Você está na página 1de 3

PROJETO: ADEQUAÇÃO DE BARRAGENS FERNANDINHO – FASE III PERIODO

INDICADORES DE MANUTENÇÃO - OBRA 133 S-91

HORAS PARADAS x DISPONIBILIDADE - SEMANA S-91


432:00:00 120,00%
370:12:00
384:00:00
99,86% 99,72% 100,00% 100,00% 100,00% 100,00% 100,00% 100,00%
336:00:00
85,77% 94,02%
288:00:00 80,00%
77,24%
240:00:00
60,00%
192:00:00

144:00:00 40,00%
56:35:00
96:00:00
53:50:00 20,00%
48:00:00
0:50:00 0:20:00 0:00:00 0:00:00 0:00:00 0:00:00 0:00:00
0:00:00 0,00%

CB EH TE GE CC AM CK MN CP PR

TEMPO TOTAL DE PARADA DISPONIBILIDADE

TEMPO MÉDIO TEMPO MÉDIO


TEMPO TOTAL HORAS
TAG DESCRIÇÃO PARADAS ENTRE PARADA DE REPARO DISPONIB.
DE REPARO DISPONÍVEIS
MTBF (HR) MTTR (HR)
CB Caminhão Basculante 36 370:12:00 2231:18:00 61,98 10,28 85,77%
EH Escavadeira Hidraulica 4 56:35:00 889:25:00 222,35 14,15 94,02%
TE Trator de Esteira 2 53:50:00 182:40:00 91,33 26,92 77,24%
MN Motoniveladora 0 0:00:00 118:15:00 0,00 0,00 100,00%
CP Caminhão Pipa 0 0:00:00 236:30:00 0,00 0,00 100,00%
CC Comboio 1 0:20:00 117:55:00 117,92 0,33 99,72%
CK Caminhão Munk 0 0:00:00 118:15:00 0,00 0,00 100,00%
AM Ambulancia 0 0:00:00 118:15:00 0,00 0,00 100,00%
PR Carreta Prancha 0 0:00:00 236:30:00 0,00 0,00 100,00%
GE Geradores 1 0:50:00 590:25:00 590,42 0,83 99,86%
TI Torre de Iluminação 0 0:00:00 591:15:00 0,00 0,00 100,00%
VL Veiculos 4x4 0 0:00:00 236:30:00 0,00 0,00 100,00%
TOTAL 44 481:47:00 10,95

LEGENDA: maior que 95% entre 85% e 95% menor que 85%

CURVA ABC - TEMPO DE PARADA x FALHA SEMANA S-91


TOP 10 FALHA MACRO TOTAL HORA %
1 COLISÃO 118:15:00 27,49%
2 PERDA DE FORÇA 84:05:00 19,55%
3 FALHA SENSOR DO ARLA 55:00:00 12,79%
4 MATERIAL RODANTE 52:30:00 12,20%
5 LAVAGEM, LUBRIFICAÇÃO E FURO DA CONCHA 44:00:00 10,23%
6 LONA DE FREIO 30:45:00 7,15%
7 FALHA SENSOR DO NÍVEL DE OLEO 14:40:00 3,41%
8 VAZAMENTO DE OLEO 12:00:00 2,79%
9 SEGUIMENTO DE RODA QUEBRADO 9:30:00 2,21%
10 CRUZETA CARDAM QUEBRADA 9:25:00 2,19%

CAUSA DA PARADA

118:15:00;
25%
363:32:00;
75%

MANUTENÇÃO OPERAÇÃO
PROJETO: ADEQUAÇÃO DE BARRAGENS FERNANDINHO – FASE III PERIODO
INDICADORES DE MANUTENÇÃO - OBRA 133 1-jul 1-dez

HORAS PARADAS x DISPONIBILIDADE - GERAL


7200:00:00 105,00%
6326:35:00
6000:00:00
99,17% 99,28% 99,87% 100,00% 100,00%
98,24%
96,25%
4800:00:00 95,02% 95,00%
93,82%
3600:00:00 90,00%
88,95% 2560:43:00
2400:00:00 84,59% 85,00%

1200:00:00 80,00%
489:05:00 321:27:00 259:03:00 45:45:00 21:36:00 18:45:00 3:20:00 0:00:00
0:00:00 75,00%

CB EH GE CP TE MN CK CC AM PR

TEMPO TOTAL DE PARADA DISPONIBILIDADE

TEMPO MÉDIO TEMPO MÉDIO


TEMPO TOTAL HORAS
TAG DESCRIÇÃO PARADAS ENTRE PARADA DE REPARO DISPONIB.
DE REPARO DISPONÍVEIS
MTBF (HR) MTTR (HR)
CB Caminhão Basculante 687 6326:35:00 50911:55:00 74,11 9,21 88,95%
EH Escavadeira Hidraulica 85 2560:43:00 14059:32:00 165,41 30,13 84,59%
TE Trator de Esteira 14 259:03:00 4943:57:00 353,14 18,50 95,02%
MN Motoniveladora 20 45:45:00 2555:45:00 127,79 2,29 98,24%
CP Caminhão Pipa 36 321:27:00 4881:33:00 135,60 8,93 93,82%
CC Comboio 6 18:45:00 2582:45:00 430,46 3,13 99,28%
CK Caminhão Munk 3 21:36:00 2579:54:00 859,97 7,20 99,17%
AM Ambulância 2 3:20:00 2598:10:00 1299,08 1,67 99,87%
PR Carreta Prancha 0 0:00:00 5203:00:00 0,00 0,00 100,00%
GE Geradores 12 489:05:00 12540:10:00 1045,01 40,76 96,25%
TI Torre de Iluminação 1 0:30:00 13007:00:00 13007,00 0,50 100,00%
VL Veiculos Leves/4x4 1 57:30:00 2544:00:00 2544,00 57,50 97,79%
TOTAL 867 10104:19:00 11,65

LEGENDA: maior que 95% entre 85% e 95% menor que 85%

CURVA ABC - TEMPO DE PARADA x FALHA GERAL


TOP 10 FALHA MACRO PARADAS TOTAL HORA %
1 ATOLAMENTO 1 1120:15:00 19,34%
2 REVISÃO 38 937:08:00 16,18%
3 PERDA DE FORÇA 45 854:21:00 14,75%
4 COLISÃO 4 536:50:00 9,27%
5 VAZAMENTO 8 513:44:00 8,87%
6 DIFERENCIAL TRASEIRO 1 455:33:00 7,86%
7 FALHA NA MUDANÇA DAS MARCHAS 20 378:49:00 6,54%
8 PNEU FURADO 157 370:15:00 6,39%
9 SEGUIMENTO DE RODA QUEBRADO 1 328:30:00 5,67%
10 MANGUEIRA FURADA/ESTOURADA 36 297:36:00 5,14%

CAUSA DA PARADA
1657:48:00;
16%

8564:46:00;
84%
MANUTENÇÃO OPERAÇÃO
PROJETO: ADEQUAÇÃO DE BARRAGENS FERNANDINHO – FASE III PERIODO
INDICADORES DE MANUTENÇÃO - OBRA 133 1-jul 1-dez

INDICADORES POR EQUIPAMENTO


TEMPO MÉDIO
TEMPO TOTAL DE TEMPO MÉDIO ENTRE
GR TAG PARADAS HR. DISP. DE REPARO DISPONIB.
REPARO PARADA (MTBF)
(MTTR)
CB CB10 4 1:55:00 1127:35:00 281,90 0,48 99,83%
CB CB11 6 8:05:00 1121:25:00 186,90 1,35 99,28%
CB CB12 8 37:00:00 1092:30:00 136,56 4,63 96,72%
CB CB16 8 63:15:00 1442:45:00 180,34 7,91 95,80%
CB CB17 3 7:54:00 2593:36:00 864,53 2,63 99,70%
CB CB18 3 29:50:00 1476:10:00 492,06 9,94 98,02%
CB CB19 6 50:19:00 2551:11:00 425,20 8,39 98,07%
CB CB20 24 312:27:00 2289:03:00 95,38 13,02 87,99%
CB CB21 28 186:39:00 2414:51:00 86,24 6,67 92,83%
CB CB22 46 572:20:00 2029:10:00 44,11 12,44 78,00%
CB CB23 40 131:31:00 2469:59:00 61,75 3,29 94,94%
CB CB24 47 249:58:00 2351:32:00 50,03 5,32 90,39%
CB CB25 21 471:35:00 2129:55:00 101,42 22,46 81,87%
CB CB26 38 204:28:00 2397:02:00 63,08 5,38 92,14%
CB CB27 32 663:51:00 1937:39:00 60,55 20,75 74,48%
CB CB28 53 337:58:00 2263:32:00 42,71 6,38 87,01%
CB CB29 30 379:40:00 2221:50:00 74,06 12,66 85,41%
CB CB30 33 282:58:00 2318:32:00 70,26 8,57 89,12%
CB CB31 38 194:41:00 2406:49:00 63,34 5,12 92,52%
CB CB32 43 430:00:00 2171:30:00 50,50 10,00 83,47%
CB CB33 40 529:02:00 2072:28:00 51,81 13,23 79,66%
CB CB34 45 208:28:00 2393:02:00 53,18 4,63 91,99%
CB CB239 7 133:37:00 1188:53:00 169,84 19,09 89,90%
CB CB240 16 372:42:00 949:48:00 59,36 23,29 71,82%
CB CB241 26 135:41:00 1186:49:00 45,65 5,22 89,74%
CB CB242 18 236:56:00 1085:34:00 60,31 13,16 82,08%
CB CB243 24 93:45:00 1228:45:00 51,20 3,91 92,91%
EH EH215 7 55:29:00 1201:46:00 171,68 7,93 95,59%
EH EH02 14 352:05:00 2249:25:00 160,67 25,15 86,47%
EH EH03 1 2:30:00 395:45:00 395,75 2,50 99,37%
EH EH08 9 1264:10:00 1337:20:00 148,59 140,46 51,41%
EH EH11 25 271:08:00 2330:22:00 93,21 10,85 89,58%
EH EH12 14 424:19:00 2177:11:00 155,51 30,31 83,69%
EH EH14 7 138:42:00 1012:33:00 144,65 19,81 87,95%
EH EH16 6 50:40:00 2550:50:00 425,14 8,44 98,05%
EH EH17 2 1:40:00 804:20:00 402,17 0,83 99,79%
TE TE04 3 77:10:00 2524:20:00 841,44 25,72 97,03%
TE TE06 11 181:53:00 2419:37:00 219,97 16,53 93,01%
CP CP03 21 161:37:00 2439:53:00 116,18 7,70 93,79%
CP CP04 15 159:50:00 2441:40:00 162,78 10,66 93,86%
CC CC03 6 18:45:00 2582:45:00 430,46 3,13 99,28%
CK CK01 3 21:36:00 2579:54:00 859,97 7,20 99,17%
PR PR01 0 0:00:00 2601:30:00 0,00 0,00 100,00%
MN MN04 20 45:45:00 2555:45:00 127,79 2,29 98,24%
AM AM01 2 3:20:00 2598:10:00 1299,08 1,67 99,87%
GE GE01 2 67:05:00 2534:25:00 1267,21 33,54 97,42%
GE GE02 2 44:40:00 503:05:00 251,54 22,33 91,85%
GE GE03 3 114:45:00 2486:45:00 828,92 38,25 95,59%
GE GE04 2 241:45:00 2359:45:00 1179,88 120,88 90,71%
GE GE05 2 1:40:00 2073:50:00 1036,92 0,83 99,92%
GE GE210 1 19:10:00 2582:20:00 2582,33 19,17 99,26%
TI TI207 0 0:00:00 2601:30:00 0,00 0,00 100,00%
TI TI208 0 0:00:00 2601:30:00 0,00 0,00 100,00%
TI TI209 0 0:00:00 2601:30:00 0,00 0,00 100,00%
TI TI210 0 0:00:00 2601:30:00 0,00 0,00 100,00%
TI TI211 1 0:30:00 2601:00:00 2601,00 0,50 99,98%
VL VL23 1 57:30:00 2544:00:00 2544,00 57,50 97,79%
TOTAL 840 10104:19:00