Você está na página 1de 1

ENTRADA 13.

8 KV 14 510 14 NOTAS:

TC.L1

DJ-2 SIMBOLOGIAS

QMT.01 SE PRINCIPAL

DPS
Barra 3F

32A
FU
52.0

(KF-CUT)
DPS DPS DPS DPS DPS DPS DPS DPS
CLASSE II CLASSE II CLASSE II CLASSE II CLASSE II CLASSE II CLASSE II CLASSE II

13.8KV-30-60Hz Icc=3.5kA BARRAMENTO 30X5mm.

DJ-10
DJ-3
DJ-4
DJ-5
DJ-6
DJ-7
DJ-8
DJ-9
Barra 3F

DJ-11
DJ-12
DJ-13
DJ-14
DJ-15
DJ-16
DJ-17
Barra 3F

52.1 52.2 52.3 52.4 52.5

Barra 3F
SE 01

SE 02

SE 03

NOMENCLATURAS:
QGD

BARRA-4
BARRA NEUTRO (N)

BALIZAMENTO
(10/350 s) QTA-1 QTA-2
C
C C C C
BAC BAC
QAT

USCA-1 USCA-1
AREFECIMENTO

DE RECALQUE
TORRES DE
CHILERS

BOMBAS

BOMBAS

PAPI

S.AUXILIARES
SPRINKLERS
(CHUV.AUT.)
HIDRANTES

S
BALIZAMENTO
KF-ALS

KT

G1 G2
450kVA 450kVA
SISTEMA

DESENHO DE MONTAGEM DO QDB


COTAS INDICADAS

SISTEMA DE ENERGIA A INSTALAR

QDB

0 I 0 I

01 01/08/2017 J.AUGUSTO J.AUGUSTO C.VINICIUS

(8/20 s) 00 06/05/2015 SIDNEY/J.AUGUSTO ROGER EDUARDO

REV. DATA PROJETISTA DESENHISTA APROVO

RCC RCC RCC C1 RCC C2 RCC C3 RCC C4 RCC C5 RCC C6 RCC RCC RCC RCC ALS RCC RCC ESCALA DATA DESENHISTA ESPECIALIDADE/SUBESPECIALIDADE

PAPI 02 PAPI 06 7,5 KVA 7,5 KVA 7,5 KVA 7,5 KVA 2,5 KW 2,5 KW ALS 1 ALS 2 FLASH SV 1 SV 2 INDICADA AGO./2017 J.AUGUSTO
(FUTURO) (FUTURO) (FUTURO) (FUTURO) (FUTURO) (FUTURO) (FUTURO) (FUTURO) (FUTURO)
FP=0,90 FP=0,90 FP=0,90 FP=0,90 FP=0,99 FP=0,99 AUTOR DO PROJETO CREA UF

143469 / MG SISTEMA DE ENERGIA - DIAGRAMA UNIFILAR GERAL

COORDENADOR RUBRICA TIPO DE OBRA CLASSE DO PROJETO

EXECUTIVO
GERENTE RUBRICA SUBSTITUI A
DIAGRAMA UNIFILAR DA KF-CUT
SEM ESCALA CARLOS VINICIUS LIMA MEIRELLES

RUBRICA DO AUTOR REG. DE ARQUIVO

SEM ESCALA
BE.02/707.23/05748/01