pared m2 total
bloque 12.5 8.875 1477.6875 % $ 83,516.34
agua 10 0.12 19.1820276 30 $ 25,054.90
arena 0.54 17.82 593.406 35 $ 29,230.72
cemento 0.32 3.07 510.47568 25 $ 20,879.09
m.o 14 2179.6 2179.6 10 $ 8,351.63
hierro 1/2 1 7 455 100 $ 83,516.34
hierro 1/4 1 1.33333333 64
alambre 0.05 0.0425 71
m.o 15 15 450
2232.85196 5820.35121
solera 1ml
qq 1/2 1.625 pared 1 m2 (12 bloques)
qq 3/8 1.26428571 bloque $ 9.60
qq amarre 24.5589286 cemento $ 2.99
arena 138.6 arena $ 18.90
cemento 16.5 agua $ 2.00
grava varilla 1/4 $ 2.00
agua Varilla 3/8 $ 4.50
armador + aux M.O $ 30.00
alb + aux $ 69.99
mo 16,703.27
$33,406.54
$25,054.90
$8,351.63
83516.34
Mojinete
Ml/ bloques 50 ml costo/uni total
Alimentador electrico
Cantidad(Materiales)
cost/unit Total
Main 1 $ 275.00 $ 275.00
Cable (Mts) 75 $ 8.00 $ 600.00
Tuberia ATM 5 $ 6.00 $ 30.00
Terminales 6 $ 4.25 $ 25.50
Conectores 25/25 12 $ 4.00 $ 48.00
Cintas aislantes 3 $ 2.75 $ 8.25
Cable 2/0 aluminio 220
(Mts) $ 4.50 $ 990.00
Cuerpo terminal 2 $ 9.00 $ 18.00
Preformadas 9 $ 3.50 $ 31.50
Conector # 2 6 6 $ 2.00 $ 12.00
$ 2,038.25
Mano de obra
Desinstalacion de cable 1 $ 55.00 $ 55.00
Conección de circuitos 1 $ 200.00 $ 200.00
Instalacion de cable nuevo 2 barra 0 1 $ 165.00 $ 165.00
Transporte 3 $ 15.00 $ 45.00
$ 465.00
Barandal
m.l 72 ml
Cantidad cost/unit Total
tubo de 1 1/2 7 $ 50.00 $ 350.00
discos 2 $ 8.00 $ 16.00
Ho 1/2 1 $ 9.75 $ 9.75 total directo $ 563.75
electrodos 1 $ 8.00 $ 8.00 indirectos $ 140.94
transporte $ 383.75 iva $ 91.61
$ 796.30
M.obra 1 obr + 2 Aux 3 dias
Obreo 3 $ 40.00 $ 120.00
Auxiliar 3 $ 20.00 $ 60.00
$ 180.00
columna
MO $ 333.00 solera
6 $ 390.00 M- Obra $477.00
4 $ 236.00 12 qq 1/2 $774.00
$ 295.00 5 qq3/8 $295.00
44 $ 381.85 1.5 qqalambre $153.00
2.67 $ 100.00 cemento $1,103.25
2.67 $ 140.00 arena $1,692.00
$ 1,875.85 grava $2,840.00
156.32 $7,334.25
$547.41 13.398
Viga de coro-.
MO $ 235.00
1% $ 739.08 qq 1/2 4 $ 260.00
qq3/8 3 $ 177.00
1.5 qqalambre $ 295.00
cemento 14 $ 381.85
arena 1 $ 35.00
grava 1 $ 50.00
Madera 15.38 $ 148.00
$ 1,581.85
$ 1,226.24
Murete 25 ml
1lto
largo 0.4
area 18
M2 bloques 7.2
bloque 12.5 63.9
agua 0.32 25
arena 0.72 108
cemento 0.42 2.14704
m.o 14 77.9
284.14704
Placas GFCI
camt costo/uni total
lamparas de emergencia
laparas de emergencia 5 $ 30.00 $ 150.00
Transporte 1 $ 15.00 $ 15.00
mano de obra 5 $ 25.00 $ 125.00
$ 290.00
Arriate
Ml/ bloques 9 ml costo/uni total
transporte 1 $ 15.00 $ 15.00
bloque 12.5 30 $ 0.75 $ 22.50
agua 100/227 0.19 $ 2.00 $ 0.38
arena 0.06 0.12 $ 40.00 $ 4.80
cemento 0.42 1.008 $ 9.35 $ 9.42
0.32 $ 52.10
m.o 7 m2 alb+aus 2 dias costo/uni
Aux $ 15.00 $ 30.00
Obr $ 35.00 $ 35.00 total directo
M. obra $ 30.00 $ 30.00 indirectos
total $ 95.00 iva
total
$ 22.50
$ 0.38
$ -
$ 9.42
$ 32.30