Você está na página 1de 1

1 2 3 4 5 6

C
G
ENTE

GEA
PRÉDIO PRÉDIO

CLI
EXISTENTE CONCENTRADOR 2
ENCAMINHAMENTO GEA (VEM DA ERP)

A A
1500

280
VAPOR 7bar - 6" (EVAP)

ERP ERP

500
EVAPORADOR SECAGEM

VAPOR 21bar - 4" (EVAP)

VAPOR 21bar- 6"

VAPOR 21bar- 4"


3

500
ÁGUA TQ L1C01 (TP-62)-6"OD (AP-S1-1002)
24
250

VAPOR 21bar - 6" (SEC)


ÁGUA TQ L1C01 (TP-61)-6"OD (AP-S1-1001)
22
225

400
RETORNO CONDENSADO (P/ TQ L1C01 TP-40)-4"OD (CD-S1-1012)
21
175 150 150 150 175

VAPOR 4bar - 6" (SEC)


ÁGUA (EVAP. MVR TP-65)-1"OD (AP-S1-1007)
23 3 2

350
SODA (P/ EVAPORADOR TP-71)-1"OD (316L) (SC-S7-1005)
16 EVAPORAÇÃO
ÁCIDO (P/ EVAPORADOR TP-70)-1"OD (316L) (SA-S7-1005) RET COND. ALTA - 4"
15 4
PARA DETALHES INSTALAÇÃO ERP's

320
PRODUTO (P/ RECOVERY TANK TP-21)-3"OD (PD-S1-1034)
20
PRODUTO (P/ EVAPORADOR TP-10)-3"OD (PD-S1-1001) RET COND. BAIXA - 3" VER DES. DT-15995-1100-A1
17 5
200

400
CIP RETORNO (EVAPORADOR TP-73)-3"OD (CR-S1-1001)-FL.001
B 18
B
200

CIP AVANÇO (EVAPORADOR TP-76)-3"OD (CA-S1-1002)-FL.001 ÁGUA INCENDIO - 8"


19 8
200

405
CIP RETORNO SIST. ALIM. -2.1/2"OD (CIPR-S1-801)-FL.010/FL.002
27

CIP RETORNO (SECADOR)-6"OD (CR-S1-707)-FL.009/FL.010 ÁGUA POTÁVEL - 6"


14 1
575

380
CIP AVANÇO (BOMBA 2-BO-803)-4"OD(CA-S1-808)-FL.010/FL.009
12
CIP AVANÇO (2-XV-805)-3"OD (CA-S1-813)-FL.010/002 SECAGEM AR COMPRIMIDO-6"
25 9
175 175 175 150

375
CIP AVANÇO (2-XV-817)-3"OD (CA-S1-812)-FL.010/FL.007
26
CIP AVANÇO (BOMBA 2-BO-804)-4"OD (CA-S1-811)-FL.010/FL.009
13 RET ÁGUA GELADA-4"
7
CIP AVANÇO (BOMBA 2-BO-805)-4"OD (CA-S1-805)-FL.010/FL.009

375
11
CIP AVANÇO (BOMBA 2-BO-801)-2.1/2"OD (CA-S1-802)-FL.010/FL.009
10
ÁGUA GELADA-4"

215
6

C C

GEA Engenharia de Processos

e Sistemas Industriais Ltda.

CERTIFICADO
3 ADIC. DISTANCIA ENTRE TUBOS 12.02.16 SGJ PPO DANILO
Data: 12 02 2016 2 REV. TAG DE LINHA CIP 30.09.15 SGJ PPO DANILO

1 REV. CONEXAO TIE-IN. REVISADO ONDE INDICADO 03.03.15 SGJ PPO DANILO
Paulo P. Oliveira
0 EMISSÃO INICIAL 03.12.14 SGJ PPO DANILO
Gerente de Projetos
REV. DESCRIÇÃO DATA DES. VERIF. APROV.
PROJETO:

PLANTA 1.2000.000kg/dia LEITE INTEGRAL


ÁREA APLICAÇÃO:

SISTEMA DE SECAGEM GEA Engenharia de Processos


D CLIENTE: N° PROJETO:
D
LIMITE DE FORNECIMENTO: CCGL 15995
UNIDADE: DESENHO REF. N°:

G GEA CRUZ ALTA - RS -


ESCALA: FOLHA:
C CLIENTE
TÍTULO: 1/25 01de 01
SHAFT UTILIDADES DESENHO N°:

0 10 20 30 40 50 60 70 80 90 100 LO-15995-0016-A2-3
FORMATO A2 594 x 420
1 2 3 4 5 6

Você também pode gostar