9 Severa 3 6 9

Cortes Golpes

Probabilidad Probabilidad
Consecuencias

Consecuencias

Baja Medio Alto Baja Medio Alto


Leve 1 2 3 Leve 1 2 3
Moderado 2 4 6 Moderado 2 4 6
Severa 3 6 9 Severa 3 6 9

Incrustaciones Ruido

Probabilidad Probabilidad
Consecuencias

Consecuencias

Baja Medio Alto Baja Medio Alto


Leve 1 2 3 Leve 1 2 3
Moderado 2 4 6 Moderado 2 4 6
Severa 3 6 9 Severa 3 6 9

Sobreesfuerzos Caídas a desnivel


7 Acero horizontal

Probabilidad Probabilidad
Consecuencias

Consecuencias
Baja Medio Alto Baja Medio Alto
Leve 1 2 3 Leve 1 2 3
Moderado 2 4 6 Moderado 2 4 6
Severa 3 6 9 Severa 3 6 9

Aplastamiento Caída de objetos

Probabilidad Probabilidad
Consecuencias

Consecuencias
Baja Medio Alto Baja Medio Alto
Leve 1 2 3 Leve 1 2 3
Moderado 2 4 6 Moderado 2 4 6
Severa 3 6 9 Severa 3 6 9

Caídas a desnivel Caídas a nivel

Probabilidad Probabilidad
Consecuencias

Consecuencias

Baja Medio Alto Baja Medio Alto


Leve 1 2 3 Leve 1 2 3
Moderado 2 4 6 Moderado 2 4 6
Severa 3 6 9 Severa 3 6 9

Caídas de altura Cortes

8 Instalaciones eléctricas

Probabilidad Probabilidad
Consecuencias

Consecuencias

Baja Medio Alto Baja Medio Alto


Leve 1 2 3 Leve 1 2 3
Moderado 2 4 6 Moderado 2 4 6
Severa 3 6 9 Severa 3 6 9

Atrapamientos Caída de objetos

Probabilidad Probabilidad
Consecuencias

Consecuencias

Baja Medio Alto Baja Medio Alto


Leve 1 2 3 Leve 1 2 3
Moderado 2 4 6 Moderado 2 4 6
Severa 3 6 9 Severa 3 6 9

Caídas de altura Contacto con temperaturas extremas


Probabilidad Probabilidad

Consecuencias

Consecuencias
Baja Medio Alto Baja Medio Alto
Leve 1 2 3 Leve 1 2 3
Moderado 2 4 6 Moderado 2 4 6
Severa 3 6 9 Severa 3 6 9

Explosión Inhalación de sustancias nocivas

Probabilidad Probabilidad
Consecuencias

Consecuencias
Baja Medio Alto Baja Medio Alto
Leve 1 2 3 Leve 1 2 3
Moderado 2 4 6 Moderado 2 4 6
Severa 3 6 9 Severa 3 6 9

Incendio Sobreesfuerzos

Probabilidad Probabilidad
Consecuencias

Consecuencias
Baja Medio Alto Baja Medio Alto
Leve 1 2 3 Leve 1 2 3
Moderado 2 4 6 Moderado 2 4 6
Severa 3 6 9 Severa 3 6 9

Caídas a nivel Tropezones

9 Instalaciones sanitarias desague

Probabilidad Probabilidad
Consecuencias

Consecuencias

Baja Medio Alto Baja Medio Alto


Leve 1 2 3 Leve 1 2 3
Moderado 2 4 6 Moderado 2 4 6
Severa 3 6 9 Severa 3 6 9

Atrapamientos Caída de objetos

Probabilidad Probabilidad
Consecuencias

Consecuencias

Baja Medio Alto Baja Medio Alto


Leve 1 2 3 Leve 1 2 3
Moderado 2 4 6 Moderado 2 4 6
Severa 3 6 9 Severa 3 6 9

Caídas de altura Contacto con temperaturas extremas

Probabilidad Probabilidad
Consecuencias

Consecuencias

Baja Medio Alto Baja Medio Alto


Leve 1 2 3 Leve 1 2 3
Moderado 2 4 6 Moderado 2 4 6
Consecuencias

Consecuencias
Severa 3 6 9 Severa 3 6 9

Explosión Inhalación de sustancias nocivas

Probabilidad Probabilidad
Consecuencias

Consecuencias
Baja Medio Alto Baja Medio Alto
Leve 1 2 3 Leve 1 2 3
Moderado 2 4 6 Moderado 2 4 6
Severa 3 6 9 Severa 3 6 9

Incendio Sobreesfuerzos

Probabilidad Probabilidad
Consecuencias

Consecuencias
Baja Medio Alto Baja Medio Alto
Leve 1 2 3 Leve 1 2 3
Moderado 2 4 6 Moderado 2 4 6
Severa 3 6 9 Severa 3 6 9

Caídas a nivel Tropezones

10 Instalaciones sanitarias agua

Probabilidad Probabilidad
Consecuencias

Consecuencias

Baja Medio Alto Baja Medio Alto


Leve 1 2 3 Leve 1 2 3
Moderado 2 4 6 Moderado 2 4 6
Severa 3 6 9 Severa 3 6 9

Atrapamientos Caída de objetos

Probabilidad Probabilidad
Consecuencias

Consecuencias

Baja Medio Alto Baja Medio Alto


Leve 1 2 3 Leve 1 2 3
Moderado 2 4 6 Moderado 2 4 6
Severa 3 6 9 Severa 3 6 9

Caídas de altura Contacto con temperaturas extremas

Probabilidad Probabilidad
Consecuencias

Consecuencias

Baja Medio Alto Baja Medio Alto


Leve 1 2 3 Leve 1 2 3
Moderado 2 4 6 Moderado 2 4 6
Severa 3 6 9 Severa 3 6 9

Explosión Inhalación de sustancias nocivas

Probabilidad Probabilidad
Consecuencias

Consecuencias
Consecuencias

Consecuencias
Baja Medio Alto Baja Medio Alto
Leve 1 2 3 Leve 1 2 3
Moderado 2 4 6 Moderado 2 4 6
Severa 3 6 9 Severa 3 6 9

Incendio Sobreesfuerzos

Probabilidad Probabilidad
Consecuencias

Consecuencias
Baja Medio Alto Baja Medio Alto
Leve 1 2 3 Leve 1 2 3
Moderado 2 4 6 Moderado 2 4 6
Severa 3 6 9 Severa 3 6 9

Caídas a nivel Tropezones

11 Vaciado horizontal

Probabilidad Probabilidad
Consecuencias

Consecuencias

Baja Medio Alto Baja Medio Alto


Leve 1 2 3 Leve 1 2 3
Moderado 2 4 6 Moderado 2 4 6
Severa 3 6 9 Severa 3 6 9

Alta de presión Atrapamiento

Probabilidad Probabilidad
Consecuencias

Consecuencias

Baja Medio Alto Baja Medio Alto


Leve 1 2 3 Leve 1 2 3
Moderado 2 4 6 Moderado 2 4 6
Severa 3 6 9 Severa 3 6 9

Atropello Caída de objetos

Probabilidad Probabilidad
Consecuencias

Consecuencias

Baja Medio Alto Baja Medio Alto


Leve 1 2 3 Leve 1 2 3
Moderado 2 4 6 Moderado 2 4 6
Severa 3 6 9 Severa 3 6 9

Caídas de altura Cortes


E
V
IPER DEL PROYECTO A
L
U
A
C
I
Ó
N
PROBABILIDAD
D

INDICE DE PERSONAS EXPUESTAS

PROCEDIMIENTOS EXISTENTES

PROBABILIDAD X SEVERIDAD
E

INDICE DE CAPACITACIÓN C

INDICE DE EXPOSICIÓN AL

PROBABILIDAD (A+B+C+D)

INDICE DE SEVERIDAD

RIESGO SIGNIFICATIVO
R

NIVEL DE RIESGO
I
E

RIESGO (D)
S
TAREA PELIGROS RIESGOS REQUISITO LEGAL
G

(A)

(B)
O

caida de objetos SI
Golpes, heridas, daños D.L 42 Art 195 al 199 y
personales. 206 al 224 2 2 2 2 8 2 16 Moderado

Caida a nivel SI
Golpes, contusiones, D.L 42 Art 195 al 199 y
traumatismos. 206 al 225 2 2 2 2 8 2 16 Moderado

caida de altura SI
Golpes, heridas, D.L 42 Art 195 al 199 y
Acero politraumatismos. 206 al 226 2 2 2 2 8 3 24 Importante
vertical
cortes D.L 42 Art 195 al 199 y NO
Heridas punzocortantes 206 al 227 2 2 2 2 8 1 8 Tolerable

sobreesfuerzos Inflamación de tendones, D.L 42 Art 195 al 199 y NO


hombros muñecas, manos. 206 al 228 2 2 2 2 8 1 8 Tolerable

tropezones D.L 42 Art 195 al 199 y NO


Golpes, contusiones, heridas. 206 al 229 2 2 2 2 8 1 8 Tolerable

incrustaciones Heridas con pentraciónde D.L 42 Art 195 al 199 y NO


partes metálicas. 206 al 230 2 2 2 2 8 2 16 Tolerable
Golpes, heridas, daños
Caida de objetos D.L 42 F ART. 195 al 2 2 2 2 8 2 16 Moderado SI
personales.
199 y 206 al 224
Golpes, heridas,
Caida a desnivel D.L 42 F ART. 195 al 2 2 2 2 8 3 24 Importante SI
politraumatismos.
199 y 206 al 224

Golpes, contusiones,
Caida a nivel D.L 42 F ART. 195 al 2 2 2 2 8 2 16 Moderado SI
traumatismos.
199 y 206 al 224
IIEE Vertical
Golpes, heridas,
Caida de altura D.L 42 F ART. 195 al 2 2 2 2 8 3 24 Importante SI
politraumatismos.
199 y 206 al 224
Quemaduras, asfixia, D.L 42 F ART. 195 al
Explosión 2 2 2 2 8 3 24 Importante SI
conmoción, traumatismo 199 y 206 al 224
Quemaduras, asfixia, paros D.L 42 F ART. 195 al
Incendio 2 2 2 2 8 3 24 Importante SI
cardiacos 199 y 206 al 224
Inflamación de tendones, D.L 42 F ART. 195 al
sobreesfuerzos 1 2 2 2 7 1 7 Tolerable NO
hombros muñecas, manos. 199 y 206 al 224
Golpes, heridas, daños D.L 42 F ART. 195 al
Caida de objetos 2 2 2 2 8 2 16 Moderado SI
personales. 199 y 206 al 224
Golpes, heridas, D.L 42 F ART. 195 al
Caida a desnivel 2 2 2 2 8 3 24 Importante SI
politraumatismos. 199 y 206 al 224
Golpes, contusiones, D.L 42 F ART. 195 al
IISS Vertical Caida a nivel 2 2 2 2 8 2 16 Moderado SI
traumatismos. 199 y 206 al 224
Golpes, heridas, D.L 42 F ART. 195 al
Caida de altura 2 2 2 2 8 3 24 Importante SI
politraumatismos. 199 y 206 al 224
Inflamación de tendones, D.L 42 F ART. 195 al
sobreesfuerzos 1 2 2 2 7 1 7 Tolerable NO
hombros muñecas, manos. 199 y 206 al 224
Golpes, heridas, daños D.L 42 F ART. 195 al
Caida de objetos 2 2 2 2 8 3 24 Importante SI
personales. 199 y 206 al 224
Golpes, heridas, D.L 42 F ART. 195 al
Caida a desnivel 2 2 2 2 8 3 24 Importante SI
politraumatismos. 199 y 206 al 224
Golpes, contusiones, D.L 42 F ART. 195 al
Caida a nivel 2 2 2 2 8 2 16 Moderado SI
traumatismos. 199 y 206 al 224
Golpes, heridas, D.L 42 F ART. 195 al
Caida de altura 2 2 2 2 8 3 24 Importante SI
politraumatismos. 199 y 206 al 224
Encofrado Contacto con sustancias Quemaduras, alergias, D.L 42 F ART. 195 al 2 2 2 2 8 2 16 Moderado SI
Vertical nocivas dermatitis. 199 y 206 al 224
Vertical

Cortes Heridas punzocortantes D.L 42 F ART. 195 al 1 2 2 2 7 1 7 Tolerable NO


199 y 206 al 224
Contusiones, heridas, D.L 42 F ART. 195 al
Golpes 1 2 2 2 7 2 14 Moderado SI
traumatismos 199 y 206 al 224
Heridas con pentraciónde D.L 42 F ART. 195 al
incrustaciones 1 2 2 2 7 3 21 Importante SI
partes metálicas. 199 y 206 al 224
Inflamación de tendones, D.L 42 F ART. 195 al
sobreesfuerzos 1 2 2 2 7 1 7 Tolerable NO
hombros muñecas, manos. 199 y 206 al 224
Golpes, heridas, daños D.L 42 F ART. 195 al
Caida de objetos 2 2 2 2 8 3 24 Importante SI
personales. 199 y 206 al 224
Golpes, heridas, D.L 42 F ART. 195 al
Caida a desnivel 2 2 2 2 8 3 24 Importante SI
politraumatismos. 199 y 206 al 224
Vaciado Golpes, contusiones, D.L 42 F ART. 195 al
Caida a nivel 2 2 2 2 8 2 16 Moderado SI
Vertical traumatismos. 199 y 206 al 224
Golpes, heridas, D.L 42 F ART. 195 al
Caida de altura 2 2 2 2 8 3 24 Importante SI
politraumatismos. 199 y 206 al 224
Contusiones, heridas, D.L 42 F ART. 195 al
Golpes 2 2 2 2 8 2 16 Moderado SI
traumatismos 199 y 206 al 224
Golpes, heridas, daños D.L 42 F ART. 195 al
Caida de objetos 2 2 2 2 8 3 24 Importante SI
personales. 199 y 206 al 224
Golpes, heridas, D.L 42 F ART. 195 al
Caida a desnivel 2 2 2 2 8 3 24 Importante SI
politraumatismos. 199 y 206 al 224
Golpes, contusiones, D.L 42 F ART. 195 al
Caida a nivel 2 2 2 2 8 2 16 Moderado SI
traumatismos. 199 y 206 al 224
Golpes, heridas, D.L 42 F ART. 195 al
Caida de altura 2 2 2 2 8 3 24 Importante SI
politraumatismos. 199 y 206 al 224
Contacto con sustancias Quemaduras, alergias, D.L 42 F ART. 195 al
Encofrado 2 2 2 2 8 2 16 Moderado SI
nocivas dermatitis. 199 y 206 al 224
Horizontal
Cortes Heridas punzocortantes D.L 42 F ART. 195 al 1 2 2 2 7 1 7 Tolerable NO
199 y 206 al 224
Contusiones, heridas, D.L 42 F ART. 195 al
Golpes 1 2 2 2 7 2 14 Moderado SI
traumatismos 199 y 206 al 224

Heridas con pentraciónde


incrustaciones D.L 42 F ART. 195 al 1 2 2 2 7 3 21 Importante SI
partes metálicas.
199 y 206 al 224

Inflamación de tendones,
sobreesfuerzos D.L 42 F ART. 195 al 1 2 2 2 7 1 7 Tolerable NO
hombros muñecas, manos.
199 y 206 al 224
Golpes, heridas, daños
Caida de objetos D.L 42 F ART. 195 al 2 2 2 2 8 2 16 Moderado SI
personales.
199 y 206 al 224

Golpes, contusiones,
Caida a nivel D.L 42 F ART. 195 al 2 2 2 2 8 2 16 Moderado SI
traumatismos.
199 y 206 al 224

Acero
Cortes Heridas punzocortantes D.L 42 F ART. 195 al 2 2 2 2 8 2 16 Moderado SI
Horizontal
199 y 206 al 224

Inflamación de tendones,
Sobreesfuerzos D.L 42 F ART. 195 al 1 2 2 2 7 1 7 Tolerable NO
hombros muñecas, manos.
199 y 206 al 224

tropezones Golpes, contusiones, heridas. D.L 42 F ART. 195 al 2 2 2 2 8 1 8 Tolerable NO


199 y 206 al 225

Golpes, heridas, daños


Caida de objetos D.L 42 F ART. 195 al 2 2 2 2 8 2 16 Moderado SI
personales.
199 y 206 al 224

Golpes, heridas,
Caida a desnivel D.L 42 F ART. 195 al 2 2 2 2 8 3 24 Importante SI
politraumatismos.
199 y 206 al 224

Golpes, contusiones,
Caida a nivel D.L 42 F ART. 195 al 2 2 2 2 8 2 16 Moderado SI
traumatismos.
199 y 206 al 224

Golpes, heridas,
IIEE Caida de altura D.L 42 F ART. 195 al 2 2 2 2 8 3 24 Importante SI
politraumatismos.
199 y 206 al 224

Quemaduras, asfixia,
Explosión D.L 42 F ART. 195 al 2 2 2 2 8 3 24 Importante SI
conmoción, traumatismo
199 y 206 al 224

Quemaduras, asfixia, paros


Incendio D.L 42 F ART. 195 al 2 2 2 2 8 3 24 Importante SI
cardiacos
199 y 206 al 224

Inflamación de tendones,
sobreesfuerzos D.L 42 F ART. 195 al 1 2 2 2 7 1 7 Tolerable NO
hombros muñecas, manos.
199 y 206 al 224

Golpes, heridas, daños


Caida de objetos D.L 42 F ART. 195 al 2 2 2 2 8 2 16 Moderado SI
personales.
199 y 206 al 224

Golpes, heridas,
Caida a desnivel D.L 42 F ART. 195 al 2 2 2 2 8 3 24 Importante SI
politraumatismos.
199 y 206 al 224

IISS Agua y
Desague
IISS Agua y Golpes, contusiones,
Caida a nivel D.L 42 F ART. 195 al 2 2 2 2 8 2 16 Moderado SI
Desague traumatismos.
199 y 206 al 224

Golpes, heridas,
Caida de altura D.L 42 F ART. 195 al 2 2 2 2 8 3 24 Importante SI
politraumatismos.
199 y 206 al 224

Inflamación de tendones,
sobreesfuerzos D.L 42 F ART. 195 al 1 2 2 2 7 1 7 Tolerable NO
hombros muñecas, manos.
199 y 206 al 224

Contusiones, heridas,
Atrapamiento D.L 42 Art 195 al 199 y 3 2 2 2 9 2 18 Importante SI
politraumatismos
206 al 224

Golpes, contusiones,
Caída a nivel 3 2 2 2 9 3 27 Intolerable SI
traumatismos
D.L 42 Art 195 al 199 y
206 al 225

Contacto con sustancias Quemaduras, alergias,


D.L 42 Art 195 al 199 y 3 2 2 2 9 1 9 Moderado SI
nocivas dermatitis
206 al 226

Golpes, heridas,
Vaciado Proyección de partículas D.L 42 Art 195 al 199 y 3 2 2 2 9 1 9 Moderado SI
politraumatismos
horizontal 206 al 227

Golpes, heridas, daños


Caída de objetos D.L 42 Art 195 al 199 y 2 2 2 2 8 3 24 Importante SI
personales
206 al 224

Golpes, heridas,
Caída a desnivel D.L 42 Art 195 al 199 y 2 2 2 2 8 3 24 Importante SI
politraumatismos
206 al 225

Golpes, heridas,
Caída de altura D.L 42 Art 195 al 199 y 2 2 2 2 8 3 24 Importante SI
politraumatismos
206 al 226

Contusiones, heridas,
Golpes D.L 42 Art 195 al 199 y 2 2 2 2 8 2 16 Moderado SI
traumatismos
206 al 227
PROBABILIDAD

INDICE PERSONAS EXPUESTAS PROCEDIMIENTOS EXISTENTES CAPACITACIÓN EXPOSICIÓN AL RIESGO SEVERIDAD (Consecuencia)
Al menos una vez al año (S) Lesión sin incapacidad (S)
Personal entrenado. Conoce el
1 De 1 a 3
peligro y lo previene
Existen son satisfactorias y suficientes Esporadicamente (SO) Disconfort/Incomodidad (SO)
Personal parcialmente Al menos una vez al mes (S) Lesión con incapacidad temporal (S)
entrenado, conoce el peligro
2 De 4 a 12
Existen parcialmente y no son satisfactorios pero no toma acciones de
o suficientes control Eventualmente (SO) Daño a la salud reversible
Personal no entrenado, no Al menos una vez al día (S) Lesión con incapacidad permanente (S)
3 Mas de 12 conoce el peligro, no toma
No existen acciones de control Permanentemente (S) Daño a la salud irreversible

RIESGO= PROBABILIDAD x CONSECUENCIA


NIVEL DE RIESGO= N° de Probabilidad X N° de Consecuencias
MEDIDAS DE CONTROL

EPP básico(casco, uniforma,


guantes, botas) EPC, SCTR, ATS,
capacitación

EPP básico(casco, uniforma,


guantes, arnés) EPC, SCTR, ATS,
capacitación

EPP básico(casco, uniforma,


guantes, arnés) EPC, SCTR, ATS,
capacitación, supervisión

EPP básico(casco, uniforma,


guantes) EPC, SCTR, capacitación

EPP básico(casco, uniforma,


guantes) EPC, SCTR, capacitación

EPP básico(casco, uniforma,


guantes) EPC, SCTR, capacitación

EPP básico(casco, uniforma,


guantes) EPC, SCTR, capacitación
EPP básico(casco, uniforma,
guantes) EPC, SCTR, ATS,
capacitación
EPP básico(casco, uniforma,
guantes) EPC, SCTR, ATS,
capacitación, supervisión
EPP básico(casco, uniforma,
guantes) EPC, SCTR, ATS,
capacitación
EPP básico(casco, uniforma,
guantes) EPC, SCTR, ATS,
capacitación, supervisión
EPP básico(casco, uniforma,
guantes) EPC, SCTR, ATS,
capacitación
EPP básico(casco, uniforma,
guantes) EPC, SCTR, ATS,
capacitación
EPP básico(casco, uniforma,
guantes) EPC, SCTR, capacitación
EPP básico(casco, uniforma,
guantes) EPC, SCTR, ATS,
capacitación
EPP básico(casco, uniforma,
guantes) EPC, SCTR, ATS,
capacitación
EPP básico(casco, uniforma,
guantes) EPC, SCTR, ATS,
capacitación
EPP básico(casco, uniforma,
guantes) EPC, SCTR, ATS,
capacitación
EPP básico(casco, uniforma,
guantes) EPC, SCTR, capacitación
EPP básico(casco, uniforma,
guantes) EPC, SCTR, ATS,
capacitación
EPP básico(casco, uniforma,
guantes) EPC, SCTR, ATS,
capacitación
EPP básico(casco, uniforma,
guantes) EPC, SCTR, ATS,
capacitación
EPP básico(casco, uniforma,
guantes) EPC, SCTR, ATS,
capacitación
EPP básico(casco, uniforma,
guantes) EPC, SCTR, ATS,
capacitación
EPP básico(casco, uniforma,
guantes) EPC, SCTR, capacitación
EPP básico(casco, uniforma,
guantes) EPC, SCTR, ATS,
capacitación
EPP básico(casco, uniforma,
guantes) EPC, SCTR, ATS,
capacitación
EPP básico(casco, uniforma,
guantes) EPC, SCTR, ATS,
capacitación
EPP básico(casco, uniforma,
guantes) EPC, SCTR, ATS,
capacitación
EPP básico(casco, uniforma,
guantes) EPC, SCTR, ATS,
capacitación
EPP básico(casco, uniforma,
guantes) EPC, SCTR, ATS,
capacitación
EPP básico(casco, uniforma,
guantes) EPC, SCTR, ATS,
capacitación
EPP básico(casco, uniforma,
guantes) EPC, SCTR, ATS,
capacitación
EPP básico(casco, uniforma,
guantes) EPC, SCTR, ATS,
capacitación
EPP básico(casco, uniforma,
guantes) EPC, SCTR, ATS,
capacitación
EPP básico(casco, uniforma,
guantes) EPC, SCTR, ATS,
capacitación
EPP básico(casco, uniforma,
guantes) EPC, SCTR, ATS,
capacitación
EPP básico(casco, uniforma,
guantes) EPC, SCTR, ATS,
capacitación
EPP básico(casco, uniforma,
guantes) EPC, SCTR, capacitación
EPP básico(casco, uniforma,
guantes) EPC, SCTR, ATS,
capacitación
EPP básico(casco, uniforma,
guantes) EPC, SCTR, ATS,
capacitación

EPP básico(casco, uniforma,


guantes) EPC, SCTR, capacitación
EPP básico(casco, uniforma,
guantes) EPC, SCTR, ATS,
capacitación
EPP básico(casco, uniforma,
guantes) EPC, SCTR, ATS,
capacitación
EPP básico(casco, uniforma,
guantes) EPC, SCTR, ATS,
capacitación

EPP básico(casco, uniforma,


guantes) EPC, SCTR, capacitación

EPP básico(casco, uniforma,


guantes) EPC, SCTR, capacitación
EPP básico(casco, uniforma,
guantes) EPC, SCTR, ATS,
capacitación
EPP básico(casco, uniforma,
guantes) EPC, SCTR, ATS,
capacitación
EPP básico(casco, uniforma,
guantes) EPC, SCTR, ATS,
capacitación
EPP básico(casco, uniforma,
guantes) EPC, SCTR, ATS,
capacitación
EPP básico(casco, uniforma,
guantes) EPC, SCTR, ATS,
capacitación
EPP básico(casco, uniforma,
guantes) EPC, SCTR, ATS,
capacitación

EPP básico(casco, uniforma,


guantes) EPC, SCTR, capacitación
EPP básico(casco, uniforma,
guantes) EPC, SCTR, ATS,
capacitación
EPP básico(casco, uniforma,
guantes) EPC, SCTR, ATS,
capacitación
EPP básico(casco, uniforma,
guantes) EPC, SCTR, ATS,
capacitación
EPP básico(casco, uniforma,
guantes) EPC, SCTR, ATS,
capacitación

EPP básico(casco, uniforma,


guantes) EPC, SCTR, capacitación
EPP básico(casco, uniforma,
guantes) EPC, SCTR, ATS,
capacitación

EPP básico(casco, uniforma,


guantes) EPC, SCTR, ATS,
capacitación, supervisión, permiso
de trabajo, proced. Trabajo
EPP básico(casco, uniforma,
guantes) EPC, SCTR, ATS,
capacitación
EPP básico(casco, uniforma,
guantes) EPC, SCTR, ATS,
capacitación
EPP básico(casco, uniforma,
guantes) EPC, SCTR, ATS,
capacitación, supervisión
EPP básico(casco, uniforma,
guantes) EPC, SCTR, ATS,
capacitación, supervisión
EPP básico(casco, uniforma,
guantes) EPC, SCTR, ATS,
capacitación, supervisión
EPP básico(casco, uniforma,
guantes) EPC, SCTR, ATS,
capacitación
ESTIMACIÓN DEL NIVEL DE RIESGO

GRADO DE RIESGO PUNTAJE


Trivial (T) 4

Tolerable (TO) De 5 a 8
Moderado (M) De 9 a 16

Importante (IM) De 17 a 24
Intolerable (IT) De 25 a 36
SEMANA 1
DESCRIPCION D1 D2 D3 D4 D5
Mon Tue Wen Thu Fri
17/2 18/2 19/2 20/2 21/2

ACERO VERTICAL AE ID ID ID IP
IIEE VERTICAL AE ID ID ID IP
IISS VERTICAL AE ID ID ID IP
ENCOFRADO VERTICAL ID ID ID IP
VACIADO VERTICAL ID ID ID IP
ETAPA 01

ENCOFRADO HORIZONTAL ID ID IP
ACERO HORIZONTAL ID IP
IIEE ID IP
IISS DESAGUE IP
IISS AGUA IP
VACIADO HORIZONTAL

Leyenda ITEM
Inspeccion diaria ID -Las inspecciones diarias son referentes al avance diario de
Inspeccion programada IP -Las inspecciones programadas son hechas por el superviso
Inspecciones especificas IE -Las inspecciones especificas son referidas a una determind
Auditorias internas AI -Las auditorias internas son realizadas cada quincena o men
Auditorias externas AE -Las auditorias externas en este proyecto se considerara un
A1 SEMANA 2 SEMANA 3
D6 D7 D8 D9 D10 D11 D12 D13 D14 D15 D16 D17 D18 D19
Sat Sun Mon Tue Wen Thu Fri Sat Sun Mon Tue Wen Thu Fri
22/2 23/2 24/2 25/2 26/2 27/2 28/2 1/3 2/3 3/3 4/3 5/3 6/3 7/3

ID ID ID ID AI ID ID ID ID IP
ID ID ID ID AI ID ID ID ID IP
ID ID ID ID AI ID ID ID ID IP
ID ID ID ID AI ID ID ID ID IP
ID ID ID ID AI ID ID ID ID IP
ID ID ID ID AI ID ID ID ID IP
ID ID ID ID AI ID ID ID ID IP
ID ID ID ID AI ID ID ID ID IP
ID ID ID ID AI ID ID ID ID IP
ID ID ID ID AI ID ID ID ID IP
ID ID ID ID AI ID ID ID ID IP

rentes al avance diario de cada partida especifica.


on hechas por el supervisor e ingeniero de campo.
referidas a una determindad partida o partidas; en este ejemplo programamos charlas especificas un dia para instalaciones electricas y san
adas cada quincena o mensualmente.
oyecto se considerara una sola vez, al finalizar la obra.
ANA 3 SEMANA 4 SEMANA 5
D20 D21 D22 D23 D24 D25 D26 D27 D28 D29 D30 D31 D32
Sat Sun Mon Tue Wen Thu Fri Sat Sun Mon Tue Wen Thu
8/3 9/3 10/3 11/3 12/3 13/3 14/3 15/3 16/3 17/3 18/3 19/3 20/3

ID ID ID ID AI ID ID ID ID
ID ID ID ID AI ID ID ID ID
ID ID ID ID AI ID ID ID ID
ID ID ID ID AI ID ID ID ID
ID ID ID ID AI ID ID ID ID
ID ID ID ID AI ID ID ID ID
ID ID ID ID AI ID ID ID ID
ID ID ID ID AI ID ID ID ID
ID ID ID ID AI ID ID ID ID
ID ID ID ID AI ID ID ID ID
ID ID ID ID AI ID ID ID ID

instalaciones electricas y sanitarias; otro dia lo referido al acero y finalmente un dia mas para encofrado y vaceado de concreto.
NA 5 SEMANA 6 SEMANA 7
D33 D34 D35 D36 D37 D38 D39 D40 D41 D42 D43 D44 D45 D46
Fri Sat Sun Mon Tue Wen Thu Fri Sat Sun Mon Tue Wen Thu
21/3 22/3 23/3 24/3 25/3 26/3 27/3 28/3 29/3 30/3 31/3 1/4 2/4 3/4

IP ID ID ID ID AI
IP ID ID ID ID AI
IP ID ID ID ID AI
IP ID ID ID ID AI IP
IP ID ID ID ID AI IP
IP ID ID ID ID AI IP ID
IP ID ID ID ID AI IP ID ID
IP ID ID ID ID AI IP ID ID
IP ID ID ID ID AI IP ID ID ID
IP ID ID ID ID AI IP ID ID ID
IP ID ID ID ID AI IP ID ID ID

vaceado de concreto.
NA 7
D47 D48 D49
Fri Sat Sun
4/4 5/4 6/4

ID
SEMANA PREVIA
P1 P2 P3 P4
DESCRIPCION
Mon Tue Wen Thu
17/2 18/2 19/2 20/2

ACERO VERTICAL
IIEE VERTICAL
IISS VERTICAL
ENCOFRADO VERTICAL
VACIADO VERTICAL
ETAPA 01

ENCOFRADO HORIZONTAL
ACERO HORIZONTAL
IIEE
IISS DESAGUE
IISS AGUA
VACIADO HORIZONTAL

* CHARLA DIAR
LOS DÍA
Leyenda ITEM
Inducción IND
Charla General CG
Curso Capataz CC
Cursos Especiales CE
Capacitación específica CAE
ANA PREVIA SEMANA 1 SEMANA
P5 P6 P7 D1 D2 D3 D4 D5 D6 D7 D8 D9
Fri Sat Sun Mon Tue Wen Thu Fri Sat Sun Mon Tue
21/2 22/2 23/2 17/2 18/2 19/2 20/2 21/2 22/2 23/2 24/2 25/2

IND. CG CC CE CAE IND. CC


IND. CG CC CE CAE IND. CC
IND. CG CC CE CAE IND. CC
IND. CC CG CAE IND. CC
IND. CC CG CAE IND. CC
IND. CC CG CAE IND. CC

IND. CC CE CG/ CAE IND. CC

IND. CC CE CG/ CAE IND. CC

IND. CC CE CG/ CAE IND. CC


IND. CC CE CAE CG IND. CC

IND. CC CG/ CAE IND. CC

* CHARLA DIARIA TODOS


LOS DÍAS
SEMANA 2 SEMANA 3 SEMANA 4
D10 D11 D12 D13 D14 D15 D16 D17 D18 D19 D20 D21 D22 D23
Wen Thu Fri Sat Sun Mon Tue Wen Thu Fri Sat Sun Mon Tue
26/2 27/2 28/2 1/3 2/3 3/3 4/3 5/3 6/3 7/3 8/3 9/3 10/3 11/3

CAE CG IND. CC CE CAE CG IND. CC


CAE CG IND. CC CE CAE CG IND. CC
CAE CG IND. CC CE CAE CG IND. CC
CE CG CAE IND. CC CG CAE IND. CC
CE CG CAE IND. CC CG CAE IND. CC
CE CG CAE IND. CC CG CAE IND. CC

CAE CG IND. CC CE CAE CG IND. CC

CAE CG IND. CC CE CAE CG IND. CC

CAE CG IND. CC CE CAE CG IND. CC


CAE CG IND. CC CE CAE CG IND. CC

CE CG CAE IND. CC CG CAE IND. CC


SEMANA 4 SEMANA 5 SEMANA 6
D24 D25 D26 D27 D28 D29 D30 D31 D32 D33 D34 D35 D36
Wen Thu Fri Sat Sun Mon Tue Wen Thu Fri Sat Sun Mon
12/3 13/3 14/3 15/3 16/3 17/3 18/3 19/3 20/3 21/3 22/3 23/3 24/3

CAE CG IND. CC CE CAE CG IND.


CAE CG IND. CC CE CAE CG IND.
CAE CG IND. CC CE CAE CG IND.
CE CG CAE IND. CC CG CAE IND. CC
CE CG CAE IND. CC CG CAE IND. CC
CE CG CAE IND. CC CG CAE IND. CC

CAE CG IND. CC CE CAE CG IND.

CAE CG IND. CC CE CAE CG IND.

CAE CG IND. CC CE CAE CG IND.


CAE CG IND. CC CE CAE CG IND.

CE CG CAE IND. CC CG CAE IND. CC


SEMANA 6 SEMANA 7
D37 D38 D39 D40 D41 D42 D43 D44 D45 D46 D47 D48 D49
Tue Wen Thu Fri Sat Sun Mon Tue Wen Thu Fri Sat Sun
25/3 26/3 27/3 28/3 29/3 30/3 31/3 1/4 2/4 3/4 4/4 5/4 6/4

CC CAE CG IND.
CC CAE CG IND.
CC CAE CG IND.
CE CG CAE IND.
CE CG CAE IND.
CE CG CAE IND.

CC CAE CG IND.

CC CAE CG IND.

CC CAE CG IND.
CC CAE CG IND.

CE CG CAE IND.
1 2 3 4 5 6 7 8 9
DESCRIPCION Mon Tue Wen Thu Fri Sat Sun Mon Tue
17/2 18/2 19/2 20/2 21/2 22/2 23/2 24/2 25/2

Casco color 15 18 12 11 8
Barbiquejo 15 18 12 11 8
Lentes luna clara 15 18 12 11 8 15 18
Guantes jebe 4 6 8 8
Guantes dieléctrico 3 3
Guantes cuero 8 12 16 8
tapones descartables 6 6 6 6 14.00 14
Zap. Cat pta de acero 12 18 12 8 8
Zapatos dieléctricos 3 3
Botas jebe c/acero 6 8
uniforme 15 18 12 11 8
cinturón porta herramientas 8 12 12 8
arnés anillos 3D 15 18 12 11 8

Leyenda
Casco color
Barbiquejo
Lentes luna clara
Guantes jebe
Guantes dieléctrico
Guantes cuero
tapones descartables
Zap. Cat pta de acero
Zapatos dieléctricos
Botas jebe c/acero
uniforme
cinturón porta herramientas
arnés anillos 3D
10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29

Wen Thu Fri Sat Sun Mon Tue Wen Thu Fri Sat Sun Mon Tue Wen Thu Fri Sat Sun Mon
26/2 27/2 28/2 1/3 2/3 3/3 4/3 5/3 6/3 7/3 8/3 9/3 10/3 11/3 12/3 13/3 14/3 15/3 16/3 17/3

12 11 8 15 18 12 11 8 15 18 12 11 8 15

14 14 14 14 14.00 14 14 14 14 14 14.00 14 14 14
30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47

Tue Wen Thu Fri Sat Sun Mon Tue Wen Thu Fri Sat Sun Mon Tue Wen Thu Fri
18/3 19/3 20/3 21/3 22/3 23/3 24/3 25/3 26/3 27/3 28/3 29/3 30/3 31/3 1/4 2/4 3/4 4/4

18 12 11 8 15 18 12 11 8 15 18 12 11 8

14 14 14.00 14 14 14 14 14 14.00 14 8 8 8 8
48 49

Sat Sun
5/4 6/4
EDIFICIO ELIT
PRESUPUESTO EQUIPO DE PROTECCIÓN PERSONAL T.C. PROTECCION DE CA
150
COTRATISTA: GOKU

Casco blanco
PERSONAL
FASE/TIEMPO: OBRA COMPLETA

DIAS
SEMANAS:
ITEM
MES Y AÑO:
DIAS/FECHA

1
ACERO VERTICAL 8 40
INSTALACIONES ELECTRICAS VERTICALES 3 40
INSTALACIONES SANITARIAS VERTICALES 4 40
ENCOFRADO VERTICAL 40 40
VACIADO VERTICAL 6 40
ENCOFRADO HORIZONTAL 24 40
ACERO HORIZONTAL 8 40
INSTALACIONES ELECTRICAS 3 40
INSTALACIONES SANITARIAS (DESAGUE) 4 40
INSTALACIONES SANITARIAS (AGUA) 4 40
VACIADO HORIZONTAL 8 40
35
0.00
FACTOR DEMASÍA 1.5 0.00
CANTIDAD REDONDEADA 0.00
PRECIO UNITARIO US$ 7.00
TOTAL US$ 0.00
PROTECCION DE CABEZA PROT. OJOS PROT. VIAS RESPIRATORIAS
150 70 5 5 2 90 8 12 10

sobremontura
Casco color

color negro
lentes luna
barbiquejo

RED LINE
respirador
mascarilla

mascarilla
filtp/polvo
pa/ polvo

cartucho

p/soldar
lentes
8.00 8.00 clara
32.00
3.00 3.00 12.00
4.00 4.00 16.00
40.00 40.00 160.00
6.00 6.00 24.00
24.00 24.00 96.00
8.00 8.00 32.00
3.00 3.00 12.00
4.00 4.00 16.00
4.00 4.00 16.00
8.00 8.00 32.00

112.00 112.00 448.00 134.4 0.00 0.00 0.00 0.00 0.00


168.00 168.00 672.00 201.60 0.00 0.00 0.00 0.00 0.00
168.00 168.00 672.00 202.00 0.00 0.00 0.00 0.00 0.00
5.20 0.45 0.72 2.29 0.82 3.56 2.43 8.76 6.65
873.60 75.60 483.84 462.58 0.00 0.00 0.00 0.00 0.00
PROT. MANOS OIDOS PROTECCIÓN DE PIES UNIFORM
30 45 200 50 1 240 240 240 240 240

zap.CAT pta.
guantes jebe

botas jebe c/
descartables
guantes hilo

dieléctricos

dieléctricos
cuero ref.

pta.acero

uniforme
ptos pvc

guantes

guantes

tapones

zapatos

zapatos
acero

acero
8.00 8.00 8.00
3 3.00 3.00
4 4.00 4.00
40.00 40.00 40.00
6.00 120.00 6.00 6.00 6.00
24.00 24.00 24.00
8 8.00 8.00
3.00 3.00 3.00
4.00 4.00 4.00
4.00 4.00 4.00
8.00 160.00 8.00 8.00 8.00

26.00 0.00 6.00 80.00 280.00 106.00 0.00 6.00 14.00 112.00
39.00 0.00 9.00 120.00 420.00 159.00 0.00 9.00 21.00 336.00
39.00 0.00 9.00 120.00 420.00 159.00 0.00 9.00 21.00 336.00
1.56 0.74 5.36 6.04 2.08 39.60 12.99 13.40 14.10 17.55
60.84 0.00 48.24 724.80 873.60 6,296.40 0.00 120.60 296.10 5,896.80
UNIFORME Ws CON ESMERIL Ws SOLD.A ELECTRICA O AUTOGENA
240 NA 240 30 100 150 150 180 150 240

cinturón porta

policarbonato
herramientas

cuero blando

8" 3 hebillasr
cuero cromo

cuero cromo

cuero cromo
cuerocromo
jean para el

guantes de

mandil de
soldador

escarpín
guantes
chaleco

mandil

careta
visor
staff

14"
8.00

40.00

24.00
8.00

0.00 80.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
0.00 120.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
0.00 120.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
8.01 6.58 12.50 4.25 3.53 6.80 7.26 3.68 6.80 6.80
0.00 789.60 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
RICA O AUTOGENA ANTI CAIDAS
240 180 240 240

amortiguador
chaqueta

anillos D
oxicorte

arnés 3
lentes
cuero

8.00
3.00
4.00
40.00
6.00
24.00
8.00
3.00
4.00
4.00
8.00

0.00 0.00 112.00 0.00


0.00 0.00 168.00 0.00
0.00 0.00 168.00 0.00
23.53 5.35 86.30 33.45
0.00 0.00 14,498.40 0.00 31,501.00
Número
de Rendimie
Metrado Número
obreros nto
por piso Und 6 Sectores de días
por (und/día)
tipico
cuadrilla
basica

Acero Vertical 5538.42 Kg 923.07 2 250 3.7


IIEE Vertical 3
ISS Vertical 2
Encofrado Vertical 2375.28 m2 395.88 5 55 7.2
Vaciado Vertical 120.66 m3 20.11 6 30 0.7
Encofrado Horizontal 872.76 m2 145.46 4 30 4.8
Acero horizontal 4542.96 kg 757.16 2 220 3.4
IIEE 3
IISS Desague 2
IISS Agua 2
Vaciado Horizontal 92.40 m3 15.40 8 60 0.3
Horas diarias por número de cuadrillas

Número
Número
Número de
Ratio de horas
de horas 1 2 3 4 5 6 cuadrillas
hombre
a usar

36.9 36.9 18.5 12.3 9.2 7.4 6.2 4 0.08 73.8

72.0 72.0 36.0 24.0 18.0 14.4 12.0 8 0.91 359.9


6.7 6.7 3.4 2.2 1.7 1.3 1.1 1 2.00 40.2
48.5 48.5 24.2 16.2 12.1 9.7 8.1 6 1.33 193.9
34.4 34.4 17.2 11.5 8.6 6.9 5.7 4 0.09 68.8

2.6 2.6 1.3 0.9 0.6 0.5 0.4 1 1.33 20.5


Número Número
de de
trabajador cuadrillas
es a usar

7.4 4 8
3.0 1 3
4.0 2 4
36.0 8 40
4.0 1 6
19.4 6 24
6.9 4 8
3.0 1 3
4.0 2 4
4.0 2 4
2.1 1 8
PARTIDAS TAREAS

SOLAQUEO DE MUROS
REVOQUES/ENLU
CIDOS LIMPIEZA PARA TRAZO / TRAZO DE TABIQUERIA Y SARDINELES
COLOCACION DE ACERO DE ANCLAJE / IIEE E IISS

MUROS / ASENTADO DE LADRILLO


TABIQUERIA
COLOCACION DE MEZCLADORES / SOLAQUEO, DERRAMES,BRU;AS / SONDEO DE IIEE E IISS
PROTOCOLO DE ALBANILERIA / 1RA REVISION
TREN 01 SSHH,COCINA,LAVANDERIA,PATIO,TERRAZA
TRAZO DE NIVELES / ENCOFRADO Y CONCRETO DE SARDINEL DE DUCHA
MUROS /
TABIQUERIA PROTOCOLO DE ALBANILERIA / 2DA REVISION
RECTIFICACION DE PISOS / TRAZO Y REPLANTEO
SOLAQUEO DE TECHOS
PRUEBA DE PRESION HIDRAULICA / DE SOLAQUEO 1RA Y 2DA REVISION
PISOS / PROTOCOLO DE SOLAQUEO / 1RA REVISION / 2DA REVISION
PAVIMENT.
ZOCALOS,CONTRAZOCALOS CERAMICOS / PISOS CERAMICOS
PROTOCOLO DE CERAMICOS / 1RA REVISION
LEVANTAMIENTO DE OBS. EN PISOS CERAMICOS
PROTOCOLO DE CERAMICOS / 2DA REVISION
BLANQUEADO DE MUROS Y TECHOS DE SSHH,COCINAS,LAV.
EMPASTE GRUESO Y LIJADO DE MUROS Y TECHOS DE SSHH.COCINA,LAV.
PINTURA EMPASTE FINO Y LIJADO EN MUROS Y TECHOS / SELLADO DE MUROS Y TECHOS
INTERIORES
PROTOCOLO DE SUPERF. PARA ESCARCHADO DE PINTURA
PRIMERA MANO DE PINTURA EN MUROS Y TECHOS
PROTOCOLO DE PINTURA EN MUROS Y TECHOS / 1RA REVISION

CABLEADO ELECTRICO DE DPTOS. / INST. DE MARCOS DE PUERTAS / INST. DE MARCOS DE ALUMINIO DE


VENTANAS / COLOCACION DE BISAGRAS Y CERRAJERIA
MARCOS Y
PUERTAS PROTOCOLO DE MEGADO
PROTOCOLO DE PINTURA EN MUROS Y TECHOS / 2DA REVISION
INSTALACION DE MARCOS Y RIELES DE MAMPARAS DE VIDRIO
INSTALACION DE MUEBLES DE COCINA / INSTALACION DE MUEBLES DE SSHH
MUEBLES PROTOCOLO DE INS. DE MOBILIARIO DE COCINA Y SSHH / 1RA REVISION
COLOCACION E INSTALACION DE TABLEROS Y SUB TABLEROS / CABLEADO DE ALIMENTADORES
INSTALACION DE APARATOS SANITARIOS *INODORO,DUCHA,LAVADERO
IIEE IISS
PROTOCOLO DE INSTALACION DE APARATOS SANITARIOS
PRUEBAS Y REPARACIONES

MUEBLES COLOCACION DE TABLERO POST.FORMADO / COLOCACION DE TABLERO DURO DE MARMOL


PROTOCOLO DE INS. DE MOBILIARIO DE COCINA Y SSHH / 2DA REVISION
DESMANCHE DESMANCHE DE TECHOS / SEGUNDA MANO DE TECHOS
CARPINTERIA METALICA: BARANDAS DE TERRAZAS
TREN 02 DORMITORIOS, SALA, COMEDOR
CARPINTERIA METALICA: BARANDAS DE ESCALERAS
RECTIFICACION DE PISOS / TRAZO Y REPLANTEO
PISOS / SOLAQUEO EN TECHOS
PAVIMENT.
PROTOCOLO DE SOLAQUEO / 1RA REVISION
PROTOCOLO DE SOLAQUEO / 2DA REVISION
BLANQUEADO DE MUROS Y TECHOS DE DORMITORIOS,SALA/COMEDOR
EMPASTE GRUESO Y LIJADO DE MUROS Y TECHOS DE DORMITORIOS,SALA/COMEDOR
PINTURA
INTERIORES EMPASTE FINO Y LIJADO EN MUROS Y TECHOS / SELLADO DE MUROS Y TECHOS
PROTOCOLO DE SUPERF. PARA COLOCACION DE PAPEL MURAL
PROTOCOLO DE PINTURA EN MUROS Y TECHOS / 1RA REVISION

CABLEADO ELECTRICO DE DPTOS. / INST. DE MARCOS DE PUERTAS / INST. DE MARCOS DE ALUMINIO DE


MARCOS Y VENTANAS / COLOCACION DE BISAGRAS Y CERRAJERIA
PUERTAS
PROTOCOLO DE MEGADO
PROTOCOLO DE PINTURA EN MUROS Y TECHOS / 2DA REVISION
COLOCACION E INSTALACION DE TABLEROS Y SUB TABLEROS / CABLEADO DE ALIMENTADORES
INSTALACION DE APARATOS SANITARIOS *INODORO,DUCHA,LAVADERO
IIEE IISS
PROTOCOLO DE INSTALACION DE APARATOS SANITARIOS
PRUEBAS Y REPARACIONES
ESCARCHADO DE TECHOS
TECHOS
PROTOCOLO DE ESCARCHADO DE TECHOS / 1RA REVISION
PROTOCOLO DE ESCARCHADO DE TECHOS / 2DA REVISION

CERRAJERIA, PROTOCOLO DE INSTALACION DE PUERTAS / 2DA REVISION


PINTURA VANOS
PRIMERA MANO DE PINTURA EN MARCOS Y HOJAS
SEGUNDA MANO DE PINTURA EN MARCOS Y HOJAS

COLOCACION DE VIDRIOS EN VENTANAS / COLOCACION DE VIDRIO TEMPLADO EN MAMPARAS Y


BALCONES
VIDRIOS
PROTOCOLO DE PINTURA DE PUERTAS / 1RA REVISION
PROTOCOLO DE COLOCACION DE VIDRIOS
DESMANCHE DE MUROS / SEGUNDA MANO DE MUROS
DESMANCHE
PROTOCOLO DE PINTURA DE PUERTAS / 2DA REVISION
INSTALACION DE PLACAS / INSTALACION DE LLAVES TERMICAS
PLACAS LLAVES
TERMICAS PROTOCOLO DE PILOTAJE
PROTOCOLO DE PRUEBAS DE INTERCOMUNICADORES
COLOCACION E INSTALACION DE PAPEL MURAL
PAPEL MURAL
PROTOCOLO DE PAPEL MURAL / 1RA REVISION
PROTOCOLO DE PAPEL MURAL / 2DA REVISION
COLOCACION E INSTALACION DE PISOS LAMINADOS
PROTOCOLO DE PISOS LAMINADOS / 1RA REVISION
PISO LAMINADO
COLOCACION DE CONTRAZOCALOS DE MADERA+RODON / COLOCACION DE TAPAJUNTAS / COLOCACION
DE TOPES DE PUERTAS
PROTOCOLO DE CONTRAZOCALOS / 1RA REVISION
PROTOCOLO DE PISOS LAMINADOS Y CONTRAZOCALOS / 2DA REVISION
LIMPIEZA LIMPIEZA DE VIDRIOS / LIMPIEZA GENERAL
ENTREGA DE DPTOS. 1RA REVISION
ENTREGA DE DPTOS. 2DA REVISION
ENTREGA DE DPTOS. 3RA REVISION
SEM 1 SEM 2
Lun Mar Mié Jue Vie Sáb Dom Lun Mar Mié

07/04/2013 08/04/2013 09/04/2013 10/04/2013 11/04/2013 12/04/2013 13/04/2013 14/04/2013 15/04/2013 16/04/2013

A1 B1 C1 D1 E1 F1 A2 B2
A1 B1 C1 D1 E1 F1 A2 B2
A1 B1 C1 D1 E1 F1 A2
A1 B1 C1 D1 E1 F1 A2
A1 B1 C1 D1 E1 F1
A1 B1 C1 D1 E1 F1

A1 B1 C1 D1 E1
A1 B1 C1 D1 E1
A1 B1 C1 D1 E1
A1 B1 C1 D1 E1
A1 B1 C1 D1
A1 B1 C1 D1
A1 B1 C1 D1
A1 B1 C1 D1
A1 B1 C1 D1
A1 B1 C1 D1
A1 B1 C1
A1 B1 C1
A1 B1 C1
A1 B1 C1
A1 B1
A1 B1

A1
A1
A1
TORRE A TORRE B
A5 B5 C5 D5 E5 F5 F5 E5
A4 B4 C4 D4 E4 F4 F4 E4
A3 B3 C3 D3 E3 F3 F3 E3
A2 B2 C2 D2 E2 F2 F2 E2
A1 B1 C1 D1 E1 F1 F1 E1

LINEA DE PRODUCCIÓN 1 LINEA DE PR


SEM 3 SEM 4
Jue Vie Sáb Dom Lun Mar Mié Jue Vie Sáb Dom Lun Mar

17/04/2013 18/04/2013 19/04/2013 20/04/2013 ### ### ### ### ### ### ### ### ###

C2 D2 E2 F2 A3 B3 C3 D3 E3
C2 D2 E2 F2 A3 B3 C3 D3 E3
B2 C2 D2 E2 F2 A3 B3 C3 D3
B2 C2 D2 E2 F2 A3 B3 C3 D3
A2 B2 C2 D2 E2 F2 A3 B3 C3
A2 B2 C2 D2 E2 F2 A3 B3 C3

F1 A2 B2 C2 D2 E2 F2 A3 B3
F1 A2 B2 C2 D2 E2 F2 A3 B3
F1 A2 B2 C2 D2 E2 F2 A3 B3
F1 A2 B2 C2 D2 E2 F2 A3 B3
E1 F1 A2 B2 C2 D2 E2 F2 A3
E1 F1 A2 B2 C2 D2 E2 F2 A3
E1 F1 A2 B2 C2 D2 E2 F2 A3
E1 F1 A2 B2 C2 D2 E2 F2 A3
E1 F1 A2 B2 C2 D2 E2 F2 A3
E1 F1 A2 B2 C2 D2 E2 F2 A3
D1 E1 F1 A2 B2 C2 D2 E2 F2
D1 E1 F1 A2 B2 C2 D2 E2 F2
D1 E1 F1 A2 B2 C2 D2 E2 F2
D1 E1 F1 A2 B2 C2 D2 E2 F2
C1 D1 E1 F1 A2 B2 C2 D2 E2
C1 D1 E1 F1 A2 B2 C2 D2 E2

B1 C1 D1 E1 F1 A2 B2 C2 D2
B1 C1 D1 E1 F1 A2 B2 C2 D2
B1 C1 D1 E1 F1 A2 B2 C2 D2
A1 B1 C1 D1 E1 F1 A2 B2 C2
A1 B1 C1 D1 E1 F1 A2 B2 C2
A1 B1 C1 D1 E1 F1 A2 B2 C2
A1 B1 C1 D1 E1 F1 A2 B2
A1 B1 C1 D1 E1 F1 A2 B2
A1 B1 C1 D1 E1 F1 A2 B2
A1 B1 C1 D1 E1 F1 A2

A1 B1 C1 D1 E1 F1 A2
A1 B1 C1 D1 E1 F1 A2
A1 B1 C1 D1 E1 F1
A1 B1 C1 D1 E1 F1

A1 B1 C1 D1 E1
A1 B1 C1 D1 E1
A1 B1 C1 D1 E1
A1 B1 C1 D1
A1 B1 C1 D1
A1 B1 C1 D1
A1 B1 C1 D1
A1 B1 C1 D1
A1 B1 C1
A1 B1 C1

A1 B1 C1
A1 B1 C1
A1 B1 C1
A1 B1
A1 B1
A1 B1
A1
A1
A1
A1
A1
TORRE C
D5 C5 B5 A5
D4 C4 B4 A4
D3 C3 B3 A3
D2 C2 B2 A2
D1 C1 B1 A1

LINEA DE PRODUCCIÓN 2
SEM 5 SEM 6
Mié Jue Vie Sáb Dom Lun Mar Mié Jue Vie Sáb Dom Lun Mar Mié Jue

### ### 02/05/2013 ### ### ### ### ### ### ### ### ### ### ### ### ###

F3 A4 B4 C4 D4 E4 F4 A5 B5 C5 D5 E5
F3 A4 B4 C4 D4 E4 F4 A5 B5 C5 D5 E5
E3 F3 A4 B4 C4 D4 E4 F4 A5 B5 C5 D5
E3 F3 A4 B4 C4 D4 E4 F4 A5 B5 C5 D5
D3 E1 F3 A4 B4 C4 D4 E4 F4 A5 B5 C5
D3 E1 F3 A4 B4 C4 D4 E4 F4 A5 B5 C5

C3 D3 E3 F3 A4 B4 C4 D4 E4 F4 A5 B5
C3 D3 E3 F3 A4 B4 C4 D4 E4 F4 A5 B5
C3 D3 E3 F3 A4 B4 C4 D4 E4 F4 A5 B5
C3 D3 E3 F3 A4 B4 C4 D4 E4 F4 A5 B5
B3 C3 D3 E3 F3 A4 B4 C4 D4 E4 F4 A5
B3 C3 D3 E3 F3 A4 B4 C4 D4 E4 F4 A5
B3 C3 D3 E3 F3 A4 B4 C4 D4 E4 F4 A5
B3 C3 D3 E3 F3 A4 B4 C4 D4 E4 F4 A5
B3 C3 D3 E3 F3 A4 B4 C4 D4 E4 F4 A5
B3 C3 D3 E3 F3 A4 B4 C4 D4 E4 F4 A5
A3 B3 C3 D3 E3 F3 A4 B4 C4 D4 E4 F4
A3 B3 C3 D3 E3 F3 A4 B4 C4 D4 E4 F4
A3 B3 C3 D3 E3 F3 A4 B4 C4 D4 E4 F4
A3 B3 C3 D3 E3 F3 A4 B4 C4 D4 E4 F4
F2 A3 B3 C3 D3 E3 F3 A4 B4 C4 D4 E4
F2 A3 B3 C3 D3 E3 F3 A4 B4 C4 D4 E4

E2 F2 A3 B3 C3 D3 E3 F3 A4 B4 C4 D4
E2 F2 A3 B3 C3 D3 E3 F3 A4 B4 C4 D4
E2 F2 A3 B3 C3 D3 E3 F3 A4 B4 C4 D4
D2 E2 F2 A3 B3 C3 D3 E3 F3 A4 B4 C4
D2 E2 F2 A3 B3 C3 D3 E3 F3 A4 B4 C4
D2 E2 F2 A3 B3 C3 D3 E3 F3 A4 B4 C4
C2 D2 E2 F2 A3 B3 C3 D3 E3 F3 A4 B4
C2 D2 E2 F2 A3 B3 C3 D3 E3 F3 A4 B4
C2 D2 E2 F2 A3 B3 C3 D3 E3 F3 A4 B4
B2 C2 D2 E2 F2 A3 B3 C3 D3 E3 F3 A4

B2 C2 D2 E2 F2 A3 B3 C3 D3 E3 F3 A4
B2 C2 D2 E2 F2 A3 B3 C3 D3 E3 F3 A4
A2 B2 C2 D2 E2 F2 A3 B3 C3 D3 E3 F3
A2 B2 C2 D2 E2 F2 A3 B3 C3 D3 E3 F3

F1 A2 B2 C2 D2 E2 F2 A3 B3 C3 D3 E3
F1 A2 B2 C2 D2 E2 F2 A3 B3 C3 D3 E3
F1 A2 B2 C2 D2 E2 F2 A3 B3 C3 D3 E3
E1 F1 A2 B2 C2 D2 E2 F2 A3 B3 C3 D3
E1 F1 A2 B2 C2 D2 E2 F2 A3 B3 C3 D3
E1 F1 A2 B2 C2 D2 E2 F2 A3 B3 C3 D3
E1 F1 A2 B2 C2 D2 E2 F2 A3 B3 C3 D3
E1 F1 A2 B2 C2 D2 E2 F2 A3 B3 C3 D3
D1 E1 F1 A2 B2 C2 D2 E2 F2 A3 B3 C3
D1 E1 F1 A2 B2 C2 D2 E2 F2 A3 B3 C3

D1 E1 F1 A2 B2 C2 D2 E2 F2 A3 B3 C3
D1 E1 F1 A2 B2 C2 D2 E2 F2 A3 B3 C3
D1 E1 F1 A2 B2 C2 D2 E2 F2 A3 B3 C3
C1 D1 E1 F1 A2 B2 C2 D2 E2 F2 A3 B3
C1 D1 E1 F1 A2 B2 C2 D2 E2 F2 A3 B3
C1 D1 E1 F1 A2 B2 C2 D2 E2 F2 A3 B3
B1 C1 D1 E1 F1 A2 B2 C2 D2 E2 F2 A3
B1 C1 D1 E1 F1 A2 B2 C2 D2 E2 F2 A3
B1 C1 D1 E1 F1 A2 B2 C2 D2 E2 F2 A3
B1 C1 D1 E1 F1 A2 B2 C2 D2 E2 F2 A3
B1 C1 D1 E1 F1 A2 B2 C2 D2 E2 F2 A3
A1 B1 C1 D1 E1 F1 A2 B2 C2 D2 E2 F2
A1 B1 C1 D1 E1 F1 A2 B2 C2 D2 E2 F2

A1 B1 C1 D1 E1 F1 A2 B2 C2 D2 E2 F2
A1 B1 C1 D1 E1 F1 A2 B2 C2 D2 E2 F2
A1 B1 C1 D1 E1 F1 A2 B2 C2 D2 E2 F2
A1 B1 C1 D1 E1 F1 A2 B2 C2 D2 E2
A1 B1 C1 D1 E1 F1 A2 B2 C2 D2 E2
A1 B1 C1 D1 E1 F1 A2 B2 C2 D2 E2
A1 B1 C1 D1 E1 F1 A2 B2 C2 D2 E2
A1 B1 C1 D1 E1 F1 A2 B2 C2 D2 E2
A1 B1 C1 D1 E1 F1 A2 B2 C2 D2 E2
A1 B1 C1 D1 E1 F1 A2 B2 C2 D2 E2
A1 B1 C1 D1 E1 F1 A2 B2 C2 D2
A1 B1 C1 D1 E1 F1 A2 B2 C2 D2
A1 B1 C1 D1 E1 F1 A2 B2 C2 D2

A1 B1 C1 D1 E1 F1 A2 B2 C2 D2
A1 B1 C1 D1 E1 F1 A2 B2 C2 D2
A1 B1 C1 D1 E1 F1 A2 B2 C2 D2
A1 B1 C1 D1 E1 F1 A2 B2 C2
A1 B1 C1 D1 E1 F1 A2 B2 C2
A1 B1 C1 D1 E1 F1 A2 B2
A1 B1 C1 D1 E1 F1 A2 B2
EM 6 SEM 7 SEM 8
Vie Sáb Dom Lun Mar Mié Jue Vie Sáb Dom Lun Mar Mié Jue Vie Sáb

### ### ### ### ### ### ### ### ### ### ### ### ### ### ### 31/05/2013

F5
F5
E5 F5
E5 F5
D5 E5 F5
D5 E5 F5

C5 D5 E5 F5
C5 D5 E5 F5
C5 D5 E5 F5
C5 D5 E5 F5
B5 C5 D5 E5 F5
B5 C5 D5 E5 F5
B5 C5 D5 E5 F5
B5 C5 D5 E5 F5
B5 C5 D5 E5 F5
B5 C5 D5 E5 F5
A5 B5 C5 D5 E5 F5
A5 B5 C5 D5 E5 F5
A5 B5 C5 D5 E5 F5
A5 B5 C5 D5 E5 F5
F4 A5 B5 C5 D5 E5 F5
F4 A5 B5 C5 D5 E5 F5

E4 F4 A5 B5 C5 D5 E5 F5
E4 F4 A5 B5 C5 D5 E5 F5
E4 F4 A5 B5 C5 D5 E5 F5
D4 E4 F4 A5 B5 C5 D5 E5 F5
D4 E4 F4 A5 B5 C5 D5 E5 F5
D4 E4 F4 A5 B5 C5 D5 E5 F5
C4 D4 E4 F4 A5 B5 C5 D5 E5 F5
C4 D4 E4 F4 A5 B5 C5 D5 E5 F5
C4 D4 E4 F4 A5 B5 C5 D5 E5 F5
B4 C4 D4 E4 F4 A5 B5 C5 D5 E5 F5

B4 C4 D4 E4 F4 A5 B5 C5 D5 E5 F5
B4 C4 D4 E4 F4 A5 B5 C5 D5 E5 F5
A4 B4 C4 D4 E4 F4 A5 B5 C5 D5 E5
A4 B4 C4 D4 E4 F4 A5 B5 C5 D5 E5

F3 A4 B4 C4 D4 E4 F4 A5 B5 C5 D5
F3 A4 B4 C4 D4 E4 F4 A5 B5 C5 D5
F3 A4 B4 C4 D4 E4 F4 A5 B5 C5 D5
E3 F3 A4 B4 C4 D4 E4 F4 A5 B5 C5
E3 F3 A4 B4 C4 D4 E4 F4 A5 B5 C5
E3 F3 A4 B4 C4 D4 E4 F4 A5 B5 C5
E3 F3 A4 B4 C4 D4 E4 F4 A5 B5 C5
E3 F3 A4 B4 C4 D4 E4 F4 A5 B5 C5
D3 E3 F3 A4 B4 C4 D4 E4 F4 A5 B5
D3 E3 F3 A4 B4 C4 D4 E4 F4 A5 B5

D3 E3 F3 A4 B4 C4 D4 E4 F4 A5 B5
D3 E3 F3 A4 B4 C4 D4 E4 F4 A5 B5
D3 E3 F3 A4 B4 C4 D4 E4 F4 A5 B5
C3 D3 E3 F3 A4 B4 C4 D4 E4 F4 A5
C3 D3 E3 F3 A4 B4 C4 D4 E4 F4 A5
C3 D3 E3 F3 A4 B4 C4 D4 E4 F4 A5
B3 C3 D3 E3 F3 A4 B4 C4 D4 E4 F4
B3 C3 D3 E3 F3 A4 B4 C4 D4 E4 F4
B3 C3 D3 E3 F3 A4 B4 C4 D4 E4 F4
B3 C3 D3 E3 F3 A4 B4 C4 D4 E4 F4
B3 C3 D3 E3 F3 A4 B4 C4 D4 E4 F4
A3 B3 C3 D3 E3 F3 A4 B4 C4 D4 E4
A3 B3 C3 D3 E3 F3 A4 B4 C4 D4 E4

A3 B3 C3 D3 E3 F3 A4 B4 C4 D4 E4
A3 B3 C3 D3 E3 F3 A4 B4 C4 D4 E4
A3 B3 C3 D3 E3 F3 A4 B4 C4 D4 E4
F2 A3 B3 C3 D3 E3 F3 A4 B4 C4 D4
F2 A3 B3 C3 D3 E3 F3 A4 B4 C4 D4
F2 A3 B3 C3 D3 E3 F3 A4 B4 C4 D4
F2 A3 B3 C3 D3 E3 F3 A4 B4 C4 D4
F2 A3 B3 C3 D3 E3 F3 A4 B4 C4 D4
F2 A3 B3 C3 D3 E3 F3 A4 B4 C4 D4
F2 A3 B3 C3 D3 E3 F3 A4 B4 C4 D4
E2 F2 A3 B3 C3 D3 E3 F3 A4 B4 C4
E2 F2 A3 B3 C3 D3 E3 F3 A4 B4 C4
E2 F2 A3 B3 C3 D3 E3 F3 A4 B4 C4

E2 F2 A3 B3 C3 D3 E3 F3 A4 B4 C4
E2 F2 A3 B3 C3 D3 E3 F3 A4 B4 C4
E2 F2 A3 B3 C3 D3 E3 F3 A4 B4 C4
D2 E2 F2 A3 B3 C3 D3 E3 F3 A4 B4
D2 E2 F2 A3 B3 C3 D3 E3 F3 A4 B4
C2 D2 E2 F2 A3 B3 C3 D3 E3 F3 A4
C2 D2 E2 F2 A3 B3 C3 D3 E3 F3 A4
SEM 9 SEM 10 SEM
Dom Lun Mar Mié Jue Vie Sáb Dom Lun Mar Mié Jue Vie Sáb Dom Lun Mar

### ### ### ### ### ### ### ### ### ### ### ### ### ### ### 16/06/2013 06/17/13

F5
F5

E5 F5
E5 F5
E5 F5
D5 E5 F5
D5 E5 F5
D5 E5 F5
D5 E5 F5
D5 E5 F5
C5 D5 E5 F5
C5 D5 E5 F5

C5 D5 E5 F5
C5 D5 E5 F5
C5 D5 E5 F5
B5 C5 D5 E5 F5
B5 C5 D5 E5 F5
B5 C5 D5 E5 F5
A5 B5 C5 D5 E5 F5
A5 B5 C5 D5 E5 F5
A5 B5 C5 D5 E5 F5
A5 B5 C5 D5 E5 F5
A5 B5 C5 D5 E5 F5
F4 A5 B5 C5 D5 E5 F5
F4 A5 B5 C5 D5 E5 F5

F4 A5 B5 C5 D5 E5 F5
F4 A5 B5 C5 D5 E5 F5
F4 A5 B5 C5 D5 E5 F5
E4 F4 A5 B5 C5 D5 E5 F5
E4 F4 A5 B5 C5 D5 E5 F5
E4 F4 A5 B5 C5 D5 E5 F5
E4 F4 A5 B5 C5 D5 E5 F5
E4 F4 A5 B5 C5 D5 E5 F5
E4 F4 A5 B5 C5 D5 E5 F5
E4 F4 A5 B5 C5 D5 E5 F5
D4 E4 F4 A5 B5 C5 D5 E5 F5
D4 E4 F4 A5 B5 C5 D5 E5 F5
D4 E4 F4 A5 B5 C5 D5 E5 F5

D4 E4 F4 A5 B5 C5 D5 E5 F5
D4 E4 F4 A5 B5 C5 D5 E5 F5
D4 E4 F4 A5 B5 C5 D5 E5 F5
C4 D4 E4 F4 A5 B5 C5 D5 E5 F5
C4 D4 E4 F4 A5 B5 C5 D5 E5 F5
B4 C4 D4 E4 F4 A5 B5 C5 D5 E5 F5
B4 C4 D4 E4 F4 A5 B5 C5 D5 E5 F5
SEM SEM
Mié Jue Vie Sáb Dom Lun Mar Mié Jue Vie Sáb

06/18/13 06/19/13 06/20/13 06/21/13 06/22/13 06/23/13 06/24/13 06/25/13 06/26/13 06/27/13 06/28/13
METRADO 1RA ETAPA - CASCO ESTRUCTURAL
Bloque tipico 1 (Bloque A)
Descripción Und Metrado Total 1er Piso 2do Piso 3ro Piso
MUROS DE CONCRETO Y COLUMNA (placas, elementos verticales)
Concreto premezclado f´c=175 kg/cm2 para muros reforzados (Cemento P-1) m3 1,026.02 68.40 68.40 68.40
Encofrado y desencofrado para muros m2 21,244.19 1,416.28 1,416.28 1,416.28
Acero corrugado fy=4200kg/cm2 grado 60 kg 48,100.34 3,206.69 3,206.69 3,206.69
MUROS DE CONCRETO (parapeto, elementos verticales)
Concreto premezclado f´c=175 kg/cm2 para muros reforzados (Cemento P-1) m3 43.50 2.90 2.90 2.90
Encofrado y desencofrado para muros m2 870.00 58.00 58.00 58.00
Acero corrugado fy=4200kg/cm2 grado 60 kg 1,770.00 118.00 118.00 118.00
VIGAS (Elementos Horizontales)
Concreto premezclado f´c=175 kg/cm2 para vigas (Cemento P-1) m3 31.49 2.10 2.10 2.10
Encofrado y desencofrado para vigas m2 314.91 20.99 20.99 20.99
Acero corrugado fy=4200kg/cm2 grado 60 kg 6,006.85 400.46 400.46 400.46
LOSAS (Elementos Horizontales)
Concreto premezclado f´c=175kg/cm2 para losas (Cemento P-1) e=0.10m, 0.15m, 0.20m m3 828.96 55.26 55.26 55.26
Encofrado y desencofrado m2 8,391.26 559.42 559.42 559.42
Acero corrugado fy=4200kg/cm2 grado 60 kg 39,530.96 2,635.40 2,635.40 2,635.40
ESCALERAS (Elementos Horizontales)
Concreto premezclado f'c=210kg/cm2 para losas (Cemento P-1) m3 56.57 3.77 3.77 3.77
Encofrado y desencofrado m2 139.69 9.31 9.31 9.31
Acero corrugado fy=4200kg/cm2 grado 60 kg 1,509.15 100.61 100.61 100.61

METRADO POR SECTORES POR PISO (FREN


Descripción Und Metrado Total S1P1 S2P1 S3P1
MUROS DE CONCRETO Y COLUMNA (placas, elementos verticales)
Acero kg 9,620.07 801.67 801.67 801.67
Encofrado y desencofrado m2 4,248.84 354.07 354.07 354.07
Concreto premezclado m3 205.20 17.10 17.10 17.10
MUROS DE CONCRETO (parapeto, elementos verticales)
Acero kg 354.00 29.50 29.50 29.50
Encofrado y desencofrado m2 174.00 14.50 14.50 14.50
Concreto premezclado m3 8.70 0.73 0.73 0.73
ELEMENTOS HORIZONTALES (vigas, losas, escaleras)
Encofrado y desencofrado m2 1,769.17 147.43 147.43 147.43
Acero corrugado kg 9,409.39 784.12 784.12 784.12
Concreto premezclado m3 183.40 15.28 15.28 15.28
368.57
que tipico 1 (Bloque A) Bloque tipico 1 (Bloque B) Bloque tipico 1 (Bloque C) Metrado de bloques A,R
4to Piso 5to Piso 1er Piso 2do Piso 3ro Piso 4to Piso 5to Piso 1er Piso 2do Piso 3ro Piso 4to Piso 5to Piso 1er Piso 2do Piso

68.40 68.40 68.40 68.40 68.40 68.40 68.40 68.40 68.40 68.40 68.40 68.40 205.20 205.20
1,416.28 1,416.28 1,416.28 1,416.28 1,416.28 1,416.28 1,416.28 1,416.28 1,416.28 1,416.28 1,416.28 1,416.28 4,248.84 4,248.84
3,206.69 3,206.69 3,206.69 3,206.69 3,206.69 3,206.69 3,206.69 3,206.69 3,206.69 3,206.69 3,206.69 3,206.69 9,620.07 9,620.07

2.90 2.90 2.90 2.90 2.90 2.90 2.90 2.90 2.90 2.90 2.90 2.90 8.70 8.70
58.00 58.00 58.00 58.00 58.00 58.00 58.00 58.00 58.00 58.00 58.00 58.00 174.00 174.00
118.00 118.00 118.00 118.00 118.00 118.00 118.00 118.00 118.00 118.00 118.00 118.00 354.00 354.00

2.10 2.10 2.10 2.10 2.10 2.10 2.10 2.10 2.10 2.10 2.10 2.10 6.30 6.30
20.99 20.99 20.99 20.99 20.99 20.99 20.99 20.99 20.99 20.99 20.99 20.99 62.98 62.98
400.46 400.46 400.46 400.46 400.46 400.46 400.46 400.46 400.46 400.46 400.46 400.46 1,201.37 1,201.37

55.26 55.26 55.26 55.26 55.26 55.26 55.26 55.26 55.26 55.26 55.26 55.26 165.79 165.79
559.42 559.42 559.42 559.42 559.42 559.42 559.42 559.42 559.42 559.42 559.42 559.42 1,678.25 1,678.25
2,635.40 2,635.40 2,635.40 2,635.40 2,635.40 2,635.40 2,635.40 2,635.40 2,635.40 2,635.40 2,635.40 2,635.40 7,906.19 7,906.19

3.77 3.77 3.77 3.77 3.77 3.77 3.77 3.77 3.77 3.77 3.77 3.77 11.31 11.31
9.31 9.31 9.31 9.31 9.31 9.31 9.31 9.31 9.31 9.31 9.31 9.31 27.94 27.94
100.61 100.61 100.61 100.61 100.61 100.61 100.61 100.61 100.61 100.61 100.61 100.61 301.83 301.83

POR SECTORES POR PISO (FRENTE 01) METRADO POR SECTORES POR PISO (FRENTE 02)
S4P1 S5P1 S6P1 S1P1 S2P1 S3P1 S4P1 S5P1 S6P1

801.67 801.67 801.67 801.67 801.67 801.67 801.67 801.67 801.67


354.07 354.07 354.07 354.07 354.07 354.07 354.07 354.07 354.07
17.10 17.10 17.10 17.10 17.10 17.10 17.10 17.10 17.10

29.50 29.50 29.50 29.50 29.50 29.50 29.50 29.50 29.50


14.50 14.50 14.50 14.50 14.50 14.50 14.50 14.50 14.50
0.73 0.73 0.73 0.73 0.73 0.73 0.73 0.73 0.73

147.43 147.43 147.43 147.43 147.43 147.43 147.43 147.43 147.43


784.12 784.12 784.12 784.12 784.12 784.12 784.12 784.12 784.12
15.28 15.28 15.28 15.28 15.28 15.28 15.28 15.28 15.28
Metrado de bloques A,R,C
3ro Piso 4to Piso 5to Piso

205.20 205.20 205.20


4,248.84 4,248.84 4,248.84
9,620.07 9,620.07 9,620.07

8.70 8.70 8.70


174.00 174.00 174.00
354.00 354.00 354.00

6.30 6.30 6.30


62.98 62.98 62.98
1,201.37 1,201.37 1,201.37

165.79 165.79 165.79


1,678.25 1,678.25 1,678.25
7,906.19 7,906.19 7,906.19

11.31 11.31 11.31


27.94 27.94 27.94
301.83 301.83 301.83
PLANOS-ESPECIFICACIONES-ETC
ACTIVIDAD

PREDECESORA
MATERIALES
SEGURIDAD

ACTIVIDAD
PERSONAL

EQUIPOS

ESPACIO

VARIOS
X
REVOQUES Y ENLUCIDOS
Responsable Sr. Chavez

x
X
Cuadrilla 1 operarios

x
3 ayudantes
MUROS Y TABIQUERIA

x
Responsable Sr. Almonacid

X x
Cuadrilla 1 operarios

X
4 ayudantes

X
X

X x
PISO/ PAVIMENTACION

X
Responsable Sr. Pereira
Cuadrilla
x
2 operarios
2 ayudantes
X

PINTURA INTERIORES
X X

Responsable Sr. Gomez


Cuadrilla 1 operarios
X

4 oficiales
X

MARCOS Y PUERTAS
x

Responsable Sr. Acosta


X
X

Cuadrilla 1 operarios
2 ayudantes X

MUEBLES x
Responsable Sr. Aramburu x
Cuadrilla 1 operarios x
4 ayudantes x

DESMACHE
X

Responsable Sr. Gonzales


x

Cuadrilla 1 operarios
X

3 ayudantes
TECHOS

x
Responsable Sr. Sawada

X
Cuadrilla 1 operario

x
2 ayudante

IIEE-IISS

X
Responsable Sr. Kosarev

x
Cuadrilla

x
2 operarios

x
1 ayudante

VIDRIOS X

Responsable Sr. Garavito X

Cuadrilla 1 operarios X

2 ayudantes X
X x

PLACAS, LLAVES TERMICAS


Responsable Sr. Lobaton

x
Cuadrilla 1 operarios x

2 ayudantes X

CERRAJERIA, PINTURA Y VANOS x

Responsable Sr. Cotrina x

Cuadrilla 1 operarios x

2 ayudantes

PAPEL MURAL x

Responsable Sr. Cisneros


x

Cuadrilla 1 operarios x

4 ayudantes
PISO LAMINADO X

Responsable Sr. Quiñones x

Cuadrilla 2 operarios x

2 ayudantes

LIMPIEZA Sr. Prado X x

Responsable
Cuadrilla 1 operarios
4 ayudantes
Residente
Ingeniero Asistente de Campo
Ingeniero Asistente de Campo
Ingeniero de Oficina Tecnica
Ingeniero de Instalaciones
Administración
Logística, Almacén
Prevencionista de Riesgo

Proveedor
Maestro de Obra

Capataz de IIEE
Capataz de IISS
FECHA: Aprobado por:
Firma:
ANALISIS DE RESTRICCIONES- ACABADOS

DESCRIPCION DE RESTRICCION

Tarrajeo a destiempo
Gran cantidad de polvo por falta de limpieza
EPPS, uso de casco, uniforme, guantes
Adquisición de herramientas: badilejo , balde
Incompatibilidad de planos
Desplome de la ultima hilada
EPPs: uso de casco, uniforme, guantes
Adquisición previa de materiales
Liberación de ambiente
Capacitación al personal
Gran cantidad de desmonte y polvo
Limpieza del ambiente
Contrapiso terminado
Ceramico para piso dañado

EPPs, uso de casco, uniforme y mascarilla


Retraso en la entrega del proveedor
Revisión estándares de calidad de pintura
Uso de brochas, rodillos, baldes, lija.
Tarrajeo interior
EPPs: uso de casco, uniforme, guantes
Pintado interior completo
Proceso incompleto: instalación de marcos y puertas sin cerradura
Limpieza del ambiente
Dimensiones de puertas inadecuadas

Retraso en la instalación de muebles de mármol


Colocación de y pintado y cerámico completo
Limpieza del ambiente
EPPs: uso de casco, uniforme, guantes y orejeras para cortado de mármol
Aparición de puntos de oxidos en las placas luego de realizao el empaste
EPPs: uso de casco, uniforme, guantes y orejeras para cortado de mármol
Pintura
EPPs: uso de casco, uniforme, botas
Adquisición de materiales
Retraso con la actividad de pintado

EPPs: uso de casco, botas, uniforme y guantes.


Capacitación al personal
Ubicación de puntos en el plano
Disponibilidad de accesorios : valvulas , codos Y T

EPPs: uso de casco, uniforme, guantes


Adquisición de materiales
Capacitación al personal
Liberación del ambiente
Medidas incorrectas en vanos

Llaves térmicas de baja calidad


Capacitación al personal
Liberación del ambiente
Culminación del tarrajeo, instalación de puertas,etc
Llegada a destiempo de materiales
Falta de capacitación del personal

Adquisición a destiempo de materiales


Termino de pintado
Liberación del Ambiente

Termino de pintado, contrapiso.


Adquisición de materiales a tiempo
Limpieza del ambiente

Culminación de todos los acabados


ADOS

RESPONSABLE FECHA DE ENTREGA

RR HH
Medio Ambiente (SSOMA).
PREVENCIONISTA
LOGISTICA

PROYECTISTA
LOGISTICA - SEGURIDAD
PREVENCIONISTA
PROVEEDOR
ING. DE CAMPO
PREVENCIONISTA
ING. DE CAMPO
ARQUITECTO

PREVENCIONISTA
PROVEEDOR
Área de Calidad
LOGISTICA
ING DE CAMPO
PREVENCIONISTA
ARQUITECTO
ARQUITECTO
PREVENCIONISTA
PROVEEDOR

RRHH
ARQUITECTO
PREVENCIONISTA
PREVENCIONISTA
RECURSOS HUMANOS
PREVENCIONISTA
ARQUITECTO
PREVENCIONISTA
LOGISTICA
RRHH

PREVENCIONISTA
PREVENCIONISTA
ING DE CAMPO
CONTRATISTA

PREVENCIONISTA
CONTRATISTA
PREVENCIONISTA / CONTRATISTA
PREVENCIONISTA
CONTRATISTA

CONTRATISTA
PREVENCIONISTA
PREVENCIONISTA
ARQUITECTO
PROVEEDOR
PREVENCIONISTA / CONTRATISTA

PROVEEDOR
ARQUITECTO
PREVENCIONISTA

ARQUITECTO
PROVEEDOR
PREVENCIONISTA

PREVENCIONISTA
x ACTIVIDAD PREDECESORA
ESPECIFICACIONES-ETC
ACTIVIDAD

MATERIALES
SEGURIDAD

PERSONAL
PLANOS -

EQUIPOS

ESPACIO
REVOQUES Y ENLUCIDOS
Responsable Sr. Chavez

X
Cuadrilla

X
1 operarios
3 ayudantes
MUROS Y TABIQUERIA

x
Responsable Sr. Almonacid

x
Cuadrilla

X
1 operarios
4 ayudantes

PISO/ PAVIMENTACION

x
Responsable Sr. Pereira
Cuadrilla 2 operarios
2 ayudantes
PINTURA INTERIORES X

Responsable Sr. Gomez


x

Cuadrilla 1 operarios
4 oficiales
MARCOS Y PUERTAS x

Responsable Sr. Acosta


x

Cuadrilla 1 operarios
2 ayudantes

MUEBLES
Responsable Sr. Aramburu
Cuadrilla 1 operarios
x

4 ayudantes
x

DESMACHE
X

Responsable Sr. Gonzales


Cuadrilla 1 operarios
3 ayudantes
TECHOS

X
Responsable Sr. Sawada

x
Cuadrilla 1 operario
2 ayudante

IIEE-IISS

X
Responsable Sr. Kosarev

x
Cuadrilla

X
2 operarios

X
1 ayudante

VIDRIOS x

Responsable Sr. Garavito

x
Cuadrilla 1 operarios
2 ayudantes

PLACAS, LLAVES TERMICAS


Responsable Sr. Lobaton

x
Cuadrilla 1 operarios
2 ayudantes
CERRAJERIA, PINTURA Y VANOS x
Responsable Sr. Cotrina
Cuadrilla 1 operarios
2 ayudantes

PAPEL MURAL X

Responsable Sr. Cisneros


Cuadrilla 1 operarios
4 ayudantes
PISO LAMINADO X

Responsable Sr. Quiñones


Cuadrilla 2 operarios
2 ayudantes

LIMPIEZA Sr. Prado


Responsable
Cuadrilla 1 operarios
4 ayudantes
Residente
Ingeniero Asistente de Campo
Ingeniero Asistente de Campo
Ingeniero de Oficina Tecnica
Ingeniero de Instalaciones
Administración
Logística, Almacén
Prevencionista de Riesgo

Proveedor
Maestro de Obra

Capataz de IIEE
Capataz de IISS
FECHA: Aprobado por:
Firma:
ANALISIS DE RESTRICCIONES- ACABADOS

DESCRIPCION DE RESTRICCION
VARIOS

Tarrajeo a destiempo
Uso de EPPs ( Casco, guantes, uniformes)
Adquisicion de herramientas ( badilejo,espatula,balde o recipiente mediano, etc)

Incompatibilidad de planos
Llegada de material a obra (tabiqueria, bolsas de cemento)
Liberacion de ambiente

Limpieza del ambiente

Uso de brochas, baldes, rodillos , etc


Revision de estandares de calidad de intura

Dimensiones de puertas inadecuadas


Retraso en el tiempo de inicio de la colocación de la puerta

Retraso en el inicio de la instalacion de los muebles de mármol


Muebles de postformado de color errado
Aparición de puntos de oxidos en las placas luego de realizao el empaste
Uso de EPPs, ademas de andamios, taburete
Retraso de pintado de techo

Instalacion de equipos sanitarios


Instalacion de tableros electronicos
Uso adecuado de EPPs ( Casco, guantes dielectricos,gafas de seguridad, botas de jebe, etc)
Instalacion de tuberias tanto para agua y desagüe como para la parte electrica

Retraso en la correcion de vanos


Falta de herramientas adecuadas para instalacion de ventanas

Llaves termicas de baja calidad

Llegada de materiales a destiempo

Llegada de materiales de obra

Llegada de pisos laminados

Residente
o Asistente de Campo
o Asistente de Campo
ro de Oficina Tecnica
niero de Instalaciones
Administración
Logística, Almacén
vencionista de Riesgo

veedor
Maestro de Obra

Capataz de IIEE
Capataz de IISS
Aprobado por:
Firma:
ADOS

RESPONSABLE FECHA DE ENTREGA

RECURSOS- HUMANOS
PREVENCIONISTA
LOGISTICA

PROYECTISTA
PROVEDOR
INGENIERO DE CAMPO

RECURSOS HUMANOS

LOGISTICA
AREA DE CALIDAD

PROVEEDOR
RECURSOS HUMANOS

RECURSOS HUMANOS
PROVEEDOR
RECURSOS HUMANOS
RECURSOS HUMANOS

PROVEDOR
LOGISTICA
LOGISTICA
RECURSOS HUMANOS

RECURSOS HUMANOS
LOGISTICA - CALIDAD

LOGISTICA- CALIDAD

PROVEDOR

PROVEDOR

PROVEDOR
ANAL

ESPECIFICACIONES-ETC
ACTIVIDAD

PREDECESORA
MATERIALES
SEGURIDAD

ACTIVIDAD
X PERSONAL
PLANOS -

EQUIPOS

ESPACIO
IIEE-IISS
Responsable Sr. Kosarev
Cuadrilla

X
2 operarios
1 ayudante
TECHOS
Responsable Sr. Nuñez

X
Cuadrilla
2 operarios
1 ayudante
VIDRIOS x

Responsable Sr. Garavito

x
Cuadrilla 1 operarios
2 ayudantes

PLACAS, LLAVES TERMICAS


Responsable Sr. Lobaton
x

Cuadrilla 1 operarios
2 ayudantes
CERRAJERIA, PINTURA Y VANOS
x

Responsable Sr. Cotrina


Cuadrilla 1 operarios
2 ayudantes

PAPEL MURAL X

Responsable Sr. Cisneros


Cuadrilla 1 operarios
4 ayudantes
PISO LAMINADO X

Responsable Sr. Quiñones


Cuadrilla 2 operarios
2 ayudantes
LIMPIEZA Sr. Prado X

Responsable
Cuadrilla 1 operarios
4 ayudantes
ENTREGA DE DPTOS. 1RA REVISION
2RA REVISION
3RA REVISION
Residente
Ingeniero Asistente de Campo
Ingeniero Asistente de Campo
Ingeniero de Oficina Tecnica
Ingeniero de Instalaciones
Administración
Logística, Almacén
Prevencionista de Riesgo

Proveedor
Maestro de Obra

Capataz de IIEE
Capataz de IISS
FECHA: Aprobado por:
Firma:
ANALISIS DE RESTRICCIONES- ACABADOS-SEMANA 10

DESCRIPCION DE RESTRICCION
VARIOS

Falta de personal

Uso adecuado de EPPs ( Casco, guantes dielectricos,gafas de seguridad, botas de jebe, etc)

Uso de EPPs, ademas de andamios, taburete

Retraso en la correcion de vanos


Falta de herramientas adecuadas para instalacion de ventanas

Llaves termicas de baja calidad

Llegada de materiales a destiempo

Llegada de materiales de obra

Llegada de pisos laminados


No se cuenta con el personal a tiempo

X Limpieza de la zona a entregar

Residente
o Asistente de Campo
o Asistente de Campo
ro de Oficina Tecnica
niero de Instalaciones
Administración
Logística, Almacén
vencionista de Riesgo

veedor
Maestro de Obra

Capataz de IIEE
Capataz de IISS
Aprobado por:
Firma:
SEMANA 10

RESPONSABLE FECHA DE ENTREGA

RECURSOS HUMANOS

LOGISTICA

LOGISTICA

RECURSOS HUMANOS
LOGISTICA - CALIDAD

LOGISTICA- CALIDAD

PROVEDOR

PROVEDOR

PROVEDOR
RECURSOS HUMANOS

LOGISTICA
PROCESO/SUB PROCESO/LUGAR …………………………………………………………
ACTIVIDAD DE TRABAJO …………………………………………………………

PROBABIL

INDICE DE PERSONAS EXPUESTAS (A)


TAREA PELIGRO RIESGO REQUISITO LEGAL

Revoques y Contrarer enfermedades


enlucidos Exposicion a sustancias pulmonares,daño a la D.L 42 Art 195 al 199 y
nocivas salud integral del trabajor 206 al 224 1

Muros / Fractura de huesos,


Tabiqueria golpes severos,daño D.L 42 Art 195 al 199 y
Golpe, caida de objetos irreversible 206 al 225 2
Pisos / Contacto con sustacias D.L 42 Art 195 al 199 y
Dermatitis, alergias.
Pavimentos nocivas 206 al 226 1

Pintura
interiores Exposicion a sustancias D.L 42 Art 195 al 199 y
nocivas Afecciones respiratorias 206 al 227 1
Marcos y Lesiones musculares, D.L 42 Art 195 al 199 y
puertas Golpe, choques golpes en el cuerpo 206 al 228 1

Muebles
D.L 42 Art 195 al 199 y
Golpes.caida de objetos Golpes, fracturas 206 al 229 2

IIEE Exposicion a descarga


Exposicion a contacto con electrica, golpes o D.L 42 Art 195 al 199 y
energia electrica fracturas 206 al 230 2
Contacto con temperaturas
IISS Quemaduras 2
extremas D.L 42 F ART. 195 al
199 y 206 al 224

Contacto con sustacias


Desmanche Dermatitis, alergias. D.L 42 F ART. 195 al 2
nocivas
199 y 206 al 224

Techos Caidas, cortes 2


Fractura de huesos,
golpes severos,daño D.L 42 F ART. 195 al
irreversible 199 y 206 al 224

Cerrajeria,
Laceraciones e
pintura Cortes. Golpes 1
infecciones D.L 42 F ART. 195 al
vanos
199 y 206 al 224

Cortes profundos de piel,


Vidrios Cortes , incrustaciones 1
heridas graves

D.L 42 F ART. 195 al


199 y 206 al 224

Placas llaves Exposicion al contacto con


1
termicas energia electrica

Exposicion a descarga D.L 42 F ART. 195 al


electrica 199 y 206 al 224

Papel mural Sobreesfuerzo Lesiones leves 1

D.L 42 F ART. 195 al


199 y 206 al 224

Piso Laceraciones e
Golpe,corte 2
laminado infecciones
D.L 42 F ART. 195 al
199 y 206 al 224
PROBABILIDAD
PROCEDIMIENTOS
INDICE PERSONAS EXPUESTAS EXISTENTES CAPACITACIÓN EXPOSICIÓN AL RI
Personal entrenado. Conoce el Al menos una vez al a
1 De 1 a 3 Existen son satisfactorias y peligro y lo previene
suficientes Esporadicamente (S
Personal parcialmente
entrenado, conoce el peligro Al menos una vez al
2 De 4 a 12 Existen parcialmente y no son pero no toma acciones de
satisfactorios o suficientes control
Eventualmente (
Personal no entrenado, no Al menos una vez al d
3 Mas de 12 conoce el peligro, no toma
No existen acciones de control Permanentement

RIESGO= PROBABILIDAD x CONSECUENCIA


VEL DE RIESGO= N° de Probabilidad X N° de Consecuencias
2
INDICE DE PROCEDIMIENTOS EXISTENTES (B)

2
2
2
2
2
2
1
INDICE DE CAPACITACIÓN C

1
1
1
1
1
1
PROBABILIDAD

2
2
1
1
1
2
1
INDICE DE EXPOSICIÓN AL RIESGO (D)

7
7
5
5
5
7
5
INDICE DE PROBABILIDAD (A+B+C+D)
………………………………………………….
………………………………………………….

1
INDICE DE SEVERIDAD

2
2
1
1
1
2
2 1 2 2
7

2 1 2 1
7

2 1 2 2

2 1 1 1
5

2 1 1 2

2 1 1 2

2 1 1 1

2 1 2 1

7
EXPOSICIÓN AL RIESGO SEVERIDAD (Consecuencia)
Al menos una vez al año (S) Lesión sin incapacidad (S)
Esporadicamente (SO) Disconfort/Incomodidad (SO)
Al menos una vez al mes (S) Lesión con incapacidad temporal (S)
Eventualmente (SO) Daño a la salud reversible
Al menos una vez al día (S) Lesión con incapacidad permanente (S)
Permanentemente (S) Daño a la salud irreversible
5
5
5
5
PROBABILIDAD X SEVERIDAD

14
14
14

M
M
M

TO
TO
TO
NIVEL DE RIESGO

TO

SI
SI
SI

NO
NO
NO
RIESGO SIGNIFICATIVO
NO
M SI
14

TO NO
7

M SI

14

TO NO
5

M SI

10

M SI

10

TO NO

TO NO

7
SEVERIDAD (Consecuencia)
Lesión sin incapacidad (S)
Disconfort/Incomodidad (SO)
Lesión con incapacidad temporal (S)
Daño a la salud reversible
Lesión con incapacidad permanente (S)
Daño a la salud irreversible
MEDIDAS DE CONTROL

Uso adecuado de
EPPs, uso de
mascarrillas
EPPs ( casco, botas
punta de acero,
guantes), SRCTR,
capitación, ATS
Uso de guantes de
cuero o jebe
Uso adecuado de
EPPs, uso de
mascarrillas
Uso de EPPs,
capacitacion

Uso de EPPs( botas


punta de acero), liberar
los espacios donde se
instalará los muebles
EPPs ( casco, botas
punta de acero,
guantes dielectricos),
SRCTR, capitación,
ATS
EPPs ( casco, botas
punta de acero,
guantes), SRCTR,
capitación, ATS
Uso adecuado de
EPPs, uso de
mascarrillas

EPPs (casco, guantes


de cuero, cinturón o
arnés de seguridad,
botas punta de acero),
SRCTR, Capacitación

EPP ( casco, guantes,


botines de cuero),
SRCTR, capacitación

EPPs ( lentes de
seguridad, guantes de
cuero), SRCTR,
Capacitación,
procedimiento de
trabajo, permiso de
trabajo, supervisión
permanente, ATS,
simulacros

EPPs ( casco, guantes


dielectricos, botas
punta de acero,
cinturón o arnés de
seguridad, gafas
panorámicas), SRCTR,
capacitación, ATS

EPPs ( casco, guantes


de jebe, botas punta de
acero, cinturón o arnés
de seguridad, gafas
panorámicas), SRCTR,
capacitación, ATS

EPPs ( casco, guantes


de jebe, botas punta de
acero, ), SRCTR,
capacitación, ATS
ESTIMACIÓN DEL NIVEL DE RIESGO

GRADO DE RIESGO PUNTAJE


Trivial (T) 4
Tolerable (TO) De 5 a 8
Moderado (M) De 9 a 16
Importante (IM) De 17 a 24
Intolerable (IT) De 25 a 36
MATRIZ DE IDENTIFICACIÓN DE PELIGROS

Contacto con energía electrica

Contacto con temperaturas


Contacto con sustancias
Plan de Seguridad, Salud

Caída de estructuras

Falta de Experiencia
y Medio Ambiente

Caidas a desnivel
Caída de objetos
Aplastamiento

Caídas de altura
Atrapamientos

Caídas a nivel
Alta presión

Derrumbes
existentes

Explosión
Atropello

extremas

Choques
nocivas

Cortes
Actividades
Movimiento de Tierras
1 Excavación manual y perfilado
2 Excavación masiva
3 Eliminación de desmonte
4 Anclaje para muro pantalla
Acero
5 Acero horizontal
6 Acero vertical
Carpintería
7 Encofrado y desencofrado
8 Armado de andamio
9 Colocación de ladrillos de techo
Concreto
10 Preparación de concreto
11 Vaciado de concreto con bomba
Mampostería
12 Muros de ladrillo
13 Tarrajeo de muros y cielos rasos
14 Solaqueos
Acabados
15 Colocación de enchapes y pisos
16 Colocación de vidrios y accesorios
17 Pintura
Instalaciones
18 Instalaciones eléctricas y sanitarias
19 Instalaciones mecánicas
Trabajos en caliente
20 Soldadura eléctrica
21 Corte, esmerilado y desbaste
22 Operaciones oxicoacetilénicas
Transporte vertical de material
23 Izaje con elevador de plataforma
ELIGROS
Inhalación de sustancias

Proyección de partículas
Ingestión de sustancias

Sobreesfuerzos
Incrustaciones

Tropezones
Volcaduras
Radiación
Incendio

Ruido
nocivas

nocivas
Golpes

Acero vertical
IIEEv
IISS v
Encofrado vertical
Concreto vertical
Encofrado de viga
Acero horizontal v
Encofrado de losa
Ladrillos de techo
Acero horizontal l
IIEE h

Concreto horizontal
Plan de Seguridad y EVALUACION DE RIESGOS
Ocupacional

19 Muros de Ladrillo

Caída de objetos Caidas a desnivel


Consecuencias

Consecuencias
Probabilidad Probabilidad
Baja Medio Alto Baja Medio Alto
Leve Tri To Mo Leve Tri To Mo
Moderado To Mo Imp Moderado To Mo Imp
Severa Mo Imp In Severa Mo Imp In

Caídas a nivel Caídas de altura


Consecuencias

Consecuencias
Probabilidad Probabilidad
Baja Medio Alto Baja Medio Alto
Leve Tri To Mo Leve Tri To Mo
Moderado To Mo Imp Moderado To Mo Imp
Severa Mo Imp In Severa Mo Imp In

Contacto con sustancias nocivas Inhalación de sustancias nocivas


Consecuencias

Consecuencias

Probabilidad Probabilidad
Baja Medio Alto Baja Medio Alto
Leve Tri To Mo Leve Tri To Mo
Moderado To Mo Imp Moderado To Mo Imp
Severa Mo Imp In Severa Mo Imp In

Proyección de partículas Tropezones


Probabilidad Probabilidad
Consecuencias

Consecuencias

Baja Medio Alto Baja Medio Alto


Leve Tri To Mo Leve Tri To Mo
Moderado To Mo Imp Moderado To Mo Imp
Severa Mo Imp In Severa Mo Imp In

EVALUACION DE RIESGOS

20 Tarrajeo de muros y cielos rasos

Caída de objetos Caidas a desnivel


Consecuencias

Consecuencias

Probabilidad Probabilidad
Baja Medio Alto Baja Medio Alto
Leve Tri To Mo Leve Tri To Mo
Moderado To Mo Imp Moderado To Mo Imp
Severa Mo Imp In Severa Mo Imp In

Caídas a nivel Caídas de altura


Consecuencias

Consecuencias

Probabilidad Probabilidad
Baja Medio Alto Baja Medio Alto
Leve Tri To Mo Leve Tri To Mo
Moderado To Mo Imp Moderado To Mo Imp
Severa Mo Imp In Severa Mo Imp In

Contacto con sustancias nocivas Cortes


Consecuencias

Consecuencias

Probabilidad Probabilidad
Baja Medio Alto Baja Medio Alto
Leve Tri To Mo Leve Tri To Mo
Consecuencias

Consecuencias
Moderado To Mo Imp Moderado To Mo Imp
Severa Mo Imp In Severa Mo Imp In
Inhalación de sustancias nocivas Proyección de partículas

Consecuencias

Consecuencias
Probabilidad Probabilidad
Baja Medio Alto Baja Medio Alto
Leve Tri To Mo Leve Tri To Mo
Moderado To Mo Imp Moderado To Mo Imp
Severa Mo Imp In Severa Mo Imp In

Tropezones
Consecuencias

Probabilidad
Baja Medio Alto
Leve Tri To Mo
Moderado To Mo Imp
Severa Mo Imp In
21 Solaqueos

Caída de objetos Caídas a desnivel


Consecuencias

Consecuencias
Probabilidad Probabilidad
Baja Medio Alto Baja Medio Alto
Leve Tri To Mo Leve Tri To Mo
Moderado To Mo Imp Moderado To Mo Imp
Severa Mo Imp In Severa Mo Imp In

Caídas a nivel Caídas de altura


Consecuencias

Consecuencias
Probabilidad Probabilidad
Baja Medio Alto Baja Medio Alto
Leve Tri To Mo Leve Tri To Mo
Moderado To Mo Imp Moderado To Mo Imp
Severa Mo Imp In Severa Mo Imp In

Contacto con sustancias nocivas Cortes


Consecuencias

Consecuencias
Probabilidad Probabilidad
Baja Medio Alto Baja Medio Alto
Leve Tri To Mo Leve Tri To Mo
Moderado To Mo Imp Moderado To Mo Imp
Severa Mo Imp In Severa Mo Imp In

Inhalación de sustancias nocivas Proyección de partículas


Consecuencias

Consecuencias

Probabilidad Probabilidad
Baja Medio Alto Baja Medio Alto
Leve Tri To Mo Leve Tri To Mo
Moderado To Mo Imp Moderado To Mo Imp
Severa Mo Imp In Severa Mo Imp In

Ruido Tropezones
Consecuencias

Consecuencias

Probabilidad Probabilidad
Baja Medio Alto Baja Medio Alto
Leve Tri To Mo Leve Tri To Mo
Moderado To Mo Imp Moderado To Mo Imp
Severa Mo Imp In Severa Mo Imp In
22 Colocación de enchapes y pisos

Consecuencias Caídas a nivel Contacto con sustancias nocivas

Consecuencias
Probabilidad Probabilidad
Baja Medio Alto Baja Medio Alto
Leve Tri To Mo Leve Tri To Mo
Moderado To Mo Imp Moderado To Mo Imp
Severa Mo Imp In Severa Mo Imp In

Cortes Golpes
Consecuencias

Consecuencias
Probabilidad Probabilidad
Baja Medio Alto Baja Medio Alto
Leve Tri To Mo Leve Tri To
Moderado To Mo Imp Moderado To Mo Imp
Severa Mo Imp In Severa Mo Imp In

Inhalación de sustancias nocivas Proyección de partículas


Consecuencias

Consecuencias
Probabilidad Probabilidad
Baja Medio Alto Baja Medio Alto
Leve Tri To Mo Leve Tri To Mo
Moderado To Mo Imp Moderado To Mo Imp
Severa Mo Imp In Severa Mo Imp In

Ruido Tropezones
Consecuencias

Consecuencias

Probabilidad Probabilidad
Baja Medio Alto Baja Medio Alto
Leve Tri To Mo Leve Tri To Mo
Moderado To Mo Imp Moderado To Mo Imp
Severa Mo Imp In Severa Mo Imp In

23 Colocación de vidrios y accesorios

Caída de objetos Caídas a nivel


Consecuencias

Consecuencias

Probabilidad Probabilidad
Baja Medio Alto Baja Medio Alto
Leve Tri To Mo Leve Tri To Mo
Moderado To Mo Imp Moderado To Mo Imp
Severa Mo Imp In Severa Mo Imp In

Caídas de altura Cortes


Consecuencias

Consecuencias

Probabilidad Probabilidad
Baja Medio Alto Baja Medio Alto
Leve Tri To Mo Leve Tri To Mo
Moderado To Mo Imp Moderado To Mo Imp
Severa Mo Imp In Severa Mo Imp In
EVALUACIÓN DE RIESGOS

Golpes Proyección de Partículas


Consecuencias

Consecuencias
Probabilidad Probabilidad
Baja Medio Alto Baja Medio Alto
Leve Tri To Mo Leve Tri To Mo
Moderado To Mo Imp Moderado To Mo Imp
Severa Mo Imp In Severa Mo Imp In

Tropezones
Consecuencias

Probabilidad
Baja Medio Alto
Leve Tri To Mo
Moderado To Mo Imp
Severa Mo Imp In

24 Pintura

Alta presión Caída de objetos


Consecuencias

Consecuencias

Probabilidad Probabilidad
Baja Medio Alto Baja Medio Alto
Leve Tri To Mo Leve Tri To Mo
Moderado To Mo Imp Moderado To Mo Imp
Severa Mo Imp In Severa Mo Imp In

Caídas a nivel Caídas de altura


Consecuencias

Consecuencias

Probabilidad Probabilidad
Baja Medio Alto Baja Medio Alto
Leve Tri To Mo Leve Tri To Mo
Moderado To Mo Imp Moderado To Mo Imp
Severa Mo Imp In Severa Mo Imp In
Contacto con sustancias nocivas Golpes

Consecuencias

Consecuencias
Probabilidad Probabilidad
Baja Medio Alto Baja Medio Alto
Leve Tri To Mo Leve Tri To Mo
Moderado To Mo Imp Moderado To Mo Imp
Severa Mo Imp In Severa Mo Imp In

Inhalación de sustancias nocivas Incendio


Consecuencias

Consecuencias
Probabilidad Probabilidad
Baja Medio Alto Baja Medio Alto
Leve Tri To Mo Leve Tri To Mo
Moderado To Mo Imp Moderado To Mo Imp
Severa Mo Imp In Severa Mo Imp In

Ingestión de sustancias nocivas Proyección de partículas


Consecuencias

Consecuencias
Probabilidad Probabilidad

Baja Medio Alto Baja Medio Alto


Leve Tri To Mo Leve Tri To Mo
Moderado To Mo Imp Moderado To Mo Imp
Severa Mo Imp In Severa Mo Imp In

Ruido Tropezones
Consecuencias

Consecuencias

Probabilidad Probabilidad
Baja Medio Alto Baja Medio Alto
Leve Tri To Mo Leve Tri To Mo
Moderado To Mo Imp Moderado To Mo Imp
Severa Mo Imp In Severa Mo Imp In

25 Instalaciones eléctricas y sanitarias

Atrapamientos Caída de objetos


Consecuencias

Consecuencias

Probabilidad Probabilidad
Baja Medio Alto Baja Medio Alto
Leve Tri To Mo Leve Tri To Mo
Moderado To Mo Imp Moderado To Mo Imp
Severa Mo Imp In Severa Mo Imp In

Caídas a desnivel Caídas a nivel


Consecuencias

Consecuencias

Probabilidad Probabilidad
Baja Medio Alto Baja Medio Alto
Leve Tri To Mo Leve Tri To Mo
Moderado To Mo Imp Moderado To Mo Imp
Severa Mo Imp In Severa Mo Imp In

EVALUACION DE RIESGOS

Caídas de altura Contacto con temperaturas extremas


Consecuencias

ConsecuenciasConsecuencias

Probabilidad Probabilidad
Baja Medio Alto Baja Medio Alto
Leve Tri To Mo Leve Tri To Mo
Moderado To Mo Imp Moderado To Mo Imp
Severa Mo Imp In Severa Mo Imp In

Explosión Inhalación de sustancias nocivas


Consecuencias

Probabilidad Probabilidad
Baja Medio Alto Baja Medio Alto
Leve Tri To Mo Leve Tri To Mo
Moderado To Mo Imp Moderado To Mo Imp
Severa Mo Imp In Severa Mo Imp In
Consecuencias Incendio Sobreesfuerzos

Consecuencias
Probabilidad Probabilidad
Baja Medio Alto Baja Medio Alto
Leve Tri To Mo Leve Tri To Mo
Moderado To Mo Imp Moderado To Mo Imp
Severa Mo Imp In Severa Mo Imp In

Tropezones
Consecuencias

Probabilidad
Baja Medio Alto
Leve Tri To Mo
Moderado To Mo Imp
Severa Mo Imp In

26 Instalaciones mecánicas

Atrapamientos Caída de objetos


Consecuencias

Consecuencias
Probabilidad Probabilidad
Baja Medio Alto Baja Medio Alto
Leve Tri To Mo Leve Tri To Mo
Moderado To Mo Imp Moderado To Mo Imp
Severa Mo Imp In Severa Mo Imp In

Caídas a desnivel Caídas a nivel


Consecuencias

Consecuencias

Probabilidad Probabilidad
Baja Medio Alto Baja Medio Alto
Leve Tri To Mo Leve Tri To Mo
Moderado To Mo Imp Moderado To Mo Imp
Severa Mo Imp In Severa Mo Imp In

EVALUACION DE RIESGOS

Caídas de altura Contacto con temperaturas extremas


Consecuencias

Consecuencias

Probabilidad Probabilidad
Baja Medio Alto Baja Medio Alto
Leve Tri To Mo Leve Tri To Mo
Moderado To Mo Imp Moderado To Mo Imp
Severa Mo Imp In Severa Mo Imp In

Explosión Inhalación de sustancias nocivas


Consecuencias

Consecuencias

Probabilidad Probabilidad
Baja Medio Alto Baja Medio Alto
Leve Tri To Mo Leve Tri To Mo
Moderado To Mo Imp Moderado To Mo Imp
Severa Mo Imp In Severa Mo Imp In

Incendio Sobreesfuerzos
Consecuencias

Consecuencias

Probabilidad Probabilidad
Baja Medio Alto Baja Medio Alto
Leve Tri To Mo Leve Tri To Mo
Moderado To Mo Imp Moderado To Mo Imp
Severa Mo Imp In Severa Mo Imp In

Tropezones
Consecuencias

Probabilidad
Baja Medio Alto
Leve Tri To Mo
Moderado To Mo Imp
Severa Mo Imp In
PARTIDAS

REVOQUES/ENLU
CIDOS

MUROS /
TABIQUERIA

TREN 01 SSHH,COCINA,LAVANDERIA,PATIO,TERRAZA

MUROS /
TABIQUERIA

PISOS /
PAVIMENT.

PINTURA
INTERIORES

MARCOS Y
PUERTAS

MUEBLES

IIEE IISS
MUEBLES

DESMANCHE

TREN 02 DORMITORIOS, SALA, COMEDOR

PISOS /
PAVIMENT.

PINTURA
INTERIORES

MARCOS Y
PUERTAS

IIEE IISS

TECHOS

CERRAJERIA,
PINTURA VANOS

VIDRIOS

DESMANCHE

PLACAS LLAVES
TERMICAS
PAPEL MURAL

PISO LAMINADO

ITEM
IND
CG
CC
CUE
CAE
CD
TAREAS

SOLAQUEO DE MUROS

LIMPIEZA PARA TRAZO / TRAZO DE TABIQUERIA Y SARDINELES

COLOCACION DE ACERO DE ANCLAJE / IIEE E IISS

ASENTADO DE LADRILLO

COLOCACION DE MEZCLADORES / SOLAQUEO, DERRAMES,BRU;AS / SONDEO DE IIEE E IISS

PROTOCOLO DE ALBANILERIA / 1RA REVISION


REN 01 SSHH,COCINA,LAVANDERIA,PATIO,TERRAZA

TRAZO DE NIVELES / ENCOFRADO Y CONCRETO DE SARDINEL DE DUCHA

PROTOCOLO DE ALBANILERIA / 2DA REVISION

RECTIFICACION DE PISOS / TRAZO Y REPLANTEO

SOLAQUEO DE TECHOS

PRUEBA DE PRESION HIDRAULICA / DE SOLAQUEO 1RA Y 2DA REVISION

PROTOCOLO DE SOLAQUEO / 1RA REVISION / 2DA REVISION

ZOCALOS,CONTRAZOCALOS CERAMICOS / PISOS CERAMICOS

PROTOCOLO DE CERAMICOS / 1RA REVISION

LEVANTAMIENTO DE OBS. EN PISOS CERAMICOS

PROTOCOLO DE CERAMICOS / 2DA REVISION

BLANQUEADO DE MUROS Y TECHOS DE SSHH,COCINAS,LAV.

EMPASTE GRUESO Y LIJADO DE MUROS Y TECHOS DE SSHH.COCINA,LAV.

EMPASTE FINO Y LIJADO EN MUROS Y TECHOS / SELLADO DE MUROS Y TECHOS

PROTOCOLO DE SUPERF. PARA ESCARCHADO DE PINTURA

PRIMERA MANO DE PINTURA EN MUROS Y TECHOS

PROTOCOLO DE PINTURA EN MUROS Y TECHOS / 1RA REVISION

CABLEADO ELECTRICO DE DPTOS. / INST. DE MARCOS DE PUERTAS / INST. DE MARCOS DE ALUMINIO DE VENTANAS / COLOCACION DE BISAGRAS Y

PROTOCOLO DE MEGADO

PROTOCOLO DE PINTURA EN MUROS Y TECHOS / 2DA REVISION

INSTALACION DE MARCOS Y RIELES DE MAMPARAS DE VIDRIO

INSTALACION DE MUEBLES DE COCINA / INSTALACION DE MUEBLES DE SSHH

PROTOCOLO DE INS. DE MOBILIARIO DE COCINA Y SSHH / 1RA REVISION

COLOCACION E INSTALACION DE TABLEROS Y SUB TABLEROS / CABLEADO DE ALIMENTADORES

INSTALACION DE APARATOS SANITARIOS *INODORO,DUCHA,LAVADERO

PROTOCOLO DE INSTALACION DE APARATOS SANITARIOS

PRUEBAS Y REPARACIONES
COLOCACION DE TABLERO POST.FORMADO / COLOCACION DE TABLERO DURO DE MARMOL

PROTOCOLO DE INS. DE MOBILIARIO DE COCINA Y SSHH / 2DA REVISION

DESMANCHE DE TECHOS / SEGUNDA MANO DE TECHOS

CARPINTERIA METALICA: BARANDAS DE TERRAZAS


REN 02 DORMITORIOS, SALA, COMEDOR
CARPINTERIA METALICA: BARANDAS DE ESCALERAS

RECTIFICACION DE PISOS / TRAZO Y REPLANTEO

SOLAQUEO EN TECHOS

PROTOCOLO DE SOLAQUEO / 1RA REVISION

PROTOCOLO DE SOLAQUEO / 2DA REVISION

BLANQUEADO DE MUROS Y TECHOS DE DORMITORIOS,SALA/COMEDOR

EMPASTE GRUESO Y LIJADO DE MUROS Y TECHOS DE DORMITORIOS,SALA/COMEDOR

EMPASTE FINO Y LIJADO EN MUROS Y TECHOS / SELLADO DE MUROS Y TECHOS

PROTOCOLO DE SUPERF. PARA COLOCACION DE PAPEL MURAL

PROTOCOLO DE PINTURA EN MUROS Y TECHOS / 1RA REVISION

CABLEADO ELECTRICO DE DPTOS. / INST. DE MARCOS DE PUERTAS / INST. DE MARCOS DE ALUMINIO DE VENTANAS / COLOCACION DE BISAGRAS Y

PROTOCOLO DE MEGADO

PROTOCOLO DE PINTURA EN MUROS Y TECHOS / 2DA REVISION

COLOCACION E INSTALACION DE TABLEROS Y SUB TABLEROS / CABLEADO DE ALIMENTADORES

INSTALACION DE APARATOS SANITARIOS *INODORO,DUCHA,LAVADERO

PROTOCOLO DE INSTALACION DE APARATOS SANITARIOS

PRUEBAS Y REPARACIONES

ESCARCHADO DE TECHOS

PROTOCOLO DE ESCARCHADO DE TECHOS / 1RA REVISION

PROTOCOLO DE ESCARCHADO DE TECHOS / 2DA REVISION

PROTOCOLO DE INSTALACION DE PUERTAS / 2DA REVISION

PRIMERA MANO DE PINTURA EN MARCOS Y HOJAS

SEGUNDA MANO DE PINTURA EN MARCOS Y HOJAS

COLOCACION DE VIDRIOS EN VENTANAS / COLOCACION DE VIDRIO TEMPLADO EN MAMPARAS Y BALCONES

PROTOCOLO DE PINTURA DE PUERTAS / 1RA REVISION

PROTOCOLO DE COLOCACION DE VIDRIOS

DESMANCHE DE MUROS / SEGUNDA MANO DE MUROS

PROTOCOLO DE PINTURA DE PUERTAS / 2DA REVISION

INSTALACION DE PLACAS / INSTALACION DE LLAVES TERMICAS

PROTOCOLO DE PILOTAJE

PROTOCOLO DE PRUEBAS DE INTERCOMUNICADORES


COLOCACION E INSTALACION DE PAPEL MURAL

PROTOCOLO DE PAPEL MURAL / 1RA REVISION

PROTOCOLO DE PAPEL MURAL / 2DA REVISION

COLOCACION E INSTALACION DE PISOS LAMINADOS

PROTOCOLO DE PISOS LAMINADOS / 1RA REVISION

COLOCACION DE CONTRAZOCALOS DE MADERA+RODON / COLOCACION DE TAPAJUNTAS / COLOCACION DE TOPES DE PUERTAS

PROTOCOLO DE CONTRAZOCALOS / 1RA REVISION

PROTOCOLO DE PISOS LAMINADOS Y CONTRAZOCALOS / 2DA REVISION

Leyenda
Inducción
Charla General
Curso Capataz
Curso Especial
Capacitación Específica
Charla Diaria
Lun Mar Mié Jue

31/03/2014 01/04/2014 02/04/2014 03/04/2014


SEM 1
Vie Sáb Dom Lun Mar Mié

04/04/2014 05/04/2014 06/04/2014 07/04/2014 08/04/2014 09/04/2014


IND CC CUE
IND CC CUE
IND CC CUE
IND CC CUE
IND CC CUE
IND CC CUE

IND CC CUE
IND CC CUE
IND CC CUE
IND CC CUE
IND CC CUE
IND CC CUE
IND CC CUE
IND CC CUE
IND CC CUE
IND CC CUE
IND CC
IND CC
IND CC
IND CC
IND CC
IND CC
IND CC
IND CC
IND CC
IND CC
IND CC CUE
IND CC CUE
IND CC CUE
IND CC CUE
IND CC CUE
IND CC CUE
IND CC CUE
IND CC CUE
IND CC
IND CC

IND CC CUE
IND CC CUE
IND CC CUE
IND CC CUE
IND CC CUE
IND CC
IND CC
IND CC
IND CC
IND CC
IND CC CUE
IND CC CUE
IND CC CUE
IND CC CUE
IND CC CUE
IND CC CUE
IND CC CUE
IND CC
IND CC
IND CC
IND CC
IND CC
IND CC
IND CC CUE
IND CC CUE
IND CC CUE
IND CC
IND CC
IND CC CUE
IND CC CUE
IND CC CUE
IND CC
IND CC
IND CC CUE
IND CC CUE
IND CC CUE
IND CC CUE
IND CC CUE
IND CC CUE

* CHARLA DIARIA TODOS LOS DÍAS


SEM 1 SEM 2
Jue Vie Sáb Dom Lun Mar

10/04/2014 11/04/2014 12/04/2014 13/04/2014 14/04/2014 15/04/2014


CAE CG IND
CAE CG IND
CAE CG IND
CAE CG IND
CAE CG IND
CAE CG IND

CAE CG IND
CAE CG IND
CAE CG IND
CAE CG IND
CAE CG IND
CAE CG IND
CAE CG IND
CAE CG IND
CAE CG IND
CAE CG IND
CG CAE IND CUE
CG CAE IND CUE
CG CAE IND CUE
CG CAE IND CUE
CG CAE IND CUE
CG CAE IND CUE
CG CAE IND CUE
CG CAE IND CUE
CG CAE IND CUE
CG CAE IND CUE
CAE CG IND
CAE CG IND
CAE CG IND
CAE CG IND
CAE CG IND
CAE CG IND
CAE CG IND
CAE CG IND
CG CAE IND CUE
CG CAE IND CUE

CAE CG IND
CAE CG IND
CAE CG IND
CAE CG IND
CAE CG IND
CG CAE IND CUE
CG CAE IND CUE
CG CAE IND CUE
CG CAE IND CUE
CG CAE IND CUE
CG CAE IND
CG CAE IND
CG CAE IND
CAE CG IND
CAE CG IND
CAE CG IND
CAE CG IND
CG CAE IND CUE
CG CAE IND CUE
CG CAE IND CUE
CG CAE IND CUE
CG CAE IND CUE
CG CAE IND CUE
CAE CG IND
CAE CG IND
CAE CG IND
CG CAE IND CUE
CG CAE IND CUE
CAE CG IND
CAE CG IND
CAE CG IND
CG CAE IND CUE
CG CAE IND CUE
CAE IND
CAE IND
CAE IND
CAE IND
CAE IND
CAE IND
SEM 3
Mié Jue Vie Sáb Dom Lun Mar

16/04/2014 17/04/2014 18/04/2014 19/04/2014 20/04/2014 21/04/2014 22/04/2014


CAE CG IND
CAE CG IND
CAE CG IND
CAE CG IND
CAE CG IND
CAE CG IND

CAE CG IND
CAE CG IND
CAE CG IND
CAE CG IND
CG CAE IND
CG CAE IND
CG CAE IND
CG CAE IND
CG CAE IND
CG CAE IND
CAE CG IND
CAE CG IND
CAE CG IND
CAE CG IND
CAE CG IND
CAE CG IND
CAE CG IND
CAE CG IND
CAE CG IND
CAE CG IND
CAE CG IND
CAE CG IND
CAE CG IND
CAE CG IND
CAE CG IND
CAE CG IND
CAE CG IND
CAE CG IND
CG CAE IND
CG CAE IND

CAE CG IND
CAE CG IND
CAE CG IND
CAE CG IND
CAE CG IND
CG CAE IND
CG CAE IND
CG CAE IND
CG CAE IND
CG CAE IND
CG CAE IND
CG CAE IND
CG CAE IND
CAE CG IND
CAE CG IND
CAE CG IND
CAE CG IND
CAE CG IND
CAE CG IND
CG CAE IND
CG CAE IND
CG CAE IND
CG CAE IND
CAE CG IND
CAE CG IND
CAE CG IND
CG CAE IND
CG CAE IND
CAE CG IND
CAE CG IND
CAE CG IND
CG CAE IND
CG CAE IND
CAE CG IND
CAE CG IND
CAE CG IND
CAE CG IND
CAE CG IND
CAE CG IND
SEM 4
Mié Jue Vie Sáb Dom Lun Mar

23/04/2014 24/04/2014 25/04/2014 26/04/2014 27/04/2014 28/04/2014 29/04/2014


CUE CAE CG IND
CUE CAE CG IND
CUE CAE CG IND
CUE CAE CG IND
CUE CAE CG IND
CUE CAE CG IND

CUE CAE CG IND


CUE CAE CG IND
CUE CAE CG IND
CUE CAE CG IND
CUE CAE CG IND
CUE CAE CG IND
CUE CAE CG IND
CUE CAE CG IND
CUE CAE CG IND
CUE CAE CG IND
CAE CG IND CUE
CAE CG IND CUE
CAE CG IND CUE
CAE CG IND CUE
CAE CG IND CUE
CAE CG IND CUE
CAE CG IND CUE
CAE CG IND CUE
CAE CG IND CUE
CAE CG IND CUE
CUE CAE CG IND
CUE CAE CG IND
CUE CG CAE IND
CUE CG CAE IND
CUE CG CAE IND
CUE CAE CG IND
CUE CAE CG IND
CUE CAE CG IND
CG IND CUE
CG IND CUE

CUE CAE CG IND


CUE CAE CG IND
CUE CAE CG IND
CUE CAE CG IND
CUE CAE CG IND
CAE CG IND CUE
CAE CG IND CUE
CAE CG IND CUE
CAE CG IND CUE
CAE CG IND CUE
CUE CAE CG IND
CUE CAE CG IND
CUE CAE CG IND
CUE CAE CG IND
CUE CAE CG IND
CUE CAE CG IND
CUE CAE CG IND
CG CAE IND CUE
CG CAE IND CUE
CG CAE IND CUE
CG CAE IND CUE
CG CAE IND CUE
CG CAE IND CUE
CUE CAE CG IND
CUE CAE CG IND
CUE CAE CG IND
CG CAE IND CUE
CG CAE IND CUE
CUE CAE CG IND
CUE CAE CG IND
CUE CAE CG IND
CG CAE IND CUE
CG CAE IND CUE
CUE CAE CG IND
CUE CAE CG IND
CUE CAE CG IND
CUE CAE CG IND
CUE CAE CG IND
CUE CAE CG IND
SEM 5
Mié Jue Vie Sáb Dom Lun Mar Mié

30/04/2014 01/05/2014 02/05/2014 03/05/2014 04/05/2014 05/05/2014 06/05/2014 07/05/2014


CAE CG IND CC CUE
CAE CG IND CC CUE
CAE CG IND CC CUE
CAE CG IND CC CUE
CAE CG IND CC CUE
CAE CG IND CC CUE

CAE CG IND CC CUE


CAE CG IND CC CUE
CAE CG IND CC CUE
CAE CG IND CC CUE
CAE CG IND CC CUE
CAE CG IND CC CUE
CAE CG IND CC CUE
CAE CG IND CC CUE
CAE CG IND CC CUE
CAE CG IND CC CUE
CAE CG IND CC
CAE CG IND CC
CAE CG IND CC
CAE CG IND CC
CAE CG IND CC
CAE CG IND CC
CAE CG IND CC
CAE CG IND CC
CAE CG IND CC
CAE CG IND CC
CAE CG IND CC CUE
CAE CG IND CC CUE
CAE CG IND CC CUE
CAE CG IND CC CUE
CAE CG IND CC CUE
CAE CG IND CC CUE
CAE CG IND CC CUE
CAE CG IND CC CUE
CAE CG IND CC
CAE CG IND CC

CAE CG IND CC CUE


CAE CG IND CC CUE
CAE CG IND CC CUE
CAE CG IND CC CUE
CAE CG IND CC CUE
CAE CG IND CC
CAE CG IND CC
CAE CG IND CC
CAE CG IND CC
CAE CG IND CC
CG CAE IND CC CUE
CG CAE IND CC CUE
CG CAE IND CC CUE
CAE CG IND CC CUE
CAE CG IND CC CUE
CAE CG IND CC CUE
CAE CG IND CC CUE
CAE CG IND CC
CAE CG IND CC
CAE CG IND CC
CAE CG IND CC
CAE CG IND CC
CAE CG IND CC
CAE CG IND CC CUE
CAE CG IND CC CUE
CAE CG IND CC CUE
CAE CG IND CC
CAE CG IND CC
CAE CG IND CC CUE
CAE CG IND CC CUE
CAE CG IND CC CUE
CAE CG IND CC
CAE CG IND CC
CAE CG IND CC CUE
CAE CG IND CC CUE
CAE CG IND CC CUE
CAE CG IND CC CUE
CAE CG IND CC CUE
CAE CG IND CC CUE
SEM 5 SEM 6
Jue Vie Sáb Dom Lun Mar Mié

08/05/2014 09/05/2014 10/05/2014 11/05/2014 12/05/2014 13/05/2014 14/05/2014


CAE CG IND
CAE CG IND
CAE CG IND
CAE CG IND
CAE CG IND
CAE CG IND

CG CAE IND
CG CAE IND
CAE CG IND
CAE CG IND
CAE CG IND
CAE CG IND
CAE CG IND
CAE CG IND
CAE CG IND
CAE CG IND
CAE CG IND CUE
CAE CG IND CUE
CAE CG IND CUE
CAE CG IND CUE
CAE CG IND CUE
CAE CG IND CUE
CAE CG IND CUE
CAE CG IND CUE
CAE CG IND CUE
CAE CG IND CUE
CAE CG IND
CAE CG IND
CAE CG IND
CAE CG IND
CAE CG IND
CAE CG IND
CAE CG IND
CAE CG IND
CG CAE IND CUE
CG CAE IND CUE

CAE CG IND
CAE CG IND
CAE CG IND
CAE CG IND
CAE CG IND
CAE CG IND CUE
CAE CG IND CUE
CAE CG IND CUE
CAE CG IND CUE
CAE CG IND CUE
CAE CG IND
CAE CG IND
CAE CG IND
CAE CG IND
CAE CG IND
CAE CG IND
CAE CG IND
CAE CG IND CUE
CAE CG IND CUE
CAE CG IND CUE
CAE CG IND CUE
CAE CG IND CUE
CAE CG IND CUE
CAE CG IND
CAE CG IND
CAE CG IND
CAE CG IND CUE
CAE CG IND CUE
CAE CG IND
CAE CG IND
CAE CG IND
CAE CG IND CUE
CAE CG IND CUE
CG CAE IND
CG CAE IND
CG CAE IND
CG CAE IND
CG CAE IND
CG CAE IND
SEM 6 SEM 7
Jue Vie Sáb Dom Lun Mar Mié

15/05/2014 16/05/2014 17/05/2014 18/05/2014 19/05/2014 20/05/2014 21/05/2014


CAE CG IND
CAE CG IND
CAE CG IND
CAE CG IND
CAE CG IND CUE
CAE CG IND CUE

CAE CG IND CUE


CAE CG IND CUE
CAE CG IND CUE
CAE CG IND CUE
CAE CG IND CUE
CAE CG IND CUE
CAE CG IND CUE
CAE CG IND CUE
CAE CG IND CUE
CAE CG IND CUE
CAE CG IND
CAE CG IND
CAE CG IND
CAE CG IND
CAE CG IND
CAE CG IND
CAE CG IND
CAE CG IND
CAE CG IND
CAE CG IND
CG CAE IND CUE
CG CAE IND CUE
CAE CG IND CUE
CAE CG IND CUE
CAE CG IND CUE
CAE CG IND CUE
CAE CG IND CUE
CAE CG IND CUE
CAE CG IND
CAE CG IND
CG
CAE CG IND CUE
CAE CG IND CUE
CAE CG IND CUE
CAE CG IND CUE
CAE CG IND CUE
CAE CG IND
CAE CG IND
CAE CG IND
CAE CG IND
CAE CG IND
CAE CG IND CUE
CAE CG IND CUE
CAE CG IND CUE
CAE CG IND CUE
CAE CG IND CUE
CAE CG IND CUE
CAE CG IND CUE
CG CAE IND
CG CAE IND
CAE CG IND
CAE CG IND
CAE CG IND
CAE CG IND
CAE CG IND CUE
CAE CG IND CUE
CAE CG IND CUE
CAE CG IND
CAE CG IND
CAE CG IND CUE
CAE CG IND CUE
CAE CG IND CUE
CAE CG IND
CAE CG IND
CAE CG IND CUE
CAE CG IND CUE
CAE CG IND CUE
CAE CG IND CUE
CAE CG IND CUE
CAE CG IND CUE
SEM 7 SEM 8
Jue Vie Sáb Dom Lun Mar Mié Jue

22/05/2014 23/05/2014 24/05/2014 25/05/2014 26/05/2014 27/05/2014 28/05/2014 29/05/2014

CAE CG IND
CAE CG IND
CAE CG IND
CAE CG IND
CAE CG IND
CAE CG IND
CAE CG IND
CAE CG IND
CAE CG IND
CAE CG IND
CAE CG IND
CAE CG IND
CAE CG IND CUE
CAE CG IND CUE
CAE CG IND CUE
CAE CG IND CUE
CAE CG IND
CAE CG IND
CAE CG IND CAE
CAE CG IND CAE
CAE CG IND CAE
CAE CG IND CAE
CAE CG IND CAE
CAE CG IND CAE
CAE CG IND CUE CG
CAE CG IND CUE CG

CAE CG IND CAE


CAE CG IND CAE
CAE CG IND CAE
CAE CG IND CAE
CAE CG IND CAE
CAE CG IND CUE CAE
CAE CG IND CUE CAE
CAE CG IND CUE CAE
CAE CG IND CUE CAE
CAE CG IND CUE CAE
CAE CG IND CAE
CAE CG IND CAE
CAE CG IND CAE
CAE CG IND CAE
CAE CG IND CAE
CAE CG IND CAE
CAE CG IND CAE
CAE CG IND CUE CAE
CAE CG IND CUE CAE
CAE CG IND CUE CAE
CAE CG IND CUE CAE
CAE CG IND CUE CAE
CAE CG IND CUE CAE
CAE CG IND CAE
CAE CG IND CAE
CAE CG IND CAE
CAE CG IND CUE CG
CAE CG IND CUE CG
CAE CG IND CG
CAE CG IND CG
CAE CG IND CG
CAE CG IND CUE CG
CAE CG IND CUE CG
CAE CG IND CAE
CAE CG IND CAE
CAE CG IND CAE
CAE CG IND CAE
CAE CG IND CAE
CAE CG IND CAE
SEM 9
Vie Sáb Dom Lun Mar Mié Jue Vie

30/05/2014 31/05/2014 01/06/2014 02/06/2014 03/06/2014 04/06/2014 05/06/2014 06/06/2014

CG IND
CG IND
CG IND
CAE IND CC
CAE IND CC

CG IND CC
CG IND CC
CG IND CC
CG IND CC CUE
CG IND CC CUE
CG IND CC
CG IND CC
CG IND CC
CG IND CC CAE
CG IND CC CAE
CG IND CC CUE CAE
CG IND CC CUE CAE
CG IND CC CUE CAE
CG IND CC CUE CAE CG
CG IND CC CUE CAE CG
CG IND CC CUE CAE CG
CG IND CC CUE CAE CG
CG IND CC CG CAE
CG IND CC CG CAE
CG IND CC CAE CG
CG IND CC CAE CG
CG IND CC CAE CG
CG IND CC CAE CG
CG IND CC CUE CAE CG
CG IND CC CUE CAE CG
CG IND CC CUE CAE CG
CAE IND CC CAE CG
CAE IND CC CAE CG
CAE IND CC CUE CAE CG
CAE IND CC CUE CAE CG
CAE IND CC CUE CAE CG
CAE IND CC CAE CG
CAE IND CC CAE CG
CG IND CC CUE CAE CG
CG IND CC CUE CAE CG
CG IND CC CUE CAE CG
CG IND CC CUE CAE CG
CG IND CC CUE CAE CG
CG IND CC CUE CAE CG
SEM 10
Sáb Dom Lun Mar Mié Jue Vie Sáb

07/06/2014 08/06/2014 09/06/2014 10/06/2014 11/06/2014 12/06/2014 13/06/2014 14/06/2014


IND
IND
IND
IND
IND
IND
IND
IND
IND
IND
IND
IND
IND
IND
IND
IND
IND
IND
IND
IND
IND
IND
IND
IND
IND
IND
1 2 3 4 5 6 7 8 9 10 11 12 13 14
DESCRIPCION Mon Tue Wen Thu Fri Sat Sun Mon Tue Wen Thu Fri Sat Sun
7/4 8/4 9/4 10/4 11/4 12/4 13/4 14/4 15/4 16/4 17/4 18/4 19/4 20/4

Casco color 3 8 8 8 3 4 4 4 3 3
Barbiquejo 3 8 8 8 3 4 4 4 3 3
Lentes luna clara 3 8 8 8 3 7 12 12 11 6
Guantes jebe 3 8 8 8 3 4 4 4 3 3
Guantes dieléctrico 3
tapones descartables
Mascarilla 4 4 4 4 4
Zap. Cat pta de acero 3 8 8 8 3 4 4 4 3 3
uniforme 3 8 8 8 3 4 4 4 3 3
Arnés

Leyenda
Casco color
Barbiquejo
Lentes luna clara
Guantes jebe
Guantes dieléctrico
tapones descartables
Mascarilla
Zap. Cat pta de acero
uniforme
Arnés
15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33

Mon Tue Wen Thu Fri Sat Sun Mon Tue Wen Thu Fri Sat Sun Mon Tue Wen Thu Fri
21/4 22/4 23/4 24/4 25/4 26/4 27/4 28/4 29/4 30/4 1/5 2/5 3/5 4/5 5/5 6/5 7/5 8/5 9/5

3 2 3 4 4 3 7 2 9 4
3 2 3 4 4 3 7 2 9 4
10 14 15 15 10 13 21 17 24 14 13 21 17 24 14
3 2 3 4 4 3 7 2 9 4 3 8 8 8 3
3 5

4 4 4 8 8 8 8 8 8 8 8 8 8 8 8
3 2 3 4 4 3 7 2 9 4
3 2 3 4 4 3 7 2 9 4
34 35 36 37 38 39 40 41 42 43 44 45 46 47 48 49 50 51 52 53

Sat Sun Mon Tue Wen Thu Fri Sat Sun Mon Tue Wen Thu Fri Sat Sun Mon Tue Wen Thu
10/5 11/5 12/5 13/5 14/5 15/5 16/5 17/5 18/5 19/5 20/5 21/5 22/5 23/5 24/5 25/5 26/5 27/5 28/5 29/5

13 21 17 24 14 13 21 17 24 14 10 17 13 21
4 4 4 3 3 3 2 3 4 4 3 7 2 9
3 3 5

8 8 8 8 8 8 8 8 8 8 8 8 8 8
54 55 56 57 58 59 60 61 62 63 64 65 66 67

Fri Sat Sun Mon Tue Wen Thu Fri Sat Sun Mon Tue Wen Thu
30/5 31/5 1/6 2/6 3/6 4/6 5/6 6/6 7/6 8/6 9/6 10/6 11/6 12/6

11 7 13 10 14 8 3 10 3 4
4 3 8 8 8 3 4 4 4 3

8 4 4 4 4 4
PARTIDAS

REVOQUES/ENLU
CIDOS

MUROS /
TABIQUERIA

TREN 01 SSHH,COCINA,LAVANDERIA,PATIO,TERRAZA

MUROS /
TABIQUERIA

PISOS /
PAVIMENT.

PINTURA
INTERIORES

MARCOS Y
PUERTAS

MUEBLES

IIEE IISS
MUEBLES

DESMANCHE

TREN 02 DORMITORIOS, SALA, COMEDOR

PISOS /
PAVIMENT.

PINTURA
INTERIORES

MARCOS Y
PUERTAS

IIEE IISS

TECHOS

CERRAJERIA,
PINTURA VANOS

VIDRIOS

DESMANCHE

PLACAS LLAVES
TERMICAS
PAPEL MURAL

PISO LAMINADO

ITEM
ID
IP
IE
AI
AE
TAREAS

SOLAQUEO DE MUROS

LIMPIEZA PARA TRAZO / TRAZO DE TABIQUERIA Y SARDINELES

COLOCACION DE ACERO DE ANCLAJE / IIEE E IISS

ASENTADO DE LADRILLO

COLOCACION DE MEZCLADORES / SOLAQUEO, DERRAMES,BRU;AS / SONDEO DE IIEE E IISS

PROTOCOLO DE ALBANILERIA / 1RA REVISION


REN 01 SSHH,COCINA,LAVANDERIA,PATIO,TERRAZA

TRAZO DE NIVELES / ENCOFRADO Y CONCRETO DE SARDINEL DE DUCHA

PROTOCOLO DE ALBANILERIA / 2DA REVISION

RECTIFICACION DE PISOS / TRAZO Y REPLANTEO

SOLAQUEO DE TECHOS

PRUEBA DE PRESION HIDRAULICA / DE SOLAQUEO 1RA Y 2DA REVISION

PROTOCOLO DE SOLAQUEO / 1RA REVISION / 2DA REVISION

ZOCALOS,CONTRAZOCALOS CERAMICOS / PISOS CERAMICOS

PROTOCOLO DE CERAMICOS / 1RA REVISION

LEVANTAMIENTO DE OBS. EN PISOS CERAMICOS

PROTOCOLO DE CERAMICOS / 2DA REVISION

BLANQUEADO DE MUROS Y TECHOS DE SSHH,COCINAS,LAV.

EMPASTE GRUESO Y LIJADO DE MUROS Y TECHOS DE SSHH.COCINA,LAV.

EMPASTE FINO Y LIJADO EN MUROS Y TECHOS / SELLADO DE MUROS Y TECHOS

PROTOCOLO DE SUPERF. PARA ESCARCHADO DE PINTURA

PRIMERA MANO DE PINTURA EN MUROS Y TECHOS

PROTOCOLO DE PINTURA EN MUROS Y TECHOS / 1RA REVISION

CABLEADO ELECTRICO DE DPTOS. / INST. DE MARCOS DE PUERTAS / INST. DE MARCOS DE ALUMINIO DE VENTANAS / COLOCACION DE BISAGRAS Y

PROTOCOLO DE MEGADO

PROTOCOLO DE PINTURA EN MUROS Y TECHOS / 2DA REVISION

INSTALACION DE MARCOS Y RIELES DE MAMPARAS DE VIDRIO

INSTALACION DE MUEBLES DE COCINA / INSTALACION DE MUEBLES DE SSHH

PROTOCOLO DE INS. DE MOBILIARIO DE COCINA Y SSHH / 1RA REVISION

COLOCACION E INSTALACION DE TABLEROS Y SUB TABLEROS / CABLEADO DE ALIMENTADORES

INSTALACION DE APARATOS SANITARIOS *INODORO,DUCHA,LAVADERO

PROTOCOLO DE INSTALACION DE APARATOS SANITARIOS

PRUEBAS Y REPARACIONES
COLOCACION DE TABLERO POST.FORMADO / COLOCACION DE TABLERO DURO DE MARMOL

PROTOCOLO DE INS. DE MOBILIARIO DE COCINA Y SSHH / 2DA REVISION

DESMANCHE DE TECHOS / SEGUNDA MANO DE TECHOS

CARPINTERIA METALICA: BARANDAS DE TERRAZAS


REN 02 DORMITORIOS, SALA, COMEDOR
CARPINTERIA METALICA: BARANDAS DE ESCALERAS

RECTIFICACION DE PISOS / TRAZO Y REPLANTEO

SOLAQUEO EN TECHOS

PROTOCOLO DE SOLAQUEO / 1RA REVISION

PROTOCOLO DE SOLAQUEO / 2DA REVISION

BLANQUEADO DE MUROS Y TECHOS DE DORMITORIOS,SALA/COMEDOR

EMPASTE GRUESO Y LIJADO DE MUROS Y TECHOS DE DORMITORIOS,SALA/COMEDOR

EMPASTE FINO Y LIJADO EN MUROS Y TECHOS / SELLADO DE MUROS Y TECHOS

PROTOCOLO DE SUPERF. PARA COLOCACION DE PAPEL MURAL

PROTOCOLO DE PINTURA EN MUROS Y TECHOS / 1RA REVISION

CABLEADO ELECTRICO DE DPTOS. / INST. DE MARCOS DE PUERTAS / INST. DE MARCOS DE ALUMINIO DE VENTANAS / COLOCACION DE BISAGRAS Y

PROTOCOLO DE MEGADO

PROTOCOLO DE PINTURA EN MUROS Y TECHOS / 2DA REVISION

COLOCACION E INSTALACION DE TABLEROS Y SUB TABLEROS / CABLEADO DE ALIMENTADORES

INSTALACION DE APARATOS SANITARIOS *INODORO,DUCHA,LAVADERO

PROTOCOLO DE INSTALACION DE APARATOS SANITARIOS

PRUEBAS Y REPARACIONES

ESCARCHADO DE TECHOS

PROTOCOLO DE ESCARCHADO DE TECHOS / 1RA REVISION

PROTOCOLO DE ESCARCHADO DE TECHOS / 2DA REVISION

PROTOCOLO DE INSTALACION DE PUERTAS / 2DA REVISION

PRIMERA MANO DE PINTURA EN MARCOS Y HOJAS

SEGUNDA MANO DE PINTURA EN MARCOS Y HOJAS

COLOCACION DE VIDRIOS EN VENTANAS / COLOCACION DE VIDRIO TEMPLADO EN MAMPARAS Y BALCONES

PROTOCOLO DE PINTURA DE PUERTAS / 1RA REVISION

PROTOCOLO DE COLOCACION DE VIDRIOS

DESMANCHE DE MUROS / SEGUNDA MANO DE MUROS

PROTOCOLO DE PINTURA DE PUERTAS / 2DA REVISION

INSTALACION DE PLACAS / INSTALACION DE LLAVES TERMICAS

PROTOCOLO DE PILOTAJE

PROTOCOLO DE PRUEBAS DE INTERCOMUNICADORES


COLOCACION E INSTALACION DE PAPEL MURAL

PROTOCOLO DE PAPEL MURAL / 1RA REVISION

PROTOCOLO DE PAPEL MURAL / 2DA REVISION

COLOCACION E INSTALACION DE PISOS LAMINADOS

PROTOCOLO DE PISOS LAMINADOS / 1RA REVISION

COLOCACION DE CONTRAZOCALOS DE MADERA+RODON / COLOCACION DE TAPAJUNTAS / COLOCACION DE TOPES DE PUERTAS

PROTOCOLO DE CONTRAZOCALOS / 1RA REVISION

PROTOCOLO DE PISOS LAMINADOS Y CONTRAZOCALOS / 2DA REVISION

Leyenda
Inspeccion diaria
Inspeccion programada
Inspecciones especificas
Auditorias internas
Auditorias externas
SEM 1
Dom Lun Mar Mié Jue Vie

06/04/2014 07/04/2014 08/04/2014 09/04/2014 10/04/2014 11/04/2014


AI ID ID ID IP
AI ID ID ID IP
ID ID ID IP
ID ID ID IP
ID ID IP
ID ID IP

LA LEYENDA SE
ENCUENTRA EN LA ID IP
PARTE FINAL DE LA
HOJA ID IP
ID IP
ID IP
IP
IP
IP
IP
IP
IP
SEM 2
Sáb Dom Lun Mar Mié Jue

12/04/2014 13/04/2014 14/04/2014 15/04/2014 16/04/2014 17/04/2014


IE ID ID ID
IE ID ID ID
ID IE ID ID
ID IE ID ID
ID ID IE ID
ID ID IE ID

ID ID ID IE
ID ID ID IE
ID ID ID IE
ID ID ID IE
ID ID ID ID
ID ID ID ID
ID ID ID ID
ID ID ID ID
ID ID ID ID
ID ID ID ID
ID ID ID ID
ID ID ID ID
ID ID ID ID
ID ID ID ID
ID ID ID
ID ID ID
ID ID
ID ID
ID ID
ID
ID
ID
SEM 3
Vie Sáb Dom Lun Mar Mié Jue Vie

18/04/2014 19/04/2014 20/04/2014 21/04/2014 22/04/2014 23/04/2014 24/04/2014 25/04/2014


IP ID ID ID IE IP
IP ID ID ID IE IP
IP ID ID ID ID IE
IP ID ID ID ID IE
IP ID ID ID ID IP
IP ID ID ID ID IP

IP ID ID ID ID IP
IP ID ID ID ID IP
IP ID ID ID ID IP
IP ID ID ID ID IP
IE ID ID ID ID IP
IE ID ID ID ID IP
IE ID ID ID ID IP
IE ID ID ID ID IP
IE ID ID ID ID IP
IE ID ID ID ID IP
IP IE ID ID ID IP
IP IE ID ID ID IP
IP IE ID ID ID IP
IP IE ID ID ID IP
IP ID IE ID ID IP
IP ID IE ID ID IP
IP ID ID IE ID IP
IP ID ID IE ID IP
IP ID ID IE ID IP
IP ID ID ID IE IP
IP ID ID ID IE IP
IP ID ID ID IE IP
IP ID ID ID ID IE
IP ID ID ID ID IE
IP ID ID ID ID IE
ID ID ID ID IP
ID ID ID ID IP
ID ID ID ID IP
ID ID ID IP
ID ID ID IP

ID ID IP
ID ID IP
ID ID IP
ID IP
ID IP
ID IP
ID IP
ID IP
IP
IP
IP
IP
IP
SEM 4
Sáb Dom Lun Mar Mié Jue Vie Sáb

26/04/2014 27/04/2014 28/04/2014 29/04/2014 30/04/2014 01/05/2014 02/05/2014 03/05/2014


ID ID ID ID IP
ID ID ID ID IP
ID ID ID ID IP
ID ID ID ID IP
IE ID ID ID IP
IE ID ID ID IP

ID IE ID ID IP
ID IE ID ID IP
ID IE ID ID IP
ID IE ID ID IP
ID ID IE ID IP
ID ID IE ID IP
ID ID IE ID IP
ID ID IE ID IP
ID ID IE ID IP
ID ID IE ID IP
ID ID ID IE IP
ID ID ID IE IP
ID ID ID IE IP
ID ID ID IE IP
ID ID ID ID IE
ID ID ID ID IE
ID ID ID ID IP
ID ID ID ID IP
ID ID ID ID IP
ID ID ID ID IP
ID ID ID ID IP
ID ID ID ID IP
ID ID ID ID IP
ID ID ID ID IP
ID ID ID ID IP
IE ID ID ID IP
IE ID ID ID IP
IE ID ID ID IP
ID IE ID ID IP
ID IE ID ID IP

ID ID IE ID IP
ID ID IE ID IP
ID ID IE ID IP
ID ID ID IE IP
ID ID ID IE IP
ID ID ID IE IP
ID ID ID IE IP
ID ID ID IE IP
ID ID ID ID IE
ID ID ID ID IE
ID ID ID ID IE
ID ID ID ID IE
ID ID ID ID IE
ID ID ID ID IP
ID ID ID ID IP
ID ID ID ID IP
ID ID ID IP
ID ID ID IP
ID ID ID IP
ID ID ID IP
ID ID ID IP
ID ID IP
ID ID IP
ID ID IP
ID ID IP
ID ID IP
ID ID IP
ID IP
ID IP
ID IP
ID IP
ID IP
ID IP
IP
IP
IP
IP
IP
IP
SEM 5
Dom Lun Mar Mié Jue Vie Sáb Dom

04/05/2014 05/05/2014 06/05/2014 07/05/2014 08/05/2014 09/05/2014 10/05/2014 11/05/2014


AI IE ID ID IP
AI IE ID ID IP
AI ID IE ID IP
AI ID IE ID IP
AI ID ID IE IP
AI ID ID IE IP

AI ID ID ID IE
AI ID ID ID IE
AI ID ID ID IE
AI ID ID ID IE
AI ID ID ID IP
AI ID ID ID IP
AI ID ID ID IP
AI ID ID ID IP
AI ID ID ID IP
AI ID ID ID IP
AI ID ID ID IP
AI ID ID ID IP
AI ID ID ID IP
AI ID ID ID IP
AI ID ID ID IP
AI ID ID ID IP
IE ID ID ID IP
IE ID ID ID IP
IE ID ID ID IP
AI IE ID ID IP
AI IE ID ID IP
AI IE ID ID IP
AI ID IE ID IP
AI ID IE ID IP
AI ID IE ID IP
AI ID ID IE IP
AI ID ID IE IP
AI ID ID IE IP
AI ID ID ID IE
AI ID ID ID IE

AI ID ID ID IP
AI ID ID ID IP
AI ID ID ID IP
AI ID ID ID IP
AI ID ID ID IP
AI ID ID ID IP
AI ID ID ID IP
AI ID ID ID IP
AI ID ID ID IP
AI ID ID ID IP
AI ID ID ID IP
AI ID ID ID IP
AI ID ID ID IP
IE ID ID ID IP
IE ID ID ID IP
IE ID ID ID IP
AI IE ID ID IP
AI IE ID ID IP
AI IE ID ID IP
AI IE ID ID IP
AI IE ID ID IP
AI ID IE ID IP
AI ID IE ID IP
AI ID IE ID IP
AI ID IE ID IP
AI ID IE ID IP
AI ID ID IE IP
AI ID ID IE IP
AI ID ID IE IP
AI ID ID IE IP
AI ID ID IE IP
AI ID ID IE IP
AI ID ID IE IP
AI ID ID ID IE
AI ID ID ID IE
AI ID ID ID IE
AI ID ID ID IE
AI ID ID ID IE
AI ID ID ID IE
SEM 6
Lun Mar Mié Jue Vie Sáb Dom Lun

12/05/2014 13/05/2014 14/05/2014 15/05/2014 16/05/2014 17/05/2014 18/05/2014 19/05/2014


ID ID ID IE IP
ID ID ID IE IP
ID ID ID ID IE ID
ID ID ID ID IE ID
ID ID ID ID IP IE
ID ID ID ID IP IE

ID ID ID ID IP ID
ID ID ID ID IP ID
ID ID ID ID IP ID
ID ID ID ID IP ID
IE ID ID ID IP ID
IE ID ID ID IP ID
IE ID ID ID IP ID
IE ID ID ID IP ID
IE ID ID ID IP ID
IE ID ID ID IP ID
ID IE ID ID IP ID
ID IE ID ID IP ID
ID IE ID ID IP ID
ID IE ID ID IP ID
ID ID IE ID IP ID
ID ID IE ID IP ID
ID ID ID IE IP ID
ID ID ID IE IP ID
ID ID ID IE IP ID
ID ID ID ID IE ID
ID ID ID ID IE ID
ID ID ID ID IE ID
ID ID ID ID IP IE
ID ID ID ID IP IE
ID ID ID ID IP IE
ID ID ID ID IP ID
ID ID ID ID IP ID
ID ID ID ID IP ID
ID ID ID ID IP ID
ID ID ID ID IP ID

IE ID ID ID IP ID
IE ID ID ID IP ID
IE ID ID ID IP ID
ID IE ID ID IP ID
ID IE ID ID IP ID
ID IE ID ID IP ID
ID IE ID ID IP ID
ID IE ID ID IP ID
ID ID IE ID IP ID
ID ID IE ID IP ID
ID ID IE ID IP ID
ID ID IE ID IP ID
ID ID IE ID IP ID
ID ID ID IE IP ID
ID ID ID IE IP ID
ID ID ID IE IP ID
ID ID ID ID IE ID
ID ID ID ID IE ID
ID ID ID ID IE ID
ID ID ID ID IE ID
ID ID ID ID IE ID
ID ID ID ID IP IE
ID ID ID ID IP IE
ID ID ID ID IP IE
ID ID ID ID IP IE
ID ID ID ID IP IE
ID ID ID ID IP ID
ID ID ID ID IP ID
ID ID ID ID IP ID
ID ID ID ID IP ID
ID ID ID ID IP ID
ID ID ID ID IP ID
ID ID ID ID IP ID
ID ID ID ID IP ID
ID ID ID ID IP ID
ID ID ID ID IP ID
ID ID ID ID IP ID
ID ID ID ID IP ID
ID ID ID ID IP ID
SEM 7 SEM 8
Mar Mié Jue Vie Sáb Dom Lun Mar

20/05/2014 21/05/2014 22/05/2014 23/05/2014 24/05/2014 25/05/2014 26/05/2014 27/05/2014

ID
ID

IE ID
IE ID
IE ID
IE ID
ID IE ID
ID IE ID
ID IE ID
ID IE ID
ID IE ID
ID IE ID
ID ID IE IP
ID ID IE IP
ID ID IE IP
ID ID IE IP
ID ID ID IE ID
ID ID ID IE ID
ID ID ID IP IE ID
ID ID ID IP IE ID
ID ID ID IP IE ID
ID ID ID IP ID IE
ID ID ID IP ID IE
ID ID ID IP ID IE
ID ID ID IP ID ID
ID ID ID IP ID ID
ID ID ID IP ID ID
IE ID ID IP ID ID
IE ID ID IP ID ID
IE ID ID IP ID ID
ID IE ID IP ID ID
ID IE ID IP ID ID

ID ID IE IP ID ID
ID ID IE IP ID ID
ID ID IE IP ID ID
ID ID ID IE ID ID
ID ID ID IE ID ID
ID ID ID IE ID ID
ID ID ID IE ID ID
ID ID ID IE ID ID
ID ID ID IP IE ID
ID ID ID IP IE ID
ID ID ID IP IE ID
ID ID ID IP IE ID
ID ID ID IP IE ID
ID ID ID IP ID IE
ID ID ID IP ID IE
ID ID ID IP ID IE
ID ID ID IP ID ID
ID ID ID IP ID ID
ID ID ID IP ID ID
ID ID ID IP ID ID
ID ID ID IP ID ID
ID ID ID IP ID ID
ID ID ID IP ID ID
ID ID ID IP ID ID
ID ID ID IP ID ID
ID ID ID IP ID ID
IE ID ID IP ID ID
IE ID ID IP ID ID
IE ID ID IP ID ID
IE ID ID IP ID ID
IE ID ID IP ID ID
IE ID ID IP ID ID
IE ID ID IP ID ID
ID IE ID IP ID ID
ID IE ID IP ID ID
ID IE ID IP ID ID
ID IE ID IP ID ID
ID IE ID IP ID ID
ID IE ID IP ID ID
SEM 8 SEM 9
Mié Jue Vie Sáb Dom Lun Mar

28/05/2014 29/05/2014 30/05/2014 31/05/2014 01/06/2014 02/06/2014 03/06/2014

ID
ID
ID
IE ID
IE ID
IE ID
ID IE IP
ID IE IP
ID IE IP
ID ID IE AI
ID ID IE AI

ID ID IP IE ID
ID ID IP IE ID
ID ID IP IE ID
ID ID IP AI IE
ID ID IP AI IE
ID ID IP AI IE
ID ID IP AI IE
ID ID IP AI IE
ID ID IP AI ID
ID ID IP AI ID
ID ID IP AI ID
ID ID IP AI ID
ID ID IP AI ID
ID ID IP AI ID
ID ID IP AI ID
ID ID IP AI ID
IE ID IP AI ID
IE ID IP AI ID
IE ID IP AI ID
IE ID IP AI ID
IE ID IP AI ID
ID IE IP AI ID
ID IE IP AI ID
ID IE IP AI ID
ID IE IP AI ID
ID IE IP AI ID
ID ID IE AI ID
ID ID IE AI ID
ID ID IE AI ID
ID ID IE AI ID
ID ID IE AI ID
ID ID IE AI ID
ID ID IE AI ID
ID ID IP IE ID
ID ID IP IE ID
ID ID IP IE ID
ID ID IP IE ID
ID ID IP IE ID
ID ID IP IE ID
SEM 9
Mié Jue Vie Sáb Dom Lun

04/06/2014 05/06/2014 06/06/2014 07/06/2014 08/06/2014 09/06/2014


ID
ID
ID
ID
ID
IE ID
IE ID
IE ID
IE ID
IE ID
ID IE IP
ID IE IP
ID IE IP
ID ID IE ID
ID ID IE ID
ID ID IE ID
ID ID IE ID
ID ID IE ID
ID ID IP IE
ID ID IP IE
ID ID IP IE
ID ID IP IE
ID ID IP IE
ID ID IP ID
ID ID IP ID
ID ID IP ID
ID ID IP ID
ID ID IP ID
ID ID IP ID
ID ID IP ID
ID ID IP ID
ID ID IP ID
ID ID IP ID
ID ID IP ID
ID ID IP ID
ID ID IP ID
SEM 10
Mar Mié Jue Vie Sáb

10/06/2014 11/06/2014 12/06/2014 13/06/2014 14/06/2014


ID
ID
ID
ID
ID
IE ID
IE ID
IE ID
IE ID
IE ID
IE ID
IE ID
ID IE AE
ID IE AE
ID IE AE
ID IE AE
ID IE AE
ID IE AE
EDIFICIO XXXXXXXXXXXX
PRESUPUESTO EQUIPO DE PROTECCIÓN PERSONAL

COTRATISTA: YYYYYYYY
FASE/TIEMPO: OBRA COMPLETA
SEMANAS:
ITEM MES Y AÑO:

DIAS/FECHA

1 REVOQUES / ENLUCIDOS

2 MUROS / TABIQUERIA

3 PISO / PAVIMENTACIÓN

4 PINTURAS INTERIORES

5 MARCOS Y PUERTAS
6 MUEBLES

7 DESMACHE

8 TECHOS

9 IIEE IISS

10 VIDRIOS

11 LLAVES TERMICAS / PLACAS

12 CERRAJERIA, PINTURA , VANOS


13 PAPEL MURAL

14 PISO LAMINADO

15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35

FACTOR DEMASÍA
CANTIDAD REDONDEADA
PRECIO UNITARIO US$
TOTAL US$
Revoques / Enlucidos
Muros / Tabiquería
Piso / Pavimentación
Pinturas Interiores
Marcos y Puertas
Muebles
Desmache
Techos
IIEE y IISS
VIDRIOS
LLAVES TERMICAS / PLACAS
CERRAJERIA, PINTURAS , VANOS
PAPEL MURAL
PISO LAMINADO
T.C. 2.78 PROTECCION DE CABEZA PROT. OJOS
150 150 70 5

PROVEEDOR

Casco blanco
PERSONAL

Casco color

lentes luna
barbiquejo
DIAS

DIAS

clara
9 25 9.00 9.00 45.00

2 25 6 6 30

4 25 4 4.00 20

6 25 6 6.00

25
6 25 6 6.00

8 25 8 8.00

6 25

25 6 6.00

2 25 6 6 30

6 2 4 4.00 20
TOTAL UNIDADES 0.00 55 55.00 145.00
1.5 0.00 82.50 82.50 217.50
0.00 83 83.00 218.00
7.00 5.20 0.45 0.72
0.00 431.60 37.35 156.96
Cálculo de cuadrilla por ratio Número
Número de horas de
Ratio
hombre trabajad
ores
3.0
8.0
3.0
4.2
4.2
3.0
2.0
2.0
3.0
1.4
4.0
5.0
3.0
4.2
PROT. OJOS
5
lentes
sobremontura

2
mascarilla pa/
polvo
90

respirador
8

filtp/polvo
RED LINE
12

cartucho color
PROT. VIAS RESPIRATORIAS

negro
10

mascarilla
p/soldar

4
30

guantes jebe
45

guantes hilo
ptos pvc
6

guantes
200
PROT. MANOS

dieléctricos

6
50

guantes cuero
ref.
9
6

4
43.5 0.00 0.00 0.00 0.00 0.00 8.00 0.00 12.00 21.00
65.25 0.00 0.00 0.00 0.00 0.00 12.00 0.00 18.00 31.50
65 0.00 0.00 0.00 0.00 0.00 12.00 0.00 18.00 32.00
2.29 0.82 3.56 2.43 8.76 6.65 1.56 0.74 5.36 6.04
148.85 0.00 0.00 0.00 0.00 0.00 18.72 0.00 96.48 193.28
1
tapones

OIDOS
descartables

240
zap.CAT pta.
acero 240

zapatos
pta.acero

6
6
240

zapatos
PROTECCIÓN DE PIES

dieléctricos
240

6.00
6.00
9.00

botas jebe c/
acero
240

4.00
6.00
9.00

6.00
uniforme
240

chaleco
UNIFORME
NA

cinturón porta
herramientas
240

jean para el
staff
6.00 6.00

8.00 8.00

6.00 6.00

6 6.00

4.00
0.00 0.00 0.00 18.00 41.00 6.00 6.00 0.00 0.00
0.00 0.00 0.00 27.00 61.50 18.00 9.00 0.00 0.00
0.00 0.00 0.00 27.00 62.00 18.00 9.00 0.00 0.00
2.08 39.60 12.99 13.40 14.10 17.55 8.01 6.58 12.50
0.00 0.00 0.00 361.80 874.20 315.90 72.09 0.00 0.00
30
visor
policarbonato

100
guantes cuero
blando Ws CON ESMERIL
150
mandil
cuerocromo
150

careta
soldador
guantes de
180

cuero cromo
14"
150

mandil de
cuero cromo
escarpín
240

cuero cromo
8" 3 hebillasr
240

chaqueta
Ws SOLD.A ELECTRICA O AUTOGENA

cuero
180

lentes oxicorte

6
9
240

arnés 3 anillos
D
ANTI CAIDAS
240

amortiguador
6
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
4.25 3.53 6.80 7.26 3.68 6.80 6.80 23.53 5.35 86.30 33.45
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
2,707.23

Você também pode gostar