Escolar Documentos
Profissional Documentos
Cultura Documentos
05 TENTO H=0,05M
.05
DUCHA 0.70 (P.A.)
SOBE RAMPA 0.65 (P.O.)
.05
TENTO H=0,05M INCL. 8,33%
.05
.05
05 07 09 11 13 15
DECK / SOLÁRIO
0.98 (P.A.)
0.88 (P.O.)
SOBE RAMPA
INCL. 8,33%
TENTO H=0,05M
.05
.05
PISCINA ADULTO TENTO H=0,05M
- 0.05 (P.A.)
TENTO H=0,05M
- 0.15 (P.O.)
0.32 (P.A.)
SOBE RAMPA 0.27 (P.O.)
.05 INCL. 8,33%
04 06 08 10 12 14
20
AL
AL
09
CHURRASQ.
0.03 (P.A.)
-0.10 (P.O.)
.0
5
6
5
4
3
.05 ESTACIONAMENTO Vegetação
2
1
SO
ES
-0.10 (P.A.)
BE
3 TENTO H=0,05M C
. AL
.05
2 18 -0.25 (P.O.)
1
Espécie Qtd Simbologia
(Mudas)
.05
PISCINA TENTO H=0,05M
3 2 1 PRAÇA CHURRASQ.
.0
5
INFANTIL 0.00 (P.A.)
-0.15 (P.A.) -0.10 (P.O.)
.05
-0.25 (P.O.) Grama amendoim 5,5 m2
TENTO H=0,05M
.05
16
0.03 (P.A.) VEST. MASC.
INCL. 8,33%
AL
.05 -0.10 (P.O.)
13
0.02 (P.A.)
-0.10 (P.O.) Strelitzia 38
.05
SOBE RAMPA
LAVANDERIA
0.03 (P.A.)
-0.10 (P.O.)
HALL
0.03 (P.A.)
Agapanthus 111
PLAYGROUND
-0.10 (P.O.)
-0.05 (P.A.) 01
-0.10 (P.O.)
MARKET
0.03 (P.A.)
-0.10 (P.O.)
.05
5
.0
.05 Capim do Texas 156
WC FEM. WC MASC.
FUNC. FUNC.
0.02 (P.A.) 0.02 (P.A.)
-0.10 (P.O.) -0.10 (P.O.)
PASSEIO PÚBLICO
.05
PCF
AL
MA
PCF 01 ELEVADOR
MA MA
Grama sintética 41,92m2
17 01
03 COPA 02 02
17 FUNC.
ELÉTRICA
0.03 (P.A.)
16 1 -0.10 (P.O.)
SANIT. MASC. 0.03 (P.A.)
P.N.E. 15 2 -0.10 (P.O.)
DESCE ESC.
1º PAV. TIPO
1º SUBSOLO
SOBE ESC.
AL 0.02 (P.A.) 14 3
06 -0.10 (P.O.)
.05
13 4
HIDRÁULICA
MA
03 12 5 Jasmin Manga 1
11 6
10 7
.05
SANIT. FEM.
P.N.E. 9 8
AL 0.02 (P.A.)
SISTEMAS
.05
06 -0.10 (P.O.)
AL
ELEVADOR 12
PROJ. PAV. TIPO
Maranta Charuto (Calathea Lutea) 24
A
COWORKING
COPA
0.03 (P.A.)
0.03 (P.A.)
-0.10 (P.O.)
-0.10 (P.O.)
AL
SAGUÃO
11
0.03 (P.A.)
AL
11
-0.10 (P.O.) Palmeira Jerivá 6
.05
AL
ESC. 1:100
SALÃO DE 10
.05
FESTAS
TENTO H=0,05M
0.03 (P.A.)
-0.10 (P.O.)
ACESSO SOCIAL
0.00 (P.A.)
JOGOS
AL 0.03 (P.A.)
-0.10 (P.O.)
09 -0.10 (P.O.)
AL
14 AL
09
ESTACIONAMENTO
-0.10 (P.A.)
AL AL -0.25 (P.O.)
08 08
.05
.05
.05
.05
PRAÇA TENTO H=0,05M TENTO H=0,05M
COQUEIRO EXISTENTE
.05
.10
.10
.10
.10
8
I = 9,3%
7
5
.0
6
PROJ. COBERTURA
SOBE ESC.
5
4 MA
02
3
SOBE RAMPA
2 LOGÍSTICA
I = 8,33%
TENTO H=0,05M 1
FE -1,53 (P.A.)
MA -0.65 (P.A.)
04
02
CENTRAL LOCKER
PROJ. COB.
FE
-1,11 (P.A.)
GÁS AL
07 05
I = 5%
SOBE
I = 5%
SOBE
03
FE
0.00 (P.A.)
-0.80 (P.A.)
-3,59 (P.A.) -3,26 (P.A.) -1,60 (P.A.)
PASSEIO PÚBLICO
-4.09(P.A.)