CULTURA
PROYECT REPARACION DE COLECTOR PRIMARIO; EN EL(LA) SERVICIO DE ALCANTARILLADO, DISTRITO DE CORONEL GREGORIO ALBARRACIN
LANCHIPA, PROVINCIA TACNA, DEPARTAMENTO TACNA
CLIENTE: MDCGAL
UBICACIÓ DISTRITO DE CORONEL GREGORIO ALBARRACIN LANCHIPA, PROVINCIA TACNA, DEPARTAMENTO TACNA
FECHA: SETIEMBRE 2020
N° MEDIDAS
ITEM DESCRIPCION PARCIAL TOTAL U.M.
VECES CANT. LARGO ANCHO
02 TRABAJOS PRELIMINARES
02.02 TRAZO, NIVELES Y REPLANTEO PRELIMINAR C/EQUIPO EN RED DE DESAGUE 1,228.20 m
Av. La Cultura
BZ E - 37 A E - 36 1.00 1.00 54.49 54.49
BZ E - 36 A E - 35 1.00 1.00 54.71 54.71
BZ E - 35 A E - 34 1.00 1.00 51.64 51.64
BZ E - 34 A E - 33 1.00 1.00 50.71 50.71
BZ E - 33 A E - 32 1.00 1.00 50.08 50.08
BZ E - 32 A E - 31 1.00 1.00 60.46 60.46
BZ E - 31 A E - 30 1.00 1.00 64.70 64.70
BZ E - 30 A P - 143 1.00 1.00 34.13 34.13
BZ P - 143 A P - 26 1.00 1.00 77.00 77.00
BZ P - 26 A E - 28 1.00 1.00 14.05 14.05
BZ E - 28 A E - 27 1.00 1.00 62.84 62.84
Bz E - 49 A E - 50 1.00 1.00 51.16 51.16
Bz E - 50 A E - 51 1.00 1.00 60.01 60.01
Bz E - 51 A E - 52 1.00 1.00 60.00 60.00
Bz E - 52 A E - 53 1.00 1.00 61.84 61.84
Bz E - 53 A E - 54 1.00 1.00 60.81 60.81
Bz E - 54 A P - 34 1.00 1.00 55.37 55.37
Bz P - 34 A P - 35 1.00 1.00 76.02 76.02
Bz P - 35 A P - 36 1.00 1.00 76.18 76.18
Bz P - 36 A P - 37 1.00 1.00 73.86 73.86
Bz P - 37 A P - 38 1.00 1.00 74.00 74.00
Bz P - 34 A E - 87 1.00 1.00 2.07 2.07
Bz P - 36 A E - 90 1.00 1.00 2.07 2.07
03 MOVIMIENTO DE TIERRAS
03.01 EXCAVACION DE ZANJA C/MAQUINARIA, ANCHO <=1.20m, 1.50M<H<3.00 M 1,191.40 m
Av. La Cultura
BZ E - 37 A E - 36 1.00 1.00 52.89 52.89
BZ E - 36 A E - 35 1.00 1.00 53.11 53.11
BZ E - 35 A E - 34 1.00 1.00 50.04 50.04
BZ E - 34 A E - 33 1.00 1.00 49.11 49.11
BZ E - 33 A E - 32 1.00 1.00 48.48 48.48
BZ E - 32 A E - 31 1.00 1.00 58.86 58.86
BZ E - 31 A E - 30 1.00 1.00 63.10 63.10
BZ E - 30 A P - 143 1.00 1.00 32.53 32.53
BZ P - 143 A P - 26 1.00 1.00 75.40 75.40
BZ P - 26 A E - 28 1.00 1.00 12.45 12.45
BZ E - 28 A E - 27 1.00 1.00 61.24 61.24
Bz E - 49 A E - 50 1.00 1.00 49.56 49.56
Bz E - 50 A E - 51 1.00 1.00 58.41 58.41
Bz E - 51 A E - 52 1.00 1.00 58.40 58.40
Bz E - 52 A E - 53 1.00 1.00 60.24 60.24
Bz E - 53 A E - 54 1.00 1.00 59.21 59.21
Bz E - 54 A P - 34 1.00 1.00 53.77 53.77
Bz P - 34 A P - 35 1.00 1.00 74.42 74.42
Bz P - 35 A P - 36 1.00 1.00 74.58 74.58
Bz P - 36 A P - 37 1.00 1.00 72.26 72.26
Bz P - 37 A P - 38 1.00 1.00 72.40 72.40
Bz P - 34 A E - 87 1.00 1.00 0.47 0.47
Bz P - 36 A E - 90 1.00 1.00 0.47 0.47
03.05 EXCAVACION MANUAL P/BUZON DE INSPECCION ( 1.20M<=H<2.00M) 27.22 m3
Av. La Cultura
BZ P - 26 1.00 1.00 area = 2.01 2.81
BZ P - 143 1.00 1.00 area = 2.01 2.69
BZ P - 34 1.00 1.00 area = 2.01 2.81
BZ P - 35 1.00 1.00 area = 2.01 2.81
BZ P - 36 1.00 1.00 area = 2.01 3.42
BZ P - 37 1.00 1.00 area = 2.01 2.61
BZ P - 38 1.00 1.00 area = 2.01 3.62
BZ P - 39 1.00 1.00 area = 2.01 3.01
BZ P - 40 1.00 1.00 area = 2.01 3.42
03.15 RELLENO C/ MATERIAL PROPIO SELECCIONADO, COMPACTADO CON EQUIPO, INC. ZARANDEO 707.95 m3
Av. La Cultura
BZ E - 37 A E - 36 1.00 1.00 52.89 1.20 25.39
BZ E - 36 A E - 35 1.00 1.00 53.11 1.20 25.49
BZ E - 35 A E - 34 1.00 1.00 50.04 1.20 24.02
BZ E - 34 A E - 33 1.00 1.00 49.11 1.20 20.63
BZ E - 33 A E - 32 1.00 1.00 48.48 1.20 23.27
BZ E - 32 A E - 31 1.00 1.00 58.86 1.20 31.78
BZ E - 31 A E - 30 1.00 1.00 63.10 1.20 34.07
BZ E - 30 A P - 143 1.00 1.00 32.53 1.20 16.40
BZ P - 143 A P - 26 1.00 1.00 75.40 1.20 38.00
BZ P - 26 A E - 28 1.00 1.00 12.45 1.20 5.98
BZ E - 28 A E - 27 1.00 1.00 61.24 1.20 29.40
Bz E - 49 A E - 50 1.00 1.00 49.56 1.20 44.60
Bz E - 50 A E - 51 1.00 1.00 58.41 1.20 52.57
Bz E - 51 A E - 52 1.00 1.00 58.40 1.20 42.05
Bz E - 52 A E - 53 1.00 1.00 60.24 1.20 28.92
Bz E - 53 A E - 54 1.00 1.00 59.21 1.20 35.53
Bz E - 54 A P - 34 1.00 1.00 53.77 1.20 35.49
Bz P - 34 A P - 35 1.00 1.00 74.42 1.20 40.19
Bz P - 35 A P - 36 1.00 1.00 74.58 1.20 53.70
Bz P - 36 A P - 37 1.00 1.00 72.26 1.20 47.69
Bz P - 37 A P - 38 1.00 1.00 72.40 1.20 52.13
Bz P - 34 A E - 87 1.00 1.00 0.47 1.20 0.25
Bz P - 36 A E - 90 1.00 1.00 0.47 1.20 0.42
05 CAMARAS DE INSPECCION
05.01 BUZONES SANITARIOS DE INSPECCION
05.01.01 BUZON DE INSPECCION 1.20<=H<2.00M, C°S° f'c=210kg/cm2 13.00 und
TRAMO 03: Colector Av. la Cultura
Bz- P-26 1.00 1.00 1.00
Bz- P-143 1.00 1.00 1.00
Bz- P-27 1.00 1.00 1.00
Bz- P-28 1.00 1.00 1.00
Bz- P-29 1.00 1.00 1.00
Bz- P-30 1.00 1.00 1.00
Bz- P-31 1.00 1.00 1.00
Bz- P-32 1.00 1.00 1.00
Bz- P-33 1.00 1.00 1.00
Bz- P-34 1.00 1.00 1.00
Bz- P-35 1.00 1.00 1.00
Bz- P-36 1.00 1.00 1.00
Bz- P-37 1.00 1.00 1.00
05.01.08 TRATAMIENTO DE BUZONES EXISTENTES TIPO I 9.00 und
TRAMO 03: Colector Av. la Cultura
Bz E-32 1.00 1.00 1.00
Bz E-33 1.00 1.00 1.00
Bz E-34 1.00 1.00 1.00
Bz E-35 1.00 1.00 1.00
Bz E-36 1.00 1.00 1.00
Bz E-51 1.00 1.00 1.00
Bz E-52 1.00 1.00 1.00
Bz E-53 1.00 1.00 1.00
Bz E-54 1.00 1.00 1.00
09 RECONEXIONES DOMICILIARIAS
CLIENTE: MDCGAL
UBICACIÓN: DISTRITO DE CORONEL GREGORIO ALBARRACIN LANCHIPA, PROVINCIA TACNA, DEPARTAMENTO TACNA
FECHA: SETIEMBRE 2020
N° MEDIDAS
ITEM DESCRIPCION PARCIAL TOTAL U.M.
VECES CANT. LARGO ANCHO ALTURA
02 TRABAJOS PRELIMINARES
02.02 TRAZO, NIVELES Y REPLANTEO PRELIMINAR C/EQUIPO EN RED DE DESAGUE 503.55 m
Av. Los Escritores
Bz E - 37 A E - 38 1.00 1.00 61.25 61.25
Bz E - 38 A P - 27 1.00 1.00 30.21 30.21
Bz P - 27 A P - 28 1.00 1.00 50.05 50.05
Bz P - 28 A P - 29 1.00 1.00 57.52 57.52
Bz P - 29 A E - 39 1.00 1.00 5.60 5.60
Bz E - 39 A P - 30 1.00 1.00 58.91 58.91
Bz P - 30 A P - 31 1.00 1.00 63.19 63.19
Bz P - 31 A P - 32 1.00 1.00 62.82 62.82
Bz P - 32 A E - 40 1.00 1.00 14.80 14.80
Bz E - 40 A P - 33 1.00 1.00 45.20 45.20
Bz P - 33 A E - 41 1.00 1.00 54.00 54.00
03 MOVIMIENTO DE TIERRAS
03.02 EXCAVACION DE ZANJA C/MAQUINARIA, ANCHO <=1.70m, 1.50M<H<2.00 M 485.95 m
Av. Los Escritores
Bz E - 37 A E - 38 1.00 1.00 59.65 59.65
Bz E - 38 A P - 27 1.00 1.00 28.61 28.61
Bz P - 27 A P - 28 1.00 1.00 48.45 48.45
Bz P - 28 A P - 29 1.00 1.00 55.92 55.92
Bz P - 29 A E - 39 1.00 1.00 4.00 4.00
Bz E - 39 A P - 30 1.00 1.00 57.31 57.31
Bz P - 30 A P - 31 1.00 1.00 61.59 61.59
Bz P - 31 A P - 32 1.00 1.00 61.22 61.22
Bz P - 32 A E - 40 1.00 1.00 13.20 13.20
Bz E - 40 A P - 33 1.00 1.00 43.60 43.60
Bz P - 33 A E - 41 1.00 1.00 52.40 52.40
03.15 RELLENO C/ MATERIAL PROPIO SELECCIONADO, COMPACTADO CON EQUIPO, INC. ZARANDEO 435.47 m3
EN ZONAS CON CARPETA ASFALTICA
Av. Los Escritores
Bz E - 37 A E - 38 1.00 1.00 59.65 1.70 0.60 60.84
Bz E - 38 A P - 27 1.00 1.00 28.61 1.70 0.60 29.18
Bz P - 27 A P - 28 1.00 1.00 48.45 1.70 0.45 37.06
Bz P - 28 A P - 29 1.00 1.00 55.92 1.70 0.45 42.78
Bz P - 29 A E - 39 1.00 1.00 4.00 1.70 0.45 3.06
Bz E - 39 A P - 30 1.00 1.00 57.31 1.70 0.45 43.84
Bz P - 30 A P - 31 1.00 1.00 61.59 1.70 0.45 47.12
Bz P - 31 A P - 32 1.00 1.00 61.22 1.70 0.45 46.83
Bz P - 32 A E - 40 1.00 1.00 13.20 1.70 0.60 13.46
Bz E - 40 A P - 33 1.00 1.00 43.60 1.70 0.60 44.47
Bz P - 33 A E - 41 1.00 1.00 52.40 1.70 0.75 66.81
05 CAMARAS DE INSPECCION
05.01 BUZONES SANITARIOS DE INSPECCION
BUZON DE INSPECCION 1.20<=H<2.00M, C°S° f'c=210kg/cm2 7.00 und
TRAMO 05: Colector Av. Escritores y Av. Gregorio Albarracín
Bz- P-27 1.00 1.00 1.00
Bz- P-28 1.00 1.00 1.00
Bz- P-29 1.00 1.00 1.00
Bz- P-30 1.00 1.00 1.00
Bz- P-31 1.00 1.00 1.00
Bz- P-32 1.00 1.00 1.00
Bz- P-33 1.00 1.00 1.00
08 VARIOS
08.01 DESVIO DE AGUAS RESIDUALES 3.00 UND
tramo 05 3.00 3.00
09 RECONEXIONES DOMICILIARIAS
09.01 TRABAJOS PRELIMINARES Y DE DEMOLICION
09.01.01 TRAZO Y NIVELES EN RED P/CONEXION DOMICILIARIA DE DESAGUE 721.04 m
AV. LOS ESCRITORES
Ca. Cristobal Colon - Av. Los Juriscunsultos 7.00 6.89 48.23
25.00 6.68 166.95
Ca. Cristobal Colon - Av. Los Juriscunsultos (mercado) 8.00 19.93 159.42
Av. Los Juriscunsultos - Av. La Bohemia Tacneña (MZ. I2) 30.00 6.57 197.16
Av. Los Juriscunsultos - Av. La Bohemia Tacneña (MZ. 51) 1.00 19.82 19.82
1.00 13.23 13.23
1.00 10.81 10.81
1.00 7.66 7.66
1.00 7.08 7.08
1.00 6.61 6.61
13.00 6.47 84.06
09.02.05 RELLENO C/ MATERIAL PROPIO SELECCIONADO, COMPACTADO CON EQUIPO, INC. ZARANDEO 721.04 m3
AV. LOS ESCRITORES
Ca. Cristobal Colon - Av. Los Juriscunsultos 7.00 6.89 48.23
25.00 6.68 166.95
Ca. Cristobal Colon - Av. Los Juriscunsultos (mercado) 8.00 19.93 159.42
Av. Los Juriscunsultos - Av. La Bohemia Tacneña (MZ. I2) 30.00 6.57 197.16
Av. Los Juriscunsultos - Av. La Bohemia Tacneña (MZ. 51) 1.00 19.82 19.82
1.00 13.23 13.23
1.00 10.81 10.81
1.00 7.66 7.66
1.00 7.08 7.08
1.00 6.61 6.61
13.00 6.47 84.06
09.05.06 REP. DE VEREDAS Y RAMPAS DE CONCRETO F'C=175KG/CM2 P/CONEX. DOMIC. ACAB. PULIDO 78.71 m2
AV. LOS ESCRITORES
Ca. Cristobal Colon - Av. Los Juriscunsultos 7.00 1.27 0.60 5.33
25.00 1.28 0.60 19.20
Ca. Cristobal Colon - Av. Los Juriscunsultos (mercado) 8.00 1.09 0.60 5.23
Av. Los Juriscunsultos - Av. La Bohemia Tacneña (MZ. I2) 30.00 1.36 0.60 24.48
Av. Los Juriscunsultos - Av. La Bohemia Tacneña (MZ. 51) 1.00 2.54 0.60 1.52
1.00 1.40 0.60 0.84
1.00 2.07 0.60 1.24
1.00 1.10 0.60 0.66
1.00 1.23 0.60 0.74
1.00 1.12 0.60 0.67
13.00 1.10 0.60 8.58
SARDINEL SUMERGIDO DE CONFINAMIENTO DE PISO DE ADOQUIN
AV. LOS ESCRITORES
Ca. Cristobal Colon - Av. Los Juriscunsultos 7.00 0.84 0.15 0.88
25.00 0.84 0.15 3.15
Av. Los Juriscunsultos - Av. La Bohemia Tacneña (MZ. I2) 30.00 0.84 0.15 3.78
Av. Los Juriscunsultos - Av. La Bohemia Tacneña (MZ. 51) 1.00 0.84 0.15 0.13
1.00 0.84 0.15 0.13
1.00 0.84 0.15 0.13
1.00 0.84 0.15 0.13
1.00 0.84 0.15 0.13
1.00 0.84 0.15 0.13
13.00 0.84 0.15 1.64
CLIENTE: MDCGAL
UBICACIÓN: DISTRITO DE CORONEL GREGORIO ALBARRACIN LANCHIPA, PROVINCIA TACNA, DEPARTAMENTO TACNA
FECHA: SETIEMBRE 2020
02 TRABAJOS PRELIMINARES
02.02 TRAZO, NIVELES Y REPLANTEO PRELIMINAR C/EQUIPO EN RED DE DESAGUE 389.97 m
Av. Bohemia Tacneña
Bz E - 55 A E - 56 1.00 1.00 69.97 69.97
Bz E - 56 A E - 57 1.00 1.00 69.50 69.50
Bz E - 57 A P - 38 1.00 1.00 52.26 52.26
Bz P - 38 A P - 39 1.00 1.00 36.02 36.02
Bz P - 39 A P - 40 1.00 1.00 31.79 31.79
Bz P - 40 A P - 41 1.00 1.00 31.46 31.46
Av. Cusco
Bz E - 58 A P - 42 1.00 1.00 26.50 26.50
Bz P - 42 A P - 43 1.00 1.00 24.96 24.96
Bz P - 43 A P - 41 1.00 1.00 24.85 24.85
Bz P - 41 A P - 44 1.00 1.00 22.66 22.66
03 MOVIMIENTO DE TIERRAS
03.01 EXCAVACION DE ZANJA C/MAQUINARIA, ANCHO <=1.20m, 1.50M<H<3.00 M 373.97 m
Av. Bohemia Tacneña
Bz E - 55 A E - 56 1.00 1.00 68.37 68.37
Bz E - 56 A E - 57 1.00 1.00 67.90 67.90
Bz E - 57 A P - 38 1.00 1.00 50.66 50.66
Bz P - 38 A P - 39 1.00 1.00 34.42 34.42
Bz P - 39 A P - 40 1.00 1.00 30.19 30.19
Bz P - 40 A P - 41 1.00 1.00 29.86 29.86
Av. Cusco
Bz E - 58 A P - 42 1.00 1.00 24.90 24.90
Bz P - 42 A P - 43 1.00 1.00 23.36 23.36
Bz P - 43 A P - 41 1.00 1.00 23.25 23.25
Bz P - 41 A P - 44 1.00 1.00 21.06 21.06
03.15 RELLENO C/ MATERIAL PROPIO SELECCIONADO, COMPACTADO CON EQUIPO, INC. ZARANDEO 345.35 m3
Av. Bohemia Tacneña
Bz E - 55 A E - 56 1.00 1.00 68.37 1.20 0.75 61.53
Bz E - 56 A E - 57 1.00 1.00 67.90 1.20 0.85 69.26
Bz E - 57 A P - 38 1.00 1.00 50.66 1.20 0.85 51.67
Bz P - 38 A P - 39 1.00 1.00 34.42 1.20 0.70 28.91
Bz P - 39 A P - 40 1.00 1.00 30.19 1.20 0.65 23.55
Bz P - 40 A P - 41 1.00 1.00 29.86 1.20 0.90 32.25
Av. Cusco
Bz E - 58 A P - 42 1.00 1.00 24.90 1.20 0.55 16.43
Bz P - 42 A P - 43 1.00 1.00 23.36 1.20 0.55 15.42
Bz P - 43 A P - 41 1.00 1.00 23.25 1.20 0.80 22.32
Bz P - 41 A P - 44 1.00 1.00 21.06 1.20 0.95 24.01
04.02 SUMINISTRO E INSTALACION DE TUB. PVC ALCANT. UF ISO 4435, SN4, DN=250 MM 283.80 m
Av. Bohemia Tacneña
Bz E - 55 A E - 56 1.00 1.00 68.77 68.77
Bz E - 56 A E - 57 1.00 1.00 68.30 68.30
Bz E - 57 A P - 38 1.00 1.00 51.06 51.06
Bz P - 38 A P - 39 1.00 1.00 34.82 34.82
Bz P - 39 A P - 40 1.00 1.00 30.59 30.59
Bz P - 40 A P - 41 1.00 1.00 30.26 30.26
05 CAMARAS DE INSPECCION
05.01 BUZONES SANITARIOS DE INSPECCION
05.01.01 BUZON DE INSPECCION 1.20<=H<2.00M, C°S° f'c=210kg/cm2 5.00 und
TRAMO 04: Colector Av. Bohemia Tacneña y Av. Nicolas Arriola
Bz- P-38 1.00 1.00 1.00
Bz- P-39 1.00 1.00 1.00
Bz- P-40 1.00 1.00 1.00
Bz- P-42 1.00 1.00 1.00
Bz- P-43 1.00 1.00 1.00
08 VARIOS
08.01 DESVIO DE AGUAS RESIDUALES 2.00 UND
tramo 04 2.00 2.00
08.08 RELLENO INTERIOR DE TUBERIA EXISTENTE CON MORTERO FLUIDO f´c=10 KG/CM2, INC. BOMBEO 2.72 m3
tramo 04 1.00 1.00 87.89 area= 0.031 2.72
09 RECONEXIONES DOMICILIARIAS
09.01 TRABAJOS PRELIMINARES Y DE DEMOLICION
09.01.01 TRAZO Y NIVELES EN RED P/CONEXION DOMICILIARIA DE DESAGUE 96.54 m
AV. LA BOHEMIA TACNEÑA
Ca. Los Proceres - Ca. Los Olivos (MZ. 59) 18.00 5.36 96.54
09.02.05 RELLENO C/ MATERIAL PROPIO SELECCIONADO, COMPACTADO CON EQUIPO, INC. ZARANDEO 26.36 m3
AV. LA BOHEMIA TACNEÑA
Ca. Los Proceres - Ca. Los Olivos (MZ. 59) 18.00 5.36 0.60 0.45 26.36
09.05.06 REP. DE VEREDAS Y RAMPAS DE CONCRETO F'C=175KG/CM2 P/CONEX. DOMIC. ACAB. PULIDO 12.42 m2
AV. LA BOHEMIA TACNEÑA
Ca. Los Proceres - Ca. Los Olivos (MZ. 59) 18.00 0.94 0.60 10.15
SARDINEL SUMERGIDO DE CONFINAMIENTO DE PISO DE ADOQUIN
AV. LA BOHEMIA TACNEÑA
Ca. Los Proceres - Ca. Los Olivos (MZ. 59) 18.00 0.84 0.15 2.27
02.02 TRAZO, NIVELES Y REPLANTEO PRELIMINAR C/EQUIPO EN RED DE DESAGÜE m 13,032.28 13,032.28 503.55 1,228.20 389.97
02.03 CONTROL TOPOGRAFICO CON EQUIPO DE TRAZO Y NIVELES m 13,032.28 13,032.28 503.55 1,228.20 389.97
02.05 CORTE DE PAVIMENTO FLEXIBLE EXISTENTE E=0.05M M 20,241.41 20,241.41 971.90 2,382.80 747.94
02.06 DEMOLICION DE PAVIMENTO FLEXIBLE EXISTENTE E=0.05M M2 16,311.84 16,311.84 826.12 1,429.68 448.76
02.07 DESMONTAJE Y RETIRO DE TUBERIA C°S°N° DN 200 - 250 MM M 4,192.89 4,192.89 490.35 884.22 191.77
03 MOVIMIENTO DE TIERRAS
03.01 EXCAVACION DE ZANJA C/MAQUINARIA, ANCHO <=1.20m, 1.50M<H<3.00 M m 4,603.86 4,603.86 - 1,191.40 373.97
03.02 EXCAVACION DE ZANJA C/MAQUINARIA, ANCHO <=1.70m, 1.50M<H<2.00 M m 7,316.29 7,316.29 485.95 - -
03.05 EXCAVACION MANUAL P/BUZON DE INSPECCION (1.20M<=H<2.00M) m3 353.76 353.76 19.70 27.22 13.67
03.10 REFINE Y NIVELACION DE ZANJA NORMAL P/TUBERIAS m 12,691.48 12,691.48 485.95 1,191.40 373.97
03.11 CAMA DE APOYO C/MAT. DE PRESTAMO E=0.10M, Bprom=1.20M m 5,375.19 5,375.19 - 1,191.40 373.97
03.12 CAMA DE APOYO C/MAT. DE PRESTAMO E=0.10M, Bprom=1.70M m 7,316.29 7,316.29 485.95 - -
03.13 SOBRECAMA PROTECTORA C/MAT. DE PRESTAMO E=0.30M, Bprom=1.20M m 5,375.19 5,375.19 - 1,191.40 373.97
03.14 SOBRECAMA PROTECTORA C/MAT. DE PRESTAMO E=0.30M, Bprom=1.70M m 7,316.29 7,316.29 485.95 - -
03.15 RELLENO C/ MATERIAL PROPIO SELECCIONADO, COMPACTADO CON EQUIPO, INC.ZARANDEO m3 21,591.10 21,591.10 435.47 707.95 345.35
03.16 ACARREO DE MATERIAL EXCEDENTE A UNA DISTANCIA PROMEDIO DE 30 M m3 22,417.33 22,417.33 1,024.40 1,657.40 554.92
03.17 CARGUIO Y ELIMINACION DE MATERIAL EXCEDENTE (D=18.00KM) m3 24,188.76 24,188.76 1,103.40 1,803.12 596.08
03.18 DISPOSICION FINAL DE MATERIAL EXCEDENTE Y/O DESMONTE M3 24,188.76 24,188.76 1,103.40 1,803.12 596.08
04 SUMINISTRO E INSTALACION DE TUBERIAS
04.01 SUMINISTRO E INSTALACION DE TUB. PVC ALCANT. UF ISO 4435, SN4, DN=200 MM m 1,123.27 1,123.27 - 1.74 72.71
04.02 SUMINISTRO E INSTALACION DE TUB. PVC ALCANT. UF ISO 4435, SN4, DN=250 MM m 3,332.04 3,332.04 - 1,198.86 283.80
04.04 SUMINISTRO E INSTALACION DE TUB. PVC ALCANT. UF ISO 4435, SN4, DN=355 MM m 1,370.38 1,370.38 490.35 - -
05 CAMARAS DE INSPECCION
05.01.01
BUZON DE INSPECCION 1.20<=H<2.00M, C°S° f'c=210kg/cm2 und 110.00 110.00 - 13.00 5.00
05.01.08
TRATAMIENTO DE BUZONES EXISTENTES TIPO I und 41.00 41.00 2.00 9.00 2.00
05.01.09
TRATAMIENTO DE BUZONES EXISTENTES TIPO II und 29.00 29.00 2.00 9.00 2.00
05.01.10
RETIRO Y REPOSICION DE MARCO Y TAPA P/BUZÓN und 70.00 70.00 4.00 18.00 4.00
05.01.11
EMPALME A BUZON Y CONSTRUCCION DE DADOS DE CONCRETO UND 434.00 434.00 22.00 47.00 20.00
06 REPOSICION DE CARPETA ASFALTICA
07.01 PROTECCIÓN EN CRUCE CON RED EXISTENTE DE AGUA POTABLE UND 626.00 626.00 - - -
07.02 PROTECCIÓN EN CRUCE CON RED EXISTENTE DE ALCANTARILLADO UND 15.00 15.00 - - -
07.03 PROTECCIÓN EN CRUCE CON RED DE GAS SUBTERRANEO UND 213.00 213.00 - - -
07.04 PROTECCIÓN EN CRUCES CON CABLE, INTERNET Y/O REDES ELECTRICAS SUBTERRANEAS UND 250.00 250.00 - - -
07.05 PROTECCIÓN EN CRUCE CON VÍA FÉRREA INC. CONCRETO F'C= 175KG/CM2 C/ENCOFRADO Y DESC. UND 1.00 1.00 - - -
07.06 PROTECCIÓN Y REPOSICION DE BASE DE POSTES Y/O SEMAFOROS UND 131.00 131.00 - - -
08 VARIOS
08.01 DESVIO DE AGUAS RESIDUALES UND 24.00 24.00 3.00 4.00 2.00
08.07 PRUEBA HIDRAULICA P/TUBERIAS Y DE INFILTRACION EN BUZONES m 12,776.71 12,776.71 490.35 1,200.60 356.51
08.08 RELLENO INTERIOR DE TUBERIA EXISTENTE CON MORTERO FLUIDO f'c=10 KG/CM2, INC. BOMBEO m3 220.47 220.47 - 10.45 2.72
09 RECONEXIONES DOMICILIARIAS
09.01.01
TRAZO Y NIVELES EN RED P/CONEXION DOMICILIARIA DE DESAGÜE m 6,241.88 6,241.88 721.04 1,092.46 96.54
09.01.03
CORTE DE PAVIMENTO FLEXIBLE EXISTENTE E=0.05M M 5,828.99 5,828.99 1,048.90 1,048.72 114.84
09.01.04
DEMOLICION DE PAVIMENTO FLEXIBLE EXISTENTE E=0.05M M2 1,748.70 1,748.70 314.67 314.62 34.45
09.01.05
DEMOLICION DE VEREDA DE CONCRETO M2 522.29 522.29 78.71 123.19 12.42
09.01.06
RETIRO DE PISO DE ADOQUIN M2 1,288.36 1,288.36 111.17 243.61 24.52
09.01.07
DESMONTAJE Y RETIRO DE TUBERIA DE DESAGÜE DE PVC M 6,241.88 6,241.88 721.04 1,092.46 96.54
09.01.08
ACARREO DE MATERIAL EXCEDENTE A UNA DISTANCIA PROMEDIO DE 30 M m3 188.55 188.55 31.87 37.87 4.00
09.01.09
CARGUIO Y ELIMINACION DE MATERIAL EXCEDENTE (D=18.00KM) m3 188.55 188.55 31.87 37.87 4.00
09.02 MOVIMIENTO DE TIERRAS
09.02.01
EXCAVACION DE ZANJA MANUAL P/CONEX DOMICILIARIA m 6,241.88 6,241.88 721.04 1,092.46 96.54
09.02.02
REFINE Y NIVELACION EN TERRENO NORMAL PARA TUBERIA m 6,241.88 6,241.88 721.04 1,092.46 96.54
09.02.03
CAMA DE APOYO C/MAT. DE PRESTAMO E=0.10M, B=0.60M m 6,241.88 6,241.88 721.04 1,092.46 96.54
09.02.04
SOBRECAMA PROTECTORA C/MAT. DE PRESTAMO E=0.30M, B=0.60M m 6,241.88 6,241.88 721.04 1,092.46 96.54
09.02.05
RELLENO C/ MATERIAL PROPIO SELECCIONADO, COMPACTADO CON EQUIPO, INC. ZARANDEO m3 2,102.24 2,102.24 721.04 198.78 26.36
09.02.06
CARGUIO Y ELIMINACION DE MATERIAL EXCEDENTE (D=18.00KM) m3 3,491.10 3,491.10 493.92 680.28 66.57
09.02.07
DISPOSICION FINAL DE MATERIAL EXCEDENTE Y/O DESMONTE M3 3,491.10 3,491.10 493.92 680.28 66.57
09.03 SUM. E INSTALACION DE TUBERÍAS DE PVC
09.03.01
SUMINISTRO E INST. TUBERIA DE PVC UF, SN 4, DN=160MM m 6,241.88 6,241.88 721.04 1,092.46 96.54
09.04 CONEXIONES DOMICILIARIAS
09.04.02
RECONEXION DOMICILIARIA DE DESAGÜE PVC 160MMX250 MM und 286.00 286.00 - 123.00 18.00
09.04.04
RECONEXION DOMICILIARIA DE DESAGÜE PVC 160MMX355 MM und 121.00 121.00 89.00 - -
09.05 REPOSICION DE CARPETA ASFALTICA
09.05.01
SUB-BASE GRANULAR H=0.15m M2 3,037.06 3,037.06 425.84 485.07 58.97
09.05.02
BASE GRANULAR E=0.15M M2 3,037.06 3,037.06 425.84 485.07 58.97
09.05.03
IMPRIMACION ASFALTICA DE LA BASE m2 1,748.70 1,748.70 314.67 218.83 34.45
09.05.04
REPOSICION DE CARPETA ASFALTICA 2" M2 1,748.70 1,748.70 314.67 218.83 34.45
09.05.05
NIVELACION Y COMPACTACION DE TERRENO NATURAL P/LOSAS m2 449.97 449.97 68.50 107.69 10.15
09.05.06
REP. DE VEREDAS Y RAMPAS DE CONCRETO F'C=175KG/CM2 P/CONEX. DOMIC. m2 522.29 522.29 78.71 123.19 12.42
09.05.07
ENCOFRADO Y DESENCOFRADO NORMAL P/PISOS DE CONCRETO m2 150.70 150.70 21.42 31.00 4.54
09.05.08
COLOCACION DE CAMA DE ARENA E=0.05 M m2 1,288.36 1,288.36 103.95 243.61 25.60
09.05.09
SUMINISTRO Y COLOCACION DE ADOQUINES DE CONCRETO E=6 CM m2 1,288.36 1,288.36 103.95 243.61 25.60
11 VARIOS COMPLEMENTARIOS E IMPACTO AMBIENTAL
5,149,087.21
751,766.73
459,556.03
6,360,409.97
6,360,409.97
1,144,873.79
7,505,283.76
54.04%