Projet : REALISATION DES LOCAUX COMMERCIAUX CITE 300 LOGTS AADL

W.D'OUARGLA

* Calcule du débord des béton cyclobien


b
Semelle 01
b0 da
a0 b0
a a0
1.00 1.00
a b da
1.40 1.40
db db
K = 1+[(3-((4/3)*((a0/a4)+(b0/b)))]*RACINE[(1-((4*a0)/(3*a)))*(1-((4*b0)/(3*b)))]

1.05 ≤ 3.3 ( C.V )

da = db = 0.20 cm
da ≥ a 0 / 6 Soit a / a0 ≥ 4 / 3

0.20 ≥ (1.00 / 6) = 0.16 (1.40/1.00) = 1.40 ≥ (4 / 3) = 1.33 ( C.V )

b
Semelle 02
b0 da
a0 b0
a a0
1.20 1.20
a b da
1.60 1.60
db db
K = 1+[(3-((4/3)*((a0/a4)+(b0/b)))]*RACINE[(1-((4*a0)/(3*a)))*(1-((4*b0)/(3*b)))]

1.00 ≤ 3.3 ( C.V )

da = db = 0.20 cm
da ≥ a 0 / 6 Soit a / a0 ≥ 4 / 3

0.20 ≥ (1.20 / 6) = 0.20 (1.60/1.20) = 1.33 ≥ (4 / 3) = 1.33 ( C.V )


b
Semelle SJ 01
b0 da
a0 b0
a a0
1.20 1.40
a b da
1.80 2.00
db db
K = 1+[(3-((4/3)*((a0/a4)+(b0/b)))]*RACINE[(1-((4*a0)/(3*a)))*(1-((4*b0)/(3*b)))]

1.10 ≤ 3.3 ( C.V )

da = 0.30 cm db = 0.30 cm
da ≥ a 0 / 6 Soit a / a0 ≥ 4 / 3
db ≥ b0 / 6 Soit b / b0 ≥ 4 / 3

0.30 ≥ (1.20 / 6) = 0.20 (1.80/1.20) = 1.50 ≥ (4 / 3) = 1.33 ( C.V )

0.30 ≥ (1.40 / 6) = 0.23 (2.00/1.40) = 1.42 ≥ (4 / 3) = 1.33 ( C.V )

b
Semelle SJ 02
b0 da
a0 b0
a a0
1.40 1.70
a b da
2.00 2.30
db db
K = 1+[(3-((4/3)*((a0/a4)+(b0/b)))]*RACINE[(1-((4*a0)/(3*a)))*(1-((4*b0)/(3*b)))]

1.03 ≤ 3.3 ( C.V )

da = 0.30 cm db = 0.30 cm
da ≥ a 0 / 6 Soit a / a0 ≥ 4 / 3
db ≥ b0 / 6 Soit b / b0 ≥ 4 / 3

0.30 ≥ (1.40 / 6) = 0.23 (2.00/1.40) = 1.42 ≥ (4 / 3) = 1.33 ( C.V )

0.30 ≥ (1.70 / 6) = 0.28 (2.30/1.70) = 1.35 ≥ (4 / 3) = 1.33 ( C.V )