MODELO COSTO

T.O D7G S/ 194.3


C.F 950H S/ 241.8
VOL 17 S/ 205.8
MOTO 120M S/ 169.9 ft= 0.60364
RODILLO CS76 S/ 198.5
EXCAVA 329D S/ 263.4
DATOS
LUGAR: HUANCAVELICA 44.7775 L= 134.555 m
ALTURA: 3999.843 m.sn.m A= 89.555 m
TEMPERATU:14.19 °C 44.7775 e= 0.688 m
OBRA
39.431 Km
ALTERNATIVA: A
T.O + C.F + VOL 31.598 Km
MODELO COSTO
T.O D7G S/ 194.3
Ant.= 5838 H/Maq BOTADERO
Mant.= Bueno L= 64.999 m
Oper.= Bueno A= 51.999 m
Ft= 0.60364

T= TF + TV
T= 0.5 15 29.7775 44.7775 0.06 = 1.61944
70% <= E <=80% 3.7 6.4 4.5

R.T.O= 60 0.73 5.75 0.65 0.60364


1.61944 1.44

R.T.O= 42.3743 m3/h


Vol. Elim = 134.555 89.555 0.688 1.44 = 11938.25 m3
PAGO
11938.25 m3 = 281.733 h = 35.21664 dias 282 horas S/ 194.3 = S/ 54,740.75
42.3743 m3/h 8
Tiempo de trabajo:
35 dias 1h 43 min 59 seg 35 dias 1h 43 min 59 seg

MODELO COSTO
C.F 950H S/ 241.8
Ant.= 5838 H/Maq
Mant.= Bueno
Oper.= Bueno T= TF + TV
Ft= 0.60364 T= 10 + 12 = 22
T= 22 = 0.36667 min
60

70% <= E <=80%

R C.F= 60 2.9 0.65 0.60364 0.73 0.764 1


0.36667

R C.F= 103.8442 m3/h

MODELO COSTO
VOL. 17 m3 S/ 205.8

Tvolq = Tcuadre + Tcarga + Tida + Tdesca + Tretorno


30seg 30 km/h 30seg 60 km/h
Tcarga 103.8442 m3 60 min
17 m3 x = 9.82241

Tida 39.431 = 39.431 60 = 78.862 min


30 30

Tretorno 31.598 = 31.598 60 = 31.598 min


60 60

Tvolq = 0.5 + 9.82241 + 78.862 + 0.5 + 31.598 = 121.2824 min

121.2824 min = 11.7494 Volq*ciclo de trabajo 12


10.32241 min 11

12 volq 10.32241 = 123.869 - 121.2824 = 2.58646 min

S/ 205.8 60
x 2.58646 x = S/ 8.87

11 volq 10.32241 = 113.546 - 121.2824 = -7.7359 min

S/ 205.8 60
x 7.73594 x = S/ 26.53

R. Volq = 12 volq = 11.7494 17 = 199.74 m3 por ciclo de trabajo

199.74 m3 121.2824
Z m3 60 min
R volq= 98.8142 m3/h COSTO
C.F= 1 121 S/ 241.8 = S/ 29,213.100
11938.25 m3 = 120.815 horas = 15.1019 dias Volq = 12 121 S/ 205.8 = S/ 298,365.066
98.8142 m3/h 8 S/ 327,578.17

15 dias 0h 48 min 54.72 seg Tiempo de trabajo:


15 dias 0h 48 min 54.72 seg

COSTO TOTAL :

T.O = 1 281.733 S/ 194.3 = S/ 54,740.75


C.F = 1 120.815 S/ 241.8 S/ 29,213.10
VOL. = 12 120.815 S/ 205.8 S/ 298,365.07
S/ 382,318.91

TIEMPO TOTAL
35 dias 1h 43 min 59 seg

ALTERNATIVA: B
EXC + VOL

MODELO COSTO
EXC 329D S/ 263.4
Ant.= 5838 H/Maq
Mant.= Bueno
Oper.= Bueno
Ft= 0.60364

R. EXC= 3600 2 1.05 0.65 0.60364 0.764 0.73


0.25 60 1.44
R. EXC= 76.5901 m3/h

Volq= 17 m3 S/ 205.8

Tvolq= 0.5 13.31765 78.862 0.5 31.598 = 124.7777 min

124.7777 = 9.03031 10
13.81765 9

10 Volq 13.81765 = 138.177 - 124.7777 = 13.39886 min

S/ 205.8 60 min
x 13.39886 x = S/ 45.96

9 Volq 13.81765 = 124.359 - 124.7777 = -0.4188 min

S/ 205.8 60 min
x 0.41879 x = S/ 1.44

9 Volq 17 = 153 m3 por ciclo de trabajo

153 124.7777
x 60 min

R. Volq= 73.5709 m3/h COSTO


EXC= 1 162 S/ 263.4 = S/ 42,741.573
11938.25 = 162.269 horas = 20.28359 dias Volq = 9 162 S/ 205.8 = S/ 300,554.070
73.5709 S/ 343,295.64

20 dias 2h 16 min 7.39 seg Tiempo de trabajo:


20 dias 2h 16 min 7.39 seg
ALTERNATIVA: C
C.F + VOL

MODELO COSTO
C.F 950H S/ 241.8
Ant.= 5838 H/Maq
Mant.= Bueno
Oper.= Bueno T= TF + TV
Ft= 0.60364 T= 10 + 12 = 22
T= 22 = 0.36667 min
60

70% <= E <=80%

R C.F= 60 2.9 0.65 0.60364 0.73 0.764


0.36667 1.44

R C.F= 72.1140 m3/h

Tcarga 72.1140 m3 60 min


17 m3 x = 14.14426

Tvolq = 0.5 + 14.14426 + 78.862 + 0.5 + 31.598 = 125.6043 min

125.6043 min = 8.57703 Volq*ciclo de trabajo 9


14.64426 min 8

9 volq 14.64426 = 131.798 - 125.6043 = 6.19411 min

S/ 241.8 60
x 6.19411 x = S/ 25.0
8 volq 14.64426 = 117.154 - 125.6043 = -8.4502 min

S/ 241.8 60
x 8.4502 x = S/ 34.05

R. Volq = 9 volq = 8.57703 17 = 145.809 m3 por ciclo de trabajo

145.809 m3 125.6043
Z m3 60 min

R volq= 69.6518 m3/h COSTO


C.F= 1 81 S/ 241.8 = S/ 19,585.800
11938.25 m3 = 171.3989 horas = 21.42486 dias Volq = 8 81 S/ 205.8 = S/ 133,358.400
69.6518 m3/h 8 S/ 152,944.20

21 dias 3h 23 min 55.97 seg Tiempo de trabajo:


21 dias 3h 23 min 55.97 seg

COSTO: TIEMPO: Una vez hecho el análisis la mejor


ALTERNATIVA: A S/ 382,318.91 35 dias 1h 43 min 59 seg alternativa para realizar este trabajo
ALTERNATIVA: B S/ 343,295.64 20 dias 2h 16 min 7.39 seg
de excavación y eliminación es la opcion
ALTERNATIVA: C S/ 152,944.20 21 dias 3h 23 min 55.97 seg
C, porque es de menor costo y menor
tiempo.
MODELO COSTO
RODILLO CS76 S/ 198.5
Ant.= 5838 H/Maq
Mant.= Bueno
Oper.= Bueno
Ft= 0.60364
F.merma 0.78

A= 84 0.0254 = 2.1336

e= 12 0.0254 = 0.3048 m

ecompa= 0.78 = 1 = 100 cm


0.78

100 = 3.28084 capas = 3 capas 100 = 30.480 cm


30.48 3

e.= 30.480 cm

Vol por capa = 64.999 51.999 0.305 = 1030.19 m3

R C.F= 10 0.8 2.1336 0.3048 5.7 30.480


5
R C.F= 508.3654 m3/h

508.3654 m3 60 min
1030.19 m3 x = 121.5883 min

Tiempo de trabajo por capa = 2h 1 min 35.30 seg


MODELO COSTO
MOTONI 120M S/ 169.9
Ant.= 5838 H/Maq
Mant.= Bueno
Oper.= Bueno
Ft= 0.60364

N pasadas
4 - 3 - 2

Tretro < Tgiro 30 seg Velocidades


1° 2° 3° Adel
2° Retro

Tretro= 64.999 3.6 = 37.7414 seg


6.2 Angulo de cuchilla
47° - 33° - 8°
51.999 = 15.6759 = 16 8.184 10.064 11.883
11.883 - 1 0.3048

51.999 = 18.8218 = 19
10.064 - 1 0.3048

51.999 = 23.7473 = 24
8.184 - 1 0.3048

T = 64.999 4 24 3.6 + 30 24 4 + 64.999 3 19 3.6


3.9 0.8 5.3 0.8

+ 30 19 3 + 64.999 2 16 3.6 + 30 16 2
7.6 0.8
T = 10079.9 + 4855.71 + 2191.56 = 17127.2 seg = 4.75754

T = 4h 45 min 27.2 seg

Tretro= 51.999 3.6 = 30.193 seg


6.2 Angulo de cuchilla
47° - 33° - 8°
64.999 = 19.5949 = 20 8.184 10.064 11.883
11.883 - 1 0.3048

64.999 = 23.5273 = 24
10.064 - 1 0.3048

64.999 = 29.6842 = 30
8.184 - 1 0.3048

T = 51.999 4 30 3.6 + 30.193 30 4 + 51.999 3 24 3.6


3.9 0.8 5.3 0.8

+ 30.193 24 3 + 51.999 2 20 3.6 + 30.193 20 2


7.6 0.8

T = 10823 + 5352.7 + 2439.27 = 18615 seg = 5.17083

T = 5h 10.25 min 15 seg