Escolar Documentos
Profissional Documentos
Cultura Documentos
PAVIMENTO 33
APARTAMENTO
01 02 03 04 01 02 03 04 01 02 03 04
INCIO
5-Jun 5-Jun 6-Jun 14-Jun 26-Jun 27-Jun 27-Jun 10-Jul 13-Jul 13-Jul 9-Jul
CONCLUIDO(%) TRMINO
100% 100% 100% 100% 100% 98% 50% 80% 30% 10% 10% 35% 26-Jun 27-Jun 29-Jun 10-Jul 4-Jul
SERVIO
OK OK OK OK OK
32
31
__________________________
ASS. ENG
SERVIO
OK OK OK OK OK
EFETIVO
Marivaldo Marivaldo Jos Carlos Jos Carlos Jorge Jorge Anderson Andr/ Paulo Andr Tarcsio/Vagner Valdinei/Railton Adriano Edson/ Antonio Carlos Jos Anselmo / Geovane
________________________________________
ASS. ENG. RESP. TRIBECA A
PAVIMENTO 33
APARTAMENTO
01 02 03 04 01 02 03 04 01 02 03 04
INCIO
5-Jun 5-Jun 6-Jun 14-Jun 26-Jun 27-Jun 27-Jun 10-Jul 13-Jul 13-Jul 9-Jul
CONCLUIDO(%) TRMINO
100% 100% 100% 100% 100% 100% 70% 90% 40% 15% 20% 45% 26-Jun 27-Jun 29-Jun 10-Jul 2-Aug
SERVIO
OK OK OK OK OK OK Finalizando latex / incio portas Portas Lixa Lixa Lixa e aditivo Lixa Ajudantes:
EFETIVO
32
31
Anderson / Antonio Carlos Andr/ Paulo Andr Tarcsio/Vagner Valdinei/Railton Adriano/ Jos Carlos Edson/ Marivaldo / Jorge Jos Anselmo / Geovane
__________________________________________
ASS. ENG. RESP. TRIBECA A
PAVIMENTO 33
APARTAMENTO
01 02 03 04 01 02 03 04 01 02 03 04 01 02 03 04
INCIO
5-Jun 5-Jun 6-Jun 14-Jun 26-Jun 27-Jun 27-Jun 10-Jul 13-Jul 13-Jul 9-Jul 3-Aug
CONCLUIDO(%) TRMINO
100% 100% 100% 100% 100% 100% 85% 100% 60% 30% 40% 55% 10% 26-Jun 27-Jun 29-Jun 10-Jul 2-Aug 3-Aug
SERVIO
OK OK OK OK OK OK Portas OK Lixa / incio latex Lixa Lixa Lixa / incio latex Lixa
32
31
30
__________________________
ASS. ENG
SERVIO
OK OK OK OK OK OK Portas OK Lixa / incio latex Lixa Lixa Lixa / incio latex Lixa
EFETIVO
Anderson / Antonio Carlos Tarcsio/Vagner Valdinei/Railton Adriano/ Jos Carlos Edson/ Marivaldo / Jorge Andr/ Paulo Andr
Ajudantes:
________________________________________
ASS. ENG. RESP. TRIBECA A
PAVIMENTO 33
APARTAMENTO
01 02 03 04 01 02 03 04 01 02 03 04 01 02 03 04
INCIO
5-Jun 5-Jun 6-Jun 14-Jun 26-Jun 27-Jun 27-Jun 10-Jul 13-Jul 13-Jul 9-Jul 3-Aug 6-Aug
CONCLUIDO(%) TRMINO
100% 100% 100% 100% 100% 100% 100% 100% 80% 50% 60% 75% 20% 10% 26-Jun 27-Jun 29-Jun 10-Jul 2-Aug 6-Aug 3-Aug
SERVIO
OK OK OK OK OK OK OK OK latex inicio latex inicio latex latex Lixa Lixa Ajudantes: 1
EFETIVO
32
31
Tarcsio/Vagner Valdinei/Railton Adriano/ Jos Carlos Edson/ Marivaldo / Jorge Andr/ Paulo Andr Anderson / Antonio Carlos Jos Anselmo / Geovane
30
__________________________________________
ASS. ENG. RESP. TRIBECA A
PAVIMENTO 33
APARTAMENTO
01 02 03 04 01 02 03 04 01
INCIO
5-Jun 5-Jun 6-Jun 14-Jun 26-Jun 27-Jun 27-Jun 10-Jul 13-Jul 13-Jul 9-Jul 3-Aug 6-Aug
CONCLUIDO(%) TRMINO
100% 100% 100% 100% 100% 100% 100% 100% 95% 70% 80% 90% 30% 20% 26-Jun 27-Jun 29-Jun 10-Jul 2-Aug 6-Aug 3-Aug
SERVIO
OK OK OK OK OK OK OK OK esmalte - portas e rodaps / perede suite amarelada latex finalizando / incio esmalte portas esmalte - portas e rodaps latex Lixa Lixa Ajudantes:
EFETIVO
32
31
30
02 03 04 01 02 03 04
Tarcsio/Vagner Valdinei/Railton Adriano/ Jos Carlos Edson/ Marivaldo / Jorge Andr/ Paulo Andr Anderson / Antonio Carlos Jos Anselmo / Geovane
__________________________________________
ASS. ENG. RESP. TRIBECA A
PAVIMENTO 33
APARTAMENTO
01 02 03 04 01 02 03 04 01 02 03 04 01 02 03 04
INCIO
5-Jun 5-Jun 6-Jun 14-Jun 26-Jun 27-Jun 27-Jun 10-Jul 13-Jul 13-Jul 9-Jul 8-Aug 3-Aug 8-Aug 6-Aug
CONCLUIDO(%) TRMINO
100% 100% 100% 100% 100% 100% 100% 100% 98% 95% 95% 100% 10% 40% 10% 25% 26-Jun 27-Jun 29-Jun 10-Jul 2-Aug 6-Aug 3-Aug
SERVIO
OK OK OK OK OK OK OK OK Retoques no rodap Finalizando portas e rodaps Finalizando portas e rodaps OK Lixa Catamento / massa Lixa Lixa / Catamento Ajudantes:
EFETIVO
32
31
Tarcsio/Vagner Railton Adriano/ Jos Carlos Edson/ Marivaldo / Jorge Andr/ Paulo Andr Valdinei Anderson / Antonio Carlos Jos Anselmo / Geovane
8-Aug
30
__________________________________________
ASS. ENG. RESP. TRIBECA A
PAVIMENTO 31
APARTAMENTO
01 02 03 04 01 02 03 04 01 02 03 04
INCIO
10-Jul 13-Jul 13-Jul 9-Jul 8-Aug 3-Aug 8-Aug 6-Aug 9-Aug 9-Aug
CONCLUIDO(%) TRMINO
99% 98% 100% 100% 40% 70% 20% 40% 10% 20% 9-Aug 8-Aug
SERVIO
Retoques na porta princial Retoques nas paredes OK OK Ltex Ltex Lixa Lixa / Catamento Lixa Lixa
EFETIVO
Railton
30
29
Edson/ Marivaldo Andr/ Paulo Andr Valdinei Anderson / Antonio Carlos Adriano / Jos Carlos Tarcsio / Vagner / Jorge
__________________________________________
ASS. ENG. RESP. TRIBECA A
PAVIMENTO 31
APARTAMENTO
01 02 03 04 01 02 03 04 01 02 03 04
INCIO
10-Jul 13-Jul 13-Jul 9-Jul 8-Aug 3-Aug 8-Aug 6-Aug 9-Aug 9-Aug
CONCLUIDO(%) TRMINO
99% 100% 100% 100% 60% 85% 40% 60% 30% 40% 10-Aug 9-Aug 8-Aug
SERVIO
Retoques portas e rodaps OK OK OK Ltex Ltex Incio ltex/ Massa nas portas Ltex Lixa/ catamento Lixa / catamento
EFETIVO
Jorge
30
29
Edson/ Marivaldo Andr/ Paulo Andr Valdinei/ Railton Anderson / Antonio Carlos Adriano / Jos Carlos Tarcsio / Vagner / Jorge
Ajudantes:
__________________________________________
ASS. ENG. RESP. TRIBECA A
PAVIMENTO 31
APARTAMENTO
01 02 03 04 01 02 03 04 01 02 03 04
INCIO
10-Jul 13-Jul 13-Jul 9-Jul 8-Aug 3-Aug 8-Aug 6-Aug 9-Aug 9-Aug
CONCLUIDO(%) TRMINO
100% 100% 100% 100% 80% 95% 50% 85% 30% 40% 13-Aug 10-Aug 9-Aug 8-Aug
SERVIO
OK OK OK OK Esmalte nas portas e rodaps Esmalte nas portas e rodaps Ltex Ltex Incio ltex Catamento
EFETIVO
30
29
Edson/ Marivaldo Andr/ Paulo Andr Valdinei/ Railton Anderson / Antonio Carlos Adriano / Jos Carlos Tarcsio / Vagner / Jorge
Ajudantes:
__________________________________________
ASS. ENG. RESP. TRIBECA A
PAVIMENTO 31
APARTAMENTO
01 02 03 04 01 02 03 04 01 02 03 04 01 02 03 04
INCIO
10-Jul 13-Jul 13-Jul 9-Jul 8-Aug 3-Aug 8-Aug 6-Aug 9-Aug 9-Aug 14-Aug 14-Aug 14-Aug 14-Aug 14-Aug
CONCLUIDO(%) TRMINO
100% 100% 100% 100% 95% 100% 75% 100% 50% 60% 10% 10% 5% 5% 5% 13-Aug 10-Aug 9-Aug 8-Aug 14-Aug 14-Aug
SERVIO
OK OK OK OK Esmalte nas portas e rodaps OK Ltex OK Ltex Catamento / Incio Ltex Lixa Lixa Lixa Lixa Lixa Ajudantes:
EFETIVO
Edson/ Marivaldo Valdinei/ Railton / Rondineli Adriano / Jos Carlos Tarcsio / Vagner / Jorge Alberto Luciano / Lus Carlos Anderson / Antonio Carlos Willian / Denilson / Ruy Weider / Jos de Jesus / Jorge Soares Andr / Paulo Andr Jos Anselmo / Geovane
30
29
28
__________________________________________
ASS. ENG. RESP. TRIBECA A
PAVIMENTO 30
APARTAMENTO
01 02 03 04 01 02 03 04 01 02 03 04
INCIO
8-Aug 3-Aug 8-Aug 6-Aug 9-Aug 9-Aug 14-Aug 14-Aug 14-Aug 15-Aug 14-Aug 14-Aug
CONCLUIDO(%) TRMINO
100% 100% 90% 100% 65% 75% 30% 30% 15% 5% 15% 20% 15-Aug 14-Aug 14-Aug
SERVIO
OK OK Esmalte nas portas e rodaps OK Ltex Ltex Lixa/ Catamento Lixa/ Catamento Lixa / Catamento Lixa/ Catamento Lixa Lixa/ Catamento Ajudantes:
EFETIVO
Valdinei/ Railton / Rondineli Adriano / Jos Carlos Tarcsio / Vagner / Jorge Alberto Luciano / Lus Carlos Anderson / Antonio Carlos Willian / Denilson / Ruy Edson/ Marivaldo Weider / Jos de Jesus / Jorge Soares Andr / Paulo Andr Jos Anselmo / Geovane
29
28
Obs: Fonte vermelha = Falta Fonte Azul = Sada s 14:00h _________________________________________ ASS. ESTAGIRIO
__________________________________________
ASS. ENG. RESP. TRIBECA A
PAVIMENTO 30
APARTAMENTO
01 02 03 04 01 02 03 04 01 02 03 04
INCIO
8-Aug 3-Aug 8-Aug 6-Aug 9-Aug 9-Aug 14-Aug 14-Aug 14-Aug 15-Aug 14-Aug 14-Aug
CONCLUIDO(%) TRMINO
100% 100% 100% 100% 90% 85% 45% 40% 30% 20% 30% 30% 15-Aug 14-Aug 16-Aug 14-Aug
SERVIO
OK OK OK OK Esmalte portas e rodaps Ltex Catamento / Massa nas portas Catamento / Massa nas portas Catamento Catamento Lixa Lixa/ Catamento Ajudantes:
EFETIVO
Adriano / Jos Carlos Tarcsio / Vagner / Jorge Alberto Valdinei/ Railton / Rondineli /Luciano / Lus Carlos Anderson / Antonio Carlos Willian / Denilson / Ruy Edson/ Marivaldo Weider / Jos de Jesus / Jorge Soares Andr / Paulo Andr Jos Anselmo / Geovane
29
28
Obs: Fonte vermelha = Falta Fonte Azul = Sada s 12:00h _________________________________________ ASS. ESTAGIRIO
__________________________________________
ASS. ENG. RESP. TRIBECA A
PAVIMENTO 30
APARTAMENTO
01 02 03 04 01 02 03 04 01 02 03 04 01 02 03 04
INCIO
8-Aug 3-Aug 8-Aug 6-Aug 9-Aug 9-Aug 14-Aug 14-Aug 14-Aug 15-Aug 14-Aug 14-Aug 17-Aug
CONCLUIDO(%) TRMINO
100% 100% 100% 100% 100% 90% 50% 50% 40% 60% 50% 50% 10% 15-Aug 14-Aug 16-Aug 14-Aug 17-Aug
SERVIO
OK OK OK OK OK Esmalte nas portas e rodaps Incio ltex Incio ltex Catamento / Massa nas portas Ltex Incio ltex Incio ltex Lixa
EFETIVO
Tarcsio / Vagner Valdinei/ Railton / Rondineli /Luciano / Lus Carlos Anderson / Antonio Carlos Willian / Denilson / Ruy Edson/ Marivaldo Weider / Jos de Jesus / Jorge Soares Andr / Paulo Andr Jos Carlos / Jorge Alberto / Adriano
29
28
27
Ajudantes:
__________________________________________
ASS. ENG. RESP. TRIBECA A
PAVIMENTO 30
APARTAMENTO
01 02 03 04 01 02
INCIO
8-Aug 3-Aug 8-Aug 6-Aug 9-Aug 9-Aug 14-Aug 14-Aug 14-Aug 15-Aug 14-Aug 14-Aug 20-Aug 17-Aug
CONCLUIDO(%) TRMINO
100% 100% 100% 100% 100% 95% 85% 80% 50% 85% 60% 60% 10% 20% 15-Aug 14-Aug 16-Aug 14-Aug 17-Aug
SERVIO
OK OK OK OK OK Esmalte nas portas e rodaps Esmalte nas portas e rodaps Esmalte nas portas e rodaps Catamento / Aditivo remox Esmalte nas portas e rodaps Ltex Ltex Lixa Lixa / Catamento
EFETIVO
29
03 04 01 02 03 04 01 02 03 04
Tarcsio / Vagner / Jlio Csar /Jorge Aberto Luciano / Lus Carlos Anderson / Antonio Carlos Willian / Denilson / Ruy Edson/ Marivaldo Weider / Jos de Jesus / Jorge Soares Andr / Paulo Andr Valdinei/ Railton / Rondineli Jos Carlos / Adriano
28
27
Ajudantes:
__________________________________________
ASS. ENG. RESP. TRIBECA A
PAVIMENTO 30
APARTAMENTO
01 02 03 04 01 02
INCIO
8-Aug 3-Aug 8-Aug 6-Aug 9-Aug 9-Aug 14-Aug 14-Aug 14-Aug 15-Aug 14-Aug 14-Aug 20-Aug 17-Aug
CONCLUIDO(%) TRMINO
100% 100% 100% 100% 100% 98% 95% 90% 70% 95% 85% 90% 25% 40% 15-Aug 14-Aug 16-Aug 14-Aug 17-Aug
SERVIO
OK OK OK OK OK Esmalte nas portas e rodaps Esmalte nas portas e rodaps Esmalte nas portas e rodaps Ltex Esmalte nas portas e rodaps Esmalte nas portas e rodaps Esmalte nas portas e rodaps Lixa Ltex
EFETIVO
29
03 04 01 02 03 04 01 02 03 04
Tarcsio / Vagner /Jorge Aberto Luciano / Lus Carlos / Julio Csar Anderson / Antonio Carlos Willian / Denilson / Ruy Edson/ Marivaldo Weider / Jos de Jesus / Jorge Soares Andr / Paulo Andr Valdinei/ Railton / Rondineli Jos Carlos / Adriano
28
27
Ajudantes:
__________________________________________
ASS. ENG. RESP. TRIBECA A
PAVIMENTO 29
APARTAMENTO
01 02 03 04 01 02 03 04 01 02 03 04 01 02 03 04 01 02 03 04
INCIO
9-Aug 9-Aug 14-Aug 14-Aug 14-Aug 15-Aug 14-Aug 14-Aug 20-Aug 17-Aug 21-Aug 22-Aug 22-Aug 22-Aug 22-Aug 22-Aug 22-Aug
CONCLUIDO(%) TRMINO
100% 98% 100% 100% 90% 100% 100% 100% 35% 65% 15% 10% 10% 10% 10% 5% 5% 22-Aug 22-Aug 17-Aug
SERVIO
OK Esmalte nas portas e rodaps OK OK Esmalte nas portas e rodaps OK OK OK Lixa Ltex Lixa / Aditivo Lixa Lixa Lixa Lixa Proteo com Fita Proteo com Fita
EFETIVO
Luciano
28
Valdinei/ Railton / Rondineli Jos Carlos / Adriano Tarcsio / Vagner /Jorge Aberto / Jos Anselmo Andr / Paulo Andr / Geovane Edson/ Marivaldo Ronildo / Jos Henrique Anderson / Antonio Carlos Weider / Jos de Jesus / Jorge Soares Lus Carlos / Julio Csar
27
26
25
__________________________________________
ASS. ENG. RESP. TRIBECA A
PAVIMENTO
APARTAMENTO
01 02 03 04 01 02 03 04 01 02 03 04 01 02 03 04 01 02 03 04
INCIO
9-Aug 9-Aug 14-Aug 14-Aug 14-Aug 15-Aug 14-Aug 14-Aug 20-Aug 17-Aug 21-Aug 22-Aug 22-Aug 22-Aug 22-Aug 22-Aug 22-Aug
CONCLUIDO(%) TRMINO
100% 100% 100% 100% 95% 100% 100% 100% 60% 80% 30% 60% 25% 20% 20% 15% 15% 17-Aug 23-Aug 22-Aug 22-Aug
PREVISO DE TRMINO
SERVIO
OK OK OK OK Esmalte nas portas e rodaps OK OK OK Ltex Esmalte nas portas e rodaps Catamento Ltex Lixa / Massa Lixa Lixa / Catamento Massa Massa
EFETIVO
29
24-Aug
28
Valdinei/ Railton / Rondineli Jos Carlos / Adriano Tarcsio / Vagner /Jorge Aberto / Jos Anselmo Andr / Paulo Andr / Geovane Edson/ Marivaldo Ronildo / Jos Henrique Anderson / Antonio Carlos Weider / Jos de Jesus / Jorge Soares Lus Carlos / Julio Csar
27
26
25
__________________________________________
ASS. ENG. RESP. TRIBECA A
PAVIMENTO
APARTAMENTO
01 02 03 04 01 02 03 04 01 02 03 04 01 02 03 04
INCIO
14-Aug 15-Aug 14-Aug 14-Aug 20-Aug 17-Aug 21-Aug 22-Aug 22-Aug 24-Aug 22-Aug 22-Aug 22-Aug 22-Aug
CONCLUIDO(%) TRMINO
100% 100% 100% 100% 80% 90% 60% 65% 40% 10% 30% 30% 30% 40% 24-Aug
PREVISO DE TRMINO
24-Aug
SERVIO
OK OK OK OK Esmalte nas portas e rodaps Esmalte nas portas e rodaps Ltex 1 demo Ltex 1 demo Lixa / Massa Lixa Lixa / Catamento Lixa / Catamento Lixa Incio ltex
EFETIVO
28
27-Aug 27-Aug 29-Aug 29-Aug 29-Aug 31-Aug 29-Aug 29-Aug 29-Aug 29-Aug
Valdinei/ Railton / Rondineli Jos Carlos / Adriano Tarcsio / Vagner /Jorge Aberto / Jos Anselmo Andr / Paulo Andr / Geovane Edson/ Marivaldo Willian / Denilson / Ruy Ronildo / Jos Henrique Anderson / Antonio Carlos Weider / Jos de Jesus / Jorge Soares Lus Carlos / Julio Csar
27
26
25
__________________________________________
ASS. ENG. RESP. TRIBECA A
PAVIMENTO
APARTAMENTO
01 02 03 04 01 02 03 04 01 02 03 04 01 02 03 04 01 02 03 04
INCIO
14-Aug 15-Aug 14-Aug 14-Aug 20-Aug 17-Aug 21-Aug 22-Aug 22-Aug 24-Aug 22-Aug 22-Aug 22-Aug 22-Aug 28-Aug 28-Aug 29-Aug
CONCLUIDO(%) TRMINO
100% 100% 100% 100% 100% 100% 100% 100% 100% 85% 100% 95% 90% 80% 30% 30% 24-Aug
PREVISO DE TRMINO
24-Aug
SERVIO
OK OK OK OK
EFETIVO
28
28-Aug 27-Aug
27-Aug 27-Aug 29-Aug 29-Aug 29-Aug 31-Aug 29-Aug 29-Aug 29-Aug 29-Aug 5-Sep 5-Sep 6-Sep Esmalte nas portas e rodaps Esmalte nas portas e rodaps Esmalte nas portas e rodaps Incio esmalte nas portas e rodaps Esmalte nas portas e rodaps Esmalte nas portas e rodaps Esmalte nas portas e rodaps Ltex Lixa Lixa Lixa Tarcsio / Vagner /Jorge Aberto Andr / Paulo Andr / Geovane Edson/ Marivaldo Denilson / Jorge Soares Ronildo / Jos Henrique Anderson Jos de Jesus / Ruy Lus Carlos / Luciano Valdinei/ Railton Jos Carlos / Adriano/ Jos Anselmo Willian /Weider / Rondineli
27
26
25
24
29-Aug
6-Sep
Lixa
Antonio Carlos
__________________________________________
ASS. ENG. RESP. TRIBECA A
PAVIMENTO
APARTAMENTO
01 02 03 04 01 02 03 04 01 02 03 04 01 02 03 04
INCIO
22-Aug 24-Aug 22-Aug 22-Aug 22-Aug 22-Aug 28-Aug 28-Aug 29-Aug 30-Aug 30-Aug 29-Aug 30-Aug 30-Aug
CONCLUIDO(%) TRMINO
100% 95% 100% 100% 100% 95% 40% 40% 20% 10% 10% 20% 10% 10% 29-Aug 29-Aug 30-Aug 30-Aug
PREVISO DE TRMINO
29-Aug 31-Aug 29-Aug 29-Aug 29-Aug 29-Aug 5-Sep 5-Sep 6-Sep 6-Sep 6-Sep 6-Sep 6-Sep 6-Sep
SERVIO
OK Esmalte nas portas e rodaps OK OK OK Esmalte nas portas e rodaps Lixa / massa nas portas Lixa / massa nas portas Lixa / catamento Lixa Lixa Lixa / catamento Lixa Lixa
EFETIVO
Denilson / Jorge Soares Ronildo / Jos Henrique
26
25
24
23
Lus Carlos / Luciano Valdinei/ Railton Jos Carlos / Adriano/ Jos Anselmo Willian /Weider / Rondineli Andr / Paulo Andr / Geovane Tarcsio / Vagner /Jorge Aberto Antonio Carlos Edson/ Marivaldo Jos de Jesus / Ruy
__________________________________________
ASS. ENG. RESP. TRIBECA A
PAVIMENTO
APARTAMENTO
01 02 03 04 01 02 03 04 01 02 03 04 01 02 03 04
INCIO
22-Aug 24-Aug 22-Aug 22-Aug 22-Aug 22-Aug 28-Aug 28-Aug 29-Aug 30-Aug 30-Aug 29-Aug 30-Aug 30-Aug 31-Aug 31-Aug
CONCLUIDO(%) TRMINO
100% 100% 100% 100% 100% 100% 50% 50% 30% 20% 20% 30% 20% 20% 10% 10% 29-Aug 31-Aug 29-Aug 30-Aug 30-Aug 31-Aug
PREVISO DE TRMINO
29-Aug 31-Aug 29-Aug 29-Aug 29-Aug 29-Aug 5-Sep 5-Sep 6-Sep 6-Sep 6-Sep 6-Sep 6-Sep 6-Sep 10-Sep 10-Sep
SERVIO
OK OK OK OK OK OK Massa nas portas / Remox Massa nas portas / Remox Lixa / catamento Lixa / catamento Lixa / catamento Lixa / catamento Lixa / catamento Lixa / catamento Lixa Lixa
EFETIVO
26
25
Valdinei/ Railton Jos Carlos / Adriano/ Jos Anselmo Willian /Weider / Rondineli Andr / Paulo Andr / Geovane Tarcsio / Vagner /Jorge Aberto / Denilson / Jorge Soares Antonio Carlos Edson/ Marivaldo Jos de Jesus / Ruy Ronildo / Jos Henrique Lus Carlos / Luciano
24
23
__________________________________________
ASS. ENG. RESP. TRIBECA A
PAVIMENTO
APARTAMENTO
01 02 03 04 01 02 03 04 01 02 03 04 01 02 03 04
INCIO
22-Aug 24-Aug 22-Aug 22-Aug 22-Aug 22-Aug 28-Aug 28-Aug 29-Aug 30-Aug 30-Aug 29-Aug 30-Aug 30-Aug 31-Aug 31-Aug
CONCLUIDO(%) TRMINO
100% 100% 100% 100% 100% 100% 65% 65% 40% 35% 35% 40% 30% 35% 20% 20% 29-Aug 31-Aug 29-Aug 30-Aug 30-Aug 31-Aug
PREVISO DE TRMINO
29-Aug 31-Aug 29-Aug 29-Aug 29-Aug 29-Aug 5-Sep 5-Sep 6-Sep 6-Sep 6-Sep 6-Sep 6-Sep 6-Sep 10-Sep 10-Sep
SERVIO
OK OK OK OK OK OK Ltex Ltex Lixa / catamento Lixa / catamento Lixa / catamento Lixa / catamento Lixa / catamento Lixa / catamento Lixa / catamento Lixa / catamento
EFETIVO
26
25
Valdinei/ Railton Jos Carlos / Adriano/ Jos Anselmo Willian /Weider / Rondineli Andr / Paulo Andr / Geovane Tarcsio / Vagner /Jorge Alberto / Denilson / Jorge Soares Antonio Carlos/ Anderson Edson/ Marivaldo Jos de Jesus / Ruy Ronildo / Jos Henrique Lus Carlos / Luciano
24
23
__________________________________________
ASS. ENG. RESP. TRIBECA A
PAVIMENTO
APARTAMENTO
01 02 03 04 01 02 03 04 01 02 03 04 01 02 03 04
INCIO
22-Aug 24-Aug 22-Aug 22-Aug 22-Aug 22-Aug 28-Aug 28-Aug 29-Aug 30-Aug 30-Aug 29-Aug 30-Aug 30-Aug 31-Aug 31-Aug
CONCLUIDO(%) TRMINO
100% 100% 100% 100% 100% 100% 75% 80% 80% 70% 40% 45% 35% 40% 25% 25% 29-Aug 31-Aug 29-Aug 30-Aug 30-Aug 31-Aug
PREVISO DE TRMINO
29-Aug 31-Aug 29-Aug 29-Aug 29-Aug 29-Aug 5-Sep 5-Sep 6-Sep 6-Sep 6-Sep 6-Sep 6-Sep 6-Sep 10-Sep 10-Sep
SERVIO
OK OK OK OK OK OK Esmalte portas e rodaps Esmalte portas e rodaps Esmalte portas e rodaps Esmalte portas e rodaps Ltex Ltex Lixa / catamento Ltex Lixa / catamento Lixa / catamento
EFETIVO
26
25
Valdinei/ Railton Jos Carlos / Adriano/ Jos Anselmo Willian /Weider / Rondineli Andr / Paulo Andr / Geovane Tarcsio / Vagner /Jorge Alberto / Denilson / Jorge Soares Antonio Carlos/ Anderson Edson/ Marivaldo Jos de Jesus / Ruy Ronildo / Jos Henrique Lus Carlos / Luciano
24
23
__________________________________________
ASS. ENG. RESP. TRIBECA A
PAVIMENTO
APARTAMENTO
01 02 03 04 01 02 03 04 01 02 03 04 01 02 03 04
INCIO
22-Aug 24-Aug 22-Aug 22-Aug 22-Aug 22-Aug 28-Aug 28-Aug 29-Aug 30-Aug 30-Aug 29-Aug 30-Aug 30-Aug 31-Aug 31-Aug
CONCLUIDO(%) TRMINO
100% 100% 100% 100% 100% 100% 95% 95% 90% 85% 60% 60% 50% 60% 25% 25% 29-Aug 31-Aug 29-Aug 30-Aug 30-Aug 31-Aug
PREVISO DE TRMINO
29-Aug 31-Aug 29-Aug 29-Aug 29-Aug 29-Aug 5-Sep 5-Sep 6-Sep 6-Sep 6-Sep 6-Sep 6-Sep 6-Sep 10-Sep 10-Sep
SERVIO
OK OK OK OK OK OK Esmalte portas e rodaps Esmalte portas e rodaps Esmalte portas e rodaps Esmalte portas e rodaps Ltex / Incio esmalte Ltex / Incio esmalte Ltex / Ltex / Incio esmalte Lixa / catamento Lixa / catamento
EFETIVO
26
25
Valdinei/ Railton Jos Carlos / Adriano/ Jos Anselmo Willian /Weider / Rondineli Andr / Paulo Andr / Geovane Tarcsio / Vagner /Jorge Alberto / Denilson / Jorge Soares Antonio Carlos/ Anderson Edson Jos de Jesus / Ruy Ronildo / Jos Henrique Lus Carlos / Luciano
24
23
__________________________________________
ASS. ENG. RESP. TRIBECA A
PAVIMENTO
APARTAMENTO
01 02 03 04 01 02 03 04 01 02 03 04 01 02 03 04 01 02 03 04
INCIO
22-Aug 24-Aug 22-Aug 22-Aug 22-Aug 22-Aug 28-Aug 28-Aug 29-Aug 30-Aug 30-Aug 29-Aug 30-Aug 30-Aug 31-Aug 31-Aug 6-Sep 6-Sep
CONCLUIDO(%) TRMINO
100% 100% 100% 100% 100% 100% 100% 100% 100% 90% 75% 70% 50% 90% 50% 30% 15% 15% 29-Aug 31-Aug 29-Aug 30-Aug 30-Aug 31-Aug 6-Sep 6-Sep 6-Sep
PREVISO DE TRMINO
29-Aug 31-Aug 29-Aug 29-Aug 29-Aug 29-Aug 5-Sep 5-Sep 6-Sep 6-Sep 6-Sep 6-Sep 6-Sep 6-Sep 10-Sep 10-Sep 17-Sep 17-Sep
SERVIO
OK OK OK OK OK OK Esmalte portas e rodaps Esmalte portas e rodaps Esmalte portas e rodaps Esmalte portas e rodaps Ltex / Esmalte portas e rodaps Ltex / Incio esmalte Ltex Esmalte portas e rodaps Ltex Lixa / catamento Lixa / catamento Lixa / catamento
EFETIVO
26
25
Jos Carlos / Adriano/ Jos Anselmo Andr / Paulo Andr / Geovane Tarcsio / Vagner /Jorge Alberto / Denilson / Jorge Soares Antonio Carlos/ Anderson Edson Jos de Jesus / Ruy Ronildo / Jos Henrique Lus Carlos Willian /Weider / Rondineli Valdinei/ Railton
24
23
22
__________________________________________
ASS. ENG. RESP. TRIBECA A
PAVIMENTO
APARTAMENTO
01 02 03 04 01 02 03 04 01 02 03 04 01 02 03 04 01 02 03 04
INCIO
22-Aug 24-Aug 22-Aug 22-Aug 22-Aug 22-Aug 28-Aug 28-Aug 29-Aug 30-Aug 30-Aug 29-Aug 30-Aug 30-Aug 31-Aug 31-Aug 6-Sep 6-Sep 10-Sep 10-Sep
CONCLUIDO(%) TRMINO
100% 100% 100% 100% 100% 100% 100% 100% 100% 95% 80% 80% 70% 100% 60% 40% 30% 30% 15% 10% 29-Aug 31-Aug 29-Aug 30-Aug 30-Aug 31-Aug 6-Sep 6-Sep 6-Sep
PREVISO DE TRMINO
29-Aug 31-Aug 29-Aug 29-Aug 29-Aug 29-Aug 5-Sep 5-Sep 6-Sep 6-Sep 6-Sep 6-Sep 6-Sep 6-Sep 10-Sep 10-Sep 17-Sep 17-Sep 18-Sep 18-Sep
SERVIO
OK OK OK OK OK OK OK OK Esmalte portas e rodaps Esmalte portas e rodaps Ltex / Esmalte portas e rodaps Ltex / Incio esmalte Ltex OK Ltex Lixa / catamento Lixa / catamento Lixa / catamento Lixa / Remox Lixa
EFETIVO
26
25
Andr / Paulo Andr / Geovane Tarcsio / Vagner /Jorge Alberto Antonio Carlos/ Anderson Edson Ronildo / Jos Henrique Lus Carlos Willian /Weider / Rondineli Valdinei/ Railton Jos de Jesus / Ruy Jos Carlos / Adriano/ Jos Anselmo
24
23
10-Sep
22
__________________________________________
ASS. ENG. RESP. TRIBECA A
PAVIMENTO
APARTAMENTO
01 02
INCIO
29-Aug 30-Aug 30-Aug 29-Aug 30-Aug 30-Aug 31-Aug 31-Aug 6-Sep 6-Sep 10-Sep 10-Sep 11-Sep
CONCLUIDO(%) TRMINO
100% 95% 100% 100% 80% 100% 70% 50% 40% 40% 25% 20% 5% 6-Sep
PREVISO DE TRMINO
6-Sep 6-Sep 6-Sep 6-Sep 6-Sep 6-Sep 10-Sep 10-Sep 17-Sep 17-Sep 18-Sep 18-Sep 19-Sep
SERVIO
OK Esmalte portas e rodaps OK OK Ltex OK Ltex / Incio leo Lixa / catamento Lixa / catamento Catamento/ massa nas portas Lixa / catamento Lixa Lixa
EFETIVO
Andr / Paulo Andr / Geovane
24
03 04 01 02 03 04 01 02 03 04 01 02 03 04
Edson / Jorge Alberto Ronildo / Jos Henrique Lus Carlos Willian /Weider / Rondineli Valdinei/ Railton Jos de Jesus / Ruy Jos Carlos / Adriano/ Jos Anselmo Tarcsio / Vagner
23
22
21
11-Sep
5%
19-Sep
Lixa
__________________________________________
ASS. ENG. RESP. TRIBECA A
PAVIMENTO
APARTAMENTO
01 02 03 04 01 02 03 04 01 02 03 04
INCIO
30-Aug 30-Aug 31-Aug 31-Aug 6-Sep 6-Sep 10-Sep 10-Sep 11-Sep 12-Sep 11-Sep
CONCLUIDO(%) TRMINO
95% 100% 95% 70% 60% 50% 35% 40% 10% 5% 10% 10-Sep
PREVISO DE TRMINO
6-Sep 6-Sep 10-Sep 10-Sep 17-Sep 17-Sep 18-Sep 18-Sep 19-Sep 20-Sep 19-Sep
SERVIO
Esmalte portas e rodaps OK Esmalte portas e rodaps Ltex Ltex Catamento/ massa nas portas Lixa / catamento Ltex Lixa/ Catamento Lixa Lixa/ Catamento
EFETIVO
Edson / Jorge Alberto Ronildo / Jos Henrique Willian /Weider / Rondineli Valdinei/ Railton Jos de Jesus / Ruy Jos Carlos / Adriano/ Jos Anselmo Tarcsio / Vagner Andr / Paulo Andr Antonio Carlos / Anderson
23
22
21
__________________________________________
ASS. ENG. RESP. TRIBECA A
PAVIMENTO
APARTAMENTO
01 02
INCIO
29-Aug 30-Aug 30-Aug 29-Aug 30-Aug 30-Aug 31-Aug 31-Aug 6-Sep 6-Sep 10-Sep 10-Sep 11-Sep 12-Sep 11-Sep
CONCLUIDO(%) TRMINO
100% 100% 100% 100% 95% 100% 95% 60% 85% 80% 50% 65% 35% 20% 35% 6-Sep 12-Sep 11-Sep 11-Sep 10-Sep
PREVISO DE TRMINO
6-Sep 6-Sep 6-Sep 6-Sep 6-Sep 6-Sep 10-Sep 10-Sep 17-Sep 17-Sep 18-Sep 18-Sep 19-Sep 20-Sep 19-Sep
SERVIO
OK OK OK OK Esmalte portas e rodaps OK Esmalte portas e rodaps Ltex Ltex / Incio esmalte Ltex / Massa portas Incio Ltex Ltex / Massa portas Lixa/ Catamento Lixa Lixa/ Catamento
EFETIVO
24
03 04 01 02 03 04 01 02 03 04 01 02 03 04
Edson / Jorge Alberto Ronildo / Jos Henrique Willian /Weider / Rondineli Valdinei/ Railton Jos de Jesus / Ruy Jos Carlos / Adriano/ Jos Anselmo Tarcsio / Vagner Andr / Paulo Andr Antonio Carlos / Anderson
23
22
21
__________________________________________
ASS. ENG. RESP. TRIBECA A
PAVIMENTO
APARTAMENTO
01 02 03 04 01 02 03 04 01 02 03 04
INCIO
30-Aug 30-Aug 31-Aug 31-Aug 6-Sep 6-Sep 10-Sep 10-Sep 11-Sep 12-Sep 11-Sep
CONCLUIDO(%) TRMINO
98% 100% 98% 85% 90% 85% 65% 75% 45% 30% 40% 10-Sep
PREVISO DE TRMINO
6-Sep 6-Sep 10-Sep 10-Sep 17-Sep 17-Sep 18-Sep 18-Sep 19-Sep 20-Sep 19-Sep
SERVIO
Esmalte portas e rodaps OK Esmalte portas e rodaps Esmalte portas e rodaps Ltex / Incio esmalte Ltex / Massa portas Incio Ltex Ltex / Massa portas Catamento Lixa Catamento/ Incio ltex
EFETIVO
Edson / Jorge Alberto Ronildo / Jos Henrique Willian /Weider / Rondineli Valdinei/ Railton Jos de Jesus / Ruy Jos Carlos / Adriano/ Jos Anselmo Tarcsio / Vagner Andr / Paulo Andr Antonio Carlos / Anderson
23
22
21
__________________________________________
ASS. ENG. RESP. TRIBECA A
PAVIMENTO
APARTAMENTO
01 02 03 04 01 02 03 04 01 02 03 04 01 02 03 04
INCIO
30-Aug 30-Aug 31-Aug 31-Aug 6-Sep 6-Sep 10-Sep 10-Sep 11-Sep 12-Sep 17-Sep 11-Sep 17-Sep 17-Sep
CONCLUIDO(%) TRMINO
100% 100% 100% 95% 100% 98% 80% 100% 50% 40% 10% 60% 5% 5% 17-Sep 10-Sep 17-Sep 17-Sep
PREVISO DE TRMINO
6-Sep 6-Sep 10-Sep 10-Sep 17-Sep 17-Sep 18-Sep 18-Sep 19-Sep 20-Sep 24-Sep 19-Sep 24-Sep 24-Sep
SERVIO
OK OK OK Esmalte portas e rodaps OK Esmalte portas e rodaps Ltex/ Esmalte portas e rodaps OK Lixa / Massa Lixa / Catamento Lixa / Remox Ltex
EFETIVO
23
Renildo /Jos Henrique Valdinei/ Railton Jos de Jesus / Ruy Tarcsio / Vagner Andr / Paulo Andr Edson / Jorge Alberto Antonio Carlos / Anderson Jos Carlos / Adriano/ Jos Anselmo Willian /Weider / Rondineli
22
17-Sep
21
20
EFETIVO TOTAL = 22
__________________________________________
ASS. ENG. RESP. TRIBECA A
PAVIMENTO
APARTAMENTO
01 02 03 04 01 02 03 04 01 02 03 04 01 02 03 04
INCIO
30-Aug 30-Aug 31-Aug 31-Aug 6-Sep 6-Sep 10-Sep 10-Sep 11-Sep 12-Sep 17-Sep 11-Sep 17-Sep 17-Sep 18-Sep
CONCLUIDO(%) TRMINO
100% 100% 100% 98% 100% 100% 98% 100% 55% 60% 35% 70% 5% 10% 10% 17-Sep 10-Sep 17-Sep 17-Sep 18-Sep 17-Sep
PREVISO DE TRMINO
6-Sep 6-Sep 10-Sep 10-Sep 17-Sep 17-Sep 18-Sep 18-Sep 19-Sep 20-Sep 24-Sep 19-Sep 24-Sep 24-Sep 25-Sep
SERVIO
OK OK OK Esmalte portas e rodaps OK OK Esmalte portas e rodaps OK Lixa / Massa Ltex Massa nas paredes Ltex Parado Lixa / Catamento Lixa / Catamento
EFETIVO
23
22
Jos de Jesus / Ruy Tarcsio / Vagner Andr / Paulo Andr Edson / Jorge Alberto Antonio Carlos / Anderson Willian /Weider / Rondineli Valdinei/ Railton
21
20
EFETIVO TOTAL = 19
__________________________________________
ASS. ENG. RESP. TRIBECA A
PAVIMENTO
APARTAMENTO
01 02 03 04 01 02 03 04 01 02 03 04 01 02 03 04 01 02 03 04
INCIO
30-Aug 30-Aug 31-Aug 31-Aug 6-Sep 6-Sep 10-Sep 10-Sep 11-Sep 12-Sep 17-Sep 11-Sep 17-Sep 17-Sep 18-Sep 19-Sep
CONCLUIDO(%) TRMINO
100% 100% 100% 98% 100% 100% 100% 100% 65% 80% 40% 95% 10% 10% 10% 10% 17-Sep 10-Sep 17-Sep 17-Sep 18-Sep 19-Sep 17-Sep
PREVISO DE TRMINO
6-Sep 6-Sep 10-Sep 10-Sep 17-Sep 17-Sep 18-Sep 18-Sep 19-Sep 20-Sep 24-Sep 19-Sep 24-Sep 24-Sep 25-Sep 26-Sep
SERVIO
OK OK OK Esmalte portas e rodaps OK OK OK OK Lixa / Massa Ltex Massa nas paredes Esmalte portas e rodaps Lixa / Catamento Lixa / Catamento Lixa / Catamento Lixa/ Catamento
EFETIVO
23
Jos Henrique
22
21
20
Tarcsio / Vagner Andr / Paulo Andr Edson / Jorge Alberto Antonio Carlos / Anderson Jos de Jesus / Ruy Willian /Weider / Rondineli Valdinei/ Railton Jos Guerra / Adriano
19
EFETIVO TOTAL = 20
__________________________________________
ASS. ENG. RESP. TRIBECA A
PAVIMENTO
APARTAMENTO
01 02 03 04 01 02 03 04 01 02 03 04 01 02 03 04 01 02 03 04
INCIO
30-Aug 30-Aug 31-Aug 31-Aug 6-Sep 6-Sep 10-Sep 10-Sep 11-Sep 12-Sep 17-Sep 11-Sep 17-Sep 17-Sep 18-Sep 19-Sep 20-Sep 20-Sep
CONCLUIDO(%) TRMINO
100% 100% 100% 98% 100% 100% 100% 100% 80% 100% 45% 100% 30% 30% 20% 10% 5% 10% 17-Sep 10-Sep 17-Sep 17-Sep 18-Sep 19-Sep 17-Sep 20-Sep 20-Sep
PREVISO DE TRMINO
6-Sep 6-Sep 10-Sep 10-Sep 17-Sep 17-Sep 18-Sep 18-Sep 19-Sep 20-Sep 24-Sep 19-Sep 24-Sep 24-Sep 25-Sep 26-Sep 27-Sep 27-Sep
SERVIO
OK OK OK Esmalte portas e rodaps OK OK OK OK Ltex OK Lixa / Incio ltes OK Lixa / Catamento Lixa / Catamento Lixa / Catamento Lixa/ Catamento Lixa/ Catamento Lixa/ Catamento
EFETIVO
23
Jos Henrique
22
Tarcsio / Vagner Edson / Jorge Alberto Antonio Carlos / Anderson Jos de Jesus / Ruy Willian /Weider / Rondineli Valdinei/ Railton Jos Guerra / Adriano Andr / Paulo Andr Antonio Carlos / Anderson
21
20
19
EFETIVO TOTAL = 23
__________________________________________
ASS. ENG. RESP. TRIBECA A
PAVIMENTO
APARTAMENTO
01 02 03 04 01 02 03 04 01 02 03 04 01 02 03 04 01 02 03 04
INCIO
30-Aug 30-Aug 31-Aug 31-Aug 6-Sep 6-Sep 10-Sep 10-Sep 11-Sep 12-Sep 17-Sep 11-Sep 17-Sep 17-Sep 18-Sep 19-Sep 20-Sep 20-Sep
CONCLUIDO(%) TRMINO
100% 100% 100% 98% 100% 100% 100% 100% 90% 100% 80% 100% 40% 40% 30% 20% 10% 20% 17-Sep 10-Sep 17-Sep 17-Sep 18-Sep 19-Sep 17-Sep 20-Sep 20-Sep
PREVISO DE TRMINO
6-Sep 6-Sep 10-Sep 10-Sep 17-Sep 17-Sep 18-Sep 18-Sep 19-Sep 20-Sep 24-Sep 19-Sep 24-Sep 24-Sep 25-Sep 26-Sep 27-Sep 27-Sep
SERVIO
OK OK OK Esmalte portas e rodaps OK OK OK OK Esmalte portas e rodaps OK Ltex 2 demo OK Lixa / Catamento Lixa / Catamento Lixa / Catamento Lixa/ Catamento Lixa/ Catamento Lixa/ Catamento
EFETIVO
23
Jos Henrique
22
Tarcsio / Vagner Edson / Jorge Alberto Antonio Carlos / Anderson Jos de Jesus / Ruy Willian /Weider / Rondineli Valdinei/ Railton Jos Guerra / Adriano Andr / Paulo Andr Antonio Carlos / Anderson
21
20
19
TEXTURA ESCADAS = Geovane / Pedro - 8 Pav HALL ELEVADORES = Lus - 1 demo de ltex at o 31 Pav
EFETIVO TOTAL = 23
__________________________________________
ASS. ENG. RESP. TRIBECA A
PAVIMENTO
APARTAMENTO
01 02 03 04 01 02 03 04 01 02 03 04 01 02 03 04 01 02 03 04
INCIO
30-Aug 30-Aug 31-Aug 31-Aug 6-Sep 6-Sep 10-Sep 10-Sep 11-Sep 12-Sep 17-Sep 11-Sep 17-Sep 17-Sep 18-Sep 24-Sep 19-Sep 20-Sep 20-Sep
CONCLUIDO(%) TRMINO
100% 100% 100% 100% 100% 100% 100% 100% 95% 100% 90% 100% 60% 60% 55% 5% 30% 20% 30% 17-Sep 10-Sep 17-Sep 21-Sep 17-Sep 18-Sep 19-Sep 17-Sep 20-Sep 20-Sep
PREVISO DE TRMINO
6-Sep 6-Sep 10-Sep 10-Sep 17-Sep 17-Sep 18-Sep 18-Sep 19-Sep 20-Sep 24-Sep 19-Sep 24-Sep 24-Sep 25-Sep 1-Oct 26-Sep 27-Sep 27-Sep
SERVIO
OK OK OK OK OK OK OK OK Esmalte portas e rodaps OK Esmalte portas e rodaps OK Ltex Ltex Ltex Lixa / Catamento Lixa/ Catamento Lixa/ Catamento Lixa/ Catamento
EFETIVO
23
22
Tarcsio / Vagner Edson / Jorge Alberto Antonio Carlos / Anderson Jos de Jesus / Ruy Willian /Weider / Rondineli Valdinei/ Railton Jos Henrique Jos Guerra / Adriano Andr / Paulo Andr Antonio Carlos / Anderson
21
20
19
EFETIVO TOTAL = 23
__________________________________________
ASS. ENG. RESP. TRIBECA A
PAVIMENTO
APARTAMENTO
01 02 03 04 01 02 03 04 01 02 03 04
INCIO
11-Sep 12-Sep 17-Sep 11-Sep 17-Sep 17-Sep 18-Sep 24-Sep 19-Sep 20-Sep 25-Sep 20-Sep
CONCLUIDO(%) TRMINO
100% 100% 95% 100% 75% 75% 80% 10% 50% 30% 5% 40% 25-Sep 20-Sep 20-Sep
PREVISO DE TRMINO
19-Sep 20-Sep 24-Sep 19-Sep 24-Sep 24-Sep 25-Sep 1-Oct 26-Sep 27-Sep 2-Oct 27-Sep
SERVIO
OK OK Arremate wc social OK Ltex/ Incio esmalte Ltex/ Incio esmalte Esmalte portas e rodaps Lixa / Catamento Ltex Lixa/ Catamento Lixa/ Catamento Lixa/ Catamento
EFETIVO
21
Edson / Jorge Alberto Jos de Jesus / Ruy Willian /Weider Valdinei/ Railton/ Rondineli Jos Henrique Jos Guerra / Adriano Andr / Paulo Andr Tarcsio / Vagner Antonio Carlos / Anderson
20
19
EFETIVO TOTAL = 21
__________________________________________
ASS. ENG. RESP. TRIBECA A
PAVIMENTO
APARTAMENTO
01 02 03 04 01 02 03 04 01 02 03 04 01 02 03 04
INCIO
11-Sep 12-Sep 17-Sep 11-Sep 17-Sep 17-Sep 18-Sep 24-Sep 19-Sep 20-Sep 25-Sep 20-Sep 27-Sep 27-Sep 27-Sep
CONCLUIDO(%) TRMINO
100% 100% 100% 100% 100% 100% 100% 30% 90% 80% 15% 70% 10% 10% 10% 25-Sep 20-Sep 26-Sep 20-Sep 26-Sep 26-Sep 26-Sep
PREVISO DE TRMINO
19-Sep 20-Sep 24-Sep 19-Sep 24-Sep 24-Sep 25-Sep 1-Oct 26-Sep 27-Sep 2-Oct 27-Sep 3-Oct 3-Oct 3-Oct
SERVIO
OK OK OK OK OK OK OK Lixa / Catamento Esmalte portas e rodaps Esmalte portas e rodaps Lixa/ Catamento Ltex Lixa/ Catamento Lixa/ Catamento Lixa/ Catamento
EFETIVO
21
20
19
18
Edson / Jorge Alberto Jos Guerra / Adriano Andr / Paulo Andr Tarcsio / Vagner Antonio Carlos / Anderson Valdinei/ Railton/ Rondineli Willian /Weider Jos de Jesus / Ruy
EFETIVO TOTAL = 19
__________________________________________
ASS. ENG. RESP. TRIBECA A
PAVIMENTO
APARTAMENTO
01 02 03 04 01 02 03 04 01 02 03 04 01 02 03 04
INCIO
11-Sep 12-Sep 17-Sep 11-Sep 17-Sep 17-Sep 18-Sep 24-Sep 19-Sep 20-Sep 25-Sep 20-Sep 27-Sep 27-Sep 27-Sep
CONCLUIDO(%) TRMINO
100% 100% 100% 100% 100% 100% 100% 40% 98% 95% 25% 90% 20% 20% 20% 25-Sep 20-Sep 26-Sep 20-Sep 26-Sep 26-Sep 26-Sep
PREVISO DE TRMINO
19-Sep 20-Sep 24-Sep 19-Sep 24-Sep 24-Sep 25-Sep 1-Oct 26-Sep 27-Sep 2-Oct 27-Sep 3-Oct 3-Oct 3-Oct
SERVIO
OK OK OK OK OK OK OK Lixa / Catamento Esmalte portas e rodaps Esmalte portas e rodaps Lixa/ Catamento Esmalte portas e rodaps Lixa/ Catamento Lixa/ Catamento Lixa/ Catamento
EFETIVO
21
20
19
18
Edson / Jorge Alberto Jos Guerra / Adriano Andr / Paulo Andr Tarcsio / Vagner Antonio Carlos / Anderson Valdinei/ Railton/ Rondineli Willian /Weider Jos de Jesus / Ruy
EFETIVO TOTAL = 19
__________________________________________
ASS. ENG. RESP. TRIBECA A
PAVIMENTO
APARTAMENTO
01 02 03 04 01 02 03 04 01 02 03 04 01 02 03 04
INCIO
17-Sep 17-Sep 18-Sep 24-Sep 19-Sep 20-Sep 25-Sep 20-Sep 27-Sep 27-Sep 27-Sep 1-Oct 1-Oct 1-Oct
CONCLUIDO(%) TRMINO
100% 100% 100% 60% 100% 100% 35% 100% 30% 30% 30% 10% 10% 10% 26-Sep 26-Sep 26-Sep
PREVISO DE TRMINO
24-Sep 24-Sep 25-Sep 1-Oct 26-Sep 27-Sep 2-Oct 27-Sep 4-Oct 4-Oct 4-Oct
SERVIO
OK OK OK Ltex OK OK Lixa/ Catamento OK Lixa/ Catamento Lixa/ Catamento Lixa/ Catamento
EFETIVO
20
19
Tarcsio / Vagner Valdinei/ Railton/ Rondineli Willian /Weider Jos de Jesus / Ruy Andr / Paulo Andr Jos Guerra / Adriano Antonio Carlos / Anderson
18
17
EFETIVO TOTAL = 20
__________________________________________
ASS. ENG. RESP. TRIBECA A
PAVIMENTO
APARTAMENTO
01 02 03 04 01 02 03 04 01 02 03 04 01 02 03 04
INCIO
17-Sep 17-Sep 18-Sep 24-Sep 19-Sep 20-Sep 25-Sep 20-Sep 27-Sep 27-Sep 27-Sep 1-Oct 1-Oct 1-Oct
CONCLUIDO(%) TRMINO
100% 100% 100% 75% 100% 100% 60% 100% 60% 45% 40% 20% 20% 20% 26-Sep 26-Sep 26-Sep 1-Oct 1-Oct 1-Oct
PREVISO DE TRMINO
24-Sep 24-Sep 25-Sep 1-Oct 26-Sep 27-Sep 2-Oct 27-Sep 4-Oct 4-Oct 4-Oct 8-Oct 8-Oct 8-Oct
SERVIO
OK OK OK Esmalte portas e rodaps OK OK Esmalte portas e rodaps OK Ltex Catamento / incio ltex Catamento / incio ltex Lixa / Catamento Lixa / Catamento Lixa / Catamento
EFETIVO
20
19
Tarcsio / Vagner Valdinei/ Rondineli Willian /Weider Jos de Jesus / Ruy Andr / Paulo Andr Jos Guerra / Adriano Antonio Carlos / Anderson
18
17
HALL ELEVADORES = Jos Henrique, Lus ESCADAS = Geovane, Pedro, Filadelfo, Ednei, Marcelo
EFETIVO TOTAL = 23
__________________________________________
ASS. ENG. RESP. TRIBECA A
PAVIMENTO
APARTAMENTO
01 02 03 04 01 02 03 04 01 02 03 04 01 02 03 04
INCIO
17-Sep 17-Sep 18-Sep 24-Sep 19-Sep 20-Sep 25-Sep 20-Sep 27-Sep 27-Sep 27-Sep 1-Oct 1-Oct 1-Oct
CONCLUIDO(%) TRMINO
100% 100% 100% 90% 100% 100% 80% 100% 70% 55% 55% 30% 30% 30% 26-Sep 26-Sep 26-Sep 1-Oct 1-Oct 1-Oct
PREVISO DE TRMINO
24-Sep 24-Sep 25-Sep 1-Oct 26-Sep 27-Sep 2-Oct 27-Sep 4-Oct 4-Oct 4-Oct 8-Oct 8-Oct 8-Oct
SERVIO
OK OK OK Esmalte portas e rodaps OK OK Esmalte portas e rodaps OK Ltex Catamento / incio ltex Catamento / incio ltex Lixa / Catamento Lixa / Catamento Lixa / Catamento
EFETIVO
20
19
Tarcsio / Vagner Valdinei/ Rondineli Willian /Weider Jos de Jesus / Ruy Andr / Paulo Andr Jos Guerra / Adriano Antonio Carlos / Anderson
18
17
HALL ELEVADORES = Jos Henrique, Lus ESCADAS = , Pedro, Filadelfo, Ednei, Marcelo REVISO 21 - Geovane
EFETIVO TOTAL = 23
__________________________________________
ASS. ENG. RESP. TRIBECA A
PAVIMENTO
APARTAMENTO
01 02 03 04 01 02 03 04 01 02 03 04 01 02 03 04
INCIO
17-Sep 17-Sep 18-Sep 24-Sep 19-Sep 20-Sep 25-Sep 20-Sep 27-Sep 27-Sep 4-Oct 27-Sep 1-Oct 1-Oct 4-Oct 1-Oct
CONCLUIDO(%) TRMINO
100% 100% 100% 100% 100% 100% 95% 100% 100% 65% 5% 65% 60% 60% 5% 40% 26-Sep 26-Sep 26-Sep 4-Oct 1-Oct 1-Oct 1-Oct 4-Oct
PREVISO DE TRMINO
24-Sep 24-Sep 25-Sep 1-Oct 26-Sep 27-Sep 2-Oct 27-Sep 4-Oct 4-Oct 11-Oct 4-Oct 8-Oct 8-Oct 11-Oct 8-Oct
SERVIO
OK OK OK OK OK OK Esmalte portas e rodaps OK OK Ltex Lixa / Catamento Ltex Ltex Ltex Lixa / Catamento Lixa / Catamento
EFETIVO
20
19
Tarcsio / Vagner
18
17
Willian /Weider Edson / Jorge Alberto Jos de Jesus / Ruy Andr / Paulo Andr Jos Guerra / Adriano Valdinei/ Rondineli Antonio Carlos / Anderson
HALL ELEVADORES = Jos Henrique, Lus ESCADAS = , Pedro, Filadelfo, Ednei, Marcelo REVISO 21 - Geovane
EFETIVO TOTAL = 23
__________________________________________
ASS. ENG. RESP. TRIBECA A
PAVIMENTO
APARTAMENTO
01 02 03 04 01 02 03 04 01 02 03 04 01 02 03 04
INCIO
17-Sep 17-Sep 18-Sep 24-Sep 19-Sep 20-Sep 25-Sep 20-Sep 27-Sep 27-Sep 4-Oct 27-Sep 1-Oct 1-Oct 4-Oct 1-Oct
CONCLUIDO(%) TRMINO
100% 100% 100% 100% 100% 100% 98% 100% 100% 75% 10% 80% 80% 70% 10% 70% 26-Sep 26-Sep 26-Sep 4-Oct 1-Oct 1-Oct 1-Oct 4-Oct
PREVISO DE TRMINO
24-Sep 24-Sep 25-Sep 1-Oct 26-Sep 27-Sep 2-Oct 27-Sep 4-Oct 9-Oct 11-Oct 8-Oct 8-Oct 9-Oct 12-Oct 9-Oct
SERVIO
OK OK OK OK OK OK Esmalte portas e rodaps OK OK Ltex Lixa / Catamento Ltex / Incio esmalte Ltex/ Incio esmalte Ltex Lixa / Catamento Lixa / Catamento
EFETIVO
20
19
Tarcsio / Vagner
18
17
Willian /Weider Edson / Jorge Alberto Jos de Jesus / Ruy Andr / Paulo Andr Jos Guerra / Adriano Valdinei/ Rondineli Antonio Carlos / Anderson
HALL ELEVADORES = Jos Henrique, Lus ESCADAS = , Pedro, Filadelfo, Ednei, Marcelo REVISO 21 - Geovane
EFETIVO TOTAL = 23
__________________________________________
ASS. ENG. RESP. TRIBECA A
PAVIMENTO
APARTAMENTO
01 02 03 04 01 02 03 04 01 02 03 04 01 02 03 04 01 02 03 04
INCIO
17-Sep 17-Sep 18-Sep 24-Sep 19-Sep 20-Sep 25-Sep 20-Sep 27-Sep 27-Sep 4-Oct 27-Sep 1-Oct 1-Oct 4-Oct 1-Oct 8-Oct 8-Oct 8-Oct
CONCLUIDO(%) TRMINO
100% 100% 100% 100% 100% 100% 100% 100% 100% 85% 15% 100% 95% 80% 20% 85% 5% 5% 5% 26-Sep 26-Sep 26-Sep 4-Oct 1-Oct 1-Oct 8-Oct 1-Oct 4-Oct
PREVISO DE TRMINO
24-Sep 24-Sep 25-Sep 1-Oct 26-Sep 27-Sep 2-Oct 27-Sep 4-Oct 9-Oct 11-Oct 8-Oct 8-Oct 9-Oct 12-Oct 9-Oct 17-Oct 17-Oct 17-Oct
SERVIO
OK OK OK OK OK OK OK OK OK Esmalte portas e rodaps Lixa / Remox OK Esmalte portas e rodaps Esmalte portas e rodaps Lixa / Catamento Esmalte portas e rodaps Lixa / Catamento Lixa / Catamento Lixa / Catamento
EFETIVO
20
19
18
8-Oct
17
Jos Guerra / Adriano Valdinei/ Rondineli Antonio Carlos / Anderson Tarcsio / Vagner Andr / Paulo Andr Jos de Jesus / Ruy
16
EFETIVO TOTAL = 19
__________________________________________
ASS. ENG. RESP. TRIBECA A
PAVIMENTO
APARTAMENTO
01 02 03 04 01 02 03 04 01 02 03 04
INCIO
27-Sep 27-Sep 4-Oct 27-Sep 1-Oct 1-Oct 4-Oct 1-Oct 8-Oct 9-Oct 8-Oct 8-Oct
CONCLUIDO(%) TRMINO
100% 95% 30% 100% 100% 90% 30% 100% 15% 5% 15% 15% 4-Oct
PREVISO DE TRMINO
4-Oct 9-Oct 11-Oct 8-Oct 8-Oct 9-Oct 12-Oct 9-Oct 17-Oct 18-Oct 17-Oct 17-Oct
SERVIO
OK Esmalte portas e rodaps Lixa / Catamento OK OK Esmalte portas e rodaps Lixa / Catamento OK Lixa / Catamento Lixa / Catamento Lixa / Catamento Lixa / Catamento
EFETIVO
Willian /Weider Edson / Jorge Alberto
18
8-Oct 9-Oct
17
Jos Guerra / Adriano Valdinei/ Rondineli Tarcsio / Vagner Antonio Carlos / Anderson Andr / Paulo Andr Jos de Jesus / Ruy
9-Oct
16
EFETIVO TOTAL = 19
__________________________________________
ASS. ENG. RESP. TRIBECA A
PAVIMENTO
APARTAMENTO
01 02 03 04 01 02 03 04 01 02 03 04 01 02 03 04
INCIO
27-Sep 27-Sep 4-Oct 27-Sep 1-Oct 1-Oct 4-Oct 1-Oct 8-Oct 9-Oct 8-Oct 8-Oct
CONCLUIDO(%) TRMINO
100% 100% 45% 100% 100% 98% 60% 100% 30% 15% 30% 30% 4-Oct 10-Oct 8-Oct 9-Oct
PREVISO DE TRMINO
4-Oct 9-Oct 11-Oct 8-Oct 8-Oct 9-Oct 12-Oct 9-Oct 17-Oct 18-Oct 17-Oct 17-Oct
SERVIO
OK OK Lixa / Catamento OK OK Esmalte portas e rodaps Ltex / Incio esmalte OK Lixa / Catamento Lixa / Catamento Lixa / Catamento Lixa / Catamento
EFETIVO
18
17
Jos Guerra / Adriano Valdinei/ Rondineli Tarcsio / Vagner Antonio Carlos / Anderson Andr / Paulo Andr Jos de Jesus / Ruy
9-Oct
16
15
10-Oct
5%
19-Oct
Lixa/ Remox
Willian/ Weider
EFETIVO TOTAL = 19
__________________________________________
ASS. ENG. RESP. TRIBECA A
PAVIMENTO
APARTAMENTO
01 02 03 04 01 02 03 04 01 02 03 04 01 02 03 04
INCIO
27-Sep 27-Sep 4-Oct 27-Sep 1-Oct 1-Oct 4-Oct 1-Oct 8-Oct 9-Oct 8-Oct 8-Oct 11-Oct 10-Oct
CONCLUIDO(%) TRMINO
100% 100% 65% 100% 100% 100% 80% 100% 60% 30% 40% 40% 5% 10% 4-Oct 10-Oct 8-Oct 9-Oct
PREVISO DE TRMINO
4-Oct 9-Oct 11-Oct 8-Oct 8-Oct 9-Oct 12-Oct 9-Oct 17-Oct 18-Oct 17-Oct 17-Oct 22-Oct 19-Oct
SERVIO
OK OK Ltex / Incio esmalte OK OK OK Esmalte portas e rodaps OK Ltex Lixa / Catamento Lixa / Catamento Lixa / Catamento Lixa/ Catamento Lixa/ Catamento
EFETIVO
18
17
Valdinei/ Rondineli Tarcsio / Vagner Antonio Carlos / Anderson Andr / Paulo Andr Jos de Jesus / Ruy Jos Guerra / Adriano Willian/ Weider
9-Oct
16
15
EFETIVO TOTAL = 19
__________________________________________
ASS. ENG. RESP. TRIBECA A
PAVIMENTO
APARTAMENTO
01 02 03 04 01 02 03 04 01 02 03 04 01 02 03 04
INCIO
27-Sep 27-Sep 4-Oct 27-Sep 1-Oct 1-Oct 4-Oct 1-Oct 8-Oct 9-Oct 8-Oct 8-Oct 11-Oct 10-Oct 15-Oct
CONCLUIDO(%) TRMINO
100% 100% 75% 100% 100% 100% 100% 100% 70% 40% 60% 65% 15% 20% 5% 4-Oct 10-Oct 8-Oct 9-Oct 11-Oct 15-Oct 9-Oct
PREVISO DE TRMINO
4-Oct 9-Oct 11-Oct 8-Oct 8-Oct 9-Oct 12-Oct 9-Oct 17-Oct 18-Oct 17-Oct 17-Oct 22-Oct 19-Oct 23-Oct
SERVIO
OK OK Esmalte portas e rodaps OK OK OK OK OK Ltex Lixa / Catamento Lixa / Catamento Lixa / Catamento Lixa/ Catamento Lixa/ Catamento Lixa
EFETIVO
18
17
16
Tarcsio / Vagner Antonio Carlos / Anderson Andr / Paulo Andr Jos de Jesus / Ruy Jos Guerra / Adriano Willian/ Weider Valdinei/ Rondineli
15
EFETIVO TOTAL = 19
__________________________________________
ASS. ENG. RESP. TRIBECA A
PAVIMENTO
APARTAMENTO
01 02 03 04 01 02 03 04 01 02 03 04 01 02 03 04
INCIO
27-Sep 27-Sep 4-Oct 27-Sep 1-Oct 1-Oct 4-Oct 1-Oct 8-Oct 9-Oct 8-Oct 8-Oct 17-Oct 11-Oct 10-Oct 15-Oct
CONCLUIDO(%) TRMINO
100% 100% 100% 100% 100% 100% 100% 100% 90% 90% 95% 95% 15% 90% 80% 40% 4-Oct 10-Oct 17-Oct 8-Oct 9-Oct 11-Oct 15-Oct 9-Oct
PREVISO DE TRMINO
4-Oct 9-Oct 11-Oct 8-Oct 8-Oct 9-Oct 12-Oct 9-Oct 17-Oct 18-Oct 17-Oct 17-Oct 22-Oct 19-Oct 23-Oct
SERVIO
OK OK OK OK OK OK OK OK Esmalte portas e rodaps Esmalte portas e rodaps Esmalte portas e rodaps Esmalte portas e rodaps Lixa Esmalte portas e rodaps Esmalte portas e rodaps Ltex
EFETIVO
18
17
16
15
Tarcsio / Vagner Antonio Carlos / Anderson Andr / Paulo Andr Jos de Jesus / Ruy Edson / Jorge Alberto Jos Guerra / Adriano Willian/ Weider Valdinei/ Rondineli
EFETIVO TOTAL = 18
__________________________________________
ASS. ENG. RESP. TRIBECA A
PAVIMENTO
APARTAMENTO
01 02 03 04 01 02 03 04 01 02 03 04
INCIO
8-Oct 9-Oct 8-Oct 8-Oct 17-Oct 11-Oct 10-Oct 15-Oct 17-Oct 17-Oct
CONCLUIDO(%) TRMINO
90% 90% 95% 95% 15% 90% 80% 40% 5% 5%
PREVISO DE TRMINO
17-Oct 18-Oct 17-Oct 17-Oct 22-Oct 19-Oct 23-Oct 26-Oct 26-Oct
SERVIO
Esmalte portas e rodaps Esmalte portas e rodaps Esmalte portas e rodaps Esmalte portas e rodaps Lixa Esmalte portas e rodaps Esmalte portas e rodaps Ltex Emassando Emassando
EFETIVO
Tarcsio / Vagner Antonio Carlos / Anderson Andr / Paulo Andr Jos de Jesus / Ruy Edson / Jorge Alberto Jos Guerra / Adriano Willian/ Weider Valdinei/ Rondineli Jos de Jesus / Ruy Andr / Paulo Andr
OBSERVAES
16
15
14
EFETIVO TOTAL = 18
__________________________________________
ASS. ENG. RESP. TRIBECA A
PAVIMENTO
APARTAMENTO
01 02 03 04 01 02 03 04 01 02 03 04
INCIO
8-Oct 9-Oct 8-Oct 8-Oct 17-Oct 11-Oct 10-Oct 15-Oct 17-Oct 19-Oct 17-Oct 19-Oct
CONCLUIDO(%) TRMINO
90% 90% 100% 100% 25% 90% 80% 60% 15% 5% 15% 5%
PREVISO DE TRMINO
17-Oct 18-Oct 17-Oct 17-Oct 26-Oct 22-Oct 19-Oct 23-Oct 26-Oct 30-Oct 26-Oct 30-Oct
SERVIO
Esmalte portas e rodaps Esmalte portas e rodaps ok ok Lixa Esmalte portas e rodaps Esmalte portas e rodaps Ltex Emassando Iniciando emassamento Emassando Iniciando emassamento
EFETIVO
Tarcsio / Vagner Antonio Carlos / Anderson Andr / Paulo Andr Jos de Jesus / Ruy Edson / Jorge Alberto Jos Guerra / Adriano Willian/ Weider Valdinei/ Rondineli Jos de Jesus / Ruy Tarcsio / Vagner Andr / Paulo Andr Antonio Carlos / Anderson
OBSERVAES
Marcado os acabamentos a serem feitos Marcado os acabamentos a serem feitos Marcado os acabamentos a serem feitos Marcado os acabamentos a serem feitos
16
19-Oct 19-Oct
15
14
HALL ELEVADORES = Jos Henrique, Lus 27 Pavimento REVISO 18 - Tarcsio, Vagner e Geovane
EFETIVO TOTAL = 18
__________________________________________
ASS. ENG. RESP. TRIBECA A
PAVIMENTO
APARTAMENTO
01 02 03 04 01 02 03 04 01 02 03 04
INCIO
8-Oct 9-Oct 8-Oct 8-Oct 17-Oct 11-Oct 10-Oct 15-Oct 17-Oct 19-Oct 17-Oct 19-Oct
CONCLUIDO(%) TRMINO
100% 100% 100% 100% 35% 100% 90% 80% 25% 15% 25% 15% 19-Oct 19-Oct 19-Oct 19-Oct
PREVISO DE TRMINO
17-Oct 18-Oct 17-Oct 17-Oct 26-Oct 22-Oct 19-Oct 23-Oct 26-Oct 30-Oct 26-Oct 30-Oct
SERVIO
ok ok ok ok Lixa/latx ok Esmalte portas e rodaps Ltex Emassando Iniciando emassamento Emassando Iniciando emassamento
EFETIVO
Tarcsio / Vagner Antonio Carlos / Anderson Andr / Paulo Andr Jos de Jesus / Ruy Edson / Jorge Alberto Jos Guerra / Adriano Willian/ Weider Valdinei/ Rondineli Jos de Jesus / Ruy Tarcsio / Vagner Andr / Paulo Andr Antonio Carlos / Anderson
OBSERVAES
Marcado os acabamentos a serem feitos Marcado os acabamentos a serem feitos Marcado os acabamentos a serem feitos Marcado os acabamentos a serem feitos
16
15
14
HALL ELEVADORES = Jos Henrique, Lus 26 Pavimento REVISO 16 - Tarcsio, Vagner e Geovane
EFETIVO TOTAL = 18
__________________________________________
ASS. ENG. RESP. TRIBECA A
PAVIMENTO
APARTAMENTO
INCIO
CONCLUIDO(%) TRMINO
35% 100% 100% 100% 75% 35% 35% 35% 60% 15% 15%
PREVISO DE TRMINO
26-Oct 22-Oct 19-Oct 23-Oct 26-Oct 30-Oct 26-Oct 30-Oct 29-Oct 31-Oct 31-Oct
SERVIO
Lixa/latx ok ok ok Latex Lixa Lixa lixa Lixa/Latex Emassamento Emassamento
EFETIVO
Edson / Jorge Alberto Jos Guerra / Adriano Willian/ Weider Valdinei/ Rondineli Jos de Jesus / Ruy Tarcsio / Vagner Andr / Paulo Andr Antonio Carlos / Anderson Jos Guerra / Adriano Valdinei/ Rondineli Willian/ Weider
OBSERVAES
01 17-Oct 11-Oct 02 15 10-Oct 03 15-Oct 04 01 17-Oct 19-Oct 02 14 17-Oct 03 19-Oct 04 01 20-Oct 23-Oct 02 13 22-Oct 03 04 HALL ELEVADORES = Jos Henrique, Lus 26 Pavimento REVISO 18 - Tarcsio e Vagner
EFETIVO TOTAL = 18
__________________________________________
ASS. ENG. RESP. TRIBECA A
PAVIMENTO
APARTAMENTO
INCIO
CONCLUIDO(%) TRMINO
80% 100% 100% 100% 90% 55% 60% 60% 75% 30% 30%
PREVISO DE TRMINO
26-Oct 22-Oct 19-Oct 23-Oct 26-Oct 30-Oct 26-Oct 30-Oct 29-Oct 31-Oct 31-Oct
SERVIO
Esmalte ok ok ok Esmalte Lixa/Latex Latex Ltex Latex/Esmalte Lixa Lixa
EFETIVO
Edson / Jorge Alberto Jos Guerra / Adriano Willian/ Weider Valdinei/ Rondineli Jos de Jesus / Ruy Tarcsio / Vagner Andr / Paulo Andr Antonio Carlos / Anderson Jos Guerra / Adriano Valdinei/ Rondineli Willian/ Weider
OBSERVAES
01 17-Oct 11-Oct 02 15 10-Oct 03 15-Oct 04 01 17-Oct 19-Oct 02 14 17-Oct 03 19-Oct 04 01 20-Oct 23-Oct 02 13 03 22-Oct 04 HALL ELEVADORES = Jos Henrique, Lus 25 Pavimento REVISO 17 - Tarcsio e Vagner
EFETIVO TOTAL = 18
__________________________________________
ASS. ENG. RESP. TRIBECA A
PAVIMENTO
APARTAMENTO
INCIO
CONCLUIDO(%) TRMINO
PREVISO DE TRMINO
26-Oct 22-Oct 19-Oct 23-Oct 26-Oct 30-Oct 26-Oct 30-Oct 29-Oct 31-Oct 31-Oct
SERVIO
Esmalte /Portas ok ok ok Esmalte em 2 portas Lixa/Latex Latex/Esmalte Esmalte Esmalte Lixa/latex Lixa/Latex
EFETIVO
Edson / Jorge Alberto Jos Guerra / Adriano Willian/ Weider Valdinei/ Rondineli Jos de Jesus / Ruy Tarcsio / Vagner Andr / Paulo Andr Antonio Carlos / Anderson Jos Guerra / Adriano Valdinei/ Rondineli Willian/ Weider
OBSERVAES
Portas com pintura
01 17-Oct 90% 11-Oct 100% 02 22-Oct 15 10-Oct 100% 03 22-Oct 15-Oct 100% 04 23-Oct 01 17-Oct 95% 19-Oct 65% 02 14 17-Oct 80% 03 19-Oct 85% 04 01 20-Oct 85% 26-Oct 23-Oct 45% 02 31-Oct 13 03 22-Oct 45% 04 31-Oct HALL ELEVADORES = Jos Henrique, Lus 25 Pavimento 75% Latex /esmalte REVISO 17 - Tarcsio e Vagner CORRIMO = 31 AO 26 SEGUNDA MO (AINDA NO TOTALMENTE REVESTIDO DE TINTA)
EFETIVO TOTAL = 18
__________________________________________
ASS. ENG. RESP. TRIBECA A
PAVIMENTO
APARTAMENTO
INCIO
CONCLUIDO(%) TRMINO
PREVISO DE TRMINO
26-Oct 22-Oct 19-Oct 23-Oct 26-Oct 30-Oct 26-Oct 30-Oct 29-Oct 31-Oct 31-Oct
SERVIO
ok ok ok ok Esmalte em 2 portas Latex Latex/Esmalte Esmalte Esmalte Latex Latex
EFETIVO
Edson / Jorge Alberto Jos Guerra / Adriano Willian/ Weider Valdinei/ Rondineli Jos de Jesus / Ruy Tarcsio / Vagner Andr / Paulo Andr Antonio Carlos / Anderson Jos Guerra / Adriano Valdinei/ Rondineli Willian/ Weider
OBSERVAES
Portas com 1 mo de tinta
01 17-Oct 95% 29-Oct 11-Oct 100% 02 22-Oct 15 10-Oct 100% 03 22-Oct 15-Oct 100% 04 23-Oct 01 17-Oct 95% 19-Oct 75% 02 14 17-Oct 90% 03 19-Oct 90% 04 01 20-Oct 90% 23-Oct 55% 02 13 03 22-Oct 55% 04 HALL ELEVADORES = Jos Henrique, Lus 25 Pavimento 90% Esmalte REVISO 17 - Tarcsio e Vagner CORRIMO = 31 AO 26 SEGUNDA MO (AINDA NO TOTALMENTE REVESTIDO DE TINTA)
Forro do s. suite de esmalte Portas com 1 mo de tinta Forro da A.tec sem lixar e pintar
EFETIVO TOTAL = 18
__________________________________________
ASS. ENG. RESP. TRIBECA A
PAVIMENTO
APARTAMENTO
01 02 03 04 01 02 03 04 01 02 03 04 01 02 03 04
INCIO
17-Oct 11-Oct 10-Oct 15-Oct 17-Oct 19-Oct 17-Oct 19-Oct 20-Oct 23-Oct 22-Oct 29-Oct 29-Oct 29-Oct
CONCLUIDO(%) TRMINO
100% 100% 100% 100% 100% 85% 100% 100% 100% 65% 65% 29-Oct 22-Oct 22-Oct 23-Oct
PREVISO DE TRMINO
26-Oct 22-Oct 19-Oct 23-Oct 26-Oct 30-Oct 26-Oct 30-Oct 29-Oct 31-Oct 31-Oct
SERVIO
ok ok ok ok ok Esmalte ok ok ok Latex
EFETIVO
Edson / Jorge Alberto Jos Guerra / Adriano Willian/ Weider Valdinei/ Rondineli Jos de Jesus / Ruy Tarcsio / Vagner Andr / Paulo Andr Antonio Carlos / Anderson Jos Guerra / Adriano Valdinei/ Rondineli Willian/ Weider Jos Guerra / Adriano Andr / Paulo Andr Edson / Jorge Alberto
OBSERVAES
Portas com 1 mo de tinta
15
14
Forro do s. suite de esmalte Portas com 1 mo de tinta Forro da A.tec sem lixar e pintar
13
12
HALL ELEVADORES = Jos Henrique, Lus 25 Pavimento 90% Esmalte REVISO 17 - Tarcsio e Vagner CORRIMO = 31 AO 26 SEGUNDA MO (AINDA NO TOTALMENTE REVESTIDO DE TINTA)
EFETIVO TOTAL = 18
__________________________________________
ASS. ENG. RESP. TRIBECA A
PAVIMENTO
APARTAMENTO
01 02 03 04 01 02 03 04 01 02 03 04 01 02 03 04
INCIO
17-Oct 19-Oct 17-Oct 19-Oct 20-Oct 23-Oct 29-Oct 22-Oct 29-Oct 29-Oct 29-Oct
CONCLUIDO(%) TRMINO
100% 85% 100% 100% 100% 65% 15% 65% 15% 30% 15% 26-Oct 26-Oct 29-Oct
PREVISO DE TRMINO
26-Oct 30-Oct 26-Oct 30-Oct 29-Oct 31-Oct 31-Oct 7-Nov 7-Nov 7-Nov
SERVIO
ok Esmalte ok ok ok Latex
EFETIVO
Jos de Jesus / Ruy Tarcsio / Vagner Andr / Paulo Andr Antonio Carlos / Anderson Jos Guerra / Adriano Valdinei/ Rondineli Jos de Jesus / Ruy Willian/ Weider Jos Guerra / Adriano Andr / Paulo Andr Edson / Jorge Alberto
OBSERVAES
14
Forro do s. suite de esmalte Portas com 1 mo de tinta Forro da A.tec sem lixar e pintar
13
12
11
30-Oct
5%
8-Nov
Emassamento
HALL ELEVADORES = Jos Henrique, Lus 24 Pavimento 15% Esmalte REVISO 17 - Tarcsio e Vagner CORRIMO = 31 AO 26 SEGUNDA MO (AINDA NO TOTALMENTE REVESTIDO DE TINTA)
EFETIVO TOTAL = 18
__________________________________________
ASS. ENG. RESP. TRIBECA A
PAVIMENTO
APARTAMENTO
01 02 03 04 01 02 03 04 01 02 03 04 01 02 03 04
INCIO
17-Oct 19-Oct 17-Oct 19-Oct 20-Oct 23-Oct 29-Oct 22-Oct 29-Oct 29-Oct 29-Oct 31-Oct 30-Oct
CONCLUIDO(%) TRMINO
100% 85% 100% 100% 100% 100% 45% 95% 15% 30% 15% 15% 30% 26-Oct 26-Oct 29-Oct 31-Oct
PREVISO DE TRMINO
26-Oct 30-Oct 26-Oct 30-Oct 29-Oct 31-Oct 6-Nov 31-Oct 7-Nov 7-Nov 7-Nov 9-Nov 8-Nov
SERVIO
ok Esmalte ok ok ok ok Lixa Reviso Emassamento/lixa Emassamento/lixa Emassamento/lixa Emassamento Lixa
EFETIVO
Jos de Jesus / Ruy Tarcsio / Vagner Andr / Paulo Andr Antonio Carlos / Anderson Jos Guerra / Adriano Valdinei/ Rondineli Jos de Jesus / Ruy Willian/ Weider Jos Guerra / Adriano Andr / Paulo Andr Edson / Jorge Alberto Valdinei/ Rondineli Antonio Carlos / Anderson
OBSERVAES
14
Forro do s. suite de esmalte Portas com 1 mo de tinta Forro da A.tec sem lixar e pintar
13
12
11
COBERTURA = SELADOR HALL ELEVADORES = Jos Henrique, Lus 24 Pavimento 45% LATEX REVISO 16 CORRIMO = 31 AO 24 PRIMEIRA MO DE ZARCO
EFETIVO TOTAL = 18
__________________________________________
ASS. ENG. RESP. TRIBECA A
PAVIMENTO
APARTAMENTO
01 02 03 04 01 02 03 04 01 02 03 04 01 02 03 04
INCIO
17-Oct 19-Oct 17-Oct 19-Oct 20-Oct 23-Oct 29-Oct 22-Oct 29-Oct 29-Oct 29-Oct 31-Oct 30-Oct
CONCLUIDO(%) TRMINO
100% 85% 100% 100% 100% 100% 45% 95% 15% 30% 15% 15% 30% 26-Oct 26-Oct 29-Oct 31-Oct
PREVISO DE TRMINO
26-Oct 30-Oct 26-Oct 30-Oct 29-Oct 31-Oct 6-Nov 31-Oct 7-Nov 7-Nov 7-Nov 9-Nov 8-Nov
SERVIO
ok Esmalte ok ok ok ok Lixa Reviso Emassamento/lixa Emassamento/lixa Emassamento/lixa Emassamento Lixa
EFETIVO
Jos de Jesus / Ruy Tarcsio / Vagner Andr / Paulo Andr Antonio Carlos / Anderson Jos Guerra / Adriano Valdinei/ Rondineli Jos de Jesus / Ruy Willian/ Weider Jos Guerra / Adriano Andr / Paulo Andr Edson / Jorge Alberto Valdinei/ Rondineli Antonio Carlos / Anderson
OBSERVAES
14
Forro do s. suite de esmalte Portas com 1 mo de tinta Forro da A.tec sem lixar e pintar
13
12
11
COBERTURA = SELADOR HALL ELEVADORES = Jos Henrique, Lus 24 Pavimento 45% LATEX REVISO 16 CORRIMO = 31 AO 24 PRIMEIRA MO DE ZARCO
EFETIVO TOTAL = 18
__________________________________________
ASS. ENG. RESP. TRIBECA A
PAVIMENTO
APARTAMENTO
01 02 03 04 01 02 03 04 01 02 03 04 01 02 03 04 01 02 03 04
INCIO
17-Oct 19-Oct 17-Oct 19-Oct 20-Oct 23-Oct 29-Oct 22-Oct 29-Oct 29-Oct 29-Oct 31-Oct 30-Oct 5-Nov
CONCLUIDO(%) TRMINO
100% 90% 100% 100% 100% 100% 65% 95% 30% 45% 30% 15% 30% 5% 26-Oct 26-Oct 29-Oct 31-Oct
PREVISO DE TRMINO
26-Oct 30-Oct 26-Oct 30-Oct 29-Oct 31-Oct 6-Nov 31-Oct 7-Nov 7-Nov 7-Nov 9-Nov 8-Nov
SERVIO
ok Esmalte ok ok ok ok Latex Reviso lixa lixa lixa Emassamento Lixa Emassamento
EFETIVO
Jos de Jesus / Ruy Tarcsio / Vagner Andr / Paulo Andr Antonio Carlos / Anderson Jos Guerra / Adriano Valdinei/ Rondineli Jos de Jesus / Ruy Willian/ Weider Jos Guerra / Adriano Andr / Paulo Andr Edson / Jorge Alberto Valdinei/ Rondineli Antonio Carlos / Anderson
OBSERVAES
14
Forro do s. suite de esmalte Portas com 1 mo de tinta Forro da A.tec sem lixar e pintar
13
12
11
10
COBERTURA = SELADOR HALL ELEVADORES = Jos Henrique, Lus 24 Pavimento 45% LATEX REVISO 16 CORRIMO = 31 AO 24 PRIMEIRA MO DE ZARCO
EFETIVO TOTAL = 18
__________________________________________
ASS. ENG. RESP. TRIBECA A
PAVIMENTO
APARTAMENTO
01 02 03 04 01 02 03 04 01 02 03 04 01 02 03 04 01 02 03 04
INCIO
17-Oct 19-Oct 17-Oct 19-Oct 20-Oct 23-Oct 29-Oct 22-Oct 29-Oct 29-Oct 29-Oct 6-Nov 31-Oct 30-Oct 5-Nov
CONCLUIDO(%) TRMINO
100% 95% 100% 100% 100% 100% 80% 100% 60% 95% 70% 5% 35% 65% 15% 26-Oct 26-Oct 29-Oct 31-Oct 5-Nov
PREVISO DE TRMINO
26-Oct 30-Oct 26-Oct 30-Oct 29-Oct 31-Oct 6-Nov 31-Oct 7-Nov 7-Nov 7-Nov 9-Nov 8-Nov
SERVIO
ok Esmalte ok ok ok ok Esmalte Reviso Emassamento/lixa Emassamento/lixa Emassamento/lixa Emassamento Emassamento Lixa Emassamento
EFETIVO
Jos de Jesus / Ruy Tarcsio / Vagner Andr / Paulo Andr Antonio Carlos / Anderson Jos Guerra / Adriano Valdinei/ Rondineli Jos de Jesus / Ruy Willian/ Weider Jos Guerra / Adriano Andr / Paulo Andr Edson / Jorge Alberto Andr / Paulo Andr Valdinei/ Rondineli Antonio Carlos / Anderson Willian/ Weider
OBSERVAES
14
Forro do s. suite de esmalte Portas com 1 mo de tinta Forro da A.tec sem lixar e pintar
13
12
11
10
COBERTURA = SELADOR HALL ELEVADORES = Jos Henrique, Lus 24 Pavimento 45% LATEX REVISO 16 CORRIMO = 31 AO 24 PRIMEIRA MO DE ZARCO
EFETIVO TOTAL = 18
__________________________________________
ASS. ENG. RESP. TRIBECA A
PAVIMENTO
APARTAMENTO
01 02 03 04 01 02 03 04 01 02 03 04 01 02 03 04 01 02 03 04
INCIO
17-Oct 19-Oct 17-Oct 19-Oct 20-Oct 23-Oct 29-Oct 22-Oct 29-Oct 29-Oct 29-Oct 6-Nov 31-Oct 7-Nov 30-Oct 5-Nov
CONCLUIDO(%) TRMINO
100% 100% 100% 100% 100% 100% 80% 100% 80% 100% 85% 15% 80% 5% 85% 25% 26-Oct 7-Nov 26-Oct 29-Oct 31-Oct 5-Nov
PREVISO DE TRMINO
26-Oct 30-Oct 26-Oct 30-Oct 29-Oct 31-Oct 6-Nov 31-Oct 7-Nov 7-Nov 7-Nov 15-Nov 9-Nov 16-Nov 8-Nov
SERVIO
ok ok ok ok ok ok Esmalte Reviso Esmalte ok Esmalte Emassamento Esmalte Esmalte Emassamento/Lixa
EFETIVO
Jos de Jesus / Ruy Tarcsio / Vagner Andr / Paulo Andr Antonio Carlos / Anderson Jos Guerra / Adriano Valdinei/ Rondineli Jos de Jesus / Ruy Willian/ Weider Jos Guerra / Adriano Andr / Paulo Andr Edson / Jorge Alberto Andr / Paulo Andr Valdinei/ Rondineli Tarcsio / Vagner Antonio Carlos / Anderson Willian/ Weider
OBSERVAES
14
Forro do s. suite de esmalte Portas com 1 mo de tinta Forro da A.tec sem lixar e pintar
13
12
7-Nov
11
10
HALL ELEVADORES = Rivailton, Lus 24 Pavimento 80% LATEX/ESMALTE PORTA CORTA FOGO = 31 AO 27 SEGUNDA MO DE TINTA CORRIMO = 33 AO 21 PRIMEIRA MO DE TINTA
EFETIVO TOTAL = 18
__________________________________________
ASS. ENG. RESP. TRIBECA A
PAVIMENTO
APARTAMENTO
01 02 03 04 01 02 03 04 01 02 03 04 01 02 03 04 01 02 03 04
INCIO
17-Oct 19-Oct 17-Oct 19-Oct 20-Oct 23-Oct 29-Oct 22-Oct 29-Oct 29-Oct 29-Oct 6-Nov 31-Oct 7-Nov 30-Oct 5-Nov
CONCLUIDO(%) TRMINO
100% 100% 100% 100% 100% 100% 95% 100% 95% 100% 95% 25% 95% 15% 95% 35% 26-Oct 7-Nov 26-Oct 29-Oct 31-Oct 5-Nov
PREVISO DE TRMINO
26-Oct 30-Oct 26-Oct 30-Oct 29-Oct 31-Oct 6-Nov 31-Oct 7-Nov 7-Nov 7-Nov 15-Nov 9-Nov 16-Nov 8-Nov
SERVIO
ok ok ok ok ok ok Esmalte Reviso Esmalte ok Esmalte Emassamento Esmalte Emassamento Esmalte Emassamento/Lixa
EFETIVO
Jos de Jesus / Ruy Tarcsio / Vagner Andr / Paulo Andr Antonio Carlos / Anderson Jos Guerra / Adriano Valdinei/ Rondineli Jos de Jesus / Ruy Willian/ Weider Jos Guerra / Adriano Andr / Paulo Andr Edson / Jorge Alberto Andr / Paulo Andr Valdinei/ Rondineli Tarcsio / Vagner Antonio Carlos / Anderson Willian/ Weider
OBSERVAES
14
Forro do s. suite de esmalte Portas com 1 mo de tinta Forro da A.tec sem lixar e pintar
13
12
7-Nov
11
10
HALL ELEVADORES = Rivailton, Lus 24 Pavimento 100% PORTA CORTA FOGO = 31 AO 27 SEGUNDA MO DE TINTA CORRIMO = 33 AO 17 PRIMEIRA MO DE TINTA
EFETIVO TOTAL = 18
__________________________________________
ASS. ENG. RESP. TRIBECA A
PAVIMENTO
APARTAMENTO
01 02 03 04 01 02 03 04 01 02 03 04 01 02 03 04
INCIO
20-Oct 23-Oct 29-Oct 22-Oct 29-Oct 29-Oct 29-Oct 6-Nov 31-Oct 7-Nov 30-Oct 9-Nov 5-Nov 9-Nov 9-Nov
CONCLUIDO(%) TRMINO
100% 100% 100% 100% 100% 100% 100% 35% 95% 30% 100% 15% 45% 15% 15%
PREVISO DE TRMINO
29-Oct 31-Oct 6-Nov 31-Oct 7-Nov 7-Nov 7-Nov 15-Nov 9-Nov 16-Nov 8-Nov
SERVIO
ok ok ok Reviso ok ok ok lixa Esmalte Emassamento Esmalte Emassamento Emassamento/Lixa Emassamento Emassamento
EFETIVO
Jos Guerra / Adriano Valdinei/ Rondineli Jos de Jesus / Ruy Willian/ Weider Jos Guerra / Adriano Andr / Paulo Andr Edson / Jorge Alberto Andr / Paulo Andr Valdinei/ Rondineli Tarcsio / Vagner Antonio Carlos / Anderson Edson / Jorge Alberto Willian/ Weider Jos de Jesus / Ruy Antonio Carlos / Anderson
OBSERVAES
Forro da A.tec sem lixar e pintar
13
12
11
9-Nov ,
10
HALL ELEVADORES = Rivailton, Lus 23 PORTA CORTA FOGO = 31 AO 27 SEGUNDA MO DE TINTA CORRIMO = 33 AO 11 PRIMEIRA MO DE TINTA
EFETIVO TOTAL = 18
__________________________________________
ASS. ENG. RESP. TRIBECA A
PAVIMENTO
APARTAMENTO
01 02 03 04 01 02 03 04 01 02 03 04 01 02 03 04
INCIO
CONCLUIDO(%) TRMINO
PREVISO DE TRMINO
7-Nov 7-Nov 7-Nov 15-Nov 9-Nov 16-Nov 8-Nov 21-Nov 14-Nov 21-Nov 21-Nov 22-Nov
SERVIO
EFETIVO
OBSERVAES
12
11
10
29-Oct 29-Oct 29-Oct 6-Nov 31-Oct 7-Nov 30-Oct 9-Nov 5-Nov 9-Nov 9-Nov 12-Nov
100% 100% 100% 45% 100% 30% 100% 25% 55% 25% 25% 5%
9-Nov 7-Nov
10-Nov 9-Nov
Jos Guerra / Adriano Andr / Paulo Andr Edson / Jorge Alberto Andr / Paulo Andr Valdinei/ Rondineli Tarcsio / Vagner Antonio Carlos / Anderson Edson / Jorge Alberto Willian/ Weider Jos de Jesus / Ruy Antonio Carlos / Anderson Valdinei/ Rondineli
HALL ELEVADORES = Rivailton, Lus 23 PORTA CORTA FOGO = 31 AO 27 SEGUNDA MO DE TINTA CORRIMO = 33 AO 11 PRIMEIRA MO DE TINTA
EFETIVO TOTAL = 18
HALL ELEVADORES = Rivailton, Lus 23 PORTA CORTA FOGO = 31 AO 27 SEGUNDA MO DE TINTA CORRIMO = 33 AO 11 PRIMEIRA MO DE TINTA
EFETIVO TOTAL = 18
__________________________________________
ASS. ENG. RESP. TRIBECA A
PAVIMENTO
APARTAMENTO
01 02 03 04 01 02 03 04 01 02 03 04 01 02 03 04
INCIO
11-Nov 29-Oct 29-Oct 29-Oct 6-Nov 31-Oct 7-Nov 30-Oct 9-Nov 5-Nov 9-Nov 9-Nov 12-Nov
CONCLUIDO(%) TRMINO
5% 100% 100% 100% 55% 100% 55% 100% 55% 75% 45% 35% 5%
PREVISO DE TRMINO
21-Nov 7-Nov 7-Nov 7-Nov 19-Nov 9-Nov 19-Nov 8-Nov 21-Nov 14-Nov 21-Nov 21-Nov 22-Nov
SERVIO
Emassamento ok ok ok Ltex/Lixa ok Lixa ok Lixa Latex/Esmalte Lixa Lixa Emassamento
EFETIVO
Jos Guerra / Adriano Jos Guerra / Adriano Andr / Paulo Andr Edson / Jorge Alberto Andr / Paulo Andr Valdinei/ Rondineli Tarcsio / Vagner Antonio Carlos / Anderson Edson / Jorge Alberto Willian/ Weider Jos de Jesus / Ruy Antonio Carlos / Anderson Valdinei/ Rondineli
OBSERVAES
12
9-Nov 7-Nov
11
10-Nov 9-Nov
10
COBERTURA= TEXTURA 30% PRONTO HALL ELEVADORES = Rivailton, Lus 21 OBS: O ANDAR 22 FOI PULADO, POIS O MESMO PRECISA DE RECUPERAO FORRO PORTA CORTA FOGO = 31 AO 22 SEGUNDA MO DE TINTA CORRIMO = 33 AO 7 PRIMEIRA MO DE TINTA
EFETIVO TOTAL = 18
PAVIMENTO
APARTAMENTO
01 02 03 04 01 02 03 04 01 02 03 04 01 02 03 04
INCIO
11-Nov 29-Oct 29-Oct 29-Oct 6-Nov 31-Oct 7-Nov 30-Oct 9-Nov 5-Nov 9-Nov 9-Nov 12-Nov 13-Nov 13-Nov
CONCLUIDO(%) TRMINO
15% 100% 100% 100% 100% 100% 95% 100% 65% 85% 55% 65% 15% 5% 5%
PREVISO DE TRMINO
21-Nov 7-Nov 7-Nov 7-Nov 19-Nov 9-Nov 19-Nov 8-Nov 21-Nov 14-Nov 21-Nov 21-Nov 22-Nov 23-Nov 23-Nov
SERVIO
Emassamento ok ok ok ok ok Lixa ok Lixa/Ltex Esmalte Lixa/Latex Ltex Emassamento Emassamento Emassamento
EFETIVO
Jos Guerra / Adriano Jos Guerra / Adriano Andr / Paulo Andr Edson / Jorge Alberto Andr / Paulo Andr Valdinei/ Rondineli Tarcsio / Vagner Antonio Carlos / Anderson Edson / Jorge Alberto Willian/ Weider Jos de Jesus / Ruy Antonio Carlos / Anderson Valdinei/ Rondineli Tarcsio / Vagner Andr / Paulo Andr
OBSERVAES
12
11
Reviso de portas
10
COBERTURA= TEXTURA 40% PRONTO HALL ELEVADORES = Rivailton, Lus 21 35% - Lixa / OBS: O ANDAR 22 FOI PULADO, POIS O MESMO PRECISA DE RECUPERAO FORRO PORTA CORTA FOGO = 31 AO 19 SEGUNDA MO DE TINTA CORRIMO = 33 AO 7 PRIMEIRA MO DE TINTA
EFETIVO TOTAL = 18
PAVIMENTO
APARTAMENTO
01 02 03 04 01 02 03 04 01 02 03 04 01 02 03 04
INCIO
11-Nov 29-Oct 29-Oct 29-Oct 6-Nov 31-Oct 7-Nov 30-Oct 9-Nov 5-Nov 9-Nov 9-Nov 19-Nov 12-Nov 13-Nov 13-Nov
CONCLUIDO(%) TRMINO
25% 100% 100% 100% 100% 100% 95% 100% 70% 100% 70% 75% 5% 45% 15% 15%
PREVISO DE TRMINO
23-Nov 7-Nov 7-Nov 7-Nov 19-Nov 9-Nov 19-Nov 8-Nov 21-Nov 14-Nov 21-Nov 21-Nov 22-Nov 23-Nov 23-Nov
SERVIO
Emassamento ok ok ok ok ok Lixa ok Lixa ok Latex Ltex Emassamento Lixa Emassamento Emassamento
EFETIVO
Jos Guerra / Adriano Jos Guerra / Adriano Andr / Paulo Andr Edson / Jorge Alberto Andr / Paulo Andr Valdinei/ Rondineli Tarcsio / Vagner Antonio Carlos / Anderson Edson / Jorge Alberto Willian/ Weider Jos de Jesus / Ruy Antonio Carlos / Anderson Willian/ Weider Valdinei/ Rondineli Tarcsio / Vagner Andr / Paulo Andr
OBSERVAES
12
11
Reviso de portas
10
COBERTURA= TEXTURA 40% PRONTO HALL ELEVADORES = Rivailton, Lus 21 35% - Lixa / OBS: O ANDAR 22 FOI PULADO, POIS O MESMO PRECISA DE RECUPERAO FORRO PORTA CORTA FOGO = 31 AO 19 SEGUNDA MO DE TINTA CORRIMO = 33 AO 7 PRIMEIRA MO DE TINTA
EFETIVO TOTAL = 18
PAVIMENTO
APARTAMENTO
01 02 03 04 01 02 03 04 01 02 03 04 01 02 03 04 01 02 03 04
INCIO
11-Nov 29-Oct 29-Oct 29-Oct 6-Nov 31-Oct 7-Nov 30-Oct 9-Nov 5-Nov 9-Nov 9-Nov 19-Nov 12-Nov 13-Nov 13-Nov
CONCLUIDO(%) TRMINO
35% 100% 100% 100% 100% 100% 100% 100% 75% 100% 85% 85% 15% 75% 35% 25%
PREVISO DE TRMINO
23-Nov 7-Nov 7-Nov 7-Nov 19-Nov 9-Nov 19-Nov 8-Nov 21-Nov 14-Nov 21-Nov 21-Nov 22-Nov 23-Nov 23-Nov
SERVIO
lixa ok ok ok ok ok Lixa ok Latex/Esmalte ok Esmalte Esmalte Emassamento Esmalte/Latex Emassamento/lixa Emassamento
EFETIVO
Jos Guerra / Adriano Jos Guerra / Adriano Andr / Paulo Andr Edson / Jorge Alberto Andr / Paulo Andr Valdinei/ Rondineli Tarcsio / Vagner Antonio Carlos / Anderson Edson / Jorge Alberto Willian/ Weider Jos de Jesus / Ruy Antonio Carlos / Anderson Willian/ Weider Valdinei/ Rondineli Tarcsio / Vagner Andr / Paulo Andr
OBSERVAES
12
11
10
20-Nov 20-Nov
5% 5%
COBERTURA= TEXTURA 40% PRONTO HALL ELEVADORES = Rivailton, Lus 21 35% - Lixa / OBS: O ANDAR 22 FOI PULADO, POIS O MESMO PRECISA DE RECUPERAO FORRO PORTA CORTA FOGO = 31 AO 14 PRIMEIRA MO DE TINTA CORRIMO = 33 AO 7 PRIMEIRA MO DE TINTA
EFETIVO TOTAL = 18
PAVIMENTO
APARTAMENTO
01 02 03 04 01 02 03 04 01 02 03 04 01 02 03 04 01 02 03 04
INCIO
11-Nov 29-Oct 29-Oct 29-Oct 6-Nov 31-Oct 7-Nov 30-Oct 9-Nov 5-Nov 9-Nov 9-Nov 19-Nov 12-Nov 13-Nov 13-Nov
CONCLUIDO(%) TRMINO
55% 100% 100% 100% 100% 100% 100% 100% 85% 100% 100% 100% 25% 85% 45% 45%
PREVISO DE TRMINO
23-Nov 7-Nov 7-Nov 7-Nov 19-Nov 9-Nov 19-Nov 8-Nov 21-Nov 14-Nov 21-Nov 21-Nov 22-Nov 23-Nov 23-Nov
SERVIO
latex ok ok ok ok ok Lixa ok Esmalte ok ok ok Lixa Latex Latex Latex
EFETIVO
Jos Guerra / Adriano Jos Guerra / Adriano Andr / Paulo Andr Edson / Jorge Alberto Andr / Paulo Andr Valdinei/ Rondineli Tarcsio / Vagner Antonio Carlos / Anderson Edson / Jorge Alberto Willian/ Weider Jos de Jesus / Ruy Antonio Carlos / Anderson Willian/ Weider Valdinei/ Rondineli Tarcsio / Vagner Andr / Paulo Andr
OBSERVAES
12
11
9-Nov 7-Nov 7-Nov 14-Nov 10-Nov 13-Nov 9-Nov 19-Nov 21-Nov 21-Nov
10
20-Nov 20-Nov
10% 15%
27-Nov 27-Nov
Emassamento Emassamento
COBERTURA= TEXTURA 40% PRONTO HALL ELEVADORES = Rivailton, Lus 21 35% - Lixa / OBS: O ANDAR 22 FOI PULADO, POIS O MESMO PRECISA DE RECUPERAO FORRO PORTA CORTA FOGO = 31 AO 14 PRIMEIRA MO DE TINTA CORRIMO = 33 AO 7 PRIMEIRA MO DE TINTA SEGUNDA MO PORTA CORTA FOGO - 25 AO 22
EFETIVO TOTAL = 18
PAVIMENTO
APARTAMENTO
01 02 03 04 01 02 03 04 01 02 03 04 01 02 03 04 01 02 03 04
INCIO
11-Nov 29-Oct 29-Oct 29-Oct 6-Nov 31-Oct 7-Nov 30-Oct 9-Nov 5-Nov 9-Nov 9-Nov 19-Nov 12-Nov 13-Nov 13-Nov 22-Nov 22-Nov 20-Nov 20-Nov
CONCLUIDO(%) TRMINO
85% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 65% 100% 65% 75% 10% 10% 15% 20%
PREVISO DE TRMINO
23-Nov 7-Nov 7-Nov 7-Nov 19-Nov 9-Nov 19-Nov 8-Nov 21-Nov 14-Nov 21-Nov 21-Nov 22-Nov 23-Nov 23-Nov 29-Nov 29-Nov 27-Nov 27-Nov
SERVIO
Latex/ Esmalte ok ok ok ok ok ok ok ok ok ok ok Lixa ok Latex/ Esmalte Latex/ Esmalte Emassamento Emassamento Emassamento Emassamento
EFETIVO
Jos Guerra / Adriano Jos Guerra / Adriano Andr / Paulo Andr Edson / Jorge Alberto Andr / Paulo Andr Valdinei/ Rondineli Tarcsio / Vagner Antonio Carlos / Anderson Edson / Jorge Alberto Willian/ Weider Jos de Jesus / Ruy Antonio Carlos / Anderson Willian/ Weider Valdinei/ Rondineli Tarcsio / Vagner Andr / Paulo Andr Jos de Jesus / Ruy Antonio Carlos / Anderson Ednei/Railton Adriano/ Jos Carlos
OBSERVAES
12
11
10
9-Nov 7-Nov 7-Nov 14-Nov 10-Nov 13-Nov 9-Nov 22-Nov 19-Nov 21-Nov 21-Nov 22-Nov
COBERTURA= TEXTURA 40% PRONTO HALL ELEVADORES = Rivailton, Lus 21 35% - Lixa / OBS: O ANDAR 22 FOI PULADO, POIS O MESMO PRECISA DE RECUPERAO FORRO PORTA CORTA FOGO = 31 AO 14 PRIMEIRA MO DE TINTA CORRIMO = 33 AO 7 PRIMEIRA MO DE TINTA SEGUNDA MO PORTA CORTA FOGO - 25 AO 18
EFETIVO TOTAL = 18
PAVIMENTO
APARTAMENTO
01 02 03 04 01 02 03 04 01 02 03 04 01 02 03 04
INCIO
11-Nov 29-Oct 29-Oct 29-Oct 19-Nov 12-Nov 13-Nov 13-Nov 22-Nov 22-Nov 20-Nov 20-Nov 23-Nov
CONCLUIDO(%) TRMINO
100% 100% 100% 100% 65% 100% 65% 75% 10% 10% 15% 20% 15% 23-Nov 9-Nov 7-Nov 7-Nov 22-Nov
PREVISO DE TRMINO
23-Nov 7-Nov 7-Nov 7-Nov 22-Nov 23-Nov 23-Nov 29-Nov 29-Nov 27-Nov 27-Nov 30-Nov
SERVIO
ok ok ok ok Latex ok Latex/ Esmalte Latex/ Esmalte Emassamento Emassamento Emassamento Emassamento Emassamento
EFETIVO
Jos Guerra / Adriano Jos Guerra / Adriano Andr / Paulo Andr Edson / Jorge Alberto Willian/ Weider Valdinei/ Rondineli Tarcsio / Vagner Andr / Paulo Andr Jos de Jesus / Ruy Antonio Carlos / Anderson Ednei/Railton Adriano/ Jos Carlos Valdinei/ Rondineli
OBSERVAES
12
COBERTURA= TEXTURA 40% PRONTO (PARADO) HALL ELEVADORES = PARADO PORTA CORTA FOGO = 31 AO 14 PRIMEIRA MO DE TINTA CORRIMO = 33 AO 7 PRIMEIRA MO DE TINTA SEGUNDA MO PORTA CORTA FOGO - 25 AO 14
EFETIVO TOTAL = 18
PAVIMENTO
APARTAMENTO
01 02 03 04 01 02 03 04 01 02 03 04
INCIO
19-Nov 12-Nov 13-Nov 13-Nov 22-Nov 22-Nov 20-Nov 20-Nov 23-Nov 26-Nov 26-Nov
CONCLUIDO(%) TRMINO
85% 100% 85% 100% 35% 35% 45% 65% 15% 5% 5%
PREVISO DE TRMINO
22-Nov 23-Nov 23-Nov 29-Nov 29-Nov 27-Nov 27-Nov 30-Nov
SERVIO
Esmalte ok Esmalte ok lixa lixa latex Latex Emassamento Emassamento Emassamento
EFETIVO
Willian/ Weider Valdinei/ Rondineli Tarcsio / Vagner Andr / Paulo Andr Jos de Jesus / Ruy Antonio Carlos / Anderson Ednei/Railton Adriano/ Jos Carlos Valdinei/ Rondineli Jos Guerra / Adriano Andr / Paulo Andr
OBSERVAES
22-Nov 26-Nov
COBERTURA= TEXTURA 40% PRONTO (PARADO) HALL ELEVADORES = PARADO PORTA CORTA FOGO = 31 AO 14 PRIMEIRA MO DE TINTA CORRIMO = 33 AO 7 PRIMEIRA MO DE TINTA SEGUNDA MO PORTA CORTA FOGO - 25 AO 14
EFETIVO TOTAL = 18
PAVIMENTO
APARTAMENTO
01 02 03 04 01 02 03 04 01 02 03 04 01 02 03 04
INCIO
19-Nov 12-Nov 13-Nov 13-Nov 22-Nov 22-Nov 20-Nov 20-Nov 23-Nov 26-Nov 27-Nov 26-Nov 27-Nov 27-Nov
CONCLUIDO(%) TRMINO
100% 100% 100% 100% 55% 65% 65% 100% 35% 15% 5% 15% 5% 5% 27-Nov 22-Nov 27-Nov 26-Nov
PREVISO DE TRMINO
22-Nov 23-Nov 23-Nov 29-Nov 29-Nov 27-Nov 27-Nov 30-Nov 4-Dec 5-Dec 4-Dec 5-Dec 5-Dec
SERVIO
ok ok ok ok lixa lixa latex Latex Emassamento Emassamento Emassamento Emassamento Emassamento Emassamento
EFETIVO
Willian/ Weider Valdinei/ Rondineli Tarcsio / Vagner Andr / Paulo Andr Jos de Jesus / Ruy Antonio Carlos / Anderson Ednei/Railton Adriano/ Jos Carlos Valdinei/ Rondineli Jos Guerra / Adriano Adriano/ Jos Carlos Andr / Paulo Andr Willian/ Weider Tarcsio / Vagner
OBSERVAES
27-Nov
COBERTURA= TEXTURA 40% PRONTO (PARADO) HALL ELEVADORES = PARADO PORTA CORTA FOGO = 31 AO 10 PRIMEIRA MO DE TINTA CORRIMO = 33 AO 7 PRIMEIRA MO DE TINTA SEGUNDA MO PORTA CORTA FOGO - 25 AO 14
EFETIVO TOTAL = 18
PAVIMENTO
APARTAMENTO
01 02 03 04 01 02 03 04 01 02 03 04 01 02 03 04
INCIO
19-Nov 12-Nov 13-Nov 13-Nov 22-Nov 22-Nov 20-Nov 20-Nov 23-Nov 26-Nov 27-Nov 26-Nov 27-Nov 27-Nov
CONCLUIDO(%) TRMINO
100% 100% 100% 100% 75% 75% 85% 100% 35% 15% 5% 15% 15% 15% 27-Nov 22-Nov 27-Nov 26-Nov
PREVISO DE TRMINO
22-Nov 23-Nov 23-Nov 29-Nov 29-Nov 27-Nov 27-Nov 30-Nov 4-Dec 5-Dec 4-Dec 5-Dec 5-Dec
SERVIO
ok ok ok ok Esmalte/latex Esmalte/latex Esmalte ok Lixa Emassamento Emassamento Emassamento Emassamento Emassamento
EFETIVO
Willian/ Weider Valdinei/ Rondineli Tarcsio / Vagner Andr / Paulo Andr Jos de Jesus / Ruy Antonio Carlos / Anderson Ednei/Railton Adriano/ Jos Carlos Valdinei/ Rondineli Jos Guerra / Adriano Adriano/ Jos Carlos Andr / Paulo Andr Willian/ Weider Tarcsio / Vagner
OBSERVAES
27-Nov
COBERTURA= TEXTURA 40% PRONTO (PARADO) HALL ELEVADORES = PARADO PORTA CORTA FOGO = 31 AO 8 PRIMEIRA MO DE TINTA CORRIMO = 33 AO 7 PRIMEIRA MO DE TINTA SEGUNDA MO PORTA CORTA FOGO - 25 AO 14
EFETIVO TOTAL = 18
PAVIMENTO
APARTAMENTO
01 02 03 04 01 02 03 04 01 02 03 04 01 02 03 04
INCIO
19-Nov 12-Nov 13-Nov 13-Nov 22-Nov 22-Nov 20-Nov 20-Nov 23-Nov 26-Nov 27-Nov 26-Nov 27-Nov 27-Nov
CONCLUIDO(%) TRMINO
100% 100% 100% 100% 100% 100% 100% 100% 45% 25% 15% 25% 25% 25% 27-Nov 22-Nov 27-Nov 26-Nov 29-Nov 29-Nov 29-Nov 27-Nov
PREVISO DE TRMINO
22-Nov 23-Nov 23-Nov 29-Nov 29-Nov 27-Nov 27-Nov 30-Nov 4-Dec 5-Dec 4-Dec 5-Dec 5-Dec
SERVIO
ok ok ok ok ok ok ok ok Latex Emassamento Emassamento Emassamento Emassamento Emassamento
EFETIVO
Willian/ Weider Valdinei/ Rondineli Tarcsio / Vagner Andr / Paulo Andr Jos de Jesus / Ruy Antonio Carlos / Anderson Ednei/Railton Adriano/ Jos Carlos Valdinei/ Rondineli Jos Guerra / Adriano Adriano/ Jos Carlos Andr / Paulo Andr Willian/ Weider Tarcsio / Vagner
OBSERVAES
COBERTURA= TEXTURA 40% PRONTO (PARADO) HALL ELEVADORES = PARADO PORTA CORTA FOGO = 31 AO 8 PRIMEIRA MO DE TINTA CORRIMO = 33 AO 8 PRIMEIRA MO DE TINTA SEGUNDA MO PORTA CORTA FOGO - 25 AO 14
EFETIVO TOTAL = 18
PAVIMENTO
APARTAMENTO
01 02 03 04 01 02 03 04
INCIO
23-Nov 26-Nov 27-Nov 26-Nov 27-Nov 27-Nov 29-Nov 29-Nov
CONCLUIDO(%) TRMINO
55% 70% 65% 65% 45% 35% 5% 5%
PREVISO DE TRMINO
30-Nov 4-Dec 5-Dec 4-Dec 5-Dec 5-Dec 10-Nov 10-Nov
SERVIO
Latex Latex/Esmalte Latex Latex/Esmalte Lixa Lixa Emassamento Emassamento
EFETIVO
Valdinei/ Rondineli Jos Guerra / Adriano Adriano/ Jos Carlos Andr / Paulo Andr Willian/ Weider Tarcsio / Vagner Jos de Jesus / Ruy Antonio Carlos / Anderson
OBSERVAES
COBERTURA= TEXTURA 40% PRONTO (PARADO) HALL ELEVADORES = PARADO PORTA CORTA FOGO = 31 AO 8 PRIMEIRA MO DE TINTA CORRIMO = 33 AO 8 PRIMEIRA MO DE TINTA SEGUNDA MO PORTA CORTA FOGO - 25 AO 14
EFETIVO TOTAL = 18
PAVIMENTO
APARTAMENTO
01 02 03 04 01 02 03 04
INCIO
23-Nov 26-Nov 27-Nov 26-Nov 27-Nov 27-Nov 29-Nov 29-Nov
CONCLUIDO(%)
55% 70% 65% 65% 45% 35% 5% 5%
TRMINO
PREVISO DE TRMINO
30-Nov 4-Dec 5-Dec 4-Dec 5-Dec 5-Dec 10-Nov 10-Nov
SERVIO
Latex Latex/Esmalte Latex Latex/Esmalte Lixa Lixa Emassamento Emassamento
EFETIVO
Valdinei/ Rondineli Jos Guerra / Adriano Adriano/ Jos Carlos Andr / Paulo Andr Willian/ Weider Tarcsio / Vagner Jos de Jesus / Ruy Antonio Carlos / Anderson
OBSERVAES
CONCLUIDO(%)
55% 55% 55% 55% 55% 45% 80% 80% 45%
TRMINO
PREVISO DE TRMINO
SERVIO
EFETIVO
OBSERVAES
Hall lixado/ Anti camera emassada Hall lixado/ Anti camera emassada Hall lixado/ Anti camera emassada Hall lixado/ Anti camera emassada Hall lixado/ Anti camera emassada Hall e anticamera emassada Esmalte Esmalte Emassado
PISO DA ESCADA = PINTADO DO ANDAR 3 AO TERREO PORTA CORTA FOGO = 33 AO 8 / 3 ao TERREO PRIMEIRA MO DE TINTA CORRIMO = 33 AO 8 / 3 AO TERREO PRIMEIRA MO DE TINTA SEGUNDA MO PORTA CORTA FOGO - 25 AO 14 COBERTURA = 90% REALIZADO, FALTANDO APENAS PEQUENOS ACABAMENTOS DE TEXTURA
EFETIVO TOTAL = 18
PAVIMENTO
APARTAMENTO
01 02 03 04 01 02 03 04
INCIO
23-Nov 26-Nov 27-Nov 26-Nov 27-Nov 27-Nov 29-Nov 29-Nov
CONCLUIDO(%)
55% 70% 65% 65% 45% 35% 5% 5%
TRMINO
PREVISO DE TRMINO
30-Nov 4-Dec 5-Dec 4-Dec 5-Dec 5-Dec 10-Nov 10-Nov
SERVIO
Latex Latex/Esmalte Latex Latex/Esmalte Lixa Lixa Emassamento Emassamento
EFETIVO
Valdinei/ Rondineli Jos Guerra / Adriano Adriano/ Jos Carlos Andr / Paulo Andr Willian/ Weider Tarcsio / Vagner Jos de Jesus / Ruy Antonio Carlos / Anderson
OBSERVAES
CONCLUIDO(%)
85% 75% 85% 80% 85% 65% 80% 80% 45%
TRMINO
PREVISO DE TRMINO
Esmalte Esmalte Esmalte Esmalte Esmalte Latx Esmalte Esmalte Emassado
SERVIO
EFETIVO
Jos Guerra / Adriano Antonio Carlos / Anderson Jos de Jesus / Ruy Willian/ Weider Andr / Paulo Andr Tarcsio / Vagner PARADO PARADO PARADO
OBSERVAES
PISO DA ESCADA = PINTADO DO ANDAR 3 AO TERREO / COBERTURA AO 30 PORTA CORTA FOGO = 33 AO 8 / 3 ao TERREO PRIMEIRA MO DE TINTA CORRIMO = 33 AO 8 / 3 AO TERREO PRIMEIRA MO DE TINTA SEGUNDA MO PORTA CORTA FOGO - 25 AO 14 COBERTURA = 90% REALIZADO, FALTANDO APENAS PEQUENOS ACABAMENTOS DE TEXTURA CORRIMO = COBERTURA AO 30 SEGUNDA MO DE TINTA
EFETIVO TOTAL = 18
PAVIMENTO
APARTAMENTO
01 02 03 04 01 02 03 04
INCIO
23-Nov 26-Nov 27-Nov 26-Nov 27-Nov 27-Nov 29-Nov 29-Nov
CONCLUIDO(%)
55% 70% 65% 65% 45% 35% 5% 5%
TRMINO
PREVISO DE TRMINO
30-Nov 4-Dec 5-Dec 4-Dec 5-Dec 5-Dec 10-Nov 10-Nov
SERVIO
Latex Latex/Esmalte Latex Latex/Esmalte Lixa Lixa Emassamento Emassamento
EFETIVO
Valdinei/ Rondineli Jos Guerra / Adriano Adriano/ Jos Carlos Andr / Paulo Andr Willian/ Weider Tarcsio / Vagner Jos de Jesus / Ruy Antonio Carlos / Anderson
OBSERVAES
CONCLUIDO(%)
85% 100% 100% 100% 100% 65% 80% 80% 45%
TRMINO
11-Dec 11-Dec 11-Dec 11-Dec
PREVISO DE TRMINO
Esmalte ok ok ok ok Latx Esmalte Esmalte Emassado
SERVIO
EFETIVO
Jos Guerra / Adriano Antonio Carlos / Anderson Jos de Jesus / Ruy Willian/ Weider Andr / Paulo Andr Tarcsio / Vagner PARADO PARADO PARADO
OBSERVAES
PISO DA ESCADA = PINTADO DO ANDAR 3 AO TERREO / COBERTURA AO 30 PORTA CORTA FOGO = 33 AO 8 / 3 ao TERREO PRIMEIRA MO DE TINTA CORRIMO = 33 AO 8 / 3 AO TERREO PRIMEIRA MO DE TINTA SEGUNDA MO PORTA CORTA FOGO - 25 AO 14 COBERTURA = 90% REALIZADO, FALTANDO APENAS PEQUENOS ACABAMENTOS DE TEXTURA CORRIMO = COBERTURA AO 30 SEGUNDA MO DE TINTA
EFETIVO TOTAL = 18
PAVIMENTO
APARTAMENTO
01 02 03 04 01 02 03 04
INCIO
23-Nov 26-Nov 27-Nov 26-Nov 27-Nov 27-Nov 29-Nov 29-Nov
CONCLUIDO(%)
55% 70% 65% 65% 45% 35% 5% 5%
TRMINO
PREVISO DE TRMINO
30-Nov 4-Dec 5-Dec 4-Dec 5-Dec 5-Dec 10-Nov 10-Nov
SERVIO
Latex Latex/Esmalte Latex Latex/Esmalte Lixa Lixa Emassamento Emassamento
EFETIVO
Valdinei/ Rondineli Jos Guerra / Adriano Adriano/ Jos Carlos Andr / Paulo Andr Willian/ Weider Tarcsio / Vagner Jos de Jesus / Ruy Antonio Carlos / Anderson
OBSERVAES
CONCLUIDO(%)
100% 65% 80% 80% 45%
TRMINO
PREVISO DE TRMINO
Esmalte Latx Esmalte Esmalte Emassado
SERVIO
EFETIVO
Jos Guerra / Adriano Tarcsio / Vagner PARADO PARADO PARADO
OBSERVAES
PISO DA ESCADA = PINTADO DO ANDAR 3 AO TERREO / COBERTURA AO 30 PORTA CORTA FOGO = 33 AO 8 / 3 ao TERREO PRIMEIRA MO DE TINTA CORRIMO = 33 AO 8 / 3 AO TERREO PRIMEIRA MO DE TINTA SEGUNDA MO PORTA CORTA FOGO - 25 AO 14 COBERTURA = 90% REALIZADO, FALTANDO APENAS PEQUENOS ACABAMENTOS DE TEXTURA CORRIMO = COBERTURA AO 30 SEGUNDA MO DE TINTA
EFETIVO TOTAL = 18
PAVIMENTO
APARTAMENTO
01 02 03 04 01 02 03 04
INCIO
23-Nov 26-Nov 27-Nov 26-Nov 27-Nov 27-Nov 29-Nov 29-Nov
CONCLUIDO(%)
55% 70% 65% 65% 45% 35% 5% 5%
TRMINO
PREVISO DE TRMINO
30-Nov 4-Dec 5-Dec 4-Dec 5-Dec 5-Dec 10-Nov 10-Nov
SERVIO
Latex Latex/Esmalte Latex Latex/Esmalte Lixa Lixa Emassamento Emassamento
EFETIVO
Valdinei/ Rondineli Jos Guerra / Adriano Adriano/ Jos Carlos Andr / Paulo Andr Willian/ Weider Tarcsio / Vagner Jos de Jesus / Ruy Antonio Carlos / Anderson
OBSERVAES
CONCLUIDO(%)
85% 70% 85% 65% 80% 80% 45%
TRMINO
PREVISO DE TRMINO
Esmalte Esmalte Esmalte Esmalte Esmalte Esmalte Emassado
SERVIO
EFETIVO
Tarcsio / Vagner Jos de Jesus / Ruy Andr / Paulo Andr Antonio Carlos / Anderson PARADO PARADO PARADO
OBSERVAES
PISO DA ESCADA = PINTADO DO ANDAR 3 AO TERREO / COBERTURA AO 30 PORTA CORTA FOGO = 33 AO 8 / 3 ao TERREO PRIMEIRA MO DE TINTA CORRIMO = 33 AO 8 / 3 AO TERREO PRIMEIRA MO DE TINTA SEGUNDA MO PORTA CORTA FOGO - 25 AO 14 COBERTURA = 90% REALIZADO, FALTANDO APENAS PEQUENOS ACABAMENTOS DE TEXTURA CORRIMO = COBERTURA AO 30 SEGUNDA MO DE TINTA
EFETIVO TOTAL =8
PAVIMENTO
APARTAMENTO
01 02 03 04 01 02 03 04
INCIO
23-Nov 26-Nov 27-Nov 26-Nov 27-Nov 27-Nov 29-Nov 29-Nov
CONCLUIDO(%)
55% 70% 65% 65% 45% 35% 5% 5%
TRMINO
PREVISO DE TRMINO
30-Nov 4-Dec 5-Dec 4-Dec 5-Dec 5-Dec 10-Nov 10-Nov
SERVIO
Latex Latex/Esmalte Latex Latex/Esmalte Lixa Lixa Emassamento Emassamento
EFETIVO
Valdinei/ Rondineli Jos Guerra / Adriano Adriano/ Jos Carlos Andr / Paulo Andr Willian/ Weider Tarcsio / Vagner Jos de Jesus / Ruy Antonio Carlos / Anderson
OBSERVAES
CONCLUIDO(%)
100% 100% 100% 100% 80% 80% 45%
TRMINO
14-Dec 15-Dec 16-Dec 17-Dec
PREVISO DE TRMINO
ok ok ok ok Esmalte Esmalte Emassado
SERVIO
EFETIVO
Tarcsio / Vagner Jos de Jesus / Ruy Andr / Paulo Andr Antonio Carlos / Anderson PARADO PARADO PARADO
OBSERVAES
PISO DA ESCADA = PINTADO DO ANDAR 3 AO TERREO / COBERTURA AO 30 PORTA CORTA FOGO = 33 AO 8 / 3 ao TERREO PRIMEIRA MO DE TINTA CORRIMO = 33 AO 8 / 3 AO TERREO PRIMEIRA MO DE TINTA SEGUNDA MO PORTA CORTA FOGO - 25 AO 14 COBERTURA = 90% REALIZADO, FALTANDO APENAS PEQUENOS ACABAMENTOS DE TEXTURA CORRIMO = COBERTURA AO 30 SEGUNDA MO DE TINTA
EFETIVO TOTAL =8
PAVIMENTO
APARTAMENTO
01 02 03 04 01 02 03 04
INCIO
23-Nov 26-Nov 27-Nov 26-Nov 27-Nov 27-Nov 29-Nov 29-Nov
CONCLUIDO(%)
55% 70% 65% 65% 45% 35% 5% 5%
TRMINO
PREVISO DE TRMINO
30-Nov 4-Dec 5-Dec 4-Dec 5-Dec 5-Dec 10-Nov 10-Nov
SERVIO
Latex Latex/Esmalte Latex Latex/Esmalte Lixa Lixa Emassamento Emassamento
EFETIVO
Valdinei/ Rondineli Jos Guerra / Adriano Adriano/ Jos Carlos Andr / Paulo Andr Willian/ Weider Tarcsio / Vagner Jos de Jesus / Ruy Antonio Carlos / Anderson
OBSERVAES
CONCLUIDO(%)
55% 80% 80% 45%
TRMINO
PREVISO DE TRMINO
Latex Esmalte Esmalte Emassado
SERVIO
EFETIVO
Adriano/ Jos Carlos PARADO PARADO PARADO
OBSERVAES
PISO DA ESCADA = PINTADO 100% PORTA CORTA FOGO = 33 AO 8 / 3 ao TERREO PRIMEIRA MO DE TINTA CORRIMO = 33 AO 8 / 3 AO TERREO PRIMEIRA MO DE TINTA SEGUNDA MO PORTA CORTA FOGO - 25 AO 14 COBERTURA = 90% REALIZADO, FALTANDO APENAS PEQUENOS ACABAMENTOS DE TEXTURA CORRIMO = COBERTURA AO 30 SEGUNDA MO DE TINTA
EFETIVO TOTAL =8
PAVIMENTO
APARTAMENTO
01 02 03 04 01 02 03 04
INCIO
23-Nov 26-Nov 27-Nov 26-Nov 27-Nov 27-Nov 29-Nov 29-Nov
CONCLUIDO(%)
55% 70% 65% 65% 45% 35% 5% 5%
TRMINO
PREVISO DE TRMINO
30-Nov 4-Dec 5-Dec 4-Dec 5-Dec 5-Dec 10-Nov 10-Nov
SERVIO
Latex Latex/Esmalte Latex Latex/Esmalte Lixa Lixa Emassamento Emassamento
EFETIVO
Valdinei/ Rondineli Jos Guerra / Adriano Adriano/ Jos Carlos Andr / Paulo Andr Willian/ Weider Tarcsio / Vagner Jos de Jesus / Ruy Antonio Carlos / Anderson
OBSERVAES
CONCLUIDO(%)
100% 80% 80% 45%
TRMINO
18-Dec
PREVISO DE TRMINO
ok Esmalte Esmalte Emassado
SERVIO
EFETIVO
Adriano/ Jos Carlos PARADO PARADO PARADO
OBSERVAES
PISO DA ESCADA = PINTADO 100% PORTA CORTA FOGO = 33 AO 8 / 3 ao TERREO PRIMEIRA MO DE TINTA CORRIMO = 33 AO 8 / 3 AO TERREO PRIMEIRA MO DE TINTA SEGUNDA MO PORTA CORTA FOGO - 25 AO 14 COBERTURA = 90% REALIZADO, FALTANDO APENAS PEQUENOS ACABAMENTOS DE TEXTURA CORRIMO = COBERTURA AO 30 SEGUNDA MO DE TINTA
EFETIVO TOTAL =8
PAVIMENTO
APARTAMENTO
01 02 03 04 01 02 03 04
INCIO
23-Nov 26-Nov 27-Nov 26-Nov 27-Nov 27-Nov 29-Nov 29-Nov
CONCLUIDO(%)
55% 70% 65% 65% 45% 35% 5% 5%
TRMINO
PREVISO DE TRMINO
30-Nov 4-Dec 5-Dec 4-Dec 5-Dec 5-Dec 10-Nov 10-Nov
SERVIO
Latex Latex/Esmalte Latex Latex/Esmalte Lixa Lixa Emassamento Emassamento
EFETIVO
Valdinei/ Rondineli Jos Guerra / Adriano Adriano/ Jos Carlos Andr / Paulo Andr Willian/ Weider Tarcsio / Vagner Jos de Jesus / Ruy Antonio Carlos / Anderson
OBSERVAES
CONCLUIDO(%)
100% 100% 35% 80% 80% 45%
TRMINO
18-Dec 20-Dec
PREVISO DE TRMINO
ok ok Lixa Esmalte Esmalte
SERVIO
EFETIVO
Adriano/ Jos Carlos Adriano/ Jos Carlos Adriano/ Jos Carlos PARADO PARADO PARADO
OBSERVAES
1 Emassado ] PORTA CORTA FOGO = 33 AO 8 / 3 ao TERREO PRIMEIRA MO DE TINTA CORRIMO = 33 AO 8 / 3 AO TERREO PRIMEIRA MO DE TINTA SEGUNDA MO PORTA CORTA FOGO - 25 AO 14 COBERTURA = 90% REALIZADO, FALTANDO APENAS PEQUENOS ACABAMENTOS DE TEXTURA CORRIMO = COBERTURA AO 30 SEGUNDA MO DE TINTA EFETIVO TOTAL =8
PAVIMENTO
APARTAMENTO
01 02 03 04 01 02 03 04
INCIO
23-Nov 26-Nov 27-Nov 26-Nov 27-Nov 27-Nov 29-Nov 29-Nov
CONCLUIDO(%)
55% 70% 65% 65% 45% 35% 5% 5%
TRMINO
PREVISO DE TRMINO
30-Nov 4-Dec 5-Dec 4-Dec 5-Dec 5-Dec 10-Nov 10-Nov
SERVIO
Latex Latex/Esmalte Latex Latex/Esmalte Lixa Lixa Emassamento Emassamento
EFETIVO
Valdinei/ Rondineli Jos Guerra / Adriano Adriano/ Jos Carlos Andr / Paulo Andr Willian/ Weider Tarcsio / Vagner Jos de Jesus / Ruy Antonio Carlos / Anderson
OBSERVAES
CONCLUIDO(%)
100% 100% 65% 80% 80% 45%
TRMINO
18-Dec 20-Dec
PREVISO DE TRMINO
ok ok Lixa Esmalte Esmalte Emassado
SERVIO
EFETIVO
Adriano/ Jos Carlos Adriano/ Jos Carlos Adriano/ Jos Carlos PARADO PARADO PARADO
OBSERVAES
] PORTA CORTA FOGO = 33 AO 8 / 3 ao TERREO PRIMEIRA MO DE TINTA CORRIMO = 33 AO 8 / 3 AO TERREO PRIMEIRA MO DE TINTA SEGUNDA MO PORTA CORTA FOGO - 25 AO 14 COBERTURA = 90% REALIZADO, FALTANDO APENAS PEQUENOS ACABAMENTOS DE TEXTURA CORRIMO = COBERTURA AO 30 SEGUNDA MO DE TINTA RODAP DA ESCADA = COBERTURA AO 31
EFETIVO TOTAL =8
PAVIMENTO
APARTAMENTO
01 02 03 04 01 02 03 04
INCIO
23-Nov 26-Nov 27-Nov 26-Nov 27-Nov 27-Nov 29-Nov 29-Nov
CONCLUIDO(%)
55% 70% 65% 65% 45% 35% 5% 5%
TRMINO
PREVISO DE TRMINO
30-Nov 4-Dec 5-Dec 4-Dec 5-Dec 5-Dec 10-Nov 10-Nov
SERVIO
Latex Latex/Esmalte Latex Latex/Esmalte Lixa Lixa Emassamento Emassamento
EFETIVO
Valdinei/ Rondineli Jos Guerra / Adriano Adriano/ Jos Carlos Andr / Paulo Andr Willian/ Weider Tarcsio / Vagner Jos de Jesus / Ruy Antonio Carlos / Anderson
OBSERVAES
CONCLUIDO(%)
100% 100% 100% 80% 80% 45%
TRMINO
18-Dec 20-Dec 2-Jan
PREVISO DE TRMINO
ok ok ok Esmalte Esmalte Emassado
SERVIO
EFETIVO
Adriano/ Jos Carlos Adriano/ Jos Carlos Adriano/ Jos Carlos PARADO PARADO PARADO
OBSERVAES
PORTA CORTA FOGO = 33 AO 8 / 3 ao TERREO PRIMEIRA MO DE TINTA CORRIMO = 33 AO 8 / 3 AO TERREO PRIMEIRA MO DE TINTA SEGUNDA MO PORTA CORTA FOGO - 25 AO 14 COBERTURA = 90% REALIZADO, FALTANDO APENAS PEQUENOS ACABAMENTOS DE TEXTURA CORRIMO = COBERTURA AO 30 SEGUNDA MO DE TINTA RODAP DA ESCADA = COBERTURA AO 16
EFETIVO TOTAL =8
PAVIMENTO
APARTAMENTO
01 02 03 04 01 02 03 04
INCIO
23-Nov 26-Nov 27-Nov 26-Nov 27-Nov 27-Nov 29-Nov 29-Nov
CONCLUIDO(%)
55% 70% 65% 65% 45% 35% 5% 5%
TRMINO
PREVISO DE TRMINO
30-Nov 4-Dec 5-Dec 4-Dec 5-Dec 5-Dec 10-Nov 10-Nov
SERVIO
Latex Latex/Esmalte Latex Latex/Esmalte Lixa Lixa Emassamento Emassamento
EFETIVO
Valdinei/ Rondineli Jos Guerra / Adriano Adriano/ Jos Carlos Andr / Paulo Andr Willian/ Weider Tarcsio / Vagner Jos de Jesus / Ruy Antonio Carlos / Anderson
OBSERVAES
CONCLUIDO(%)
100% 100% 100% 55% 80% 80% 45%
TRMINO
18-Dec 20-Dec 2-Jan
PREVISO DE TRMINO
SERVIO
ok ok ok Emassamento Esmalte
EFETIVO
Adriano/ Jos Carlos Adriano/ Jos Carlos Adriano/ Jos Carlos Adriano/ Jos Carlos Adriano/ Jos Carlos PARADO PARADO
OBSERVAES
Esmalte Emassado
PORTA CORTA FOGO = 33 AO 8 / 3 ao TERREO PRIMEIRA MO DE TINTA CORRIMO = 33 AO 8 / 3 AO TERREO PRIMEIRA MO DE TINTA SEGUNDA MO PORTA CORTA FOGO - 25 AO 14 COBERTURA = 90% REALIZADO, FALTANDO APENAS PEQUENOS ACABAMENTOS DE TEXTURA CORRIMO = COBERTURA AO 30 SEGUNDA MO DE TINTA RODAP DA ESCADA = COBERTURA AO 16
EFETIVO TOTAL =8
PAVIMENTO
APARTAMENTO
01 02 03 04 01 02 03 04
INCIO
23-Nov 26-Nov 27-Nov 26-Nov 27-Nov 27-Nov 29-Nov 29-Nov
CONCLUIDO(%)
55% 70% 85% 90% 45% 45% 5% 5%
TRMINO
PREVISO DE TRMINO
30-Nov 4-Dec 5-Dec 4-Dec 5-Dec 5-Dec 10-Nov 10-Nov
SERVIO
Latex Latex/Esmalte Esmalte Esmalte Lixa Lixa Emassamento Emassamento
EFETIVO
Valdinei/ Rondineli Jos Guerra / Adriano Adriano/ Jos Carlos Andr / Paulo Andr Willian/ Weider Tarcsio / Vagner Jos de Jesus / Ruy Antonio Carlos / Anderson
OBSERVAES
CONCLUIDO(%)
100% 100% 100% 85% 80% 80% 45%
TRMINO
18-Dec 20-Dec 2-Jan
PREVISO DE TRMINO
ok ok ok Esmalte Esmalte Esmalte Emassado
SERVIO
EFETIVO
Adriano/ Jos Carlos Adriano/ Jos Carlos Adriano/ Jos Carlos Adriano/ Jos Carlos Adriano/ Jos Carlos PARADO PARADO
OBSERVAES
PORTA CORTA FOGO = 33 AO 8 / 3 ao TERREO PRIMEIRA MO DE TINTA CORRIMO = 33 AO 8 / 3 AO TERREO PRIMEIRA MO DE TINTA SEGUNDA MO PORTA CORTA FOGO - 25 AO 14 COBERTURA = 90% REALIZADO, FALTANDO APENAS PEQUENOS ACABAMENTOS DE TEXTURA CORRIMO = COBERTURA AO 30 SEGUNDA MO DE TINTA RODAP DA ESCADA = COBERTURA AO 5
EFETIVO TOTAL =8
PAVIMENTO
APARTAMENTO
01 02 03 04 01 02 03 04
INCIO
23-Nov 26-Nov 27-Nov 26-Nov 27-Nov 27-Nov 29-Nov 29-Nov
CONCLUIDO(%)
55% 70% 85% 90% 45% 55% 5% 5%
TRMINO
PREVISO DE TRMINO
30-Nov 4-Dec 5-Dec 4-Dec 5-Dec 5-Dec 10-Nov 10-Nov
SERVIO
Latex Latex/Esmalte Esmalte Esmalte Lixa Latex Emassamento Emassamento
EFETIVO
Valdinei/ Rondineli Jos Guerra / Adriano Adriano/ Jos Carlos Andr / Paulo Andr Willian/ Weider Tarcsio / Vagner Jos de Jesus / Ruy Antonio Carlos / Anderson
OBSERVAES
CONCLUIDO(%)
100% 100% 100% 100% 80% 80% 45%
TRMINO
18-Dec 20-Dec 2-Jan 8-Jan
PREVISO DE TRMINO
ok ok ok ok Esmalte Esmalte Emassado
SERVIO
EFETIVO
Adriano/ Jos Carlos Adriano/ Jos Carlos Adriano/ Jos Carlos Adriano/ Jos Carlos Adriano/ Jos Carlos PARADO PARADO
OBSERVAES
PORTA CORTA FOGO = 33 AO 8 / 3 ao TERREO PRIMEIRA MO DE TINTA CORRIMO = 33 AO 8 / 3 AO TERREO PRIMEIRA MO DE TINTA SEGUNDA MO PORTA CORTA FOGO - 25 AO 14 COBERTURA = 90% REALIZADO, FALTANDO APENAS PEQUENOS ACABAMENTOS DE TEXTURA CORRIMO = COBERTURA AO 30 SEGUNDA MO DE TINTA RODAP DA ESCADA = COBERTURA AO 5
EFETIVO TOTAL =8
PAVIMENTO
APARTAMENTO
01 02 03 04 01 02 03 04
INCIO
23-Nov 26-Nov 27-Nov 26-Nov 27-Nov 27-Nov 29-Nov 29-Nov
CONCLUIDO(%)
75% 85% 100% 100% 45% 85% 5% 5%
TRMINO
PREVISO DE TRMINO
30-Nov 4-Dec 5-Dec 4-Dec 5-Dec 5-Dec 10-Nov 10-Nov
SERVIO
Esmalte Esmalte ok ok Lixa Esmalte Emassamento Emassamento
EFETIVO
Valdinei/ Rondineli Jos Guerra / Adriano Adriano/ Jos Carlos Andr / Paulo Andr Willian/ Weider Tarcsio / Vagner Jos de Jesus / Ruy Antonio Carlos / Anderson
OBSERVAES
9-Jan 9-Jan
CONCLUIDO(%)
100% 80% 80% 45% 35% 35%
TRMINO
8-Jan
PREVISO DE TRMINO
ok Esmalte Esmalte Emassado Emassado Emassado
SERVIO
EFETIVO
Adriano/ Jos Carlos Adriano/ Jos Carlos PARADO PARADO
OBSERVAES
Anti-camera Anti-camera
PORTA CORTA FOGO = 33 AO 8 / 3 ao TERREO PRIMEIRA MO DE TINTA CORRIMO = 33 AO 8 / 3 AO TERREO PRIMEIRA MO DE TINTA SEGUNDA MO PORTA CORTA FOGO - 25 AO 14 COBERTURA = 90% REALIZADO, FALTANDO APENAS PEQUENOS ACABAMENTOS DE TEXTURA CORRIMO = COBERTURA AO 30 SEGUNDA MO DE TINTA RODAP DA ESCADA = COBERTURA AO 5
EFETIVO TOTAL =8
PAVIMENTO
APARTAMENTO
01 02 03 04 01 02 03 04
INCIO
23-Nov 26-Nov 27-Nov 26-Nov 27-Nov 27-Nov 29-Nov 29-Nov
CONCLUIDO(%)
85% 90% 100% 100% 45% 90% 5% 5%
TRMINO
PREVISO DE TRMINO
30-Nov 4-Dec 5-Dec 4-Dec 5-Dec 5-Dec 10-Nov 10-Nov
SERVIO
Esmalte Esmalte ok ok Lixa ok Emassamento Emassamento
EFETIVO
Valdinei/ Rondineli Jos Guerra / Adriano Adriano/ Jos Carlos Andr / Paulo Andr Willian/ Weider Tarcsio / Vagner Jos de Jesus / Ruy Antonio Carlos / Anderson
OBSERVAES
9-Jan 9-Jan
CONCLUIDO(%)
100% 80% 80% 45% 35% 35% 35% 35%
TRMINO
8-Jan
PREVISO DE TRMINO
ok Esmalte Esmalte Emassado Emassado Emassado Emassado Emassado
SERVIO
EFETIVO
Adriano/ Jos Carlos Adriano/ Jos Carlos PARADO PARADO Jos de Jesus Jos de Jesus Jos de Jesus Jos de Jesus
OBSERVAES
PORTA CORTA FOGO = 33 AO 8 / 3 ao TERREO PRIMEIRA MO DE TINTA CORRIMO = 33 AO 8 / 3 AO TERREO PRIMEIRA MO DE TINTA SEGUNDA MO PORTA CORTA FOGO - 25 AO 14 COBERTURA = 90% REALIZADO, FALTANDO APENAS PEQUENOS ACABAMENTOS DE TEXTURA CORRIMO = COBERTURA AO 30 SEGUNDA MO DE TINTA RODAP DA ESCADA = COBERTURA AO 5
EFETIVO TOTAL =8