MEDIÇAO: FORMA/CONCRETO/ARMAÇÃO NA FUNDAÇÃO (LAJES)

CLIENTE : CRITÉRIO ADOTADO:


OBRA : VConc. = L1 x L2 x L3 x Quant.
LOCAL : AForma =
Obs.: Quant. de aço deverá ser
ASSUNTO: SUBSOLO obtida dos resumos das plantas
No. FOLHA: 02
CONCRETO FCK: 18 MPa ( ADOTADO) DATA:
LAJES QUANT. L1 L2 L3 VOL. AREA AÇO CA-50 AÇO CA-50 AÇO CA-50 AÇO CA-60
(LARG.) (COMP) (ESP) CONC. FORMA ATÉ 4,76MM 6,25 A 9,52MM 12,70 A 25,40MM 3,40 A 6,00MM
(m) (m) (m) (m3) (m2) (kg) (kg) (kg) (kg)
SUBSOLO 1.00 83.76 37.35 0.15 469.27
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
SUB-TOTAL 469.27 0.00 0.00 0.00 0.00 0.00
SBD S/C LTDA
MEDIÇAO: FORMA/CONCRETO/ARMAÇÃO NA FUNDAÇÃO (PAREDES DE CONCRETO)

CLIENTE : CRITÉRIO ADOTADO:


OBRA : VConc. = L1 x L2 x L3 x Quant.
LOCAL : AForma =(L1 x L2) x Quant.
Obs.: Quant. de aço deverá ser
ASSUNTO: SUBSOLO obtida dos resumos das plantas
No. FOLHA: 02
CONCRETO FCK: 18 MPa DATA:
PAREDES QUANT. L1 L2 L3 VOL. AREA AÇO CA-50 AÇO CA-50 AÇO CA-50 AÇO CA-60 AÇO CA-60
DE (COMP) (ALT) (ESP) CONC. FORMA ATÉ 4,76MM 6,25 A 9,52MM 12,70 A 25,40MM 3,40 A 6,00MM 6,40 A 9,50MM
CONCRETO (m) (m) (m) (m3) (m2) (kg) (kg) (kg) (kg) (kg)
P1 1.00 29.00 2.52 0.20 14.62 73.08
P2 1.00 41.37 2.77 0.20 22.92 114.59
P3 1.00 28.10 2.47 0.20 13.88 69.41
P4 1.00 19.44 2.52 0.20 9.80 48.99
P5 1.00 19.18 2.47 0.20 9.47 47.37
P6 1.00 29.45 2.52 0.20 14.84 74.21
P7 1.00 18.60 2.47 0.20 9.19 45.94
P8 1.00 18.75 2.32 0.20 8.70 43.50
P9 1.00 20.75 1.81 0.20 7.51 37.56
P10 1.00 13.90 1.81 0.20 5.03 25.16
POÇO DO ELEVADOR 3.00 10.04 1.50 0.20 9.04 45.18
ESCADA - A B C 0.00 0.00
PE1 3.00 1.25 3.21 0.20 2.41 12.04
PE2 3.00 1.25 3.21 0.20 2.41 12.04
PE3 3.00 1.25 3.21 0.20 2.41 12.04
PE4 3.00 1.13 3.21 0.20 2.18 10.88
PE5 3.00 1.13 3.21 0.20 2.18 10.88
PE6 3.00 1.25 3.21 0.14 1.69 12.04
PE7 3.00 1.81 3.21 0.09 1.57 17.43
PE8 3.00 1.22 3.21 0.09 1.06 11.75
PE9 3.00 2.19 3.21 0.09 1.90 21.09
PE9' 3.00 0.80 2.41 0.09 0.52 5.78
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
SUB-TOTAL 143.33 750.96 0.00 0.00 0.00 0.00 0.00
SBD S/C LTDA

MEDIÇAO: FORMA/CONCRETO/ARMAÇÃO NA FUNDAÇÃO (BLOCOS)

CLIENTE : CRITÉRIO ADOTADO:


OBRA : VConc. = L1 x L2 x L3 x Quant.
LOCAL : AForma =2 x( L1+L3) x L2 x Quant.
Obs.: Quant. de aço deverá ser
ASSUNTO: obtida dos resumos das plantas
No. FOLHA:
CONCRETO FCK: DATA:
BLOCOS QUANT. L1 L2 L3 VOL. AREA AÇO CA-50 AÇO CA-50 AÇO CA-50 AÇO CA-60 AÇO CA-60
(COMP) (ALT.) (LARG.) CONC. FORMA ATÉ 4,76MM 6,25 A 9,52MM 12,70 A 25,40MM 3,40 A 6,00MM 6,40 A 9,50MM
(m) (m) (m) (m3) (m2) (kg) (kg) (kg) (kg) (kg)
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
SUB-TOTAL 0.00 0.00 0.00 0.00 0.00 0.00 0.00
SBD S/C LTDA

MEDIÇAO: FORMA/CONCRETO/ARMAÇÃO NA FUNDAÇÃO (SAPATAS)

CLIENTE : CRITÉRIO ADOTADO:


OBRA : VConc. =[((Bxb)+(Bxb))/2] x H x Quant.
LOCAL :
Obs.: Quant. de aço deverá ser
ASSUNTO: obtida dos resumos das plantas
No. FOLHA:
CONCRETO FCK:
SAPATAS QUANT. AREA MAIOR AREA MENOR H VOL. AREA AÇO CA-50 AÇO CA-50 AÇO CA-50
(B) (b) (B) (b) (ALT) CONC. FORMA ATÉ 4,76MM 6,25 A 9,52MM 12,70 A 25,40MM
(m) (m) (m) (m) (m) (m3) (m2) (kg) (kg) (kg)
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
SUB-TOTAL 0.00 0.00 0.00 0.00 0.00
SBD S/C LTDA

MEDIÇAO: FORMA/CONCRETO/ARMAÇÃO NA FUNDAÇÃO (VIGAS BALDRAMES)

CLIENTE : CRITÉRIO ADOTADO:


OBRA : VConc. = L1 x L2 x L3 x Quant.
LOCAL : AForma =(2 x L2) x L1 x Quant.
Obs.: Quant. de aço deverá ser
ASSUNTO: obtida dos resumos das plantas
No. FOLHA:
CONCRETO FCK: DATA:
VIGAS QUANT. L1 L2 L3 VOL. AREA AÇO CA-50 AÇO CA-50 AÇO CA-50 AÇO CA-60 AÇO CA-60
(COMP) (ALT.) (LARG.) CONC. FORMA ATÉ 4,76MM 6,25 A 9,52MM 12,70 A 25,40MM 3,40 A 6,00MM 6,40 A 9,50MM
(m) (m) (m) (m3) (m2) (kg) (kg) (kg) (kg) (kg)
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
SUB-TOTAL 0.00 0.00 0.00 0.00 0.00 0.00 0.00
SBD S/C LTDA

MEDIÇAO: FORMA/CONCRETO/ARMAÇÃO NA ESTRUTURA (PILARES)


CRITÉRIO ADOTADO:
CLIENTE :
OBRA : VConc. = L1 x L2 x L3 x Quant.
LOCAL : AForma =2(L2+ L3) x L1xQuant. L1
Obs.: Quant. de aço deverá ser
ASSUNTO: SUBSOLO - PILARES DA PAREDE obtida dos resumos das plantas
L3
No. FOLHA: 06 L2
CONCRETO FCK: 18 MPa DATA:
PILARES QUANT. L1 L2 L3 VOL. AREA AÇO CA-50 AÇO CA-50 AÇO CA-50 AÇO CA-60 AÇO CA-60
(ALT.) (LARG.) (COMP.) CONC. FORMA ATÉ 4,76MM 6,25 A 9,52MM 12,70 A 25,40MM 3,40 A 6,00MM 6,40 A 9,50MM
(m) (m) (m) (m3) (m2) (kg) (kg) (kg) (kg) (kg)
PM31A A PM39 10.00 2.52 0.19 0.40 1.92 29.74
PM84 A PM 90A 8.00 2.47 0.19 0.40 1.50 23.32
PM19 A PM30 12.00 2.52 0.19 0.40 2.30 35.68
PM91A A PM98 9.00 2.47 0.19 0.40 1.69 26.23
PM1 A PM17 17.00 2.20 0.20 0.30 2.24 37.40
PM18 1.00 2.20 0.19 0.19 0.08 1.67
PM99 1.00 2.32 0.19 0.40 0.18 2.74
PM40B A PM52 14.00 2.52 0.19 0.40 2.68 41.63
PM53 A PM72 20.00 2.77 0.19 0.40 4.21 65.37
PM73 A PM83B 12.00 2.47 0.19 0.40 2.25 34.98
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
SUB-TOTAL 19.05 298.76 0.00 0.00 #REF! 0.00
SBD S/C LTDA

MEDIÇAO: FORMA/CONCRETO/ARMAÇÃO NA ESTRUTURA (PILARES)


CRITÉRIO ADOTADO:
CLIENTE :
OBRA : VConc. = L1 x L2 x L3 x Quant.
LOCAL : AForma =2(L2+ L3) x L1xQuant. L1
Obs.: Quant. de aço deverá ser
ASSUNTO: SUBSOLO- TORRE A E PISCINA obtida dos resumos das plantas
L3
No. FOLHA: 06 L2
CONCRETO FCK: 18 MPa DATA:
PILARES QUANT. L1 L2 L3 VOL. AREA AÇO CA-50 AÇO CA-50 AÇO CA-50 AÇO CA-60 AÇO CA-60
(ALT.) (LARG.) (COMP.) CONC. FORMA ATÉ 4,76MM 6,25 A 9,52MM 12,70 A 25,40MM 3,40 A 6,00MM 6,40 A 9,50MM
(m) (m) (m) (m3) (m2) (kg) (kg) (kg) (kg) (kg)
PG1A PG14 14.00 3.21 0.25 0.60 6.74 76.40
P1A 1.00 3.21 0.25 0.66 0.53 5.84
P2A 1.00 3.21 0.25 1.20 0.96 9.31
P3A 1.00 3.21 3.14 0.06 0.60 5.04
P4A 1.00 3.21 0.18 0.80 0.46 6.29
P5A 1.00 3.21 0.18 0.66 0.38 5.39
P6A 1.00 3.21 0.18 0.66 0.38 5.39
P7A 1.00 3.21 0.28 0.40 0.36 4.37
P8A 1.00 3.21 0.30 0.80 0.77 7.06
P9A 1.00 3.21 0.11 3.14 1.11 5.33
P10A 1.00 3.21 0.23 1.00 0.74 7.90
P11A/19A 2.00 3.21 0.18 0.66 0.76 10.79
P12A/20A 2.00 3.21 0.18 0.80 0.92 12.58
P13A/14A/17A/18A 4.00 3.21 0.18 1.05 2.43 31.59
P15A 1.00 3.21 0.06 2.61 0.50 4.10
P16A1/16A2 2.00 3.21 0.18 1.00 1.16 15.15
P21A 1.00 3.21 0.23 1.00 0.74 7.90
P22A 1.00 3.21 0.18 0.92 0.53 7.06
P23A 1.00 3.21 0.38 0.40 0.49 5.01
P24A 1.00 3.21 0.30 0.80 0.77 7.06
P25A 1.00 3.21 3.14 0.11 1.11 6.55
P26A 1.00 3.21 0.18 0.66 0.38 5.39
P27A 1.00 3.21 0.25 0.66 0.53 5.84
P28A 1.00 3.21 0.25 1.20 0.96 9.31
P29A 1.00 3.21 0.06 3.14 0.60 4.10
P30A 1.00 3.21 0.18 0.80 0.46 6.29
PILARETES T. A 21.00 3.21 0.14 0.14 1.32 37.75
PILARES PISCINA 0.00 0.00
PP1 A PP6 6.00 2.95 0.14 0.14 0.35 9.91
PILARETES 8.00 2.65 0.14 0.14 0.42 11.87
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
SUB-TOTAL 27.46 336.57 0.00 0.00 #REF! 0.00
SBD S/C LTDA

MEDIÇAO: FORMA/CONCRETO/ARMAÇÃO NA ESTRUTURA (PILARES)


CRITÉRIO ADOTADO:
CLIENTE :
OBRA : VConc. = L1 x L2 x L3 x Quant.
LOCAL : AForma =2(L2+ L3) x L1xQuant. L1
Obs.: Quant. de aço deverá ser
ASSUNTO:SUBSOLO - TORRE B obtida dos resumos das plantas
L3
No. FOLHA: 06 L2
CONCRETO FCK: 18 MPa DATA:
PILARES QUANT. L1 L2 L3 VOL. AREA AÇO CA-50 AÇO CA-50 AÇO CA-50 AÇO CA-60 AÇO CA-60
(ALT.) (LARG.) (COMP.) CONC. FORMA ATÉ 4,76MM 6,25 A 9,52MM 12,70 A 25,40MM 3,40 A 6,00MM 6,40 A 9,50MM
(m) (m) (m) (m3) (m2) (kg) (kg) (kg) (kg) (kg)
PG15 A PG20 5.00 3.21 0.25 0.60 2.41 27.29
P1B 1.00 3.21 0.25 0.66 0.53 5.84
P2B 1.00 3.21 0.25 1.20 0.96 9.31
P3B 1.00 3.21 0.25 0.66 0.53 5.84
P4B 1.00 3.21 0.18 0.80 0.46 6.29
P5B 1.00 3.21 0.25 0.66 0.53 5.84
P6B 1.00 3.21 0.18 0.92 0.53 7.06
P7B 1.00 3.21 0.38 0.40 0.49 5.01
P8B 1.00 3.21 0.30 0.80 0.77 7.06
P9B 1.00 3.21 0.30 1.00 0.96 8.35
P10B 1.00 3.21 0.23 1.00 0.74 7.90
P11B 1.00 3.21 0.18 0.66 0.38 5.39
P12B 1.00 3.21 0.18 0.80 0.46 6.29
P13B 1.00 3.21 0.18 1.05 0.61 7.90
P14B 1.00 3.21 0.18 1.05 0.61 7.90
P15B 1.00 3.21 0.23 1.00 0.74 7.90
P16B 1.00 3.21 3.14 0.11 1.11 6.55
P17B 1.00 3.21 0.18 1.05 0.61 7.90
P18B 1.00 3.21 0.18 1.05 0.61 7.90
P19B 1.00 3.21 0.18 0.66 0.38 5.39
P20B 1.00 3.21 0.18 0.80 0.46 6.29
P21B 1.00 3.21 0.23 1.00 0.74 7.90
P22B 1.00 3.21 0.18 0.92 0.53 7.06
P23B 1.00 3.21 0.38 0.40 0.49 5.01
P24B 1.00 3.21 0.30 0.80 0.77 7.06
P25B 1.00 3.21 0.23 1.20 0.89 9.18
P26B + P27B 1.00 3.21 3.14 0.11 1.11 6.66
P28B 1.00 3.21 0.25 1.20 0.96 9.31
P29B 1.00 3.21 0.18 0.92 0.53 7.06
P30B 1.00 3.21 0.25 0.66 0.53 5.84
PILARETES TORRE B 7.00 3.21 0.14 0.14 0.44 12.58
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
SUB-TOTAL 21.87 242.86 0.00 0.00 #REF! 0.00
SBD S/C LTDA

MEDIÇAO: FORMA/CONCRETO/ARMAÇÃO NA ESTRUTURA (PILARES)


CRITÉRIO ADOTADO:
CLIENTE :
OBRA : VConc. = L1 x L2 x L3 x Quant.
LOCAL : AForma =2(L2+ L3) x L1xQuant. L1
Obs.: Quant. de aço deverá ser
ASSUNTO: SUBSOLO TORRE C obtida dos resumos das plantas
L3
No. FOLHA: 08 L2
CONCRETO FCK: 18 MPa DATA:
PILARES QUANT. L1 L2 L3 VOL. AREA AÇO CA-50 AÇO CA-50 AÇO CA-50 AÇO CA-60 AÇO CA-60
(ALT.) (LARG.) (COMP.) CONC. FORMA ATÉ 4,76MM 6,25 A 9,52MM 12,70 A 25,40MM 3,40 A 6,00MM 6,40 A 9,50MM
(m) (m) (m) (m3) (m2) (kg) (kg) (kg) (kg) (kg)
PG21/22/23/24/25/26/27/28 8.00 3.21 0.25 0.60 3.85 43.66
P1C 1.00 3.21 0.25 0.66 0.53 5.84
P2C 1.00 3.21 0.30 0.80 0.77 7.06
P3C 1.00 3.21 0.18 0.92 0.53 7.06
P4C 1.00 3.21 0.18 0.80 0.46 6.29
P5C 1.00 3.21 0.18 0.66 0.38 5.39
P6C 1.00 3.21 0.38 0.40 0.49 5.01
P8C 1.00 3.21 0.30 0.80 0.77 7.06
P9C 1.00 3.21 0.23 1.20 0.89 9.18
P10C 1.00 3.21 0.23 1.00 0.74 7.90
P11C 1.00 3.21 0.18 0.66 0.38 5.39
P12C 1.00 3.21 0.18 0.80 0.46 6.29
P13C 1.00 3.21 0.18 1.05 0.61 7.90
P14C 1.00 3.21 0.18 1.04 0.60 7.83
P15C 1.00 3.21 0.23 1.00 0.74 7.90
P16C 1.00 3.21 0.18 1.00 0.58 7.58
P17C 1.00 3.21 0.18 1.05 0.61 7.90
P18C 1.00 3.21 0.18 1.05 0.61 7.90
P19C 1.00 3.21 0.18 0.66 0.38 5.39
P20C 1.00 3.21 0.18 0.80 0.46 6.29
P21C 1.00 3.21 0.18 0.23 1.00 2.63
P22C 1.00 3.21 0.18 0.92 0.53 7.06
P23C 1.00 3.21 0.38 0.40 0.49 5.01
P24C 1.00 3.21 0.30 0.80 0.77 7.06
P25C 1.00 3.21 0.23 1.20 0.89 9.18
P26C + P27C 1.00 3.21 3.14 0.11 1.11 6.66
P28C 1.00 3.21 0.25 1.20 0.96 9.31
P29C 1.00 3.21 0.18 0.92 0.53 7.06
P30C 1.00 3.21 0.25 0.80 0.64 6.74
PILARETES TORRE C 15.00 3.21 0.14 0.14 0.94 26.96
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
SUB-TOTAL 22.70 262.49 0.00 0.00 #REF! 0.00
SBD S/C LTDA

MEDIÇAO: FORMA/CONCRETO/ARMAÇÃO NA ESTRUTURA (VIGAS)

CLIENTE : CRITÉRIO ADOTADO:


OBRA : VConc. = L1 x L2 x L3 x Quant.
LOCAL : AForma =(2 x L2+L3) x L1 x Quant.
Obs.: Quant. de aço deverá ser
ASSUNTO: SUBSOLO - TORRE A E PISCINA obtida dos resumos das plantas
No. FOLHA: 06 E 05
CONCRETO FCK: 18 MPa DATA:
VIGAS QUANT. L1 L2 L3 VOL. AREA AÇO CA-50 AÇO CA-50 AÇO CA-50 AÇO CA-60 AÇO CA-60
(COMP) (ALT.) (LARG.) CONC. FORMA ATÉ 4,76MM 6,25 A 9,52MM 12,70 A 25,40MM 3,40 A 6,00MM 6,40 A 9,50MM
(m) (m) (m) (m3) (m2) (kg) (kg) (kg) (kg) (kg)
V101 A 1.00 2.30 0.40 0.19 0.17 2.28
V101 B 1.00 1.87 0.40 0.19 0.14 1.85
V101 C 1.00 1.71 0.40 0.19 0.13 1.69
V101 D 1.00 1.81 0.40 0.19 0.14 1.79
V101 E 1.00 1.51 0.40 0.19 0.11 1.49
V101F 1.00 1.80 0.40 0.19 0.14 1.78
V101 G 1.00 1.71 0.40 0.19 0.13 1.69
V102 A 1.00 1.71 0.40 0.19 0.13 1.69
V102 B 1.00 1.80 0.40 0.19 0.14 1.78
V102 C 1.00 1.71 0.40 0.19 0.13 1.69
V102 D 1.00 1.76 0.40 0.19 0.13 1.74
V102 E 1.00 1.76 0.40 0.19 0.13 1.74
V103 A 1.00 1.66 0.40 0.19 0.13 1.64
V103 B 1.00 1.85 0.40 0.19 0.14 1.83
V103 C 1.00 1.76 0.40 0.19 0.13 1.74
V104 A 1.00 1.76 0.40 0.19 0.13 1.74
V104 B 1.00 1.85 0.40 0.19 0.14 1.83
V104 C 1.00 1.76 0.40 0.19 0.13 1.74
V104 D 1.00 1.76 0.40 0.19 0.13 1.74
V104 E 1.00 1.46 0.40 0.19 0.11 1.45
V105 A 1.00 4.37 0.60 0.20 0.52 6.12
V105 B 1.00 3.81 0.60 0.20 0.46 5.33
V105 C 1.00 5.81 0.60 0.20 0.70 8.13
V105 D 1.00 5.81 0.60 0.20 0.70 8.13
V105 E 1.00 3.91 0.60 0.20 0.47 5.47
V106 A 1.00 4.40 0.60 0.25 0.66 6.38
V106 B 1.00 5.99 0.60 0.25 0.90 8.69
V107 A 1.00 4.58 0.50 0.18 0.41 5.40
V107 B 1.00 2.81 0.50 0.18 0.25 3.32
V108 * 1.00 6.35 0.60 0.25 0.95 9.21
V108 A 1.00 3.91 0.60 0.25 0.59 5.67
V108 B 1.00 4.85 0.70 0.25 0.85 8.00
V108 C 1.00 6.10 0.70 0.25 1.07 10.07
V108 D 1.00 3.65 0.70 0.25 0.64 6.02
V109 1.00 5.24 0.50 0.18 0.47 6.18
V110 A 1.00 2.90 0.50 0.18 0.26 3.42
V110 B 1.00 4.25 0.60 0.18 0.46 5.87
V111 1.00 2.72 0.50 0.18 0.24 3.21
V112 1.00 3.02 0.50 0.18 0.27 3.56
V113 A 1.00 4.15 0.60 0.25 0.62 6.02
V113 B 1.00 4.40 0.70 0.25 0.77 7.26
V113 C 1.00 6.05 0.70 0.25 1.06 9.98
V113 D 1.00 3.45 0.70 0.25 0.60 5.69
V113 E 1.00 2.10 0.40 0.14 0.12 1.97
V113 F 1.00 1.95 0.40 0.14 0.11 1.83
V114 A 1.00 2.72 0.50 0.18 0.24 3.21
V114 B 1.00 1.87 1.00 0.18 0.34 4.08
V115 A 2.00 1.63 0.60 0.18 0.35 4.50
V115 B 2.00 1.85 0.50 0.18 0.33 4.37
V116 1.00 3.70 0.60 0.23 0.51 5.29
V117 A 1.00 2.90 0.50 0.18 0.26 3.42
V117 B 1.00 1.87 1.00 0.18 0.34 4.08
V118 * 1.00 6.40 0.60 0.25 0.96 9.28
V118 A 1.00 4.15 0.60 0.25 0.62 6.02
V118 B 1.00 4.40 0.70 0.25 0.77 7.26
V118 C 1.00 6.05 0.70 0.25 1.06 9.98
V118 D 1.00 3.45 0.70 0.25 0.60 5.69
V119 A 1.00 2.80 0.50 0.18 0.25 3.30
V119 B 1.00 4.25 0.60 0.18 0.46 5.87
V120 1.00 2.80 0.50 0.18 0.25 3.30
V121 1.00 2.10 0.50 0.18 0.19 2.48
V121 * 1.00 4.30 0.60 0.18 0.46 5.93
V122 1.00 5.11 0.50 0.18 0.46 6.03
V123 A 1.00 4.30 0.50 0.18 0.39 5.07
V123 B 1.00 2.80 0.50 0.18 0.25 3.30
V124 A 1.00 4.41 0.60 0.25 0.66 6.39
V124 B 1.00 6.05 0.60 0.25 0.91 8.77
V124 A* 1.00 3.90 0.60 0.25 0.59 5.66
V124 B* 1.00 3.65 0.70 0.25 0.64 6.02
V124 C* 1.00 6.05 0.70 0.25 1.06 9.98
V124 D* 1.00 3.45 0.70 0.25 0.60 5.69
V125 A 1.00 3.95 0.70 0.18 0.50 6.24
V125 B 1.00 5.95 0.70 0.18 0.75 9.40
V125 C 1.00 3.40 0.70 0.18 0.43 5.37
V125 D 1.00 5.35 0.70 0.18 0.67 8.45
V125 E 1.00 6.40 0.70 0.25 1.12 10.56
V125 F 1.00 8.20 0.70 0.25 1.44 13.53
V125 G 1.00 3.85 0.60 0.25 0.58 5.58
V126 A 1.00 2.55 0.40 0.19 0.19 2.52
V126 B 1.00 2.65 0.40 0.19 0.20 2.62
V126 C 1.00 2.60 0.40 0.19 0.20 2.57
V127 A 1.00 2.60 0.40 0.19 0.20 2.57
V127 B 1.00 2.60 0.40 0.19 0.20 2.57
V127 C 1.00 2.60 0.40 0.19 0.20 2.57
V127 D 1.00 2.60 0.40 0.19 0.20 2.57
V128 A 1.00 2.60 0.40 0.19 0.20 2.57
V128 B 1.00 2.65 0.40 0.19 0.20 2.62
V128 C 1.00 2.30 0.40 0.19 0.17 2.28
V29/101 1.00 0.60 1.01 0.29 0.18 1.39
V129 A 1.00 2.35 0.50 0.18 0.21 2.77
V129 B 1.00 2.40 1.00 1.00 2.40 7.20
V129 C 1.00 2.40 0.50 0.18 0.22 2.83
V130 A 1.00 6.30 0.60 0.25 0.95 9.14
V130 B 1.00 4.60 0.50 0.18 0.41 5.43
V131 A 1.00 4.55 0.50 0.18 0.41 5.37
V131 B 1.00 3.15 0.60 0.18 0.34 4.35
V132 A 1.00 6.15 0.60 0.25 0.92 8.92
V132 B 1.00 4.20 0.60 0.18 0.45 5.80
V132 C 1.00 4.20 0.60 0.23 0.58 6.01
V132 D 1.00 3.95 0.60 0.23 0.55 5.65
V132 E 1.00 4.30 0.60 0.18 0.46 5.93
V132 F 1.00 2.70 0.60 0.18 0.29 3.73
V133 1.00 1.70 0.50 0.13 0.11 1.92
V134 1.00 4.40 0.50 0.18 0.40 5.19
V135 1.00 4.35 0.50 0.18 0.39 5.13
V136 1.00 5.95 0.60 0.25 0.89 8.63
V137 A 1.00 3.60 0.60 0.25 0.54 5.22
V137 B 1.00 1.90 0.50 0.18 0.17 2.24
V137 C 1.00 3.40 0.60 0.25 0.51 4.93
V138 1.00 2.70 0.60 0.18 0.29 3.73
V139 1.00 2.45 0.40 0.13 0.13 2.28
V140 1.00 2.75 0.40 0.13 0.14 2.56
V141 1.00 2.75 0.40 0.13 0.14 2.56
V142 1.00 6.10 0.70 0.25 1.07 10.07
V143 1.00 1.60 0.60 0.18 0.17 2.21
V144 A 1.00 3.05 0.60 0.25 0.46 4.42
V144 B 1.00 2.90 0.60 0.25 0.44 4.21
V144 C 1.00 2.45 0.60 0.25 0.37 3.55
V144 D 1.00 2.92 0.60 0.25 0.44 4.23
V144 E 1.00 3.00 0.60 0.25 0.45 4.35
V145 A 1.00 1.55 0.60 0.18 0.17 2.14
V145 B 1.00 2.90 0.60 0.18 0.31 4.00
V146 A 1.00 6.25 0.70 0.25 1.09 10.31
V146 B 1.00 6.25 0.70 0.25 1.09 10.31
V146 C 1.00 6.25 0.70 0.25 1.09 10.31
V146 D 1.00 2.10 0.60 0.25 0.32 3.05
V147 1.00 6.20 0.70 0.25 1.09 10.23
V148 A 1.00 6.25 0.70 0.25 1.09 10.31
V148 B 1.00 6.25 0.70 0.25 1.09 10.31
V148 C 1.00 6.25 0.70 0.25 1.09 10.31
V148 D 1.00 2.35 0.60 0.25 0.35 3.41
V149 1.00 6.20 0.70 0.25 1.09 10.23
V150 A 1.00 6.20 0.70 0.25 1.09 10.23
V150 B 1.00 6.25 0.70 0.25 1.09 10.31
V150 C 1.00 6.25 0.70 0.25 1.09 10.31
V150 D 1.00 6.25 0.70 0.25 1.09 10.31
V150 E 1.00 2.55 0.60 0.25 0.38 3.70
V151 A 1.00 1.94 0.40 0.19 0.15 1.92
V151 B 1.00 1.75 0.40 0.19 0.13 1.73
V151 C 1.00 1.86 0.40 0.19 0.14 1.84
V152 A 1.00 1.86 0.40 0.19 0.14 1.84
V152 B 1.00 1.75 0.40 0.19 0.13 1.73
V152 C 1.00 1.86 0.40 0.19 0.14 1.84
V152 D 1.00 1.86 0.40 0.19 0.14 1.84
V153 A 1.00 1.75 0.40 0.19 0.13 1.73
V153 B 1.00 1.75 0.40 0.19 0.13 1.73
V153 C 1.00 1.86 0.40 0.19 0.14 1.84
V154 A 1.00 1.75 0.40 0.19 0.13 1.73
V154 B 1.00 1.86 0.40 0.19 0.14 1.84
V154 C 1.00 2.92 0.40 0.19 0.22 2.89
PISCINA 0.00 0.00
VP1 1.00 1.68 0.95 0.14 0.22 3.43
VP2 1.00 1.68 0.95 0.14 0.22 3.43
VP3 1.00 20.00 1.25 0.14 3.50 52.80
VP4 1.00 2.00 0.95 0.14 0.27 4.08
VP5 1.00 3.80 1.25 0.14 0.67 10.03
VP6 1.00 4.05 1.25 0.14 0.71 10.69
VP7 A 1.00 3.80 0.95 0.14 0.51 7.75
VP7 B 1.00 3.35 0.95 0.14 0.45 6.83
VP8 1.00 8.00 1.25 0.14 1.40 21.12
VP9 1.00 3.45 1.25 0.14 0.60 9.11
VP10 1.00 1.70 0.95 0.14 0.23 3.47
VP11 1.00 1.75 0.95 0.14 0.23 3.57
VP12 1.00 2.00 0.95 0.14 0.27 4.08
VP13 1.00 3.90 0.95 0.14 0.52 7.96
VP14 A 1.00 2.10 0.95 0.14 0.28 4.28
VP14 B 1.00 6.40 0.95 0.14 0.85 13.06
VP14 C 1.00 6.34 0.95 0.14 0.84 12.93
VP14 D 1.00 4.25 0.95 0.14 0.57 8.67
VP15 1.00 16.30 0.95 0.14 2.17 33.25
VP16 A 1.00 4.80 0.95 0.14 0.64 9.79
VP16 B 1.00 4.35 0.95 0.14 0.58 8.87
VP16 C 1.00 2.45 0.95 0.14 0.33 5.00
VP16 D 1.00 2.70 1.25 0.14 0.47 7.13
VP 17 1.00 3.30 1.25 0.14 0.58 8.71
VP18 A 1.00 4.40 0.95 0.14 0.59 8.98
VP18 B 1.00 1.35 0.95 0.14 0.18 2.75
VP19 1.00 1.86 0.95 0.14 0.25 3.79
VP20 1.00 0.75 0.95 0.14 0.10 1.53
VP21 1.00 0.75 0.95 0.14 0.10 1.53
VP22 A 1.00 4.05 0.95 0.14 0.54 8.26
VP22 B 1.00 1.80 0.95 0.14 0.24 3.67
VP23 1.00 1.86 0.95 0.14 0.25 3.79
VP24 1.00 3.30 1.25 0.14 0.58 8.71
VP25 1.00 2.05 0.95 0.14 0.27 4.18
VP26 A 1.00 1.90 0.95 0.14 0.25 3.88
VP26 B 1.00 5.55 0.95 0.14 0.74 11.32
VP27 A 1.00 3.30 1.25 0.14 0.58 8.71
VP27 B 1.00 1.40 0.95 0.14 0.19 2.86
VP28 1.00 2.10 0.95 0.14 0.28 4.28
VP29 1.00 1.30 0.95 0.14 0.17 2.65
VP30 1.00 7.70 0.95 0.14 1.02 15.71
VP31 1.00 8.84 0.40 0.14 0.50 8.31
VF A 1.00 16.30 0.50 0.14 1.14 18.58
SUB-TOTAL 94.84 1,115.17 0.00 0.00 0.00 0.00 0.00
SBD S/C LTDA

MEDIÇAO: FORMA/CONCRETO/ARMAÇÃO NA ESTRUTURA (VIGAS)


CLIENTE : CRITÉRIO ADOTADO:
OBRA : VConc. = L1 x L2 x L3 x Quant.
LOCAL : AForma =(2 x L2+L3) x L1 x Quant.
Obs.: Quant. de aço deverá ser
ASSUNTO: SUBSOLO - TORRE B obtida dos resumos das plantas
No. FOLHA: 07
CONCRETO FCK: 18 MPa DATA:
VIGAS QUANT. L1 L2 L3 VOL. AREA AÇO CA-50 AÇO CA-50 AÇO CA-50 AÇO CA-60 AÇO CA-60
(COMP) (ALT.) (LARG.) CONC. FORMA ATÉ 4,76MM 6,25 A 9,52MM 12,70 A 25,40MM 3,40 A 6,00MM 6,40 A 9,50MM
(m) (m) (m) (m3) (m2) (kg) (kg) (kg) (kg) (kg)
V155 A 1.00 13.50 0.70 0.18 1.70 21.33
V155 B 1.00 18.80 0.70 0.25 3.29 31.02
V155 C 1.00 3.50 0.60 0.25 0.53 5.08
V156 1.00 5.28 0.50 0.18 0.48 6.23
V157 1.00 3.02 0.50 0.18 0.27 3.56
V158 1.00 4.25 0.60 0.18 0.46 5.87
V159 1.00 2.25 0.50 0.18 0.20 2.66
V160/V167 A 2.00 4.15 0.60 0.25 1.25 12.04
V160/V167 B 2.00 4.35 0.50 0.25 1.09 10.88
V161 1.00 10.70 0.70 0.25 1.87 17.66
V162/V166 A 2.00 3.10 0.50 0.18 0.56 7.32
V162/V166 B 2.00 2.00 1.00 0.18 0.72 8.72
V163/V165 A 2.00 1.48 0.60 0.18 0.32 4.08
V163/V165 B 2.00 1.85 0.50 0.18 0.33 4.37
V164 1.00 3.70 0.60 0.23 0.51 5.29
V168 1.00 11.20 0.70 0.25 1.96 18.48
V169 1.00 4.25 0.60 0.18 0.46 5.87
V170 1.00 2.80 0.50 0.18 0.25 3.30
V171 1.00 2.45 0.50 0.18 0.22 2.89
V172 1.00 5.15 0.50 0.18 0.46 6.08
V169 A 1.00 4.78 0.50 0.18 0.43 5.64
V173 A 1.00 7.70 0.60 0.18 0.83 10.63
V173 B 1.00 27.35 0.70 0.25 4.79 45.13
V174 1.00 17.66 0.40 0.19 1.34 17.48
V175 1.00 18.30 0.60 0.25 2.75 26.54
V176 1.00 12.94 0.60 0.18 1.40 17.86
V177 A 1.00 4.42 0.60 0.25 0.66 6.41
V177 B 1.00 0.20 1.01 0.25 0.05 0.45
V178 A 1.00 4.62 0.60 0.18 0.50 6.38
V178 B 1.00 0.56 1.01 0.13 0.07 1.20
V179 A 1.00 3.70 0.60 0.18 0.40 5.11
V179 B 1.00 11.50 0.60 0.23 1.59 16.45
V179 C 1.00 1.68 0.60 0.18 0.18 2.32
V179 D 1.00 0.35 1.01 0.25 0.09 0.79
V180 1.00 1.68 0.50 0.13 0.11 1.90
V181/V182 2.00 4.38 0.50 0.18 0.79 10.34
V183 1.00 7.98 0.50 0.18 0.72 9.42
V184 1.00 2.54 0.40 0.13 0.13 2.36
V185/V186 2.00 2.75 0.40 0.13 0.29 5.12
V187 A 1.00 3.04 0.70 0.39 0.83 5.44
V187 B 1.00 10.83 0.70 0.25 1.90 17.87
V188 1.00 1.10 1.01 0.66 0.73 2.95
V189 1.00 2.10 1.01 0.66 1.40 5.63
V190 1.00 18.18 0.60 0.25 2.73 26.36
V191 A 1.00 18.25 0.60 0.25 2.74 26.46
V191 B 1.00 12.30 0.60 0.20 1.48 17.22
V192 1.00 16.28 0.40 0.19 1.24 16.12
VF A 1.00 12.66 0.50 0.14 0.89 14.43
VF B 1.00 12.66 0.50 0.19 1.20 15.07
0.00 0.00
0.00 0.00
SUB-TOTAL 49.19 521.81 0.00 0.00 0.00 0.00 0.00
SBD S/C LTDA

MEDIÇAO: FORMA/CONCRETO/ARMAÇÃO NA ESTRUTURA (VIGAS)


CLIENTE : CRITÉRIO ADOTADO:
OBRA : VConc. = L1 x L2 x L3 x Quant.
LOCAL : AForma =(2 x L2+L3) x L1 x Quant.
Obs.: Quant. de aço deverá ser
ASSUNTO: SUBSOLO - TORRE C obtida dos resumos das plantas
No. FOLHA: 08
CONCRETO FCK: 18 MPa DATA:
VIGAS QUANT. L1 L2 L3 VOL. AREA AÇO CA-50 AÇO CA-50 AÇO CA-50 AÇO CA-60 AÇO CA-60
(COMP) (ALT.) (LARG.) CONC. FORMA ATÉ 4,76MM 6,25 A 9,52MM 12,70 A 25,40MM 3,40 A 6,00MM 6,40 A 9,50MM
(m) (m) (m) (m3) (m2) (kg) (kg) (kg) (kg) (kg)
V194 A 1.00 7.70 0.60 0.18 0.83 10.63
V194 B 1.00 28.80 0.70 0.18 3.63 45.50
V195 1.00 11.30 0.70 0.25 1.98 18.65
V196 A 1.00 11.95 0.70 0.25 2.09 19.72
V196 B 1.00 3.90 0.60 0.25 0.59 5.66
V197 A 1.00 4.50 0.60 0.25 0.68 6.53
V197 B 1.00 2.80 0.60 0.18 0.30 3.86
V 198 1.00 5.15 0.50 0.18 0.46 6.08
V199 1.00 2.40 0.50 0.18 0.22 2.83
V200 1.00 2.72 0.50 0.18 0.24 3.21
V201 1.00 7.10 0.60 0.18 0.77 9.80
V202 A 1.00 11.80 0.70 0.25 2.07 19.47
V202 B 1.00 3.85 0.60 0.25 0.58 5.58
V203/V207 A 2.00 3.11 0.50 0.18 0.56 7.34
V203/V207B 2.00 2.00 1.00 0.18 0.72 8.72
V204/V206 A 2.00 1.50 0.60 0.18 0.32 4.14
V204/V206B 2.00 1.85 0.50 0.18 0.33 4.37
V205 1.00 4.45 0.60 0.23 0.61 6.36
V209 1.00 4.30 0.60 0.18 0.46 5.93
V210 1.00 2.75 0.50 0.18 0.25 3.25
V211 1.00 2.40 0.50 0.18 0.22 2.83
V208 A 1.00 11.35 0.70 0.25 1.99 18.73
V208 B 1.00 4.00 0.60 0.25 0.60 5.80
V212 1.00 8.60 0.60 0.18 0.93 11.87
V213 1.00 5.20 0.50 0.18 0.47 6.14
V214 A 1.00 10.51 0.70 0.25 1.84 17.34
V214 B 1.00 6.80 0.60 0.25 1.02 9.86
V215 A 1.00 8.10 0.60 0.25 1.22 11.75
V215 B 1.00 7.75 0.40 0.19 0.59 7.67
V216/V217/V218 3.00 6.20 0.40 0.19 1.41 18.41
V219 1.00 7.14 0.40 0.19 0.54 7.07
V220 1.00 9.95 0.40 0.19 0.76 9.85
V221 1.00 7.42 0.50 0.18 0.67 8.76
V222 A 1.00 4.62 0.60 0.18 0.50 6.38
V222 B 1.00 6.60 0.60 0.25 0.99 9.57
V223 A 1.00 6.40 0.50 0.18 0.58 7.55
V223 B 1.00 5.80 0.60 0.23 0.80 8.29
V223 C 1.00 1.45 0.60 0.18 0.16 2.00
V223 D 1.00 3.71 0.60 0.18 0.40 5.12
V223 E 1.00 5.90 0.60 0.25 0.89 8.56
V224 1.00 1.68 0.50 0.13 0.11 1.90
V225/V226 2.00 4.38 0.50 0.18 0.79 10.34
V227 1.00 3.20 0.50 0.18 0.29 3.78
V228 1.00 7.98 0.50 0.18 0.72 9.42
V229 1.00 5.90 0.60 0.25 0.89 8.56
V230 1.00 2.54 0.40 0.13 0.13 2.36
V231/V232 2.00 2.74 0.40 0.13 0.28 5.10
V233 A 1.00 1.35 1.01 0.66 0.90 3.62
V233 B 1.00 3.00 0.70 0.39 0.82 5.37
V233 C 1.00 13.00 0.70 0.25 2.28 21.45
V234 1.00 3.55 0.50 0.18 0.32 4.19
V235 1.00 5.90 0.60 0.25 0.89 8.56
V236 1.00 24.33 0.60 0.25 3.65 35.28
V237 1.00 27.95 0.60 0.25 4.19 40.53
V238 A 1.00 28.05 0.60 0.25 4.21 40.67
V238 B 1.00 28.40 0.60 0.20 3.41 39.76
V239 A 1.00 24.95 0.40 0.19 1.90 24.70
VF A 1.00 29.30 0.50 0.14 2.05 33.40
VF B 1.00 29.30 0.50 0.19 2.78 34.87
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
SUB-TOTAL 64.88 715.04 0.00 0.00 0.00 0.00 0.00
SBD S/C LTDA

MEDIÇAO: FORMA/CONCRETO/ARMAÇÃO NA ESTRUTURA (LAJES)

CLIENTE : CRITÉRIO ADOTADO:


OBRA : VConc. = L1 x L2 x L3 x Quant.
LOCAL : AForma =(L1 x L2) x Quant.
Obs.: Quant. de aço deverá ser
ASSUNTO: SUBSOLO - TORRE A E PISCINA obtida dos resumos das plantas
No. FOLHA: 06 E 05
CONCRETO FCK: 18 MPa DATA:
LAJES QUANT. L1 L2 L3 VOL. AREA AÇO CA-50 AÇO CA-50 AÇO CA-50 AÇO CA-60
(LARG.) (COMP) (ESP) CONC. FORMA ATÉ 4,76MM 6,25 A 9,52MM 12,70 A 25,40MM 3,40 A 6,00MM
(m) (m) (m) (m3) (m2) (kg) (kg) (kg) (kg)
L1 1.00 2.43 4.37 0.10 1.06 10.62
L2 1.00 2.60 3.81 0.10 0.99 9.91
L3 1.00 2.00 5.40 0.10 1.08 10.80
L4 1.00 2.18 6.00 0.10 1.31 13.08
L5 1.00 1.43 4.01 0.10 0.57 5.73
L6 2.00 1.65 5.77 0.10 1.90 19.04
L7 1.00 1.80 5.90 0.10 1.06 10.62
L8 1.00 2.00 3.90 0.10 0.78 7.80
L9 1.00 4.37 4.62 0.10 2.02 20.19
L10 1.00 3.40 4.62 0.10 1.57 15.71
L11 1.00 4.35 4.35 0.10 1.89 18.92
L12 A 1.00 4.35 7.15 0.10 3.11 31.10
L12 B 1.00 0.30 1.57 0.10 0.05 0.47
L12 C 1.00 2.75 0.65 0.10 0.18 1.79
L12 D 1.00 0.45 3.45 0.10 0.16 1.55
L13 A 1.00 4.01 6.23 0.12 3.00 24.98
L13 B 1.00 0.25 3.50 0.12 0.11 0.88
L14 A 1.00 5.20 6.23 0.12 3.89 32.40
L15 A 1.00 4.43 3.70 0.15 2.46 16.39
L15 B 1.00 1.58 3.70 0.15 0.88 5.85
L16 A 1.00 1.28 6.25 0.15 1.20 8.00
L16 B 2.00 2.40 6.25 0.15 4.50 30.00
L17 1.00 2.90 7.75 0.10 2.25 22.48
L18/L19 A 2.00 0.80 2.45 0.10 0.39 3.92
L18/L19 B 2.00 3.75 4.25 0.10 3.19 31.88
L20/L22 2.00 3.75 5.20 0.10 3.90 39.00
L21 1.00 1.53 1.28 0.10 0.20 1.96
L23/L26 2.00 2.75 3.04 0.10 1.67 16.72
L24/L27 2.00 2.95 3.02 0.10 1.78 17.82
L25 C 1.00 1.43 2.35 0.15 0.50 3.36
L15 D 1.00 2.35 4.80 0.15 1.69 11.28
L25 1.00 1.95 2.54 0.10 0.50 4.95
L28 1.00 4.10 6.23 0.12 3.07 25.54
L29 1.00 4.80 6.23 0.12 3.59 29.90
L30 A 1.00 1.73 1.55 0.15 0.40 2.68
L30 B 1.00 1.73 0.50 0.15 0.13 0.87
L30 C 1.00 1.25 1.95 0.15 0.37 2.44
L30 D 1.00 3.90 1.50 0.15 0.88 5.85
L30 E 1.00 4.55 6.25 0.15 4.27 28.44
L31 A 1.00 1.68 6.20 0.15 1.56 10.42
L31 B 1.00 2.13 1.75 0.15 0.56 3.73
L31 C 1.00 2.00 2.70 0.15 0.81 5.40
L31 D 1.00 1.88 1.60 0.15 0.45 3.01
L32 1.00 4.35 4.62 0.10 2.01 20.10
L33 1.00 3.40 4.60 0.10 1.56 15.64
L34 1.00 4.40 4.40 0.10 1.94 19.36
L35 A 1.00 1.00 4.40 0.10 0.44 4.40
L35 B 1.00 3.15 4.95 0.10 1.56 15.59
L35 C 1.00 3.02 4.80 0.10 1.45 14.50
L35D 1.00 0.25 1.55 0.10 0.04 0.39
L36 A 1.00 1.40 3.90 0.12 0.66 5.46
L36 B 1.00 4.10 4.85 0.12 2.39 19.89
L37 A 1.00 4.40 4.15 0.12 2.19 18.26
L37 B 1.00 1.80 1.90 0.12 0.41 3.42
L37 C 1.00 2.25 1.90 0.12 0.51 4.28
L38 A 1.00 2.05 2.80 0.15 0.86 5.74
L38 B 1.00 4.25 2.80 0.15 1.79 11.90
L38 C 1.00 6.38 3.20 0.15 3.06 20.42
L39 A 1.00 2.10 6.25 0.15 1.97 13.13
L39 A 1.00 1.60 6.25 0.15 1.50 10.00
L40 1.00 4.30 6.65 0.10 2.86 28.60
L41 1.00 3.30 6.65 0.10 2.19 21.95
L42 1.00 5.95 6.00 0.12 4.28 35.70
L43 1.00 5.30 6.00 0.12 3.82 31.80
L44 A 1.00 0.35 5.95 0.12 0.25 2.08
L44 B 1.00 5.95 6.35 0.12 4.53 37.78
L45 A 1.00 1.88 1.81 0.12 0.41 3.40
L45 B 1.00 1.40 1.95 0.12 0.33 2.73
L45 C 1.00 3.35 4.35 0.12 1.75 14.57
L46 A 1.00 3.58 2.20 0.15 1.18 7.88
L46 B+L47 B 1.00 1.00 12.59 0.15 1.89 12.59
L47 A 1.00 3.80 2.20 0.15 1.25 8.36
L46 C 1.00 1.00 12.19 0.15 1.83 12.19
L47 C 1.00 1.00 10.73 0.15 1.61 10.73
L ESCADA 1.00 4.85 2.54 0.12 1.48 12.32
LAJE PISCINA 0.00 0.00
L101 A 1.00 3.83 2.00 0.10 0.77 7.66
L101 B 1.00 0.20 1.00 0.10 0.02 0.20
L102 1.00 1.88 6.70 0.10 1.26 12.60
L103 1.00 1.65 5.80 0.10 0.96 9.57
L104 1.00 2.48 6.45 0.10 1.60 16.00
L105 1.00 3.86 3.26 0.10 1.26 12.58
L106 1.00 6.85 6.40 0.12 5.26 43.84
L107/L108 2.00 0.76 1.70 0.10 0.26 2.58
L110 1.00 1.63 7.05 0.10 1.15 11.49
L111 1.00 3.35 3.25 0.10 1.09 10.89
L109 A 1.00 6.34 5.45 0.12 4.15 34.55
L109 B 1.00 1.85 1.40 0.12 0.31 2.59
L109 C 1.00 1.30 1.38 0.12 0.22 1.79
L112 A 1.00 2.00 4.25 0.12 1.02 8.50
L112 B 1.00 4.75 6.45 0.12 3.68 30.64
L113 A 1.00 1.70 0.70 0.10 0.12 1.19
L113 B 1.00 2.20 2.95 0.10 0.65 6.49
L113 C 1.00 1.55 4.60 0.10 0.71 7.13
L114 1.00 1.76 1.92 0.10 0.34 3.38
LF3 1.00 2.08 6.35 0.10 1.32 13.21
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
SUB-TOTAL 146.08 1,249.52 0.00 0.00 0.00 0.00
SBD S/C LTDA

MEDIÇAO: FORMA/CONCRETO/ARMAÇÃO NA ESTRUTURA (LAJES)


CLIENTE : CRITÉRIO ADOTADO:
OBRA : VConc. = L1 x L2 x L3 x Quant.
LOCAL : AForma =(L1 x L2) x Quant.
Obs.: Quant. de aço deverá ser
ASSUNTO: SUBSOLO - TORRE B obtida dos resumos das plantas
No. FOLHA: 07
CONCRETO FCK: 18 MPa DATA:
LAJES QUANT. L1 L2 L3 VOL. AREA AÇO CA-50 AÇO CA-50 AÇO CA-50 AÇO CA-60
(LARG.) (COMP) (ESP) CONC. FORMA ATÉ 4,76MM 6,25 A 9,52MM 12,70 A 25,40MM 3,40 A 6,00MM
(m) (m) (m) (m3) (m2) (kg) (kg) (kg) (kg)
L48/L71 2.00 4.10 6.10 0.10 5.00 50.02
L49 A 1.00 1.60 5.36 0.10 0.86 8.58
L49 B 1.00 4.55 6.60 0.10 3.00 30.03
L50 1.00 3.43 5.36 0.10 1.84 18.38
L51 1.00 4.30 4.38 0.10 1.88 18.83
L52 A 1.00 4.38 7.15 0.10 3.13 31.32
L52 B 1.00 2.70 0.60 0.10 0.16 1.62
L52 C 1.00 3.45 0.45 0.10 0.16 1.55
L53 A 1.00 3.70 3.75 0.10 1.39 13.88
L53 B 1.00 3.45 2.40 0.10 0.83 8.28
L54 1.00 4.43 6.10 0.10 2.70 27.02
L55 A 1.00 0.45 3.08 0.10 0.14 1.39
L55 B 1.00 3.70 6.15 0.10 2.28 22.76
L56 1.00 4.10 6.13 0.10 2.51 25.13
L57 1.00 4.55 6.13 0.10 2.79 27.89
L58/L59 2.00 3.76 5.03 0.10 3.78 37.83
L60 1.00 3.75 5.24 0.10 1.97 19.65
L61 1.00 2.75 3.05 0.10 0.84 8.39
L62 1.00 3.05 3.00 0.10 0.92 9.15
L63 1.00 1.68 1.48 0.10 0.25 2.49
L64 1.00 1.90 2.45 0.10 0.47 4.66
L65 1.00 3.75 5.20 0.10 1.95 19.50
L66 1.00 3.21 2.74 0.10 0.88 8.80
L67 1.00 3.03 2.92 0.10 0.88 8.85
L68 1.00 3.70 6.23 0.10 2.31 23.05
L69 1.00 3.93 6.23 0.10 2.45 24.48
L70 1.00 3.10 6.23 0.10 1.93 19.31
L72 1.00 4.55 6.15 0.10 2.80 27.98
L73 A 1.00 1.65 4.60 0.10 0.76 7.59
L73 B 1.00 3.10 4.60 0.10 1.43 14.26
L73 C 1.00 0.45 1.65 0.10 0.07 0.74
L73 D 1.00 0.45 3.10 0.10 0.14 1.40
L74 1.00 4.40 4.35 0.10 1.91 19.14
L75 A 1.00 2.80 0.60 0.10 0.17 1.68
L75 B 1.00 3.30 0.40 0.10 0.13 1.32
L75 C 1.00 4.35 7.05 0.10 3.07 30.67
L76 A 1.00 3.70 6.10 0.10 2.26 22.57
L77 A 1.00 3.48 6.10 0.10 2.12 21.23
L78 1.00 3.13 6.15 0.10 1.92 19.25
LF 2.00 0.60 6.18 0.10 0.74 7.42
L ESCADA 1.00 4.80 2.54 0.10 1.22 12.19
0.00 0.00
0.00 0.00
SUB-TOTAL 66.04 660.28 0.00 0.00 0.00 0.00
SBD S/C LTDA

MEDIÇAO: FORMA/CONCRETO/ARMAÇÃO NA ESTRUTURA (LAJES)

CLIENTE : CRITÉRIO ADOTADO:


OBRA : VConc. = L1 x L2 x L3 x Quant.
LOCAL : AForma =(L1 x L2) x Quant.
Obs.: Quant. de aço deverá ser
ASSUNTO: SUBSOLO - TORRE C obtida dos resumos das plantas
No. FOLHA: 08
CONCRETO FCK: 18 MPa DATA:
LAJES QUANT. L1 L2 L3 VOL. AREA AÇO CA-50 AÇO CA-50 AÇO CA-50 AÇO CA-60
(LARG.) (COMP) (ESP) CONC. FORMA ATÉ 4,76MM 6,25 A 9,52MM 12,70 A 25,40MM 3,40 A 6,00MM
(m) (m) (m) (m3) (m2) (kg) (kg) (kg) (kg)
L79 1.00 4.25 6.65 0.10 2.83 28.26
L80 1.00 3.36 6.65 0.10 2.23 22.34
L81 1.00 5.20 5.90 0.10 3.07 30.68
L82 1.00 6.40 5.90 0.10 3.78 37.76
L83 1.00 3.35 6.90 0.10 2.31 23.12
L84 1.00 4.53 6.90 0.10 3.13 31.26
L85 1.00 4.53 6.90 0.10 3.13 31.26
L86 1.00 3.25 6.90 0.10 2.24 22.43
L87 1.00 4.55 4.25 0.10 1.93 19.34
L88 1.00 3.40 4.55 0.10 1.55 15.47
L89 1.00 4.40 4.35 0.10 1.91 19.14
L90 A 1.00 1.00 4.40 0.10 0.44 4.40
L90 B 1.00 2.75 4.95 0.10 1.36 13.61
L90 C 1.00 3.40 4.80 0.10 1.63 16.32
L90 D 1.00 0.25 1.57 0.10 0.04 0.39
L91 A 1.00 3.60 5.50 0.10 1.98 19.80
L91 B 1.00 3.35 0.75 0.10 0.25 2.51
L92 1.00 4.10 6.25 0.10 2.56 25.63
L93 A 1.00 0.25 3.15 0.10 0.08 0.79
L94 1.00 3.20 6.30 0.10 2.02 20.16
L95 A 1.00 0.63 2.20 0.10 0.14 1.39
L95 B 1.00 0.40 0.55 0.10 0.02 0.22
L95 C 1.00 2.70 7.30 0.10 1.97 19.71
L96/L97 2.00 3.75 5.00 0.10 3.75 37.50
L98 A 1.00 0.75 2.55 0.10 0.19 1.91
L98 B 1.00 0.50 2.50 0.10 0.13 1.25
L99 2.00 3.70 5.24 0.10 3.88 38.78
L102 1.00 1.68 1.48 0.10 0.25 2.49
L100/L105 2.00 3.11 2.75 0.10 1.71 17.11
L101/L106 2.00 3.02 2.92 0.10 1.76 17.64
L103 1.00 1.95 2.54 0.10 0.50 4.95
L107 1.00 3.60 6.10 0.10 2.20 21.96
L108 1.00 3.68 6.20 0.10 2.28 22.82
L109 A 1.00 0.50 3.15 0.10 0.16 1.58
L109 B 1.00 4.28 6.30 0.10 2.70 26.96
L110 A 1.00 0.40 3.15 0.10 0.13 1.26
L110 B 1.00 3.03 6.30 0.10 1.91 19.09
L111 1.00 4.35 4.40 0.10 1.91 19.14
L112 A 1.00 3.25 4.80 0.10 1.56 15.60
L112 B 1.00 2.80 4.95 0.10 1.39 13.86
L112 C 1.00 1.00 4.35 0.10 0.44 4.35
L113 A 1.00 3.25 1.75 0.10 0.57 5.69
L113 B 1.00 3.65 2.97 0.10 1.08 10.84
L114 1.00 3.30 4.65 0.10 1.53 15.35
L115 A 1.00 0.40 3.15 0.10 0.13 1.26
L115 B 1.00 4.30 6.30 0.10 2.71 27.09
L116 A 1.00 0.45 3.15 0.10 0.14 1.42
L116 B 1.00 3.03 6.30 0.10 1.91 19.09
L117 1.00 3.08 5.35 0.10 1.65 16.48
L118 1.00 3.35 6.50 0.10 2.18 21.78
L119 A 1.00 3.70 6.50 0.10 2.41 24.05
L119 B 1.00 0.20 3.90 0.10 0.08 0.78
L120 A 1.00 0.20 1.10 0.10 0.02 0.22
L120 B 1.00 2.28 4.40 0.10 1.00 10.03
L121 A 1.00 0.15 1.20 0.10 0.02 0.18
L121 B 1.00 2.48 3.20 0.10 0.79 7.94
LF 1.00 0.60 29.00 0.10 1.74 17.40
L ESC. 1.00 4.80 2.54 0.10 1.22 12.19
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
SUB-TOTAL 86.63 866.03 0.00 0.00 0.00 0.00
SBD S/C LTDA

MEDIÇAO: FORMA/CONCRETO/ARMAÇÃO NA ESTRUTURA (PILARES)


CRITÉRIO ADOTADO:
CLIENTE :
OBRA : VConc. = L1 x L2 x L3 x Quant.
LOCAL : AForma =2(L2+ L3) x L1xQuant. L1
Obs.: Quant. de aço deverá ser
ASSUNTO: TÉRREO obtida dos resumos das plantas
L3
No. FOLHA: L2
CONCRETO FCK: 18 MPa DATA:
PILARES QUANT. L1 L2 L3 VOL. AREA AÇO CA-50 AÇO CA-50 AÇO CA-50 AÇO CA-60 AÇO CA-60
(ALT.) (LARG.) (COMP.) CONC. FORMA ATÉ 4,76MM 6,25 A 9,52MM 12,70 A 25,40MM 3,40 A 6,00MM 6,40 A 9,50MM
(m) (m) (m) (m3) (m2) (kg) (kg) (kg) (kg) (kg)
P1/P5/P6/P22/P26/P27 6.00 3.05 0.18 0.66 2.17 30.74
P11/P19/P12/P20 4.00 3.05 0.18 0.66 1.45 20.50
P7/P23 2.00 3.05 0.34 0.40 0.83 9.03
P2/P28 2.00 3.05 0.18 1.20 1.32 16.84
P8/P24 2.00 3.05 0.25 0.75 1.14 12.20
P13/P17/P15 3.00 3.05 0.18 1.00 1.65 21.59
P14/P18 2.00 3.05 0.18 0.66 0.72 10.25
P3/P29 2.00 3.05 0.18 0.92 1.01 13.42
P9/P25 2.00 3.05 0.18 1.20 1.32 16.84
P4/P30 2.00 3.05 0.18 0.80 0.88 11.96
P10/P16/P21 3.00 3.05 0.18 1.00 1.65 21.59
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
SUB-TOTAL 14.14 184.96 0.00 0.00 0.00 0.00 0.00
SBD S/C LTDA

MEDIÇAO: FORMA/CONCRETO/ARMAÇÃO NA ESTRUTURA (VIGAS)

CLIENTE : CRITÉRIO ADOTADO:


OBRA : VConc. = L1 x L2 x L3 x Quant.
LOCAL : AForma =(2 x L2+L3) x L1 x Quant.
Obs.: Quant. de aço deverá ser
ASSUNTO: TÉRREO / TIPO obtida dos resumos das plantas
No. FOLHA:
CONCRETO FCK: 18 MPa DATA:
VIGAS QUANT. L1 L2 L3 VOL. AREA AÇO CA-50 AÇO CA-50 AÇO CA-50 AÇO CA-60 AÇO CA-60
(COMP) (ALT.) (LARG.) CONC. FORMA ATÉ 4,76MM 6,25 A 9,52MM 12,70 A 25,40MM 3,40 A 6,00MM 6,40 A 9,50MM
(m) (m) (m) (m3) (m2) (kg) (kg) (kg) (kg) (kg)
V1 2.00 1.64 0.50 0.13 0.21 3.71
V2 2.00 3.04 0.50 0.13 0.40 6.87
V ESC. 1.00 3.50 0.50 0.18 0.32 4.13
V3 2.00 2.77 0.50 0.13 0.36 6.26
V4 2.00 5.04 0.50 0.13 0.66 11.39
V5 1.00 2.54 0.50 0.13 0.17 2.87
V7 2.00 3.20 0.50 0.13 0.42 7.23
V6/V9 2.00 1.68 0.50 0.13 0.22 3.80
V8 2.00 4.45 0.50 0.13 0.58 10.06
V10 2.00 7.56 0.50 0.13 0.98 17.09
V11 2.00 4.80 0.50 0.18 0.86 11.33
V12 2.00 3.71 0.50 0.18 0.67 8.76
TEST. A 2.00 4.80 0.50 0.12 0.58 10.75
TEST. B 2.00 1.48 0.50 0.12 0.18 3.32
V13 2.00 10.39 0.50 0.18 1.87 24.52
V14 2.00 2.81 0.50 0.18 0.51 6.63
V15 2.00 5.26 0.50 0.13 0.68 11.89
V16 A 2.00 2.82 0.50 0.13 0.37 6.37
V16 B 2.00 2.28 0.50 0.18 0.41 5.38
V17 2.00 0.50 0.50 0.18 0.09 1.18
V18 A 2.00 3.21 0.50 0.13 0.42 7.25
V18 B 2.00 1.06 0.50 0.18 0.19 2.50
V19 2.00 3.88 0.50 0.13 0.50 8.77
V20 1.00 3.30 0.50 0.18 0.30 3.89
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
SUB-TOTAL 11.95 185.95 0.00 0.00 0.00 0.00 0.00
SBD S/C LTDA

MEDIÇAO: FORMA/CONCRETO/ARMAÇÃO NA ESTRUTURA (LAJES)

CLIENTE : CRITÉRIO ADOTADO:


OBRA : VConc. = L1 x L2 x L3 x Quant.
LOCAL : AForma =(L1 x L2) x Quant.
Obs.: Quant. de aço deverá ser
ASSUNTO: TÉRREO/ TIPO obtida dos resumos das plantas
No. FOLHA:
CONCRETO FCK: 18 MPa DATA:
LAJES QUANT. L1 L2 L3 VOL. AREA AÇO CA-50 AÇO CA-50 AÇO CA-50 AÇO CA-60
(LARG.) (COMP) (ESP) CONC. FORMA ATÉ 4,76MM 6,25 A 9,52MM 12,70 A 25,40MM 3,40 A 6,00MM
(m) (m) (m) (m3) (m2) (kg) (kg) (kg) (kg)
L1/L13 A 2.00 1.64 4.11 0.08 1.08 13.48
L1/L13 B 2.00 3.22 3.58 0.08 1.84 23.06
L2/L14 A 2.00 0.62 2.20 0.08 0.22 2.73
L2/L14 B 2.00 4.45 3.36 0.08 2.39 29.90
L3/L15 2.00 4.45 4.40 0.08 3.13 39.16
L7/L12 2.00 3.86 5.31 0.08 3.28 40.99
L8 A 1.00 1.10 1.50 0.12 0.20 1.65
L8 B 1.00 1.32 0.55 0.12 0.09 0.73
L8 C 1.00 1.01 0.50 0.12 0.06 0.51
L9 1.00 1.55 2.54 0.09 0.35 3.94
L6/L11 2.00 3.21 2.95 0.09 1.70 18.94
L10 1.00 1.68 1.53 0.07 0.18 2.57
L4/L16 A 2.00 3.48 4.80 0.10 3.34 33.41
L4/L16 B 2.00 5.08 3.79 0.10 3.85 38.51
L5/L17 2.00 1.48 4.68 0.12 1.66 13.85
LA 2.00 0.46 0.41 0.10 0.04 0.38
LB 2.00 0.20 0.21 0.10 0.01 0.08
L ESC A 1.00 2.40 2.54 0.12 0.73 6.10
L ESC B 1.00 0.66 2.54 0.12 0.20 1.68
LESC C 1.00 1.80 0.65 0.12 0.14 1.17
0.00 0.00
0.00 0.00
SUB-TOTAL 24.49 272.84 0.00 0.00 0.00 0.00
SBD S/C LTDA

MEDIÇAO: FORMA/CONCRETO/ARMAÇÃO NA ESTRUTURA (PILARES)


CRITÉRIO ADOTADO:
CLIENTE :
OBRA : VConc. = L1 x L2 x L3 x Quant.
LOCAL : AForma =2(L2+ L3) x L1xQuant. L1
Obs.: Quant. de aço deverá ser
ASSUNTO: PAVIMENTO TIPO obtida dos resumos das plantas
L3
No. FOLHA: L2
CONCRETO FCK: 18 MPa DATA:
PILARES QUANT. L1 L2 L3 VOL. AREA AÇO CA-50 AÇO CA-50 AÇO CA-50 AÇO CA-60 AÇO CA-60
(ALT.) (LARG.) (COMP.) CONC. FORMA ATÉ 4,76MM 6,25 A 9,52MM 12,70 A 25,40MM 3,40 A 6,00MM 6,40 A 9,50MM
(m) (m) (m) (m3) (m2) (kg) (kg) (kg) (kg) (kg)
P1/P5/P6/P22/P26/P27 6.00 2.70 0.18 0.66 1.92 27.22
P11/P19/P12/P20 4.00 2.70 0.18 0.66 1.28 18.14
P7/P23 2.00 2.70 0.34 0.40 0.73 7.99
P2/P28 2.00 2.70 0.18 1.20 1.17 14.90
P8/P24 2.00 2.70 0.25 0.75 1.01 10.80
P13/P17/P15 3.00 2.70 0.18 1.00 1.46 19.12
P14/P18 2.00 2.70 0.18 0.66 0.64 9.07
P3/P29 2.00 2.70 0.18 0.92 0.89 11.88
P9/P25 2.00 2.70 0.18 1.20 1.17 14.90
P4/P30 2.00 2.70 0.18 0.80 0.78 10.58
P10/P16/P21 3.00 2.70 0.18 1.00 1.46 19.12
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
SUB-TOTAL 12.51 163.72 0.00 0.00 0.00 0.00 0.00
SBD S/C LTDA

MEDIÇAO: FORMA/CONCRETO/ARMAÇÃO NA ESTRUTURA (VIGAS)

CLIENTE : CRITÉRIO ADOTADO:


OBRA : VConc. = L1 x L2 x L3 x Quant.
LOCAL : AForma =(2 x L2+L3) x L1 x Quant.
Obs.: Quant. de aço deverá ser
ASSUNTO: obtida dos resumos das plantas
No. FOLHA:
CONCRETO FCK: DATA:
VIGAS QUANT. L1 L2 L3 VOL. AREA AÇO CA-50 AÇO CA-50 AÇO CA-50 AÇO CA-60 AÇO CA-60
(COMP) (ALT.) (LARG.) CONC. FORMA ATÉ 4,76MM 6,25 A 9,52MM 12,70 A 25,40MM 3,40 A 6,00MM 6,40 A 9,50MM
(m) (m) (m) (m3) (m2) (kg) (kg) (kg) (kg) (kg)
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
SUB-TOTAL 0.00 0.00 0.00 0.00 0.00 0.00 0.00
SBD S/C LTDA

MEDIÇAO: FORMA/CONCRETO/ARMAÇÃO NA ESTRUTURA (LAJES)


CLIENTE : CRITÉRIO ADOTADO:
OBRA : VConc. = L1 x L2 x L3 x Quant.
LOCAL : AForma =(L1 x L2) x Quant.
Obs.: Quant. de aço deverá ser
ASSUNTO: obtida dos resumos das plantas
No. FOLHA:
CONCRETO FCK: DATA:
LAJES QUANT. L1 L2 L3 VOL. AREA AÇO CA-50 AÇO CA-50 AÇO CA-50 AÇO CA-60
(LARG.) (COMP) (ESP) CONC. FORMA ATÉ 4,76MM 6,25 A 9,52MM 12,70 A 25,40MM 3,40 A 6,00MM
(m) (m) (m) (m3) (m2) (kg) (kg) (kg) (kg)
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
SUB-TOTAL 0.00 0.00 0.00 0.00 0.00 0.00
DATA:
AÇO CA-60 AÇO CA-60
3,40 A 6,00MM 6,40 A 9,50MM
(kg) (kg)
0.00 0.00
SBD S/C LTDA

MEDIÇAO: MOVIMENTO DE TERRA NA FUNDAÇÃO (BLOCOS)

CLIENTE: SEGEN S/A CRITÉRIO ADOTADO:


OBRA: CONSTRUÇÃO DE GALPÃO INDUSTRIAL - YAKULT
LOCAL: AV.DONA RUYCE FERRAZ ALVIM, 1.020 - DIADEMA

ASSUNTO:
No. FOLHA: LE1/LE2/LE3=Dimensão adicional ao L1,L2 E L3, r
CONCRETO FCK:
QUANT. L1 LE1 L2 LE2 L3 LE3 VOL. AREA
BLOCOS (COMP.) (COMP.) (LARG.) (LARG.) (ALT) (ALT) ESCAV. REGUL.
(m) (m) (m) (m) (m) (m) (m3) (m2)
0.00 0.00 0.00 0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00 0.00 0.00 0.00
SUB-TOTAL 0.00 0.00
SBD S/C LTDA

MEDIÇAO: MOVIMENTO DE TERRA NA FUNDAÇÃO (VIGAS BALDRAME)

#REF! CRITÉRIO ADOTADO:


#REF!
#REF!

ASSUNTO: GALPÃO
No. FOLHA: LE1/LE2/LE3=Dimensão adicional ao L1,L2 E L3, r
CONCRETO FCK: 15MPa
QUANT. L1 EL1 L2 EL2 L3 VOL. AREA VOL.
VIGAS (LARG.) (LARG.) (ALT.) (ALT.) (COMP.) ESCAV. REGUL. LASTRO
(m) (m) (m) (m) (m) (m3) (m2) (m3)
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
SUB-TOTAL 0.00 0.00 0.00
SBD S/C LTDA

RESUMO : FORMA/CONCRETO/ARMAÇÃO
CLIENTE :
OBRA :
LOCAL :
ASSUNTO: VOL. AREA VOL. VOL. VOL.
ESCAV. REGUL. LASTRO REATERROTRANS.TERRA EXC.
(m3) (m2) (m3) (m3) (m3)
MOVIMENTO DE TERRA - SUBSOLO

0.00 0.00 0.00 0.00 0.00


#REF! #REF! #REF!
SUB-TOTAL 0.00 0.00 #REF! #REF! #REF! 0.00
ASSUNTO: VOL. AREA AÇO CA-50 AÇO CA-50 AÇO CA-50 AÇO CA-60
CONC. FORMA ATÉ 4,76MM 6,25 A 9,52MM12,70 A 25,40MM3,40 A 6,00MM
(m3) (m2) (kg) (kg) (kg) (kg)
FUNDAÇÃO - SUBSOLO
LAJE DE CONC 469.27 0.00 37,541.60 9,385.40
PAREDE 143.33 750.96 11,466.40 2,866.60

0.00 0.00

SUB-TOTAL 612.60 750.96 0.00 49,008.00 0.00 12,252.00


ESTRUTRA - SUBSOLO
PILARES-PARE 19.05 298.76 1,524.00 381.00
PILARES-TORRE 27.46 336.57 2,196.80 549.20
PILARES-TORRE 21.87 21.87 1,749.60 437.40
PILARES-TORR 22.70 262.49 1,816.00 454.00
VIGAS-TORRE A 94.84 1,115.17 7,587.20 1,896.80
VIGAS-TORRE B 49.19 521.81 3,935.20 983.80
VIGAS-TORRE 64.88 715.04 5,190.40 1,297.60
LAJES-TORRE A 146.08 1,249.52 11,686.40 2,921.60
LAJES-TORRE B 66.04 660.28 5,283.20 1,320.80
LAJES-TORRE 86.63 866.03 6,930.40 1,732.60
SUB-TOTAL 598.74 6,047.54 0.00 47,899.20 0.00 11,974.80
ESTRUTRA - TÉRREO A
PILARES 14.14 184.96 1,018.08 254.52
VIGAS 11.95 185.95 860.40 215.10
LAJES 24.49 272.84 1,763.28 440.82
SUB-TOTAL 50.58 643.75 0.00 3,641.76 0.00 910.44
ESTRUTRA - TÉRREO B
PILARES 14.14 184.96 1,018.08 254.52
VIGAS 11.95 185.95 860.40 215.10
LAJES 24.49 272.84 1,763.28 440.82
SUB-TOTAL 50.58 643.75 0.00 3,641.76 0.00 910.44
ESTRUTRA - TÉRREO C
PILARES 14.14 184.96 1,018.08 254.52
VIGAS 11.95 185.95 860.40 215.10
LAJES 24.49 272.84 1,763.28 440.82
SUB-TOTAL 50.58 643.75 0.00 3,641.76 0.00 910.44
ESTRUTRA - PAVIMENTO TIPO ( 1 X )
PILARES 12.51 163.72 800.64 200.16
VIGAS 11.95 185.95 764.80 191.20
LAJES 24.49 272.84 1,567.36 391.84
SUB-TOTAL 48.95 622.51 0.00 3,132.80 0.00 783.20
o L1,L2 E L3, respectivamente para cálculo de escavação

VOL. VOL. VOL.


LASTRO REATERRO TRANS.TERRA EXC.
(m3) (m3) (m3)
0.00 0.00 0.00
0.00 0.00 0.00
0.00 0.00 0.00
0.00 0.00 0.00
0.00 0.00 0.00
0.00 0.00 0.00
0.00 0.00 0.00
0.00 0.00 0.00
0.00 0.00 0.00
0.00 0.00 0.00
0.00 0.00 0.00
0.00 0.00 0.00
0.00 0.00 0.00
0.00 0.00 0.00
0.00 0.00 0.00
0.00 0.00 0.00
0.00 0.00 0.00
0.00 0.00 0.00
0.00 0.00 0.00
0.00 0.00 0.00
0.00 0.00 0.00
0.00 0.00 0.00
0.00 0.00 0.00
o L1,L2 E L3, respectivamente para cálculo de escavação
DATA:
VOL. VOL.
REATERRO
TRANS.TERRA EXC.
(m3) (m3)
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
DATA:

0.00
AÇO CA-60 CONSUMO CONSUMO
6,40 A 9,50MM FORMA AÇO
(kg) (M2/M3) (KG/M3)

0.00 1.23 100.00

0.00 10.10 100.00


0.00 12.73 90.00

0.00 12.73 90.00

0.00 12.73 90.00

0.00 12.72 80.00