15 m

5m 5m 5m
31/05/2021 22/05/2021
6.0 6.0 7.0 7.0 7.0 7.0 6.0 7.0 5 5 5
6.0 6.0 7.0 6.0 6.0 7.0 6.0 6.0 6 6 6 37 m
6.0 6.0 7.0 6.5 7.0 7.0 6.0 6.0 5.6 6 6 14/05 al 17/05
01/06/2021 24/05/2021
6.0 6.0 7.0 7.0 8.0 6.0 6.0 6.0 6 7 5
DRAGADO TERMINAL V

6.0 6.5 7.0 7.0 8.0 7.0 6.0 6.0 6 6 5


6.0 6.0 7.0 6.0 7.0 6.0 6.0 6.0 6 6 5 PLATAFORMA 4 Y 5
02/06/2021 25/05/202
6.0 6.0 8.6 8.6 8.0 6.0 6.0 5.0 5 6 6
6.0 6.0 8.6 8.6 8.6 7.0 6.0 6.0 6 6 5.6
6.0 6.0 8.6 8.0 8.6 6.0 7.0 6.0 6 6 6 17m 18/05/2021
04/06/2021
26/05/2021
100 m

6.0 6.0 8.0 8.6 8.6 7.0 6.0 6.0 6 6 5.6


6.0 6.0 8.0 8.6 8.6 6.0 6.0 7.0 6 6 6
6.0 6.0 8.0 8.0 8.6 6.0 6.0 6.0 6 6 5.6 18m 19/05/2021
29/05/2021
6.0 6.0 5.0 6.0 6.0 6.0 6.0 7.0 6 6 5.6
6.0 6.0 6.0 6.0 6.0 6.0 7.0 6.0 6 6 6 12m 20/05/2021
6.0 6.0 6.0 6.0 6.0 6.0 6.0 7.0 5 5 5
29/05/2021
6.0 6.0 5.0 6.0 6.0 6.0 7.0 6.0 6 6 6
6.0 6.0 6.0 6.0 6.0 6.0 6.0 6.0 6 6 5 16m 21/05/2021
6.0 6.0 6.0 6.0 6.0 6.0 6.0 6.0 6 6 5
6.0 6.0 6.0 6.0 6.0 6.0 5.5 5.0 6
6.0 6.0 5.0 6.0 6.0 6.0 6.0 5.5 6
TERRENO INICIAL
14/05/2021
TE
RM
IN
AL
V

6 pies

15 m
TERRENO ACTUAL TE
RM
04/06/2021 IN
AL
V

6 pies

15 m
TERMINAL 6 RELLENO MATERIAL
RETIRADO

TERMINAL VI
30m
15m 12m

8m 28/05/2021
27m 27/05/2021 18m

7m 29/05/2021

TERMINAL V 5m 31/05/2021
01/05/2021 5m
OBRA RELLENO
OBRA GAVIONES
TERMINAL IV Y V

GAVIONES

TERMINAL IV - V

RELLENO TERMINAL FASE 1 = 253.440 Bs (EJECUTADO) CONSTRUCCION DE GAVIONES = 182.314 Bs (EJECUTADO)


= 36.414 $us 100% 100%
= 26.195 $us
RELLENO TERMINAL FASE 2 = 183.040 Bs (AVANCE 40%)
= 26.299 $us
AREA A DRAGAR
DETALLE 04/06/2021
DETALLE Bs $us
GASTOS DRAGADOS EQUIPOS 343,316.60 49,327.10
GASTOS DRAGADO PERSONAL 7,672.84 1,102.42
TOTALES 350,989.44 50,429.52

MATERIAL RETIRADO M3 = 11.000 M3

TERMINAL TERMINAL TERMINAL TERMINAL


V IV III II

TERMINAL
VI
EXCAVADORA
(SERVICIO)

ESTOS COSTOS SERAN REDUCIDOS, UNA VEZ


TENGAMOS LA EXCAVADORA LISTA PARA OPERAR,
YA QUE UN DIAGNOSTICO ERRADO NOS LIMITO EL
USO DE LA MISMA, Y SE GESTIONO OTRA OPCION
PARA ARREGLO DE LA MISMA CON UN MENOR
COSTO.
PLANILLA DE CONTROL GASTOS

DETALLE % DE AVANCE MONTO Bs MONTO $US


OBRA DE GAVIONES 100 182,314.00 26,194.54
OBRA DE RELLENO FASE 1 100 253,440.00 36,413.79
OBRA DE RELLENO FASE 2 40 183,040.00 26,298.85
DRAGADO TERMINAL VI 50 277,008.00 39,800.00
TOTAL   895,802.00 128,707.18

PRESUPUESTO GENERAL = 214.000 $US (100 %)


AVANCE DE OBRA = 128.707 $US (60 %)